SECTION A: GENERAL
1.0 2.0 3.0 4.0 SCOPE OF WORKS PROGRAMME AND PROGRESS OF WORKS CONSTRUCTION SITE PREPARATION OF THE WORK AREA 4.1 4.2 4.3 4.4 5.0 5.1 5.2 5.3 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 Detection of Existing Utilities and Services Isolating of Valve Trench Excavation / Cutting of Metalled Premix Road Dewatering of Trench Normal Earth Shoulder Shoulder with hard standing / tiles Metalled Premix Road A.1 A.1 A.1 A.2 A.2 A.2 A.3 A.3 A.4 A.4 A.4 A.5 A.6 A.6 A.7 A.7 A.8 A.8 A.9 A.10 A.11 A.11 A.11 A.12 A.12 A.12 A.13 A.13 A.13 A.14 A.14 A.14 A.15 A.15 A.16 A.16 A.16 A.16 A.17
REINSTATEMENT WORK
SETTING OUT AND RE-SURVEY PROVISION OF SURVEY INSTRUMENTS AND CHAINMEN ORDERING MATERIALS MATERIALS AND WORKMANSHIP SUPPLY OF MATERIALS BY SYABAS REQUIREMENTS OF OTHER CONTRACTOR PUBLIC UTILITIES AND OTHER SERVICE PUBLIC AND PRIVATE ROAD WORK THROUGH PRIVATE LAND CONTRACTORS FACILITIES SAFETY AND SECURITY MEASURES DAMAGES TO EXISTING WORK PROTECTION OF WORKS SITE DRAINAGE PIPE DUMPS FIRST AID BOX CONTRACTORS PLANTS CLEARING UP AND REINSTATEMENT ON COMPLETION S.O.S APPROVAL DAYWORK COVERING UP OF WORK SIGNBOARDS CLAUSES RELATING TO WORK OR MATERIALS NOT REQUIRED IN THE WORKS EMPLOYEES SOCIAL SECURITY ACT DELAYS AND STOPPAGES WARRANTY STATUTORY HOLIDAYS
33.0 34.0 35.0 36.0 37.0 38.0 39.0 40.0 41.0 42.0 43.0 44.0 45.0 46.0 47.0 48.0 49.0 50.0 51.0 52.0 53.0 54.0 55.0 56.0 57.0 58.0
CONTRACT DOCUMENTS EXPLANATION OF THE DOCUMENTS CONTRACTOR'S AGENT PROJECT DIARY CO-ORDINATION MEETINGS AND PROGRESS REPORTS TRANSPORT ASSISTANCE TO SUPERINTENDING OFFICER'S REPRESENTATIVE SUPERINTENDING OFFICER'S APPROVAL TEMPORARY ACCESS ROAD WORK OUTSIDE NORMAL HOURS FORMS FOR MONTHLY STATEMENTS TEMPORARY CONNECTIONS DURING CONTRACT PERIOD OBVIOUS WORK STATUTORY REGULATIONS AND APPROVAL NOISE DELAYED TAKING OVER FIRE SUPERVISION PIPE BALANCE AND EXCESS MATERIALS RIGHT TO OPERATE UNSATISFACTORY EQUIPMENT SUPPLY OF CLEAR WATER FOR TESTING AND COMMISSIONING TRAINING OF OPERATORS LABELS APPLICATIONS FOR PAYMENT REQUIREMENT OF CONSTRUCTION INDUSTRY DEVELOPMENT BOARD ENVIRONMENTAL POLICY 58.1 58.2 58.3 58.4 58.5 58.6 General Policy Compliance with Environmental Legislation Environmental Co-ordination Environmental Audit Environmental Training Close-Out Scope of Services Accuracy of Survey Survey Plan and Scales
A.17 A.18 A.18 A.19 A.19 A.20 A.20 A.21 A.21 A.21 A.21 A.22 A.22 A.23 A.23 A.24 A.24 A.24 A.24 A.25 A.25 A.25 A.25 A.26 A.27 A.27 A.27 A.27 A.28 A.28 A.28 A.29 A.29 A.30 A.31 A.32 A.32 A.33
59.0
60.0 61.0
SECTION B: EXCAVATION
1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 GENERAL SITE CLEARING EXCAVATION GENERALLY EXCAVATION FOR PIPE TRENCHES ROCK EXCAVATION USE OF EXPLOSIVES WEATHERED ROCK EXCAVATION UNAUTHORIZED EXCESSIVE EXCAVATION ADDITIONAL EXCAVATION ORDERED BY THE S.O. TIMBER LEFT IN EXCAVATION EXCAVATION IN ROADS CROSSING WATER-COURSES ETC. INSPECTION BACKFILLING OF EXCAVATIONS OTHER THAN PIPE TRENCHES BACKFILLING OF PIPE TRENCHES APPROVED FILL MATERIAL ROAD REINSTATEMENT REMOVAL OF SURPLUS EMBANKMENTS SOILING AND TURFING LEVELS TO BE RECORDED CARE OF EXISTING SERVICES HEDGES, FENCES AND WALLS MACKINTOSH PROBES UTILITY SURVEYING AND MAPPING MEASUREMENT OF GENERAL EXCAVATION MEASUREMENT OF TRENCH EXCAVATION MEASUREMENT OF FILLING PAYMENT FOR TRENCH EXCAVATION AND RESTORATION MEASUREMENT OF TOP SOILING AND TURFING PAYMENT FOR TURFING PAYMENT OF FEES TO AUTHORITIES B.1 B.1 B.1 B.2 B.3 B.4 B.4 B.4 B.5 B.5 B.5 B.6 B.6 B.6 B.6 B.7 B.7 B.8 B.8 B.9 B.9 B.9 B.10 B.11 B.11 B.11 B.12 B.14 B.14 B.15 B.15 B.15
