Академический Документы
Профессиональный Документы
Культура Документы
3I >
I I n = 1A 5A I n = 1A 5A
Applications where non-directional overcurrent and earth-fault protections are needed, e.g. - feeder protection - transformer protection - back-up protection - power utilities - industries - marine and offshore installations
(I ) (I o )
f n = 50Hz X
60Hz
I L1 I L2 I L3 I o IRF
SPAJ 140 C
X 80...265 V ac/dc 18...80 V dc
SPCJ 4D29 REGISTERS OPER.IND.
U aux
I>/In
t> [s] k
RESET STEP
I>>/In
t>> [s]
0 1 I > START 2 I > TRIP 3 I >> START 4 I >> TRIP 5 I 0> START 6 I 0> TRIP 7 I 0>> START 8 I 0>> TRIP 9 GBFP
1 IL1 / In 2 IL2 / In 3 IL3 / In 4 Imax (15 min) 5 t(I>)[%] 6 t(I>>)[%] 7 I0 / In 8 t(I0>)[%] 9 t(I0>>)[%]
I0>/In
t0> [s] k0
I0>>/In
t0>> [s]
PROGRAM
878E
RS 611
Ser.No.
879B
SPCJ 4D29
Three-phase, high-set phase overcurrent protection with instantaneous or Low-set, non-directional earth-fault protection with definite time or
inverse definite minimum time (IDMT) characteristic definite time function
51 N
SIGNAL 2
IL3
50 N
START 1
Io
REMOTE RESET, REMOTE SETTING CONTROL OR BLOCKING INPUT FOR THE DIFFERENT CURRENT STAGES
START 2
BS Blocking or reset
51BF
IRF
Prot. functions
Wide and accurate numerical settings with perfect long-time stability Possibility for two sets of relay settings Local man-machine communication with push-buttons and a digital display High immunity to electrical and electromagnetic interference Rigid aluminium relay case with a degree of protection by enclosure to IP 54 Extensive data communication capability over built-in serial port Enhanced system reliability and availability due to continuous
hardware and software self-supervision
I +
0 + Rx
SPA-ZC_
Tx
+ (~) - (~)
U aux
START 1
74 75 + + E TS1 D SS1 1 1
EXTERNAL CONTROL
63 1 2 3 4 5 6 7 8 9 25 26 27
5A 1A 5A 1A 5A 1A 5A 1A
IRF
62 61 70 71 72
START 2
77 78 +
SIGNAL 1
80 81 + C SS2 1
SIGNAL 2
68 69 + B SS3 1
TRIP
65 66 + A TS2
LATCHING SGB/6 SGB/7
SGR2/8
11
10
SERIAL PORT
~
F
U2 U3
+ 1
TRIP R
SGR1/1
SGR1/3
SGR1/5
SGR1/7
SGR2/3
SGR2/5
SGR2/7
SGR2/2
SGR2/4
SGR3/1
SGR3/2
SGR3/3
SGR3/4
SGR3/5
SGR3/6
SGR3/7
SGR3/8
SGR2/1
SGR2/6
SPCJ 4D29 U1
SGB/1
SGR1/2 SGR1/4
3I> 3I>>
T1 T3
SGR1/6
IRF
SGR1/8
T2 T4
SGB/2
Io>
SGB/3
T5 T6 T7
I/O
SGB/5
RC SETTINGS RESET
SPAJ 140 C
SGB/8
T9
SGF/4 0.1...1s
U1
Connections
SGB/4
Io>>
T8
3I >
I I L1 I L2 I L3 I o IRF
t > [ s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
SPCJ 4D29
I >/I n
RESET STEP
t > [ s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
SPCJ 4D29
Second Settings
2 Start current of stage I> Operate time t> or multiplier k Start current of stage I>> Operate time t>> Start current of stage Io> Operate time to> or multiplier ko
Dual setting banks
1 1
2 2
2 2
1 1
3I >
I I L1 I L2 I L3 I o IRF
RESET STEP
t > [ s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
TRIP
SPCJ 4D29
3I >
I I L1 I L2 I L3 I o IRF
Operate time to> for definite time Time multiplier k at inverse time High-set stage Io>>: Start current Io>> Operate time to>>
t > [ s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
SPCJ 4D29
3I >
I I L1 I L2 I L3 I o IRF
t > [ s]
k
I >> / I n
t >> [s]
I o >/ I n
t o > [s ]
ko
I o >> /I n
t o >>[s]
PROGRAM
SPCJ 4D29
Relay
IRF
IRF
F E
TS1
START 1
SGB / 2
SS1
1
SGF1 / 4
0.1...1s
START 2
BS
(AR2)
SS2
SGF2 / 8 SGR3 / 5 SGR1 / 5 SGR3 / 6 SGR2 / 5 SGR2 / 6 SGR1 / 6 SGR3 / 7 SGR1 / 7 SGR3 / 8 SGR2 / 7 SGR2 / 8 SGR1 / 8
RESET+ PROGRAM
SIGNAL 1
(AR3)
SS3
(AR1)
SGB / 7
SIGNAL 2
Io>
to>, ko
Io
SGB / 3
TS2
TRIP
A
Output signals
Io>>
to>>
1
TRIP RESET
SIGNAL DIAGRAM
SPCJ 4D29
SPTU ___R1
Very inverse
SGR
TRIP
Normal inverse
Main set
Default programming
RXIDG characteristic
Long-term inverse
Extremely inverse
RI characteristic
Not in use
Yes
SPCJ 4D29
Operation characteristic 0 1 0 1 of the low-set overcurrent 0 0 1 1 stage (I>) 0 0 0 0 Circuit breaker failure protection selected Energizing will double the I>> setting Operation characteristic 0 1 0 1 of the low-set earth-fault 0 0 1 1 stage (Io>) 0 0 0 0
0 0 1
1 0 1
0 1 1
1 1 1 1 1 0 0
0 0 1
1 0 1
0 1 1
1 1 1
0 0 0 0 0 0 0 0
Setting
No
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
Main set
SGR
TRIP
Default programming
Yes
SPCJ 4D29
Manual resetting of I> start indication Manual resetting of I>> start indication Manual resetting of Io> start indication Manual resetting of Io>> start indication I>> stage is blocked Io>> stage is blocked I>> start signal to autoreclose output AR1 Io> start signal to autoreclose output AR2 Io>> start signal autoreclose output AR3
1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Setting
No
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
Main set
SGR
TRIP
Default programming
Yes
SGB
1 2 3 4 5 6 7 8
BS input = I> stage blocking BS input = I>> stage blocking BS input = Io> stage blocking BS input = Io>> stage blocking BS input or command V150 activates the second setting Overcurrent unit latches the relay A (signal TS2) Earth-fault unit latches the relay A (signal TS2) BS input resets latched output relay and recorded values
1 1 1 1 1 1 1 1
No
Second set
SPCJ 4D29
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Setting
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
Main set
SGB SGR
TRIP
Default programming
Yes
SPCJ 4D29
I> start signal routed to relay D (signal SS1) I> start signal routed to relay A (signal TS2) I>> start signal routed to relay D (signal SS1) I>> start signal routed to relay A (signal TS2) Io> start signal routed to relay D (signal SS1) Io> start signal routed to relay A (signal TS2) Io>> start signal routed to relay D (signal SS1) Io>> start signal routed to relay A (signal TS2)
1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0
1 1 0 1 0 1 0 1
Setting
No
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
Main set
SGB SGR
TRIP
Default programming
Yes
SPCJ 4D29
I> operate signal routed to relay C (signal SS2) I> operate signal routed to relay B (signal SS3) I>> operate signal routed to relay C (signal SS2) I>> operate signal routed to relay B (signal SS3) Io> operate signal routed to relay C (signal SS2) Io> operate signal routed to relay B (signal SS3) Io>> operate signal routed to relay C (signal SS2) Io>> operate signal routed to relay B (signal SS3)
1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0
1 0 1 0 0 1 0 1
Setting
No
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
Main set
SGB SGR
TRIP
Default programming
Yes
SPCJ 4D29
I> operate signal routed to relay E (signal TS1) I> operate signal routed to relay E (signal TS1) I>> operate signal routed to relay E (signal TS1) I>> operate signal routed to relay E (signal TS1) Io> operate signal routed to relay E (signal TS1) Io> operate signal routed to relay E (signal TS1) Io>> operate signal routed to relay E (signal TS1) Io>> operate signal routed to relay E (signal TS1)
1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Setting
No
x x x x x x x x
1= 2= 4= 8= 16 = 32 = 64 = 128 =
The trip reason and phase conditions can be read on the front of the relay The latest five values of the measured values are stored in the memory The number of starts of all the protection stages available in the memory
1
IL1
IL2
IL3
tI>
nI> nI>>
tI>>
Io
tIo>
nIo> nIo>>
tIo>>
Without self-supervision
With self-supervision
TRIP
Once every 5 ms
U ref
P
P
SIGNAL
Measuringof referencevoltage Checking for correct value Measurementof supply voltages Feedbackfrom output relays Visual inspection
Rx Tx
WD
IRF t
DC/DCconverter
Once a minute
+
<U<
Once a minute
Auto-resetand IRFrelay
2 kV
>100Mohm,500Vdc
2.5 kV / 2.5 kV
4 kV ,5/50 ns 2 kV ,5/50 ns
IP54
162
139 1
136
PANEL CUT-OUT
Semi-flush mounting
a 176 136 96
b 74 114 154
Surface mounting
SPA-ZX 110
7 +0,4 177 0 (4U)
158 115 263 6
101,6
SPA-ZX 106
21,5
101,6
312
292
21,5
10
6 115 98