Hi-Tech Gears

Dec-10

Introduction
Founded in year 1986 A part of 100 million USD multi-location, multi-dimensional diversified Hi-Tech Group Products ranges from Automotive transmission parts to Industrial Robots Inbuilt Lean and TPM philosophies in operations Over 1600+ people ranging from Operational technologist to AI researchers Applied excellence in:
Manufacturing Transmission & Engine Components Engineering Services Industrial Automation & Robotics Embedded Systems and Artificial Intelligence

Vision & Mission Statement


Hi-Tech Gears Vision

Be A Global Footprint Company and A Benchmark For World Class Manufacturing Systems
Hi-Tech Gears Mission

We will be the preferred partner in delivering engineering products and design solutions through lean philosophy with a focus on: Building a customer centric organization Rapid development of products and innovative solutions Ensuring cost effectiveness Developing competent and committed people

Organization
Deep Kapuria
50-50 Joint Venture with GETRAG
Getrag Hitech Gears I. pvt Ltd
Timing Gears

Pranav Kapuria
Hitech Gears Ltd

Anuj Kapuria
Hitech ESoft Hitech Robotic Systemz
Robotics

Power Transmission & Two-Wheeler Precision Forging/ Engineering Prec. Machining Transmission Unit Solutions Engine Components

Suman Kumar
GETRAG Hi-Tech

Rajesh Magoo
HGL Bhiwadi T&EC Plant

A.K. Verma
HGL Bhiwadi 2W Plant HGL Manesar Plant

Prashant Joshi
Millennium Plaza

K. Srinivasan
Info City Gurgaon

Bhiwadi

Gurgaon

Avinash Rao

Prashant Kumar

S.K. Chatterjee

cc A.K. Verma

Human Resource

Corporate Strategic Planning

Business Development

Finance & Accounts

Milestones
1986 - 1990 The Beginning Product Indigenization 1991 - 1995 Technology Tie-Ups & Indigenization 1996 - 2000 Extending Partnership to Global Supply Chain 2001 - 2005 Growth for Domain Leadership 2006 - . Consolidation & Moving up the Value Chain

Incorporated as a Public Ltd Co. Production Commencement Single Source to Hero Honda

Technical Tie-Up with MUSASHI (Honda Motors, Japan) Backward Integration into Precision Forging

Technical Partnership with GETRAG, U.S. (1996 ~2006) Started Business with TATA CUMMINS LTD.

Launched initiative of Lean Manufacturing Certified for TS 16949 ISO 14001 OHSAS 18001 State-of-the-art manufacturing facility set up at Manesar Established HiTech Robotic Systemz

TPM implemented in full-scale across the group; TPM Excellence Award Awarded by JIPM ACMA Gold Medal for Manufacturing Excellence

Single Source supplier to Honda Power.

Started supplies to Cummins Via Getrag


Certified as ISO 9002 & QS 9000 Started Engineering software division Hi-Tech e-Soft

Shingo Silver Medallion for Operational Excellence


New Plant Setup

Hi-Tech Robotics & Hi-Tech E-Soft certified for ISO9001

Operations Foot Print


Hi-Tech Gears Ltd.
IMT Manesar
Trans. Gears & Shafts, Precision machined parts ISO TS16949 Striving for ISO14000 Striving for OSHAS 18001

Hi-Tech Gears Ltd.


Bhiwadi Plant
Trans. Gears & Shafts Engine Gears, Precision machining & forging ISO TS16949 ISO14000 OSHAS 18001

Hi-Tech Gears Ltd. Corporate Office


Gurgaon
12th & 14th Floor

Hi-Tech Robotic Systemz


Gurgaon / Pune / Chennai
Computer Vision, Artificial Intelligence, and Robotics ISO 9001

GETRAG Hi-Tech Gears Ltd.


Bhiwadi
Joint Venture with GETRAG Corp USA - 100% EOU for Timing Gears ISO TS16949 ISO14000 OSHAS 18001

Hi-Tech Gears Ltd.


