Appendix N-1
7/01/10
SYNCHRONOUS MACHINES
IN THE
PG&E SYSTEM
FOR POWER FLOW, TRANSIENT STABILITY, AND FAULT ANALYSIS
Revision 5/95
Note 1: If you have more than 1 generator that normally operates interconnected with
PG&Es system, please complete a separate data sheet for each generator.
Note 2: This data sheet is for synchronous machines only, not induction machines
Questions?
Please Contact: Manager, Transmission Planning Department
Pacific Gas and Electric Company
P.O. Box 770000 Mail Code Z6A
San Francisco, CA 94177
Transmission Planning Department
(415) 973-7611
Project Name
Unit Number
Log Number
Telephone Number
Appendix N-2
7/01/10
Generator Data
(Final transformer and generator data must be based on actual test results for the particular
transformer and generator. Typical values, calculated values or type testing are acceptable only
if guaranteed in writing by manufacturer to be within +/- 3% accuracy):
1.
Generator Manufacturer
____________
2.
____________
3.
____________
MVA
4.
____________
kV
5.
____________
rpm
6.
Number of Poles
____________
7.
____________
8.
____________
9.
R2
____________
lb-ft2
10.
H:
____________
sec or MJ/MVA
11.
____________
12.
____________
MW
13.
____________
MW
14.
QMAX:
____________
MVAR, lagging
QMIN:
____________
MVAR, leading
____________
psig
15.
16.
Appendix N-3
7/01/10
Xd
____________
pu
18.
Xq
____________
pu
19.
Xd
____________
pu
20.
Xds
____________
pu
21.
Xq
____________
pu
22.
Xqs
____________
pu
23.
Xd
____________
pu
24.
Xds
____________
pu
25.
Xd
____________
pu
26.
Xds
____________
pu
27.
XL
____________
pu
28.
Ra
armature resistance
____________
pu
29.
Tq0
____________
sec
30.
Tq0
____________
sec
31.
Tq0
____________
sec
32.
Tq0
____________
sec
33.
TAGEN
____________
sec
34.
TD
____________
sec
35.
TQ
____________
sec
36.
TD
____________
sec
37.
TQ
____________
sec
38.
X2
______/______
pu
39.
X0
______/______
pu
40.
Please attach a plot of generator terminal voltage versus field current that shows the air gap
line, the open-circuit saturation curve, and the saturation curve at full load and rated power
factor.
Appendix N-4
7/01/10
_________________________________________
B. Rotating DC commentator exciter with continuously acting regulator. The regulator power
source is bus fed from the generator terminal voltage.
___ 1. Westinghouse, PRX-400 regulator
___ 2. Other: Manufacturer _________________________________________
Type:
_________________________________________
_________________________________________
_________________________________________
Appendix N-5
7/01/10
D. Rotating AC Alternator Exciter with non-controlled (diode) rectifiers. The regulator power
source is independent of the generator terminal voltage and current (not bus-fed).
___ 1. Westinghouse Brushless
___ 2. Westinghouse High Initial Response Brushless
___ 3. Other: Manufacturer
Type:
_________________________________________
_________________________________________
E. Rotating AC Alternator Exciter with controlled (thyristor) rectifiers. The regulator power
source is fed from the exciter output voltage.
___ 1. General Elextric Alterrex
___ 2. Other: Manufacturer
Type:
_________________________________________
_________________________________________
_________________________________________
_________________________________________
G. Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from
the generator terminal voltage.
___ 1. Canadian General Electric Silcomatic
___ 2. Westinghouse Canada Solid State Thyristor System
___ 3 Westinghouse Type PS Static System, Type WTA, WHS, WTA-300 regulators
___ 4. ASEA Static System
___ 5. Brown Boveri Static System
___ 6. Rayrolle-Parsons Static System
___ 7. GEC-Eliott Static System
___ 8. Toshiba Static System
___ 9. Mitsubishi Static System
___ 10. General Electric Potential Source Static System
___ 11. Hitachi Static System
___ 12. Other: Manufacturer
Type
_________________________________________
_________________________________________
H. Static Exciter with controlled (thyristor) rectifiers. The regulator power source is bus-fed from
a combination of generator terminal voltage and current (compound-source controlled
rectifiers system.
Pacific Gas and Electric 2010
Appendix N-6
7/01/10
_________________________________________
_________________________________________
I. Please attach a copy of the instruction manual for your excitation system. Make sure that a
block diagram or schematic of the excitation system is included in the manual. The diagram
should show the input, output, and all feedback loops of the excitation system.
