CHAPTER IV RECOMMENDATIONS

SYSTEM DEVELOPMENT LIFE CYCLE The process system of development life cycle is the overall retiring from and

developing, systems

implementing, a multistep

and

information initiation,

through

process

analysis,

design,

implementation,

maintenance to disposal.

SYSTEM INITIAION/PLANNING The first phase of the SDLC of our senior project is planning. The planning stage establishes a birds eye view of the intended software product and uses this to establish the basic project structure, evaluate feasibility and risks associated management planned with and the project, and describe In we this propose appropriate point, for we our

technical what

approaches. should

first

project

thesis. The first thing that entered in our mind is to develop a biometric device that can be used in monitoring the attendance of employees in Partido College. In this process we have to identify the projects requirement and main features proposed in the application. We noticed that the project that we proposed needs more time at about eight

months

to

develop.

Therefore,

we

decided

to

change

our

senior proposal matter and put aside our first proposal project. We want to develop something which is possible to finish before the year ends. We researched and researched for a project which is easy for us to finish it at the right time. The three of us has decided to develop a game which is possible for us. After finalizing of our chosen topic, we gathered first some information which is related about game development. We

SYSTEM REQUIREMENT ANALYSIS This is also known as feasibility study. We study the need for possible software automation in the given system. By the end of the feasibility study, our group furnishes a document that holds the different specific recommendations for the game development. The requirements gathering

process is intensified and focused specially on software. The essential purpose of this segment is to find the need and to define the problem that needs to be solved. To

understand the nature of the program to built, we tried to understand the information domain for the game development, as well as required functions, performance and the

interfacing. From the available information that we have

gathered, we have the sample cases and the system level that is needed as the requirement for the project.

SYSTEM DESIGN The third phase is project design. Here we create the screen layout, are storyboard, during and the outline contents. These It and

criteria

useful

development

process.

builds upon the work performed during our analysis, results in a into translation a complete the and of the

functional solution.

requirements This solution

technical

dictates

technical strategies to

architecture, be followed

standards,

specifications

throughout the building, testing, and implementation of the system. The completion of this stage also marks the point

in the project at which our group should be able to plan, in detail, all future project phases.

SYSTEM CONSTRUCTION In this part, the design must be translated into a machine readable form. The code generation step performs this task. The development phase involves the actual coding of the entire application. Its design is performed in a detailed manner. Code generation can be accomplished

without much complicated. Programming tools like compilers,

interpreters like c, c++, and java are used for coding. Because of the deference to the type of application, we used the right programming language is chosen.

SYSTEM IMPLEMENTATION The implementation of the new system is led by various procedures followed by the previous stage (Avison et al. 2003, 30). It involves creating or acquiring the various system components detailed in the systems design,

assembling them, and placing the new or modified system into operation (Stair et al. 2009, 498). Based on the

physical design model, if it includes computer programs, these have to be written and tested individually, and if it requires hardware and software systems, those also need to be purchased and installed. It is important that the system is formally tested and accepted before change over (Curtis et al. 2005, 409). By contrast, failure will cause a lack of confidence and, possibly, future computer applications (Avison et al. 2003, 30).

SYSTEM MAINTENANCE The final stage of the system development process

occurs when the system is running and in continuous use. There will be a review of the system to ensure that it does

conform study

to

the

requirements and the

set

out

at not

the

feasibility those

stage,

costs

have

exceeded

predicted (Avison et al. 2003, 31). This process includes a periodic review or audit of a system, the audit occurs in addition potential to continually or monitoring a new system et for al.

problems

necessary

changes

(OBrien

2008, 406). It is customary to produce an evaluation report to gain an improvement in the way other systems are

developed through the process of (Avison et al. 2003, 31).

organizational learning

Shortcomings will be identified,

if these are easily rectified, then changes will be made during normal maintenance (Curtis et al. 2005, 410).

IMPLEMENTATION PLAN

INFRASTRUCTURE/DEPLOYMENT