New Plant at Bhiwadi Under Construction

HI-TECH e-Soft
Gurgaon / Pune / Chennai
A Division of Hi-Tech Gears e - Engineering Services ISO 9001

Vulcan Electro Control


Bhiwadi
Machine Refurbishing Machining ISO 9001

Clientele

Strategic Alliances

Corporate Strategy Technology


Regularly upgrade manufacturing technologies to world class Q,C,D standards Align manufacturing with the Lean Philosophy
R&D facilities to develop Robots-Micro & Industrial, automotive embedded vision& safety solutions

Create an environment conducive for absorption of technology through training

Corporate Strategy Marketing

To focus on OEMs for local supply and exports

Supply world class components

Broaden the customer base Marketing of Engineering Services & robotics as a separate division

Corporate Strategy Finance


To remunerate the shareholders Maintain the healthy debt equity ratio and current ratio Follow International Accounting Standards Maintain a reasonable profit & growth level keeping in view the commitments to customers, shareholders

Corporate Social Commitment

TPM

03-Dec-10

14

Products Offering thru Manufacturing Foot Print : Hi-Tech Gears


Timing Gears
(Capacity 1.5 Mn.) Diesel Engine for Off Highway Vehicles & Gensets

Transmission Gears & Shafts (Capacity 0.5 Mn.)


Passenger Car & MUV

Power Take Off Units


(Capacity 0.3 Mn.) Off Highway Vehicles

Diesel Engine & Other Automotive Applications

Precision Forging & Machining (Capacity 4.5 Mn.)

Transmission Gears & Shafts (Capacity 18 Mn.)


2-Wheelers (Motorcycles & Scooters)

Diversified Customer Breadth


North America
Getrag Cummins Caterpillar Robert Bosch

Europe
GAWD JCB Cummins Robert Bosch Lister Peter

Asia (Excl. India)


Cummins Robert Bosch

India South America


Cummins Robert Bosch MWM Hero Honda Honda Motorcycle & Scooters India Honda Siel Cars India Tata Cummins Cummins India DICV New Holland Tractors JCB Avtec (for GM India) Simpson Bharat Forge Musashi

Lean Supply Chain Logistics


North America
FCL ~ 12 Shipments (L.T. 30~35 Days) LCL ~ 40 Shipments (L.T. 40~45 Days) Customer Support Engineer stationed at Customer Site

Europe
FCL ~ 4 Shipments (L.T. 25~30 Days) LCL ~ 5 Shipments (L.T. 25~30 Days)

Asia (Excl. India)


LCL ~ 10 Shipments (L.T. ~25 Days)

India South America


LCL ~ 10 Shipments (L.T. 55~60 Days) Outbound Customer ~ 140 Shipments Key i3PL Partners Panalpina Khuene Nagel Schenker OTS Astracon LLC

Customer Support Engineer stationed at Customer Site

Single point contact to the export customers for cargo related queries Cost minimization by maximizing returnable packaging & other improvements e.g. started long term contracts with i3PL for better rates negotiation, importing packing material from Sweden on behalf of one customer under bond to reduce cost
# of shipments are expressed in per month basis

Products Development Approach


Robust APQP Process inline with TS16949 standard Design support thru Hi-Tech E-Soft Inspection plan development as per international standards e.g. DIN, JIS, AGMA, ISO Adoption to customers standards e.g. Volvo & Caterpillar Inspection Software Close interface with customer thru single point contact Product design VA / VE ideas generation and discussion along with customer Timely development thru structured Project Management Office (PMO)

Suggested and implemented elimination of non value added holes

Suggested three piece component to one piece component to save cost


(approval awaited)

Manufacturing Processes
Forging
Hot Forging Warm Forging Cold Forging Cold Extrusion Coining

Finishing

Gear GrinderNew Honing, Gear Honing, Hard Turning, Grinding, etc.

CNC Turning Gear Cutting (Wet & Dry Hobbing / Broaching / Shaping / Shaving) Spline Rolling Auto Shaft straightening Deep Hole Drilling, etc

Machining

Die Manufacturing
Vertical Machining Center EDM, etc.

