0 оценок0% нашли этот документ полезным (0 голосов)
31 просмотров10 страниц
Io. Single line Diagrams and substation layouts are not available in the offer, Please. Submit the station Single line Diagram and layout and the same shall be as per PTS requirement. Ii. If any deviation to the TMSS, TES or TCS standard, the Contractor should get this deviation approved from the specifications department, else / otherwise he should stick to Contract requirements.
Io. Single line Diagrams and substation layouts are not available in the offer, Please. Submit the station Single line Diagram and layout and the same shall be as per PTS requirement. Ii. If any deviation to the TMSS, TES or TCS standard, the Contractor should get this deviation approved from the specifications department, else / otherwise he should stick to Contract requirements.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
Io. Single line Diagrams and substation layouts are not available in the offer, Please. Submit the station Single line Diagram and layout and the same shall be as per PTS requirement. Ii. If any deviation to the TMSS, TES or TCS standard, the Contractor should get this deviation approved from the specifications department, else / otherwise he should stick to Contract requirements.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd