Вы находитесь на странице: 1из 4

MCA (Sem-VI) Project Evaluation Pattern Marks Distribution Table Project Report 50 Term Work 25 Presentation 25 Oral(Viva) 50 Total

l 150 [Note: - 45 % passing in each individual section] Internal examiner and external examiner have same amount of marks to be given to the students For internal examiner marks to be given 1) Project report - 50 marks (Has to give at the time of final presentation in front of external) 2) Term work - 25 marks For external examiner marks to be given 1) Final Presentation 25 marks 2) Viva 50 marks Final Examination is expected in 2nd week of June. It includes presentation and viva.

Student has to submit 2 hard copies and 1 soft copy of project in college. o 1 hard copy and 1 soft copy for college o 1 hard copy for student. Minimum 60 pages should be in project report. Duration of project - 6 month (1st Jan-30th June) Acceptable Project types are:1) Live industry project. 7 to 8 can work on one project, depends on project size. But each student in a group has to develop different module of that project. 2) In house project is acceptable. But students have to show that much of work of project. And student should have domain knowledge of that project. 3) For in-house project group of 3-4 student are acceptable. Again work should be modularized. 4) Testing projects are acceptable. Student should have domain knowledge of project. 5) The student who is getting directly job offer instead of internship can be considered. This student can present their work as a project for their final exam. Internal guide duty:1) Internal guide have to give internal term work marks on the basis of Project progress report submission and mid term presentation. The details of project progress report is described in section-A. 2) Internal guide should contact external guide at least once during the tenure of

the project and visit the site if possible. 3) Internal guide has to take feedback of student from their external guide throughout the project. 4) External guide (company guide) should give the trainees feedback in a standard format. He/she should issue training completion certificate at the end of the project. Section A:Progress report submission details1) First project progress report submission (15 th March) Expectations in report - Synopsis - System study - Literature survey - Knowledge domain - Industrial scenario - Abstract 2) First project progress report submission (15 Th April) Expectations in report - Requirement gathering

- Design - Abstract & Synopsis With Midterm presentation of project 3) First project progress report submission (15 th May) Expectations in report - Methodology - Implementation - Testing 4) Final project report submission date is 31st May

Вам также может понравиться