Core
Priority
p. .
Containment
Core
Containment
Core
Containment
548 fuel assemblies - fuel damaged; RPV pressure: -5.224,psig (JAIF 4/2); RPV level: - 2/5 TAF (IAEA 3/28) Rad levels indicate fuel covered (site team); freshwater injection 30.64gpmvia temp. electric pump (Site Team 4/1) Vessel temp: Btm Head 116.3 0Ct (Site Team 4/1); FW nozzle: 92.6 0Ct (Site Team 4/1) rec. ext. power (NISA). Primary: Japanese report functional. RST suspects failure. D/w pressure: 0.82 psig (JAIF 4/1). 2750 rem/hrJ, (Site Team 3/31) Torus: 100 rem/hr4, (Site Team 4/1) Secondary: - severe damage from H2 explosion. Same plan as U-2 to
4 5
Common SF Pool