Architectural Professional Studies

ARCT 1053
Laura Edwards Unit 15

PART 1:

Introduction
Site & Project Brief Existing & Proposed Building Processes Automated Border Control Clients

.....1 .....2 .....3 .....4 .....5 .....6 Cost Planning Sustainability Modern Methods of Construction Principle Project Drivers & Objectives ....26 ....27 ....28

PART 4: PART 2:

Legal Issues
Planning Legislation

....29

Architectural Management
The Architects Role & Responsibilities Issues to Consider Pre-Contract Procurement Method Project Timeline

.....7 .....8 .....9 ....10 ....11

Rights of Way Conservation Areas & Listed Buildings

....30 ....31 ....33

Property Law Adjoining Owners and Boundaries Party Wall etc Act 1996

Avoiding & Managing Risk in Construction Logistics Site Delivery & Storage ....12 ....13 ....14 ....15 ....16 .....17 ....18

....34

CONTENTS

Planning Applications Process Previous Applications Appeals and Enforcement ....35 ....36 ....37

Access: Neighbouring Buildings Noise & Working Hours Rights to Light

The Architects Legal Duties & Responsibilities ....38

CDM Regulations

Risk Assessment

Issues to Consider Post-Completion Building Management Building Performance Indicators ....21 ....22

PART 5:

Appendix
Appendix A: RIBA Outline Plan of Work 2007 Appendix B: Conservation Area Planning Consent Application Form Appendix C: Party Structure Notice

....39 ....40

....41 ....42 ....43 ....44 ....50

PART 3:

Building Economics
Procurement Method Design Impact

....23 ....24 ....25

Appendix D: 3/6 Metre Notice Appendix E: Planning Application Form Appendix F: Proposed Planning Drawings

Project Briefing: Programme

PART 1: Introduction
This section of the Design Realisation Report details the architects professional responsibilities from the design inception through to completion. Areas of consideration include: Architectural Management, Building Economics, and Legal Issues

PART 1: Introduction

Bangla State

Spitalfields & Banglatown Ward boundary

Site

Site & Project Brief

Spitalfields & Banglatown Ward Aerial View, Source: Google Maps

Spitalfields & Banglatown Ward


Population: 8,383 This area within the London Borough of Tower Hamlets forms part of the council ward of Spitalfields and Banglatown. Its name represents the modern association of the Bangladeshi community with this area and neighbouring Brick Lane. My building design responds to a hypothetical dissection of the Spitalfields and Banglatown ward into two parts one of which is a state in its own right and responds to recent extremist movements calling for the Banglatown and Brick Lane area to be under its own jurisdiction. As such, my design acts as a border control centre and temporarily houses select immigrants who are looking to invest in the new state.

Key Items
The Project Brief
The design and erection of a border control station and high quality residential units with associated facilities and parking, including the creation of new public, landscaped space, within a 6 month timeframe, with minimal disturbance to neighbouring buildings and infrastructure.

Required Project Outcomes


Quick erection of development (social-political responce); Low energy performance building; Efficient automated border control system (elimination of discrimination); Creation of new public Space; High quality design; Low Life-time and Maintenance Costs;

PART 1: Introduction

Existing Site

Existing & Proposed

After Completiton

PART 1: Introduction

Building Processes
3D Diagram Showing Movement Across Borders Within the Building

The public space to the raised ground floor plaza level is punctuated with brightly coloured platforms, which direct the user to their destination, whether that be across the border or into the Inter-State residency. As part of the building project, the existing accesses on either side of the site will be connected via a border control station for the movement of cars. However, as the Bangla-State will be a largely pedestrian area, this will be reserved mainly for VIP use.

Key Automated Border Control Inter-State Access Platforms


Car Border Control Station

PART 1: Introduction

Cultural M

edia

Cu

ltu

ral

od

ific

ati

Automated Border Control

on

To eliminate discrimination within border control systems, and to make the process more efficient in transporting commuters, the border control system utilised within the building will be automated. The system will educate travellors on the State cultural differences on a moving platform after granting them access through a fingerprint scan.

Mo

vin

g W alk

wa

Conceptual Image Showing the Automated Border Control Process

PART 1: Introduction

Fingerprint Recognition System

Reliance Industries Ltd. Profile: The Reliance Group, founded by Dhirubhai H. Ambani (1932-2002), is Indias largest private sector enterprise, with businesses in the energy and materials value chain. Groups annual revenues are in excess of US$ 58 billion. The flagship company, Reliance Industries Limited, is a Fortune Global 500 company and is the largest private sector company in India. Reliance enjoys global leadership in its businesses, being the largest polyester yarn and fibre producer in the world and among the top five to ten producers in the world in major petrochemical products. Project Drivers: This project is a great opportunity for Reliance to show their support to overseas Bengalee Communities and advertise their brand prior to establishing an international market, while promoting sustainable, energy efficient living counteracting bad press against their oil energy products. Objectives: Promote International Relationships Create Positive Press Support Overseas Bengalee Community Promote Investment in Bengalee Community Low Life-time Costs