Heat Treatment

Normalizing Case Carburizing, Carbo-nitriding, Nitro Carburizing, Press QuenchingNew Hardening Tempering etc.

Automation
Automation design and fabrication unit, Vision Inspection Robot integration setup

Manufacturing Infrastructure

Quality System & Support Approach


Integrated Management System in compliance of ISO TS16949 Hi-Tech Customer Support Engineers located at major customer sites in India and U.S. Effective and efficient response system to customer complaints/ concerns Lead time to reacting on customer return for immediate action max. 24 hrs Lead time to Investigation & proposed action max. 48 hours Lead time to plan submission for corrective and preventive action max. 7days Complaints closure thru Poka-Yoke Tracking for non- repetition thru Kakotora Activity

BEFORE Sensor Loacting Loacting Pin


Locate on O/D (Not in Teeth)

AFTER

Example of POKA YOKE to avoid Punching angle out due to wrong broaching operation

Testing Infrastructure
Standard Room

Metallurgy Lab

Test Instruments Calibration Cutter Grinder

Vickers Rockwell Hardness Tester Hardness Tester

Microscope

Dial Calibration Height Micrometer Master Master Callibration Master

Shaving cutter Grinder

Strive for Business Excellence & Policy Deployment thru Mini-Factory Concept
Hi-Tech Group has the clearly defined process for 'Business Plan Development' and 'Policy Deployment
Business Strategy Development Mid-Term Plan Annual Operating Plan & Project Bank Policy Deployment (Linked with Performance Management System)

To support the policy deployment, we have Project Management Office (PMO)


Operational controls thru PMO Mini Factory Structure (Factories within Factory) Ownership and management control by line supervisors & associates Glasswall is divided into Daily Work Management (DWM) Glass wall Monthly Performance Indicator Glass wall Focused Improvement Glass wall Employees Morale Glass wall

Mini-Factory Glass wall Meeting

PRODUCTIVITY QUALITY

COST

DELIVERY

SAFETY

MORALE

ENVIRONMENT

Adoption of Lean Philosophy

JISHU HOSEN JISHU HOSEN

KOBETSU KAIZEN KOBETSU KAIZEN

PLANNED MAINT. PLANNED MAINT.

QUALITY MAINT. QUALITY MAINT.

Adoption of TPM Philosophy

TPM TPM

S.H.E. S.H.E.

INITIAL CONTROL INITIAL CONTROL

TOTAL EMPLOYEES INVOLVEMENT TOTAL EMPLOYEES INVOLVEMENT


EDUC. & TRAINING EDUC. & TRAINING OFFICE TPM OFFICE TPM

All TPM 8 Pillars Structure & activities are in place at all manufacturing location at Hi-Tech Gears

Visual Factory

Examples of Process Control Systems & Tools

Recognition & Awards


AWARD/ RECOGNITION
GOLD AWARD ICQCC 2010 (INTERNATIONAL LEVEL) GOLD AWARD QUALITY CIRCLE CONVENTION SILVER TROPHY FOR EXPORT EXCELLENCE SHINGO PRIZE (SILVER MEDAL)
[DESCRIBED BY BUSINESS WEEK MAGAZINE AS THE NOBEL PRIZE OF MANUFACTURING]

YEAR
2010 2010 2009-10 2009

RECOGNITION BY
QUALITY CIRCLE FORUM OF INDIA QUALITY CIRCLE FORUM OF INDIA (DELHI CHAPTER) ACMA SHINGO PRIZE ACADEMY, U.S.

