Академический Документы
Профессиональный Документы
Культура Документы
a. b. c. d. e. f. g. h. i.
Assembly-to-Order With Production Order Assembly-to-Order With Variant Configuration Assembly-to-Order With Project Assembly-to-Order With Planned Order Special setting for Production Order Special setting for Planned Order Special setting for Project Special setting for Repetitive Manufacturing Special setting for Variant Configuration
i. i.
i.
ii. iii.
ii.
y Customer requirement
Availability Check for Customer Requirement Creating Customer Requirement Changing Customer Requirement
3.b. Long Term Planning(PP-MP-LTP) y Creating Planned independent requirement Version i. Copying Planned independent requirement version for LTP. y Creating and releasing Planning Scenario
a. Creating and changing Planning scenario b. Releasing the Planning Scenario c. Calculating Average Plant stock Copying Firm Planned order s from operative Planning Carrying Out MRP for Long Term Planning
i.
2. Capacity Planning (PP-CRP) Calling up the area menu for capacity planning. Capacity Planning Available capacity y Capacity Requirement
Distribution of Capacity requirement
a. b. Continuous and Discrete distribution Distribution of remaining capacity requirement i. ii. iii. iv. Static Cumulation Period Pattern Key Dynamic Cumulation Cumulation of Available Capacity
y Scheduling
i. Element of Scheduling
Scheduling Element for Network ,PMO Element of Scheduling for Planned Orders and Production orders Duration of Operation Operating Time How Schedule is carried out Scheduling and Capacity Requirement Calculation Scheduling Levels Parameters for detail Scheduling Reduction Scheduling Partially Confirmed Operation Scheduling Log
ii.
i. ii. iii.
Selection Screen Calling up Selection screen Set Combination Layout of Data Distribution of capacity requirement Cumulation of Available capacity and requirement Display and Audit Object Calling up capacity leveling Graphical display Printing Exporting an valuation list to Excel file Shop Floor Information System Calling up SF information system Input/Output Diagram Calling up input/output diagram Extended Evaluation
Capacity Leveling(PP-CRP-LVL) Capacity Planning In SOP Capacity Leveling in PP-SOP and LO-LIS-PLN Capacity Planning in Long Term Planning Capacity Planning in MPS and MRP Capacity Planning in Repetitive Manufacturing Capacity Planning in Shop Floor Control Capacity Planning in Process Industries Capacity Planning in Customer Service and Plant Maintenance Capacity Planning in Project System.