Clients

Tower Hamlets Council Profile: The London Borough of Tower Hamlets is the Local Authority for the Spitalfields and Banglatown Ward, and will be the officials for border control during and after the Ward division. They will partner with Reliance for this development and will manage the building after completion. Project Drivers: The site is currently owned by Truman Brewery, who have no intention of selling due to their land banking strategies. In the case of this project, Turman Brewery will longlease the land to the clients in return for payment of the revenue created from the new residential units within the Inter-State. Tower Hamlets Council and Indian Company Reliance Industries Ltd. will collaborate into a Partnership for this project. Reliance will provide the majority of the funding and Tower Hamlets Council will manage the building postcompletion. The development will fulfill the need for a user-friendly automated border control system, which seeks to eliminate discrimination and educate users on cultural differences. The project also seeks to treat the border as a transparent, integrated area in order to create a feeling of unity between the two sides without physically being as such. Objectives: Efficient Border Control Quick Erection Low Life-time and Maintenance Costs Build Inter-State Relations Respond to Unitary Development Plan Objectives

PART 1: Introduction

PART 2: Architectural Management

The architects responsibility is to interpret and develop the clients brief during the various stages of the project. First the architect will define the Clients requirements in a Design Brief which will assist the design team in their work. The architect, with assistance from the design team, will then: Identify constraints; Advise the Client in terms of feasibility studies and option appraisals; Arrange site investigations and surveys; Establish the preferred solution; Advise on sustainability; Manage initial health and safety issues; Develop the design; Obtain Client sign off of the design at appropriate stages; Advise on materials selection; Prepare construction drawings and specifications etc.; and Prepare a design which meets all the clients requirements, including budget and timescale.

The Architects Role & Responsibilities

The architect acts as the leader of the rest of the design team and consultants, and co-ordinates their specialist input with their own. At Stage D the architect will prepare and submit the Planning Application in co-ordination with the rest of the Team. During the works on site, the architect will assist the Clerk of Works in monitoring quality on site. At handover the Architect will assist in ensuring that the works are complete and that the clients needs have been met, and will continue their involvement through the Defects Liability period, and the final resolution of defects. After novation (in the case of a Design & Build Contract), the Architect will work for the contractor and will no longer be in the direct employment or control of the client.

PART 2: Architectural Management

Required Project Outcomes


Quick erection of development (social-political responce); Low energy performance building; Efficient automated border control system (elimination of discrimination); Creation of new public Space; High quality design; Low Life-time and Maintenance Costs;

The Project Brief


The design and erection of a border control station and high quality residential units with associated facilities and parking, including the creation of new public, landscaped space, within a 6 month time-frame, with minimal disturbance to neighbouring buildings and infrastructure.

Selection of Consultants, Advisers and Contractors


As the client is not familiar with UK property and planning law, and will not have a working relationship with any particular contractor or consultants, it is the duty of the architect to recommend the consulants, advisors and contractors deemed suitable for the project. The following is a list of the key team members to be appointed for this project: Main Contractor CDM Co-ordinator Employers Agent Quantity Surveyor Civil Engineer Planning Consultant Fire Consultant Landscape Architect English Heritage Secure by Design Consultant BREEAM Consultant

Issues to Consider Pre-Contract

Before a contract is made between all parties concerned, several areas require consideration to enable the architect to select (and revise if appropriate) the right contratual document to enable the project to be procured effectively. The key areas are as follows: 1. Required project outcomes. 2. The project brief. 3. Selection of consultants, advisers and contractors. 4. The construction procurement process.

The Construction Procurement Method


In order to select the most appropriate construction procurement method the client must be made aware of the potential risks involed within each area, including how the differing methods are likely to affect design quality and financial risks to the client. The procurement method must also be determined on the desired level of client involvement.

PART 2: Architectural Management

Land Owner
The site is currently owned by Truman Brewery, who have no intention of selling due to their land banking strategies. In the case of this project, Turman Brewery will long-lease the land to the clients in return for payment of the revenue created from the new residential units within the Inter-State. During the Design & Build contract period the lease on the site will be transferred to the contractor for site security responsibility purposes.

Clients
Tower Hamlets Council and Indian Company Reliance Industries Ltd. will collaborate into a Partnership for this project. Reliance will provide the majority of the funding and Tower Hamlets Council will manage the building post-completion.

The CDM Co-Ordinator will be appointed by the client to oversee health & saftey on the project, inform the client of their responsibilities and report back to HSE

Procurement Method

Architect
The Architect will work up to stage E to achieve planning permission before being novated by the client onto the contractors consultant team via a tripartite agreement between client, consultant and contractor.

CDM Co-ordinator

Employers Agent

The select procurement method is Design and Build. This has been selected on the following merits: 1. 2. 3. It is proven to be one of the fastest methods of procurement. The clients and architect have less liability One client is largely overseas and will not be able to oversee the works effectively, and the other is a Council who, it is assumed will feel more comfortable with less risk involved. High level of financial security to the client as cost is finalised before works commence. Suppliers Engineer
Design & Build Procurement Relationships Diagram

Quantity Surveyor

Contractor
Mace have provided contractor services to many award winning developments, and are very experienced in all building sectors.

Consultants

However, Design & Build is not without its risks: Due to the design element being controlled by the contractor, costs are prioritised and design quality can suffer. To reduce this risk he initial works, up to stage E, will be carried out by the architect and then the architect will be novated by the client onto the sub-contractor team, as it is in the clients interest to maintain design quality.

10

PART 2: Architectural Management

June 2012

September 2012

December 2012

March 2013

June 2013

Planning

Design Review

L3

L1+2

Project Timeline: RIBA Stages of Work

Project Timeline

Key Due to time constraints within the brief, the project is required to be completed 12 months from inception. As illustrated in the timeline above, the majority of the design and pre-construction work occurs for 5 months before construction and production information is continuously developed alongside the construction works for three months, allowing a speedier process. After practical completion the building is handed over to the client and the building is inspected, users are assisted during the inital occupation period, and the project performance in use is reviewed. For more detailed infomation see Appendix A: RIBA Outline Plan of Work 2007 Appointment of Consultants Preperation Design Pre-Construction Processes Construction Use A B C D E F G Appraisal Design Brief Concept Design Development Technical Design Production Information Tender Documentation Tender Action Mobilisation Construction to Practical Completion Post Practical Completion

H J K L

PART 2: Architectural Management

11

Aerial View of Constructed Glulam Members

Side View of Constructed Glulam Members

Avoiding & Managing Risk In Construction Logistics

During the design process it is important to consider the impacts of the design upon the construction and/or use of the building. One such element of this scheme is the ability to transport and erect the 24 Glulam members, as some of them reach up to 13 meters long and just as wide due to their shape. To overcome issues of transportation the members will be constructed in two parts: One consists of the structural column and the other curves round to form the ground floor lighting strategy, which is suspended from the ceiling. The coloumns will be fitted before the ground floor plate is cast, and the second will be lifted from the ground floor and fitted in place before the fist fix electric works commence. The adjacent image shows how the members can now be easily transported to site using this method.
Glulam Transportation Method

12

PART 2: Architectural Management

Avoiding & Managing Risk In Construction Site Delivery & Storage


There are two access points to the site: One off Osborn Street to the East, and the other off Gunthorpe Street to the West. Gunthorpe Street, however, is only a small road with a dead end, therefore Osborn Street will be the primary access for deliveries. During Phase 1 of the project, the intention is that vehicles will enter Osborn Street from Whitechapel High Street, and reverse onto the site via the existing access before off-loading its contents into the storage area shown on the diagram. Deliveries will need to be taken outside of office hours so that the neighbouring commercial buildings accesses are not affected, and traffic should be low. A Highways officer will need to determine whether this is a suitable arrangement before work commences. During Phase 2 a permit will be required for the delivery vehicles to park on Osborn Street, as this is when landscaping will be carried out. The contractor will also need to arrange delieveries of materials in such a way that the need for storage is reduced.
3D Image Showing Party Wall to No. 27 Osborn Street (NTS)

Key Site Boundary Storage Area


Site Offices

Delivery Vehicle Movement

PART 2: Architectural Management

13

Avoiding & Managing Risk In Construction Access: Neighbouring Buildings


3D Image Showing Possible Access Areas to Neighbouring Buildings (NTS)

The neighbouring buildings to the South of the Site are a mixture of commercial and public buildings, which are likely to require rear access for deliveries and fire escape routes. As the proposed development consists of both building and landscaping works, the two will have to be phased so that the hoarding can be in a position to enable access to the necessary areas during the building works, and then dismantled when the building is secure to allow landscaping and infrastructure works to be carried out. It is possible that certain areas of landscaping works will need to be carried out on saturdays when they should have a minimum affect on the neighbouring businesses. In any case that accesss will be affected, consent will need to be sought from the building owners.

Key Site Boundary Possible Access Areas

14

PART 2: Architectural Management

Avoiding & Managing Risk In Construction Noise & Working Hours


Construction Noise Distribution Diagram

Under the Control of Pollution Act 1974 Environmental Protection Act 1990, noise pollution from construction works must be forcasted and controlled wherever possible. Before construction commences a noise survey will be carried out in order to determine the maximum levels enforced during construction works. This will have an effect on how the construction is undertake in certain areas. The contractor will be required to submit documentation to Tower Hamlets Council including: Manufacturers literature relating to noise emissions from plant machinery. A programme of works to be carried out on site and the associated noise levels. A method statement detailing the measures taken to control the noise pollution from plant machinery.

In addition all construction works must be carried out within the Tower Hamlets Local Authority enforced working hours for construction sites: Monday - Friday: Saturday: 0800 - 1800 0800 1300

Work is not permitted on Sundays or Bank Holidays.

PART 2: Architectural Management

15

Shadows at 21st June, 05:00 PM

Avoiding & Managing Risk In Construction Rights to Light


Common law states that all building owners have a legal right to maintain levels of daylight from windows within their building. Any new development must not adversely affect the levels of daylight to any neighbouring buildign by more than 20 percent. Although Rights of Light are not within planning legislation, impacts of the proposed development on daylight and sunlight levels will be taken into consideration during the planning process. It is likely that a Daylight/Sunlight Study will be required for the project. The exisitng building that will be most adveresly affected in terms of sunlight is the EDF Energy substation at No. 27 Osborn Street, which is located along the North boundary of the site. There are currently several windows along this South elevation. However, there is approved planning consent for this building, which includes the removal of these openings (see drawings opposite).
EDF Energy Sub-station South Elevation Drawings, Adrian Salt and Pang Ltd.