TPM EXCELLENCE AWARD BEST SUPPLIER AWARD GOLD TROPHY FOR MANUFACTURING EXCELLENCE SILVER TROPHY FOR EXPORT EXCELLENCE STATE AWARD FOR EXPORT EXCELLENCE BRONZE TROPHY FOR EXPORT EXCELLENCE EXCELLENT PERFORMANCE AWARD AWARDED FOR DEPENDABILITY ON DELIVERY AWARDED FOR ACHIEVING QUALITY AND DELIVERY TARGETS AWARDED FOR VALUABLE CONTRIBUTION AND SUPPORT BEST QUALILTY AWARD

2009 2007-08 2007-08

JAPAN INSTITUTE OF PLANT MAINTENANCE (JIPM), JAPAN FIAT GROUP NEW HOLLAND INDIA AUTO COMPONENTS MANUFACTURERS ASSOCATION OF INDIA ACMA GOVT. OF RAJASTHAN ACMA CUMMINS INDIA TATA CUMMINS HONDA MOTOR CYCLES AND SCOOTERS HONDA MOTOR CYCLES AND SCOOTERS TATA CUMMINS

2007-08 2008 2006-07 2007 2006-07 2005-06 2006 2004

03-Dec-10

28

T&EC Business Overview


Transmission & Engine Components (T&EC) is one of the business vertical that contributes about 15% of total Hi-Tech Gears business (2008-09) and manufactures primarily timing gears for diesel engines for light, medium & heavy commercial / offhighway vehicles and transmission gears & shafts for four wheeler vehicles and other applications.
This business vertical is having a wide customer base that include some of the most prestigious OEMs with spread around the globe including United States and Europe. Existing Major Customers Tata Cummins Cummins Caterpillar New Holland Honda Siel DICV JCB UK JCB IN MWM Brazil New Customers
INR Mn.

Actual Forecast

New Plant Envisioning


Envisaging its solid growth, Hi-Tech Gears is getting ready to set-up a new ECOFAC green world-class facility on Lean Logistics principles at Bhiwadi just opposite to the mother plant that shall set new benchmarks in manufacturing

PROJECT SITE HI-TECH GEARS BHIWADI PLANT

Salient Features of New Plant


21,100 sq.m. facility Shop Area - 4627 sq.m (Ist phase) 100% Future Expansion Provision Vaastu Compliant Design ECOFAC Green Building (Maintenance-Friendly)

Sophisticated Machining Setup


Manufacturing Excellence Drive
Lean Mini factory concept / Pull system / Flow lines TPM Pillars activities
PROJECT SITE HI-TECH GEARS BHIWADI PLANT

TEI Team activities and Kaizen culture

Sound Operating System thru Image Plan

T&EC New Plant Vision

Rev. 01

TO BE A BENCHMARK IN OPERATIONAL EXCELLENCE THROUGH CULTURE OF TOTAL EMPLOYEE INVOLVEMENT TO PROVIDE CUSTOMER DELIGHT
LEARNING ORGANIZATION RIGHT TALENT VISUAL FACTORY EHS SYSTEM-DRIVEN ECO FACTORY CONTINUOUS FLOW LEAN LOGISTICS ALL ROUND GROWTH SHARED LEADERSHIP

T&EC New Plant Philosophy

A P CONTINUOUS IMPROVEMENT D C

SUPPLIER

CUSTOMER

NEW PLANT PHILOSOPHY


LEAN

LEAN LOGISTICS OPERATING MODEL


Customer Demand Driven Operating Model with Least Thruput Time Efficient Return on Investment

System Organisation Infrastructure

TPM

GREEN ECOFAC PLANT


Resource-Efficient (On the principal of 3Rs - Reduce, Reuse, Recycle) Maintenance-Friendly (Economical, Social, and Ecological Sustainable)

TEI

TOTAL EMPLOYEES INVOLEMENT


Employees-Friendly Operations Culture of Continuous Improvement

SO HP PA HS
. ID .C . 6.0M W E R .C ROAD

Image Plan Framework

CA AD S R PY R

A TE WS ISP . D O

ID A AS W LKW Y 2.00MW E

W LKW S2.00MW A AY I

SO H PA HS

ID A AS W LKW Y 2.00MW E

ORGANIZATION

SYSTEMS

IMAGE PLAN FRAMEWORK (INFRASTRUCTURE)


Materials Receipt Board
Updation by - _________ Time - _____ Org Structure Dept Objective Dept. Targets

