Measurement Works A Item No Description Unit Qty Rate Amount

Bill No.1 - Ground work Preambles 1. Machines shall use for excavations appropriately. 2. Exctd materials shall disposal 100m away on site. 3. Only imported granular shall use for filling. 4. The 2nd class timber shall use maximum 4 times for earth work support. 5. Filling wk shall use compact with manual rammers.

1. Site clearing vegn the area covered by n ext.girth of ext.fd . 2. Excavation 2.1 150mm top soil excavation the area covered by ext.girth of ext.fdn. 2.2 Tre.excn in hard soil commence from strip level max.dp e 1.0m Width e 0.3m 3.

m2

216

m2 m2

216

51

Disposal 3.1 Disposal of top soil excavated material 50m away on site for preservation m3 32

3.2 Disposal of exctd material on site 100m m3 away 3.3 disposal of surface water 4. Back filling to fdn 5. Trimmy sides of fdn Item m3 m3

51

Item 18 125

Total forward next page

Measurement Works A Total from previous page 6. Earth wk support max dp e 1.00 opp.face e2.00m 7. Level & compaction excn 8. H.c filling 8.1 Filling ht "0.25m 8.2 Filling ht e0.25m m3 m3 34 07 m2 m2

125

78

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.2 - Masonry Preambles 1. Cement shall comply with BS 72. 2. Brick shall use common brick. 3. English bond shall use for the brick work. 4. Clean water shall use for mixing. 5. All aggregate & sand shall free from mud, dust or chemical. 6. Precast conc. shall use with 2nos & 10J mild steel.

1. 230 Brick wall with 1:6 ct:mtr in dpc to roof level. 2. P.Cast lintel 2.1 230v150v1414 half round 2.2 230v150v1790 lintel 2.3 230v150v1300 lintel 2.4 230v150v1000 lintel 2.5 230v150v1900 lintel 2.6 230v150v1600 lintel 2.7 230v150v1150 lintel 3.

m2

419

nr nr nr nr nr nr nr m2

01 01 05 03 07 02 03

300thk rubble masonry wk

33

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.3 - In situ/precast concrete Preambles 1. Cement shall comply with BS 72. 2. Crushed stone shall use for work. 3. 1:3:6 ratio shall use with manual mixing. 4. Only river sand shall use for fine aggregate. 5. Clean water shall use for mixing. 6. Rates shall include mixing, transporting, placing, compacting, and curing concrete.

1. 1:3: 6 blind concrete in ground. 2. ground floor slab thickness e 150mm 3. P.C Conc. slab w 10J bars r/f

m3 m3 m3

12 17 17

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.4 - damp proofing Preambles 1. Thickness of horizontal DPC is 20mm. 2. Cement shall comply with BS 72. 3. Two coats of hot dpc. tar shall apply on ct. Dpc & blinded w. fine sand. 4. The weight of polythene 1.07kg/m2 5. 150mm side & end laps shall maintain for dpm. m2 m2

1. 1000 gauge DPM 2. DPC w.1:4 ct:mtr width 225-300 mm

165 33

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.5 - Windows & Doors Preambles 1. Normal timber, louver timber and aluminium shall use. 2. Fanlight & glass shall use on top. 3. Plain glass shall use for fan light and above in wdw.

1. Timber paneled as per given drawing 1.1 1070v2135v25 paneled dr 1.2 770v2035v25 paneled dr 1.3 620v2035v25 paneled dr 1.4 620v1675v25 paneled louver dr 1.5 1070v1735v25 paneled dr nr nr nr nr nr 01 05 02 01 01

2. Timber frame as pre given drawing 2.1 1500v1200 frame wdw 3. Aluminium frame as per given drawing 3.1 1500v2550 w. fanlight 3.2 1500v1800 w. fanlight 3.3 1500v1500 w. fanlight 3.4 600v1050 w. glass above nr nr nr nr 02 03 01 02 nr 01

Total forward next page

Measurement Works A Total from previous page

4. Composite items as specified

nr

09

5. 75v100 timber dr hd 6. 75v100 timber dr jbs 7. 50v100 timber dr transom 8. 5 thk planed & router edged coconut rafters 9. 600v300v25 Steel paneled as per given drawing. 10. tbr. beam to given drawing

11

42

m m2

02

02

nr

01

nr

01

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.6 - Surface finishing Preambles 1. Cement shall comply with BS 72. 2. Clean water shall use for mixing. 3. Varnish coating shall use for tbr surface. 4. 1:1:6 ct:mtr:lime mixing ratio shall use for rough plastrg. 5. Sand shall free from mud, dust or chemical.

1. 15 thk rough ext.plastrg dpc to roof level

m2 m2 m2 m2 m2 m2 m2 m2 m2

225

2. 15 thk smooth int. plastrg dpc to roof level

469

3. Ext. paintg to wall dpc to roof level 4. int. paintg to wall dpc to roof level 5. paintg to tbr surface 6. Paintg to general surface girth "300 7. 100 sktg w. 1:4 ct:sand mtr 8. 25 thk smooth floor screed w 1:4 ct:mtr 9. 100v100ceramic wall tiles w. 1:4 ct:mtr fixed w. tile adhesive w. jts w. matching colour

225 472 42 37 112 164

14

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.7 - building fabric sundries/ iron mongeries Preambles 1. Prs stl. Shall use for iron mongeries. 2. iron mongeries shall supply by one nominated supplier. 3. Fixing shll do by another supplier.