16

PART 2: Architectural Management

CLIENT Check competence and resources of all appointees Ensure there are suitable management arrangements for the project welfare facilities Allow sufficient time and resources for all stages Provide pre-construction information to designers and contractors Appoint CDM co-ordinator* Appoint principal contractor* Make sure that the construction phase does not start unless there are suitable welfare facilities and a construction phase plan is in place. Provide information relating to the health and safety file to the CDM co-ordinator Retain and provide access to the health and safety file

CDM CO-ORDINATOR Advise and assist the client with his/her duties Notify HSE co-ordinate health and safety aspects of design work and co-operate with others involved with the project Facilitate good communication between client, designers and contractors Liaise with principal contractor regarding ongoing design Identify, collect and pass on pre-construction information Prepare/update health and safety file

DESIGNER Eliminate hazards and reduce risks during design Provide information about remaining risks Check client is aware of duties and CDM co-ordinator has been appointed Provide any information needed for the health and safety file

PRINCIPAL CONTRACTOR Plan, manage and monitor construction phase in liaison with contractor Prepare, develop and implement a written plan and site rules (Initial plan completed before the construction phase begins) Give contractors relevant parts of the plan Make sure suitable welfare facilities are provided from the start and maintained throughout the construction phase Check competence of all appointees Ensure all workers have site inductions and any further information and training needed for the work Consult with the workers Liaise with CDM co-ordinator regarding ongoing design Secure the site

CONTRACTOR Plan, manage and monitor own work and that of workers Check competence of all their appointees and workers Train own employees Provide information to their workers Comply with the specific requirements in Part 4 of the Regulations Ensure there are adequate welfare facilities for their workers Check client is aware of duties and a CDM co-ordinator has been appointed and HSE notified before starting work Co-operate with principal contractor in planning and managing work, including reasonable directions and site rules Provide details to the principal contractor of any contractor whom he engages in connection with carrying out the work Provide any information needed for the health and safety file Inform principal contractor of problems with the plan Inform principal contractor of reportable accidents, diseases and dangerous occurrences

CDM Regulations

As the construction will take longer than 30 days, the project will be notifiable to the Health and Safety Executive (HSE). Therefore the client will need to employ a Construction (Design and Mangement) (CDM) Co-ordinator who will advise the client on their health and safety obligations and oversee constructon works. The CDM Coordinator will report to HSE regularly. The adjacent table details the key roles and duties of each profession.

Source: Health and Safety Executive http://www.hse.gov.uk/construction/cdm/ responsibilities.htm

PART 2: Architectural Management

17

JOB TITLE: 19-25 Osborn Street, Tower Hamlets


Construction (Design & Management) Regulations 2007 HS2-Hazard Identification & Risk Assessment Ref. Item Type of Hazard (1) Population (2) Risk Assessment Likelihood (3) Severity (4) Score (5) Comments, Actions:

Site clearance & excavation

1,3,4,9, 10,11 & 14

C, V

A soil investigation should be carried out to find out if there is any contamination. If there is isolation of work areas necessary and suitable staging to be agreed. Method statement to be provided by specialist sub-contractor and approved prior to commencement on site. To reduce the amount of excavated soil to be removed from the site, some will be reused in the construction of the raised ground floor plaza level to either end of the building. Care should be taken to make sure all other existing materials, foundations, etc. are completely removed. Special consideration should be given to the existing foundations of neighbouring properties, which are in very close adjacency to site. Suitable scaffolding and heavy machinery to be provided in prevention of falling onto all surrounding roads and neighbouring properties. Osborn Street is a public road therefore care should be taken working on and around this road and public pavement in line with Tower Hamlets Code of Construction Practice. In particular, sufficient headroom (usually 2.5m) should be provided from the pavement and a width of at least 1.25m between pavement structures and the scaffolding above to prevent objects falling onto the highway. The adjacent EDF Energy Substation is in close proximity to the proposed scheme. Party wall agreement will be required. All buildings on site are to be demolished. An inspection of the existing buildings should be carried out before work commences to identify any hazardous substances, such as asbestos. Any hazardous materials will require removal by a specialist. Disturbance to neighbouring buildings and residences to be kept at minimum. All hazards and risks to be identified in association with the contractor. Method statement to be provided by contractor in association with the Structural Engineer and approved prior to commencement.

CDM Regulations Risk Assessment

Neighbouring properties and public highways

1, 2, 3, 4, 5, 9

C, V, P

Before work commences on site we must consider several issues relating to the construction and use of the building in order to reduce possible risks. Working alongside other core consultants through a central co-ordinator, risk can be managed effectively, identified early and dealt with by the most suitable consultant in the team. The adjacent table identifies potential Health and Safety risks and ways to reduce them. NB: A legend to the various codes within the table can be found on page 19.

Demolition work

1, 3, 4, 5, 6, 9, 14, 15

C, V

Foundations

2,4,9

18

PART 2: Architectural Management

Ref. Ref.

Item Item

Type of Hazard (1) Type of Hazard (1)

Population (2) Population (2)

Risk Assessment Risk Assessment Likelihood Severity (3) (4) Likelihood (3) M Severity (4) L Score (5) Score (5) 2

Comments, Actions: Comments, Actions:

5 5

External Walls External Walls

1,2,3,4, 9 1,2,3,4, 9

C,V,P C,V,P

6 7 6 7

Floors Roof Floors Roof

1,2,3,5, 9 1,3,9 1,2,3,5, 9 1,3,9

C C C C

M M M M

L H L H

1 6 1 6

8 8

Working at height Working at height

1,2,3,9 1,2,3,9

C C

L L

H H

3 3

9 9

External works - hard and soft landscaping External works - hard and soft landscaping