PAYMENT FOR MAKING INTERNALLY AND EXTERNALLY WELDED SLIP AND COLLAR JOINTS C.8 MECHANICAL COUPLING AND FLANGED JOINTS 22.1 Making Joints with Mechanical Couplings and Flange Adapters MAKING FLANGED JOINTS PIPELINE INSPECTION TESTING OF PIPELINES 25.1 25.2 25.3 Testing Pipelines Testing of MS/DI Pipelines Testing HDPE Pipelines C.8 C.8 C.9 C.9 C.9 C.9 C.12 C.12 C.13 C.13 C.13 C.13 C.14 C.14 C.14 C.15
PAYMENT FOR PRESSURE TESTING PIPELINES COMMISIONING OF PIPELINE MISCELLANEOUS 28.1 28.2 28.3 28.4 28.5 Measurement of Steel Pipes and Fittings Concrete Protection to Pipes Thrust and Anchor Blocks Valve Chambers Crossing Over Streams, Culvert and Rivers
28.6 28.7 28.8 28.9 28.10 28.11 28.12 28.13 28.14 29.0 29.1 29.2 29.3 29.4 29.5 29.6 29.7 29.8 29.9 27.10 30.0
Swabbing of Pipelines Sterilization of Pipelines Flushing of Pipelines Payment for Sterilizing Pipelines Clearing Up ABS Maker Posts Painting Pipe-work and Valves in Chambers Painting Pipework Above Ground Payment of Fees to Authorities General Performance Requirements Approval of Owner Jacking Operation Safety Design of the Jacking Pipes Welding of Pipe in the Field Grouting at Welded Joints Internal Lining at Welded Joints Connections at Ends of Jacked Pipeline
C.15 C.15 C.16 C.16 C.16 C.16 C.17 C.17 C.17 C.17 C.17 C.18 C.19 C.19 C.20 C.21 C.21 C.22 C.23 C.23 C.23
PIPE JACKING
CUTTING OVALITY CORRECTION HANDLING OF LOOSE POLYETHYLENE SLEEVING ADDED PIPE JOINT PROTECTION METHOD OF TYTON AND K TYPE JOINTS
15.4
Electrofusion Saddle Jointing 15.4.1 General 15.4.2 Equipment 15.4.3 Electrofusion Saddle Jointing Method
F.26 F.26 F.27 F.27 F.29 F.30 F.30 F.30 F.31 F.31 F.31 F.32 F.32 F.32 F.32 F.32 F.32 F.33 F.33 F.33 F.33 F.33 F.34 F.34 F.34 F.34
15.5 16.0 16.1 16.2 17.0 17.1 17.2 18.0 18.1 18.2 19.0 19.1 19.2 19.3 20.0 20.1
Mechanical Joints Preparation Of Pipes Laying Of Pipes General Laying of Communication Pipe Connection to HDPE Pipe Connection to Pipes of Other Materials Jointing of HDPE Service Pipes Jointing of Dissimilar Service Pipes Testing and Commissioning of Service Pipes Repairs To HDPE Pipe 20.1.1 General 20.1.2 Emergency Repairs 20.1.3 Permanent Repairs Using Fusion Joints 20.1.4 Permanent Repairs Using Mechanical Joints 20.1.5 Repairs to HDPE Service Pipe 20.1.6 Squeeze-Off Closure Technique
REPAIR METHODS
Illustration Materials. 1.6.1 1.6.2 1.6.3 1.6.4 Body Bolt, Nut and WasherM. Sealing Gasket Polyamide Adaptor
Effect of Non-Metallic Products on Water Quality Workmanship 1.8.1 Casting Nominal Sizes Dimension and Tolerances 1.10.1 Boss Dimensions 1.10.2 Tapping Dimensions 1.10.3 Bolts, Nuts and Washer Dimensions 1.10.4 Sealing Gasket Dimensions
2.0
PROTECTION AGAINST CORROSION 2.1 2.2 2.3 2.4 2.5. Surface Preparation Degreasing Abrasive Cleaning Pre-Treatment Coating 2.5.1 2.5.2 2.5.3 2.6 2.7. General Body Fasteners
Sampling Protection Against Damage in Storage; Transport and Handling Testing 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 Test Requirement Strength Testing Functional Testing Corrosion Testing Water Absorption Test Cathodic Disbondment test Adhesion Test Chemical Resistance Test Visual Inspection
TESTING
H.10 H.10 H.10 H.11 H.11 H.11 H.11 H.12 H.12 H.12 H.12 H.12 H.12
3.1.10 Short Term Pressure Testing 3.2. 4.0 4.1 Production Testing Marking MARKING
SECTION I: VALVE
