l. a) b) c) d) 2. a) b) 3' a) b) c) d) 4. a) b) c) d) 5' a) Whichis theFIRSTpositiveindicator the well is flowing ? that Variationin pumpspeed pressure. and Drilling Break Increase pit volume in Increase returnflow rate in Which is the correctdefinition of a 'drilling break' ? A doublingor halvingofthe ROPsustained over a 5ft interval A doublingor halvingofthe ROP sustained over a 10ft interval What is the correctcourse action,if on a trip oug the holedoesnot takethe correctamountof of fluid ? Proceed with cautionuntil you reachthe shoeandflow check. Call the instrument technician checkout the gauges. to Pull another twenty stands if hole fill is still incorrect,call the Toolpusher and Immediately cautiouslybackto bottomandcirculatebottoms-up. run Wherearethe notices displayingthe shutin procedures be posted? to Toolpushers office Drill floor Coffeeshop Company man'soffrce Which of the following generalshut-inprocedures equivalent that described the WCM? is to in Stoprotation b) Pick up to shut-in position Stoppumps& flow check(positive) Closetheannular Openchokelinevalves(choke closed) Notiff Toolpusher& OIM Monitor & recordshut-inparameters check space & closepiperams out Bleed-offpressure between & annular ram Stoprotation Pick up to shut-in position Stoppumps& flow check(positive) Openchokeline valves Closetheannular Closethechoke Noti& Toolpusher OIM & Monitor & recordshut-inparameters check space & closeupperpiperams out Bleed-offpressure between ram & anflular

If a kick is detected, who hasthe responsibility shuttingin the well" asquickly aspossible? for a) Toolpusher

WClr,taualQuiz

Page[APG]

tADl

CONFIDENTIAL

TRN-MDL-OO86EO3O

Exhibit No. -Worldwide Court Inc.

-l-rr"roo"""r,
Section - ActionsUoonTakine A Kick 5
b) c) d) performingthat function Driller or person Man Company Driller Assistant

(O

{:

(o

WOr,lanualQtiz

tAD]

a:

CONFIDENTIAL

TRN-MDL4OE6EO31

1?o*
Section - ActionsUoon Takine A Kick 5
whiletrippingandthepipeis set ]ei"h ofthe followingis thefirst actionto takeif a kick oocurs in theslips?
a) b) c) d) 8.

Close BOP andopenthechokeline valv{s) the Install andclosea firlly openingsafetyvalve Sbear pipe the Phone Toolpusher advice the for Ilaving shutin the well with a subsea BOP, what is importantto Dotewith regardto chokeand kill lines, in relationto pressure readings ? Lengthof choke& kill line Intemaldiameterof chokeaodkill line Distance from RKB to sealevel Fluid densityin the chokeandkill line Ifuving shutin thewell at how manyminuteintervalsareyou requiredto recordSIDpp & SICP until the pressures havestabilised ? 1 minuteintervals 2 minuteintervals 3 minuteintervals 4 minuteintervals

a) b) c) d)

9. a) b) c) d)

10. TheSIDPP- ShutIn Drill PipePressure reflectsthe differencebetween hydrostatic preszure in the &ill stringandthe kick zonepressure (True or False) a) b) I l. a) b) c) True False Thegradientof the kick canbe usefulto know, in orderto determine which of the following:(two answers) Expected pressures. annulus Kill procedure. Theplanforthe handling disposal and ofthe kick at surface.

12. Whichof the followingkick gradient ranges, wouldindicate gaskick hascomeinto the I wellbore? a) 0.05- 0.2psi/ft

WCltaf,udQuiz

Page[AFG]

tADI

CONFIDENTIAL

TRN-MDL-00868032

J-rr"*
5 Section - ActionsUoonTakineA Kick
b) c) 0.30- 0.4psi/ft greater than0.4 psi/ft

nr

,O

f,;
!:,

(.a

WClaanualQuiz

Page [APGI

tAD]

CONFIDENTIAL

TRN-MDL-00858033