1,4,9 1,4,9

C C

L L

M M

2 2

Suitable scaffolding and access for operatives and materials to be provided. Method statement to be provided by contractor, and approved prior to Suitable scaffolding and access for operatives and commencement. materials to be provided. Method statement to be provided by contractor, and approved prior to Consideration should be given to the different materials commencement. and different construction methods between each floor, which will be employed at different areas of the Consideration should be given to the different materials building. and different construction methods between each floor, which will be employed at different areas of the Extra protection, safety measures maybe required building. when working next to Osborn Street. Method statement to bemeasuresby specialist subExtra protection, safety provided maybe required contractor andnext to Osborn Street. when working approved prior to commencement Suitablestatement toand provided by specialist and Method scaffolding be access for operatives submaterials. and approved prior to produced by contractor Method statement to commencement contractor, and approved prior to commencement. Suitable scaffolding and access for operatives and materials. Method statement to produced by Allowances should be made on site as to extra space contractor, and approved prior to commencement. required at ground level by specialist sub-contractors during construction period. Roof manufacturer to Allowances should be made on site as to extra space advise. required at ground level by specialist sub-contractors during construction period. Roof manufacturer to Post-construction maintenance safety features for advise. cleaning and repair to be fitted during construction period. Manufacturer to advise. Post-construction maintenance safety features for cleaning and repair to be fitted during construction To minimise maintenance rodding access points to rain period. Manufacturer to advise. water pipes and weir overflows to gutters should be considered. Mansafe system maybe required to nonTo minimise maintenance rodding access points to rain terraced roof areas for roof and PV panel maintenance. water pipes and weir overflows to gutters should be considered. Mansafe system maybe required to nonSpecial consideration should be given to protection of terraced roof areas for roof and PV panel maintenance. persons from falling, after completion of works. All railings and parapet walls to be agreed with BC Officer, Special consideration should be given to protection of including balustrades to podium. persons from falling, after completion of works. All Contractor parapet provision agreed with BC railings andto ensurewalls to beof adequate and Officer, suitable safety rails etc. podium. including balustrades to to all work areas above ground level. Isolation of work area necessary, and suitable Contractor to ensure provision of adequate and access for operatives and materials. Method suitable safety rails etc. to all work areas above ground statement to be produced by contractor, and approved level. Isolation of work area necessary, and suitable prior to commencement. access for operatives and materials. Method Method statement to be provided by specialist substatement to be produced by contractor, and approved contractor, and approved prior to commencement. prior to commencement.

Method statement to be provided by specialist subAdditional safety requirements for working at high level, contractor, and approved prior to commencement. podium & terraces, landscaping. Additional safety requirements for working at high level, podium & terraces, landscaping.

PART 2: Architectural Management

19

Ref.

Item

Type of Hazard (1)

Population (2)

Risk Assessment Likelihood (3) Severity (4) Score (5)

Comments, Actions:

Ref. 10

Item Windows (cleaning)

Type of 1 Hazard (1)

Population P (2)

Risk Assessment L H Likelihood (3) Severity (4)

3
Score (5)

Comments, Actions:

All windows first floor and above capable of being cleaned from the inside, or from balconies.

10

Windows (cleaning)

11

Safe access for maintenance

C,V

11

Safe access for maintenance

C,V

All windows will be operated from the inside. Opening angle of windows will be restricted to prevent occupants from falling, or access to non-terraced roof areas. Tilt & turn or easy clean windows to be All windows first floor and above capable of being considered. cleaned from the inside, or from balconies. Separate method statement to be provided for the All windows will windows in common areas, windows to maintenance of be operated from the inside. Opening angle of windows willand restricted to openings. be utilised as AOVs be glass block prevent occupants from falling, or access to non-terraced roof areas. Tilt & turn or easy clean windows to be All accessible considered. external areas above the height of 2 metres will be enclosed with parapet wall or railings. Separate system to be considered provided for the roof Mansafe method statement to be for non-terraced maintenance of windows in common areas, windows to areas. be utilised as AOVs and glass block openings. Roof maintenance to be carried out by an experienced contractor and a layman would not be permitted access All accessible external areas above the height of 2 non-terraced to roof top areas. Appropriate anchors metres will to enclosed with parapet wall or design and fixings be be incorporated at the detailedrailings. Mansafe stage. system to be considered for non-terraced roof areas. Careful consideration to be given to the installation and Roof maintenance to Panels. maintenance of Solar be carried out by an experienced contractor and a layman would not be permitted access All railings and enclosures to terraces and podium to non-terraced to roof top areas. Appropriate anchors be approved by BC Officer. at the detailed design and fixings to be incorporated stage. Careful consideration to be given to the installation and maintenance of Solar Panels. All railings and enclosures to terraces and podium to be approved by BC Officer.

20

PART 2: Architectural Management

(1) Identify Hazard from the following list or write in other: 1. Falling of personnel (>2m) 2. Falling of personnel (<2m) 3. Struck by falling/moving objects 4. Struck by vehicle 5. Contact with moving machinery 6. Entrapment (by collapse/overturn) (1) Identify Hazard from the following list or write in other: 7. Fire/Explosion 1. Asphyxiation/Drowning 8. Falling of personnel (>2m) 2. Musculoskeletal (handling/lifting/carrying) 9. Falling of personnel (<2m) 3. Respiratory (dust/asbestos/etc) 10.Struck by falling/moving objects 4. Poisoning/radiation 11.Struck by vehicle 5. Hearing damage 12.Contact with moving machinery 6. Vision damage 13.Entrapment (by collapse/overturn) 7. Skin contact 14.Fire/Explosion 8. Electric Shock 15.Asphyxiation/Drowning 9. Musculoskeletal (handling/lifting/carrying) 10. Respiratory (dust/asbestos/etc) 11. Poisoning/radiation 12. Hearing damage 13. Vision damage 14. Skin contact 15. Electric Shock

(2) Population C= contractors V= visitors P= public (3) Likelihood: Low: very seldom or never; Medium: reasonably likely (2) Population near certain High: certain or C= contractors V= visitors P= public (3) Likelihood: Low: very seldom or never; Medium: reasonably likely High: certain or near certain