INFRASTRUCTURE
Incoming Inspection Board
Updation by - _________ Time - _____ Org Structure Dept Objective Dept. Targets Process 3 Process 1 Process 2 Process 3
Partition between Rec eipt Store & Supermarket

Incoming Materials Dock & Receipt Area


20 0 + 5 50
4.5 M. WIDE C . . R O A D 0 C
S. . P. T E. T. . P SLUDG E DI PO L S SA R. O . PLANT D. . M WATER SO FT WATER W ALK W AYS 200M DE . WI WALKWAYS2. 00M DE WI

6.0 M . WIDE R.C.C. R O AD

D I 0 AYS 2. 0M W E ALK W W

0 6. M. WIDE R.C.C. R O A D

I 0 A K AYS 2. 0M W DE W L W

SHO P F LO OR PHASE - II

WI . AYS 200M DE ALK W W

R ECO SH ED

ND ITION ING

ASTE W S DI PO .

S E N W

SCRAP YARD

230THK BRI K W C ALL ( O BEDI SM T ENTAL LATER)

WALKWAYS2. 0M W DE I

WALKWAYS2. 00M DE WI

SHOP FL OO R PH ASE -I

I 0 A WALKW YS2. 0M W DE

I 0 A K AYS 2. 0M W DE W L W

WI . AYS 200M DE ALK W W

Process 1

Process 2

PG L. . . RAG STO E

O AM NI A

G F. . DI SPATCH RM PLATEFO

BI N RAG E STO

BI N AS N W HI G

30m NG LE TH STRUCURE T WALKWAYS2. 00M DE WI

C AP. PANEL

1600 mm

Receipt Vs Pending # of Non Conformity Found # of Kaizen

# of Indirect Pending Lots Lots Receipt Details Vs Pending Action on Non Conformity # of Accidents DWM Action Log Audit Score

Supplier Tags Receipt Pending Lots Performance Vs Inspected Details Status # of Non Conformity Found # of Kaizen Action on Non Conformity # of Accidents DWM Action Log Audit Score

M NTAI EDLAN AI N W

VCBRO M 900X700 0 0O

4PO E L STRUCTRE U 33VHTLI E K N

M ETERRO M O 300X400 0 0

4 SF6-

SF6- 3

2 SF6-

2. 5M A V T2 SEC. . BI G W / RD E RO M O

2. M 5 VA T- 1

2PO LE STRUTURE C

Trolley Arrange men t as per FIFO Rule

Receipt Trolley

Tu n gI a r i ds e i n Rel o t t ai y A ch i ect u r e, St r ct ur e, P l ann er s & I t er i r s r t u n o J 2/1 5B as em en t , K i r i E xt n. Ma l i aN a gar h k v y N ew D el hi - 1100 17 Pho ne 011- 32565 401, 3 25654 18- 93 51409 980 e m a i - i nf o@ s hi l pka ar ar chi t ect s . o m l c

Form 1

Form 2

Form 3

Form 1

Form 2

Form 3

POCKET FOR KANBAN


Inspection Display Board

3500 mm
Bench for Drivers

2000 mm

Powered

<DT.>

<DT.>

<DT.>

<DT.>

<DT.>

<DT.>

PENDING KANBAN

Vendor Rejection Material Area

ARRANGEMENT TIME - _______

RESP. - _______

2000 mm

Scissor Lift

Pallet Truck

Platform

Receipt Display Board

Pallets Arrangeme nt as per FIFO Rule

1000 mm (Clear)

1000 mm (Clear )

Tags (Order) Chute

Suppliers Kanban Status Board

Unpacking Tools Stand

PPAP Files/ Limit Sample Cabinet

Surface Plate

Retur n Chute
Marker Board

example

Revision Details Rev.00 (11-Oct-08)

Chute having one lot per pocket showing pending # of lots

Insp. Desk Insp. Desk (1000x800 mm) (1000x800 mm)

Receipt Desk (1000x800mm)