J. If the manufacturers data for the excitation system (i.e., time constants, gains, and saturation
curves) are available, please attach these also.
K. What is the excitation system response ratio (ASA)?
L. What is the rated exciter output voltage at full load?
___________ volts
M. What is the maximum exciter output voltage (ceiling voltage)? ___________ volts
N. Other comments regarding the excitation system?
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Appendix N-7
7/01/10
A. Manufacturer:
___ 1. General Electric
___ 2. Westinghouse
___ 3. Toshiba
___ 4. PTI
___ 5. Alsthom
___ 6. Other: ____________________________
B. Is your PSS digital or analog?
________________
C. What is the actuating signal (the input signal) for your PSS?
_____ Bus frequency ______ Shaft slip _____ Accelerating power ______Other
If Other, indicate signal ______________________.
D. Please attach a copy of the instruction manual for your PSS. The manual should include a
block diagram or schematic of the PSS and the correspondence between dial settings and the
time constants or PSS gain.
E. Please attach a copy of the test report for your PSS. This report should contain the dial
settings or time constants and PSS gain. If this report is not available, write the dial settings
below:
1.
T1
_________________
2.
T2
_________________
3.
T3
_________________
4.
T4
_________________
5.
T5
_________________
6.
_________________
7.
Vmax
_________________
8.
Vcut
_________________
9.
Other
________________________________________
_________________
10.
Other
________________________________________
_________________
Who installed your PSS? Please give persons name, company, and location.
Name:
_____________________________________________________
Company: _____________________________________________________
City, State: ____________________________________________________
Phone:
(____)_______________________________________________
Appendix N-8
7/01/10
Appendix N-9
7/01/10
Turbine-Governor Information
Please complete Part A for steam, gas or combined-cycle turbines, Part B for hydro turbines, and
Part C for both.
A.
1.
_____________
2.
_____________
3.
B.
_____________
_____________
Hydro turbines:
1.
_____________
2.
_____________
ft
3.
_____________
ft2
4.
_____________
ft
5.
_____________
6.
_____________
ft3/sec
7.
_____________
kW-hrs/acre-ft
8.
_____________
kW-hrs
Appendix N-10
7/01/10
C.
Complete this section for each machine, independent of the turbine type.
1.
Turbine manufacturer
_________________________________
2.
_____________
MW
3.
_____________
MW
4.
Governor information:
a: Droop setting (speed regulation)
_____________
_____________
_____________
sec
______________________________________________
_____________
sec
______________________________________________
_____________
sec
Appendix N-11
7/01/10
____________
2.
Rated MVA
____________ MVA
3.
_________
_________
_________
_________
_________
_________
4.
_________
_________
_________
_________
_________
_________
kV
kV
kV
kV
kV
kV
5.
6.
7.
____
Wye
____
____
L.V. Side:
____
Wye
Grounded Wye
____
Grounded Wye
Delta
____
Delta
8.
9.
If the transformer test report is not available, please provide the following impedances
using the MVA base given in (2) above):
10.
RT
_________ pu
XT
_________ pu
BT
_________ pu
GT
_________ pu
Appendix N-12
7/01/10
________________________ MVA
2. Please indicate typical peak generation level (in MW). If generator serves plant load on the
same side of the PG&E meter, also indicate typical load level. (Metered power equals peak
generation level minus corresponding plant load).
a. Peak Generation Level
____________________ MW
____________________ MW
3. Please indicate typical planned seasonal and time period variations as percentage of levels
specified in (2) above. Approximate percentages in increments of 25% (0%, 25%, 50%, 75%,
100%).
Summer
April thru October
Time of Day (24-Hr format)
06:00 12:00
Generation
Load
Winter
November thru March
Generation
Load
12:00 18:00
18:00 22:00
22:00 06:00
Appendix N-13
7/01/10
_______ kV
Standard PG&E operation bandwidth is 0.90 lagging (producing vars) to 0.95 leading
(absorbing vars). If actual operation (not capability) is typically narrower than these limits,
please indicate range.
____________
Lagging
(producing
vars)
to
____________
Leading
(bsorbing vars)
_______________
_______________ %
Appendix N-14
7/01/10
C. Governor Control
Do you operate with an automatic turbine speed controller (governor)? _______
If yes, do you operate with it blocked? _____
If yes, what percent of the time?
______ %