(4) Severity Low: minor injury or illness; Medium: Injury or illness causing; High: fatal or major illness/injury causing long (4) Severity term disability Low: minor injury or illness; Medium: Injury or illness causing; High: fatal or major illness/injury causing long term disability

(5) Score as follows: Likelihood Severity 1 2 3 Low Med High 3 2 1 High 3 6 9 (5) Score 4 Med 2 as follows: 6 Likelihood 2 Severity Low 1 3 1 2 3 Low Med High 3 High 3 2 Med 2 1 Low 1 6 4 2 9 6 3

Issues to Consider Post-Completion Building Management

After practical completion of the building works the building will be handed over to the client. A tthis stage the client will be assisted in the various management aspects including: Automated border control system Electrical systems Plant management Material and PV panel maintenance Intelligent building systems ie. climate control system

Perspective Section Through Proposed Building

The residential Inter-State will be managed by an indipendant company.

PART 2: Architectural Management

21

Issues to Consider Post-Completion Building Performance Indicators

After the building has been handed over to the client and is being used, key performance indicators will be used to assess the success of the project. These may include the following: Amount of renewable energy created by PV panels; Thermal performance of the building (ie. temperature levels measured at regular intervals throughout the day); User feedback; Border control effficiency (ie. waiting time in line and number of issues); and Daylight levels within different areas of the building. The structural integrity of the building (ie. movement)

Internal View of Public Plaza

22

PART 2: Architectural Management

PART 3: Building Economics

23

Land Owner

Clients

Procurement Method Design Impact

Architect CDM Co-ordinator

Employers Agent

Design & Build


The Design & Build procurement method allows cost certainty for the client and transfers risk to the contractor. The architect will create a design package including all stage D drawings, room data sheets and an accommodation schedule to allow for the pricing of the works by the contractor in what is known as a Single Stage Tender. The contractor then prices the work as a fixed fee to the client, within which are all anticipated sub-contractor and consultants fees. For the client to maintain a degree of control over the design quality is it advisable to novate the architect onto the contractors consultants so that construction drawings can be performed by the architect. It is also recommended for the Quantity Surveyor to work alongside the contractor and architect to work out any cost issues in such a way that design quality is not adversely affected. Quantity Surveyor

Contractor

Consultants Suppliers Engineer


Design & Build Procurement Relationships Diagram

24

Secon

d Floo

First

Floo

Massing Model

Rai

sed

Gro

Project Briefing: Programme

und

Flo

or

Amenity Spaces (660m2) The two ares of amenity space are located on the ground floor plaza level, which will be finised in hard landscaping, and on the roof terrace, which serves the residential units.

Automated Border Control (40m2) Situated on the basement floor, these will be self-contained, automated spaces with entrances and exits at either end via a platform to the ground floor level. The areas will include a specialised electronic system, which will need to be designed by an M&E Consultant.

Inter-State Accommodation (500m2) The two levels of residential units are constructed from cross-laminated timber panels, costs are reduced in construction (see pg. 27).

Low

er G

rou

nd F

loor

State Offices (570m2) Located on the lower ground floor in a fully insulated space, this area of the building is constructed from in-situ concrete and glulam columns.

Service/Plant Rooms (550m2) As the building will be managed by two seperate parties on either side of the border, the plant room is split into two and operated seperately. This will have a significant impact on costs as two sets of machinery will be required. However, it is unavoidable.

Stair Cores Due to the divided nature of the site across the border, four stair cores are required, two of which will need lifts. However, they are constructed of in-situ concrete and form the main element of the primary structure, reducing additional structural costs.

Ba

sem

ent

Exploded Massing Model

PART 3: Building Economics

25

Income generated from PV Panels


Residential Area: 483m2 Average Electricity: 483m2 x 0.082 kWh = 40 kWh Average Space heating: Office:
View of PV Panels

83m2 x 0.219 kWh = 106 kWh Average Cooking:

483m2 x 0.019 kWh = 9 kWh 811m2

Average Power : 572m2 x 233kWh=

133,276kWh

Total Usage (Residential & Commercial):

40 + 106 + 9 + 133 = 288kWh

Average daily Energy Created by PV Panels: 4.53kWh x 168 m2 = 761 kWh

Cost Planning Sustainability


PV Panels
The 88 Photovoltaic (PV) panels to be installed on the roof of the residential area are proposed to power the majority, if not all, of the building. This will significantly diminish the running costs of the building once completed and earn additional income for the owner. Unused energy is proposed to be fed directly to the neighbouring EDF Energy Sub-Station, which porovides electricity for the whole of the Tower Hamlets Borough. The adjacent figures for residential and commercial energy use are based on calculations of average energy consumpiton in central London as of 2005. However, it is likely that the energy consumption will be less in the proposed building due to sustainable methods of construction within the design.