Guages & Doc. Rack

Board & Doc. Rack

Example Image Plan - System


PROCESS < EXAMPLE > CUSTOMER DEMAND RECEIPT & CONVERTING TO LEVELLED SCHEDULE FOR PRODUCTION

ExampleFRAMEWORK (INFRASTRUCTURE) InfrastructureDock & Receipt Area Image Plan - Incoming Materials IMAGE PLAN
200 + 550
4 .5 0 M . W ID E C .C . R O A D
S .T .P . E .T .P . SLU DG E D IS P O S A L R .O . PLANT D .M . W ATER SOFT W ATER W A L K W A Y S 2 .0 0 M W ID E W A L K W A Y S 2 .0 0 M W ID E
W A Y S 2 .0 0 M W A LK W A LK

WALK WAYS 2.00M WIDE

W A LK

S H E D

Updation by - _________ Time - _____ Org Structure Dept Objective Dept. Targets

Updation by - _________ Time - _____ Org Structure Dept Objective Dept. Targets

R .C .C . R

W A Y S 2 .0 0 M

R .C .C . R

W A Y S 2 .0 0 M

SH O P FLO O R P H A S E - II

R E C O N D IT IO N IN G

Materials Receipt Board

Incoming Inspection Board

A D

W ID E

W ID E

W ID E

A D

6 .0 M . W ID E

6 .0 M . W ID E

Y A R D W A S TE

D IS P O .

B IN

W A S H IN G

S E N W

S C R AP

2 3 0 T H K B R IC K W A L L ( T O B E D IS M E N T A L L A T E R )

W A L K W A Y S 2 .0 0 M W ID E

W A L K W A Y S 2 .0 0 M W ID E

F .G . D IS P A T C H

SH O P FLO O R P H A S E -I
W ID E W ID E W ID E

W A Y S 2 .0 0 M

2 .0 0 M

W A Y S 2 .0 0 M

W A YS

A M O N IA

Process 1

Process 2

Process 3

Process 1

Process 2

Process 3

Partition between Receipt Store & Supermarket

L .P .G .

S T O R A G E

W A LK

W A LK

W A LK

P LA TE F O R M

B IN

S TO R AG E

3 0m LE N G T H S TRU C TU R E

W A L K W A Y S 2 .0 0 M W ID E

CAP. PANEL

1600 mm

Receipt Vs Pending # of Non Conformity Found # of Kaizen

# of Indirect Pending Lots Lots Receipt Details Vs Pending Action on Non Conformity # of Accidents DWM Action Log Audit Score

Supplier Tags Receipt Pending Lots Performance Vs Inspected Details Status # of Non Conformity Found # of Kaizen Action on Non Conformity # of Accidents DWM Action Log Audit Score

M A IN T A IN E D L A W N

VCB ROOM 90 00X 7000


S F 6 -4 S F 6 -3 S F 6 -2

4 PO LE S TR U C TU R E 3 3 K V H T L IN E

M ETER R OOM 3000X 4000

2 .5 M V A T -2
S E C ./W .B R ID G E ROOM

2 .5 M V A T -1

2 P OLE S TR U C TU R E

Trolley Arrangement as per FIFO Rule

Receipt Trolley

T u rn in g Id e a s in t o R e a lit y

A r c h ite c tu r e , S t r u c tu r e , P la n n e r s & J - 2 / 1 5 B a s e m e n t, K h ir k i E x t n . M a lv N e w D e lh i - 1 1 0 0 1 7 Phone 011- 32565401, 32565418- 935 e m a il - in f o @ s h ilp k a a r a r c h ite c ts .c o m

Form 1

Form 2

Form 3

Form 1

Form 2

Form 3

POCKET FOR KANBAN


Inspection Display Board

3500 mm
Bench for Drivers

2000 mm

Powered

VENDOR
ABC XYZ ASD ZKN ZDC

<DT.>

<DT.>

<DT.>

<DT.>

<DT.>

<DT.>

MON MON.

TUE MON.

