BILL OF QUANTITIES

Construction of Test Tunnel Item Description of Works No. 1 General Items Insurance of works, materials, equipment and 1.1 personnel and third party 1.2 Bank Charges for Performance Security 1.3 Temporary Buildings and Site Facilities 1.4 Construction Power Supply 1.5 Transportation of Construction Equipment and Plants Sub-Total 1 2 Test Adit Tunnel Works 2.1 Care of water during construction 2.2 Tunnel excavation including haulage upto portal area Haulage of tunnel muck from tunnel portal area to 2.3 disposal site (average distance upto 1 km) 2.4 Rock Bolts (Dia = 25 mm) 2.5 Shotcrete, t = 50 mm 2.6 Shotcrete, t = 100 mm 2.7 Wire mesh for shotcrete (Not required with Steel fiber) Steel fiber reinforced shotcrete, t = 100 mm 2.8 (replacement of item nos. 2.6 and 2.7) 2.9 Structural Steel Support Sub-Total 2 Test adit tunnel inlet portal including temporary 3 access road and river crossing works 3.1 3.2 3.3 3.4 3.5 Open cut excavation in soil Open cut excavation in rock Rock Dowel (Dia = 25mm) Shotcrete t = 100mm Wire mesh for shotcrete Tamakoshi 7x7 Unit Quantity In Figure Rasuwa 6x6 Rate (NRs.)

L.S. L.S. L.S. L.S. L.S.

1 1 1 1 1

2,170,050.00 102,120.00 8,337,988.00 18,550,296.00 24,102,050.00

2,000,000.00 100,000.00

L.S. m3 m m m2 m2 m2 m Ton
2 3

1.00 9,638.20 7,228.65 4,374.90 4,268.00 4,268.00 4,268.00 4,268.00 10.00

1,068,842.00 1,400.00

1,050,000.00 1,450.00 250.00 850.00 1,200.00 2,368.00 800.00 3,200.00 111,000.00

838.67 1,200.00 2,368.00 758.50 3,160.50 111,000.00

m 3 m m m2 m2

600.00 400.00 550.00 500.00 500.00

128.00 708.00 838.67 2,368.00 758.50

150.00 708.00 840.00 2,400.00 760.00

Page 1 of 6

Item Description of Works No. 3.6 Hume Pipes (Dia = 1200 mm) 3.7 Boulder Riprap 3.8 Gabion Works Sub-Total 3 4 Bunker house construction 4.1 Open cut excavation in soil 4.2 Stone soling Concrete works in 1:3:6 mix with cement, sand and aggregate including laying, curing and finishing to level in lines all complete as per drawing, specification and 4.3 instruction nett. Sotne masonry work in 1:6 cement and sand mortar in foundation and Superstructure with random rubble stone of appropriate size and quality including wetting the stones, packing the joints and curing the works etc all complete as per drawing, specification and 4.4 instruction nett. Concrete works in 1:2:4 mix with cement, sand and aggregate including laying, curing and finishing to level in lines all complete as per drawing, specification and 4.5 instruction nett. Backfilling in foundation trenches and rooms in layers, watered and well rammed by earth rammer for proper compaction as per drawing, specification and 4.6 instruction nett. Wooden flooring works by local wood with 1 inch thick wooden plank as per drawing, specification and 4.7 instruction nett.

Unit m m2 3 m

Quantity In Figure 85.00 300.00 60.00

Rate (NRs.) 15,000.00 1,800.00 4,200.00

m3 m3

40.90 15.98

128.00

150.00 1,500.00

m3

7.99

6,238.00

6,300.00

m3

79.66

3,800.00

m3

14.42

7,200.00

m3
2

19.68

68.00

70.00

65.66

3,500.00

Page 2 of 6

Item No.

Description of Works Providing and placing of steel reinforcement bar (Fe 415) confirming to IS code including strengthing, cutting, bending, placing and binding in position by binding wire with hooked end as per drawing, specification andd instruction nett. Providing, making and fixing local wood work for door and ventilation frame with 3"x4" section, in plum including fixing hole fasts etc all complete as per drawing, specification and instruction nett. Providing, making and fixing pannelled door and ventilation shutter of 38 mm thick local wood with 45 mm beading all around including fixing with approved type of aluminium towerbolts 150 mm on top and 3 nos. of 10 cm long iron hinges, mortise lock and door stopper etc all complete as per drawing, specification and instruction nett.. Providing, fitting and fixing standard formwork of shuttering of good plunks including all necessary props, bracing, wedges and nails etc in ground floor and removal of formworks at approved time for all types of R.C.C. works all complete as per specification and instruction nett. Supply, Laying and fixing of 50 x 50 mm M.S. Angle section of 4 mm thickness with twelve gauge barbed wire fencing work as per drawing, specification and instruction nett with all complete works. Sub-Total 4 Total (1+2+3+4) Value Added Tax @ 13% Grand Total

Unit

Quantity In Figure

Rate (NRs.)

4.8

Ton

0.74

120,000.00

4.9

0.58

50,000.00

4.10

4.62

1,800.00

4.11

124.09

425.00

4.12

60.00

800.00

Page 3 of 6

Rate (NRs.) In Words

Amount (NRs.)

Remarks

Two Million Rupees One Hundred Thousand Rupees

2,000,000.00 100,000.00 -

1,050,000.00 13,975,390.00 1,807,162.50 3,718,665.00 5,121,600.00 10,106,624.00 3,414,400.00 13,657,600.00 1,110,000.00 53,961,441.50

Eight Hundred Rupees

90,000.00 283,200.00 462,000.00 1,200,000.00 380,000.00

Page 4 of 6

Rate (NRs.) In Words

Amount Remarks (NRs.) 1,275,000.00 540,000.00 252,000.00 4,482,200.00 6,135.00 23,970.00

50,337.00

302,708.00

103,824.00

1,377.60

229,810.00

Page 5 of 6

Rate (NRs.) In Words

Amount (NRs.)

Remarks

88,800.00

29,000.00

8,316.00

52,738.25

48,000.00 945,015.85 59,388,657.35

Page 6 of 6