1. Prs. stl iron monger fix only to wd surface. nr 1.1 150 butts nr 1.2 motice lock nr 1.3 Tower bolts nr 1.4 Dr. closer 06 09 11 26

2. Allow a price cost sum of Rs. for supplying of all necessary iron mongernies by ABC nominated supplier profit for main contractor. Item Item

Total carry to summary

Measurement Works A Total forward next page Total from previous page

Bill No.8 Cladding/covering Preambles 1. Class 1 tbr shall use for roof wk. 2. corrugatated sheet shall use for roof wk. 3. m.s J hooks shall use for fixing roof wk. 4. Asbestos sheet shall use for roof wk. 1. Class 1 tbr in wall plate in roof. m 1.1 100v75 shwn m 1.2 50v175 ridge plate m 1.3 ridge tile m 1.4 50v70 rafter m 1.5 50v150 valley rafter m 1.6 50v150 battens m 1.7 Zl/Al gutter m2 1.8 cement fibre incline ceiling 2. 25v300 valance board Class 2 tbr in wall plate in roof. 3. 25r corrugate asbestos roof sheet fix to m.s J hooks. 4. Double side foils insulation for roof. m2 m2 155 m 57 155 57 431 21 44 28 28 40

155

Total carry to summary

Measurement Works A Total forward next page Total from previous page

Bill No.9 Disposal system Preambles 1.PVC pipes shall use for rain wks. 2.PVC brackets shall use for fixing. 3.Salven cement shall use for fixing the pipes.

1.

E.O PVC items nr 1.1 End cap to gutter nr 1.2 Running head 04 04

2. 75J pvc down pipe fix to Bk wk.w.pvc brackets in 750 centers.

13

Total carry to summary

Total forward next page

Measurement Works A Total from previous page

Bill No.10 Electrical services Preambles 1. 100w pendant bulb shall use for each room. 2. Colour code cables shall use. 3. Three core cable shall use for lighting wk. 4. Plastic sunk box shall use for fitting wk. 5. 1.00mm2 pvc insul Shall use for lighting final circuit. 6. 1.00mm2 &2.5mm2 pvc insul Shall use for lighting final circuit. 7. Timber clips shall use fir fittg.

1. Final circuit 1.1 Cable & conduit in lighting circuit: Concealed insulation. fix sixteen lighting points & 16 nr 1 way swithch. 1.2 Cable & conduit in power circuit: Concealed insulation. fix thirteen SSO (12 nr single 5amp&1 nr 15 amp singke SSO) 2. Panden fittg w. brass lamp holder & pvc insul & cable drop e1.00 3. Accessories 3.1 1 gang, 1 way 5 amp flashes, sunk box plugd & scrd to masonry. 3.2 5 amp: 3pin flah single switched SSO: includg sunk box plugd & scrd masonry.
3.3 15 amp: 3pin flah single switched SSO: includg sunk box plugd & scrd masonry.

nr

01

nr

16

nr

16

nr

16

nr

12

nr

01

Total forward next page

Measurement Works A Total from previous page

4. 100 w lamps G.L.S as specified. 5. Making the posn. Of holes mors & shoes in the structure for the general lightg & power insulln.

nr

16

Item

Item

6. Allow a provizial sum of Rs .. for bringg main cable to buildg install meter & conn. Item to switch gear by nominated supplier. 7. m.c.b consumer control unit w. 32 amp main switch: two 6 amp & six 10 amp & one 16 amp m.c.b.s : one 30 amp E.L.C.B; plugd & scrd to masonry. 8. testg & comsg as specified for general lightg & power instlln. 9. cutg or formg holes, mors, sikgs & chases for ele. install & making good. 9.1 circuit 2 9.2 luminaries 10. 3cores. cable from meter to distribution panel. nr nr m

Item

nr

01

Item

Item

13 16 08

Total carry to summary

Measurement Works A

General Summary Bill No.1 - Ground work Bill No.2 - Masonry Bill No.3 - In situ/precast concrete Bill No.4 - damp proofing Bill No.5 - Windows & Doors Bill No.6 - Surface finishing Bill No.7 - building fabric sundries/ Iron mongeries Bill No.8 Cladding/covering Bill No.9 Disposal system Bill No.10 Electrical services

Rs

Ct

Measurement Works A

Critical reflection
I followed the SMM7 for did this assignment. When I did this assignment, some section was new for me. When I did the Door & window section, there frames had aluminium. So, this is new for me. But I classified the SMM7 for know the detail about calculations. This had interested for me. Because, when we search the information own, we can get new thinks. I took as a composite item aluminium frame works. Next thing is slab and beam. I took as a slab will precast concrete. Then it is easy for measure. In SMM7 there is one section for precast concrete. And when did the roof part, there is some difficult in rafter calculation. Then Brick work calculation also had difficult. Because, there had different wall heights.

I get some information about iron monganies in BMICH exhibitions. I saw some new designs butts and motice lock. When I did the electrical services section, that is very easy and interesting. Because, we studied one example electrical section. That was helped to me. Totally, this measurement works assignment had very interesting for me.

Measurement Works A

Reference
1. SMM 7