WED

THU

FRI

SAT

PENDING KANBAN KANBAN DROP POST

Vendor Rejection Material Area

DATE

ARRANGEMENT TIME - _______

RESP. - _______

2000 mm

KANBAN STATUS BOARD

Scissor Lift

Pallet Truck

Platform

Receipt Display Board

Pallets Arrangement as per FIFO Rule

1000 mm (Clear)

1000 mm (Clear)

Tags (Order ) Chute

Suppliers Kanban Status Board

Unpacking Tools Stand

PPAP Files/ Limit Sample Cabinet

Surface Plate

Return C
Marker Board

hute

Revision Details Rev.00 (11-Oct-08)

Chute having one lot per pocket showing pending # of lots

Insp. Desk Insp. Desk (1000x800 mm) (1000x800 mm)

Receipt Desk (1000x800mm)

Guages & Doc. Rack

Board & Doc. Rack

ECOFAC DRIVE thru IGBC CERTIFICATION


With the objective of building the Green ECOFAC plant, Hi-Tech Gears is aspiring to challenge the IGBC Green Factory Building Certification

Focus shall be on Efficient use of resources (on the principles of 3Rs Reduce, Reuse, Recycle) Maintenance friendliness

Implementation drive shall be through Study, analyzing the IGBC Green Factory Building Certification requirements and incorporating them into project timeline (one time tasks) and daily work management (for recurring tasks)

System review / upgrade ISO 14001


TPM activities

Total Employees Involvement Approach


Total Employees Involvement is intended to be achieved by strengthening the relationship as depicted in the diagram.
HAPPY SUPPLIER (Leveled Schedule)

Business Head

GREEN BUILDING & LEAF (ecofac)

LEAN LOGISTICS Each employee shall be assigned to an experienced, more HAPPY SUPPLIER (ecofac) (frequent delivery in senior employee - a mentor who provides guidance (Leveled Schedule) Operations small lots) through the process of making actual work-related Head LEAN LOGISTICS improvements GREEN BUILDING & LEAF HAPPY SUPPLIER (Leveled Schedule)

GREEN BUILDING & LEAF

HAPPY INV (sees grow

(frequent delivery in CNC MACHINES (ecofac) Supplier small lots) (technology) Production

Head

A SPIC N SP P CONTINUOUS IMPROVEMENT Hi-Tech Gea (high level C HAPPY D INVESTOR


(sees growth)
oo SUPPLIER

GREEN BUILDING & LEAF LEAN LOGISTICS HAPPY SUPPLIER (frequent(ecofac) in CNC MACHINES delivery Supplier (technology) Mini-Factory (Leveled Schedule) small lots)

Leader

A P CONTINUOUS IMPROVEMENT D C
oo SUPPLIER

oo oo oo LEAN LOGI SPIC N SPAN(frequent d Hi-Tech Gears 5-S) lots) (high level of small

LEAN LOGISTICS (frequent delivery in CNC MACHINES small Supplier lots) (technology)

o oo

A P CONTINUOUS IMPROVEMENT D C
oo SUPPLIER

SUPPLIER Hi-Tech Gears

oo o o o o LEAN LOGISTICS CNC o CNC o (frequent delivery in small lots)

SH

CNC (gl

LOAD LEVELING Supplier


CNC MACHINES (technology)

A P CONTINUOUS IMPROVEMENT D C
oo SUPPLIER

o oo

CNC oo oo

CNC oo oo

CNC

CNC

SUPPLIER Hi-Tech Gears LOAD

LOAD LEVELING
oo

LEVELING
oo oo

CNC

oo oo

CNC

SUPPLIER

LOAD LEVELING
CNC CNC CNC

TOYOTA $ CNC CNC MUSIC KATA NOTES as SUPERMARKET RHYTHM OF WORK (pull system) (sound operating plan APPROACH

MUS SUPERMARKET Custom RHY (pull system) (sou

LOAD LEVELING
CNC
SUPPLIER

LOAD LEVELING

LOAD LEVELING

SUPERMARKET (pull system)

MUSIC NOTES as CUSTOMER HAPPY EMPLO RHYTHM OF WORK (sound operating plan) (employee frien

THANKS FOR YOUR ATTENTION