Surplus Daily Energy: EDF Energy purcase rates:

761 - 335 = 426 kWh 7p x 426 = 29.82 29.82 x 365 = 10.884.30 p/a

7p per kWh

ROCs: 761 x 365 = 277,765 277,765/1000 = 277.77 Mwh 277.77 Mwh x 40 = 11,110.80 p/a

Total Annual Income from PV Panels = 21.995.10

Average cost of PV Panels = 20,000 each 88 x 20,000 = 176,000 Average Energy Cost per kWh = 10p 10p x 288 x 365 = 10,512

Pay back period = 176,000 / (10,512 + 21.995) = 5.4 years

Source: PVGIS European Communities, 2001-2010

26

PART 3: Building Economics

Cost Planning Modern Methods of Construction

Typical One-Bedroomed flat External View

Cross-Laminated Timber
This method of construction significantly reduces construction time and material waste, both of which have a direct impact on the build cost. As the cross-laminated timber panels are constructed off-site from the architects drawings, which are prepared in consultation with the supplier, quality control is high and the inital construction of the panels is not affected by weather conditions, or impeeded by other factors on site. After the panels are transported to site, they are craned onto the concrete structure and fixed in place by a dedicated and experienced team. This process has been known to take as little as a week per floor on residential projects such as the Stadthaus apartments in London by Waugh Thistleton Architects. Therefore construction costs will be significantly reduced in terms of labour and crane hire.
Cross-Laminated Timber Wall to Floor Joint

PART 3: Building Economics

27

Principle Project Drivers & Objectives

One of the principle project objectives affecting cost is to create a sustainable building that costs very little to run and maintain. This will be achieved through the selection of low maintenance materials with high thermal mass, renewable energy creation (PV panels), and passive ventilation systems. The programme of the building means that the ground floor and basement will not require climate control, which will significantly reduce the running costs of the building.

Key No climate control Medium Climate Control High Climate Control Cold Air In Warm Air Out Photovoltaic (PV) Panels

Perspective Section Through Proposed Building

28

PART 3: Building Economics

PART 4: Legal Issues

PART 3: Building Economics

29

Planning Legislation Rights of Way


Aerial Image Showing Right of Way and Diversions

Highway...a way over which the public have the right to pass and repass. UK Common Law The Highways Act 1980 sets out the requirements relating to construction work on or near a highway. the key requirements of the act include: Permission by formal agreement from the Highways Authority for any works to highways; Licences are required for permission to place temporary obstructions on the highway; Deposition of mud or other such materials on the high way is prohibited; Surface drainage from a construction site must not be allowed to run across the footway part of a public highway.

In the last phase of the construction, hard landscaping works will be carried out on site which butts up to the highway. In order for these works to be carried out, a small area of the pavement will need to be closed. It is also a possibility that a Section 106 aggreement will require a new pavement to be constructed to deal with the higher footfall levels. The contractor will need to consult with the London Borough of Tower Hamlets at the initial project stages to assess the adverse affects of closing this area of pavement and alternate methods of construction. Licences for this closure or part closure will be required prior to commencement of the works. All diversion will need to be defined by clear signing, and any closed routes blocked off by a continuous barrier.

Key Site Boundary Area of Pavement to be Closed Pedestrian Diversion

30

PART 4: Legal Issues

Toynbee Hall

Site Whitechapel Art Gallery New Whitechapel Art Gallery (formerly Whitechapel Library) 85 Whitechapel High Street & Angel Alley
Extract Plan 1:2000

Planning Legislation Conservation Areas & Listed Buildings


The site resides in the Brick Lane & Fourier Street Conservation Area of Tower Hamlets. Planning legislation states that consent is required for the demolish of any building within a Conservation Area that is more than 115m3 in volume or a gate or fence that is more than 1m high where abutting a highway, or more than 2m elsewhere. Conservation Area Planning Consent Application Form is attached as Appendix B The proposal will need to be in accordance with Planning Policy Statement 5: Planning for the Historic Environment. Discussions with a Planning Consultant would benefit the case and will give direction to enable a befitting development proposal. However, in the case of this project, it will be in Tower Hamlet Councils best interest to approve the demolition of the existing, disused buildings on site as they are a fire risk due to vandalism. They will also be keen for the border control to be moved through quickly.

Key
Site Conservation Area

Listed Buildings Grade II Listed Grade II* Listed Brick Lane & Fornier Street: London Borough of Tower Hamlets

PART 4: Legal Issues

31

Planning Legislation Conservation Areas & Listed Buildings

View from Whitechapel High Street West to Listed Buildings

Important Views:
The site is in close proximity to Listed Buildings Whitechapel Gallery and The Passmore Library (listed buildings), shown abjacent in yellow. Therefore its important that the proposed building does not impose on view to these two buildings. The images above show that the proposed building can just be glimpsed from the view West to the listed buildings, and not seen at all from the East view along Whitechapel High Street.

Key
Listed Buildings: Whitechapel Gallery & The Passmore Library

View from Whitechapel High Street East to Listed Buildings

32

PART 4: Legal Issues

STREET

GUNTHORPE

Ho McA use uley

GUNTH

TREET ORPE S 3

Hos

Hou s Nag e pal

lley Angel A

1 to

25
Sta tion

Ele ctric ity S

ub

bS

ta

tory Fac

Hou Bar se tlett


88 to 94

tel
El S u

84b
Art Gallery
Whitechapel
19

Library

to

Gara ge

77

23
17

19 to 23

1 to 7
29

11

13

15

17

27

2 to 10

12 to 20

22

Existing Site plan (NTS)

PH

26

32 to 38

40

42

STREET OLD MONTAGUE

OSBORN STREET

OSBORN STREET

OSBORN STREET

Property Law
Long-Lease
The site is currently owned by Trumans Brewery and will be long-leased to the London Borough of Tower Hamlets (LBTH) for a set period of time which would be around 50 years, or as long as the building is anticipated to exist. This is a contractual agreement between the owner and the lease-holder and can be renewed after the stated period if both parties agree. During the Design and Build contract period the property lease is typically transfered to the contractor, the main reason being to transfer legal responsibilities of security. Meaning that the contractor will be held responsible for any trespassing on site during the construction and consequential injuries. Therefore it is in the interest of the contractor to carry out his duties in terms of repairing any damage to hoarding etc. When the building is handed over to LBTH, the lease will also be transfered. Rather than paying Trumans Brewery ground rent, it is possible that the two parties will agree to a transfer of residential income from the development.
Existing Site 3D Image