1.0 GENERAL 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 3.0 3.1 3.2 Approved makes and Brand of Valves Drawings Manufacturing Report and Instruction Manuals Quality Assurance Notice of Deliveries Marking Inspection Delivery, Install and Commission Site Conditions Valve Agent Standard and Codes of Practice Materials Samples and Test on Samples Test Certificates Independent and Local Tests Testing Facilities Certificates of Quality and Warranty Rejected Material General Requirement Valve, Fittings and Actuators I.1 I.1 I.1 I.2 I.3 I.4 I.4 I.4 I.5 I.5 I.5 I.6 I.6 I.7 I.7 I.8 I.8 I.9 I.9 I.9 I.10 I.10 I.13
REQUIREMENT
DIMENSIONS & THREADING REQUIREMENTS TESTS AND INSPECTION MARKING FOR METER POSITION
1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63
No-Fines Concrete Precast Concrete Products Sampling and Testing of Aggregate Sampling and Testing of Concrete Compliance with Specified Requirements Non-Compliance Cutting and Testing of Core Samples Inspection Procedures Concrete Protection Systems Concrete Protection Procedures Machinery Bases and Closure of pocket Measurement of In-Site Concrete Measurement of Form Opening of Build in Plant Measurement of Grouting Back The Opening Measurement of Precast Concrete Sizes and Sequence of Concrete Pours Cleaning to Water Retaining Structures Testing of Water Retaining Structures Disinfection of Water Retaining Structures Chlorine Bearing Solution/Mixture for Disinfection Sealing Compounds Joint Fillers Waterstops Movement Joints Structural Tests
L.18 L.19 L.19 L.20 L.20 L.20 L.21 L.21 L.22 L.24 L.24 L.25 L.25 L.26 L.26 L.26 L.27 L.27 L.28 L.29 L.30 L.30 L.31 L.31 L.32
SECTION M: FORMWORK
1.0 GENERAL 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 Scope Submissions Materials Design and Detailing Formed Surfaces - Class of Finish Erection of Formwork Removal of Formwork Building in Plant Dry-Pack Mortar Defects in Formed Surfaces Movement Joints Sliding Planes and Joints Inspection and Testing Measurement of Formwork M.1 M.1 M.1 M.1 M.1 M.2 M.2 M.3 M.4 M.4 M.5 M.6 M.7 M.8 M.8
4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 5.0 5.1
Marking Warranty Delivery and Stacking Pile Head Pitching and Driving of Piles Lengthening of Piles Defects on Piles while Driving Preparation of Pile Heads General 5.1.1 5.1.2 Type of Tests Necessary Safety Precautions
N.10 N.11 N.11 N.11 N.11 N.12 N.12 N.12 N.12 N.12 N.12 N.12 N.12 N.12 N.13 N.13 N.13 N.13 N.13 N.13 N.13 N,13 N.13 N.13 N.14 N.14 N.15 N.15 N.15 N.15 N.15 N.16 N.16 N.16 N.16 N.16 N.17 N.17
PILE TESTING
5.2
Definitions 5.2.1. Compression Pile 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 Anchor Pile Test Pile Reaction System Kentledge Maintained Load Test Constant Rate of Penetration Test (CRP)
5.3 5.4
Supervision Reaction System 5.4.1 5.4.2 5.4.3 General Kentledge Anchor Pile and Ground Anchor
5.5 5.6
Testing Equipment Preparation of a Working Pile to be Tested 5.6.1 5.6.2 5.6.3 5.6.4 5.6.5 General Driving Records Cut-off Level Pile Head of Compression Test Notice of Test
5.7 5.8
Settlement Measurement Test Procedure 5.8.1 5.8.2 5.8.3 General Maintained Load Test Constant Rate of Penetration Test
5.9
Presentation of Results
N.17 N.17 N.18 N.18 N.18 N.19 N.19 N.19 N.19 N.19 N.19 N.19
Interpretation of Test Results 5.11.1 Measuring Equipment 5.11.2 Kentledge 5.11.3 Ground Anchors and Temporary Piles
5.12
Load Testing of Bakau Piles 5.12.1 General 5.12.2 Arrangement of Test Piles 5.12.3 Pile Cap 5.12.4 Test Procedure. 5.12.5 Interpretation of Results
SECTION P: BRICKWORK
1.0 2.0 GENERAL MORTAR 2.1 2.2 2.3 2.4 2.5 3.0 4.0 5.0 BRICKS BRICKWALLING BOND General Cement Admixtures Sand Water P.1 P.1 P.1 P.1 P.1 P.2 P.2 P.2 P.2 P.3
SECTION R: MISCELLANEOUS
1.0 2.0 3.0 4.0 5.0 Fence and Gate Manholes and Valves Chambers Pre-cast Chambers Washout Indicator Post R.1 R.2 R.3 R.3 R.3