PART 4: Legal Issues

33

Adjoining Owners & Boundaries Party Wall etc Act 1996


Key Party Wall 3D Image Showing Party Wall to No. 27 Osborn Street

The proposed building works will involve the construction of a concrete sub-structure against part of a wall belonging to EDF Energy at No. 27 Osborn Street (shown in blue). Under the Party Wall etc. Act 1996 Tower Hamlets Council will need to submit a Party Structure Notice (see appendix C) to EDF Energy at least 2 months before they wish to start the works. If agreed, the agreement is valid for 1 year. In accordance with the Party Wall Act works can be started no earlier than 2 months from the submission of the notice with written consent from the adjoining owner. If EDF Energy does not agree to the works an agreed surveyor will be appointed by Tower Hamlets Council with the agreement of the adjoining owner (otherwise 2 surveyors can be employed to draw the party wall agreement up together).

The agreed surveyor must be an impartial party and consider the implications for both owners. They will draw up a Party Wall Award, which consists of an outline of the works to be carried out, and how and when they will be carried out. The Party Wall Award is final. A Right of Support will also be required between No. 27 Osborn Street and the proposed building. The contractor will have to provide support to the party wall during and after the proposed construction works. This will probably be included in the basement tanking structure, but will require a structural engineer to assess.

If you plan to excavate,or excavate and construct foundations for a new building or structure, within 3 metres of a neighbouring owners building or structure, where that work will go deeper than the neighbours foundations you must inform the adjoining owner or owners by serving a notice
The Party Wall Etc. Act 1996: Explanatory Booklet Communities and Local Government This also includes basement structures which are within 6m of a neighbouring building when taking a 45 degree line from the foundations. However, this does not apply to any of the buildings in the vacinity other than No. 27.

As previously stated, the proposed works include excavation of just over 5m. This will be directly against No. 27 Osborn Street for up to 10m along the Party Wall. The Party Wall etc Act also includes basement structures which are within 6m of a neighbouring building when taking a 45 degree line from the foundations. However, this does not apply to any of the buildings in the vacinity other than No. 27. In addition to the Party Structure Notice, EDF Energy will need to be served with a 3/6 Metre Notice (see appendix D), which must a state the structural intentions of the proposal with regards to supporting the party wall.

34

PART 4: Legal Issues

The adjacent diagram illustrates how the planning process is carried out.

Obtain Pre-Planning Advice from Planning Consultant Submit Planning Application Online or in Paper Format to Local Authority (LA)

Outline Application

Full Application

Submit Application with Correct Fee And Supporting Documents LA Validates Application and Requests any Additional Information

LA Acknowledges Valid Application

Planning Applications Process


An application for Full Planning Permission involves submission of the following information to the Local Planning Authority: Planning Application Form (Attached as appendix E) Conservation Area Demolition Consent Application Form (attached as appendix F) Exisitng Plans and Elevations Proposed Plans and Elevations Design & Access Statement Consevation Area Statement LA Publicises and Consults on Application Application is Considered by Planning Officer or Planning Committee

Permission Granted with Conditions

Application not Decided in 8 Weeks

Permission Refused

Once the planning application is submitted to Tower Hamlets Planning Authority it will be assesed by Planning Officers in line with Tower Hamlets Development Plan. If planning permission is approved, it is likely that conditions will be attached to a development such as this project. This is a method used by the Local Planning Authority to control specific elements of the development to ensure it meets their requirements. The conditions will need to be discharged (mostly through issuing additional information) before the construction is completed.

Change Proposal and Submit New Application

Right of Appeal to the Secretary of State

Start Work Within the Time Limit and Comply with Conditions

Permission Refused

Permission Granted

Permission Granted
Adapted from Planning Portal Application Process Flow Chart Diagram

PART 4: Legal Issues

35

Planning Applications Previous Applications


Existing Site in Context

All previous planning applications for proposals on the site in the last 10 years have been withdrawn by the applicant. This may be due to several reasons, but the most likely cause of application withdrawals is adverse feedback from planning officers and/ or opposition from locals. However it could be to do with new information arising, which results in necessary changes to the proposal, or funding issues. Unfortunately the planning database does not hold any drawings for these applications, therefore an in-depth analysis cannot be carried out with the sole use of the adjacent information.

Decision Date: Planning Reference: Proposal:

25th September 2001 PA/00/00639

29th October 2003 PA/02/01542

7th December 2009 PA/09/01402

2nd March 2011 PA/10/02748

Demolition of main buildings and development of a six storey building facing Osborn Street providing retail, showroom, light industrial and office with flats above.

Use of ground floor and part first floor as entertainment venue including function / performance hall, restaurant and four bars with ancillary offices.

Demolition of all buildings on site and a change of use to a car park.

Demolition of all buildings on site (except the building at 17 Osborn Street) and erection of a brick wall and planting on the east boundary plus a metal palisade fence.

Decision:

Withdrawn

Withdrawn

Withdrawn

Withdrawn

36

PART 4: Legal Issues

Planning Applications Appeals

If a planning application has been refused or taken more than 8 weeks, the applicant can make an appeal against the Local Authority to the Secretary of State within 6 months of the date of decision. Appeals can also be made against conditions attached to an approved planning permission if they are deemed to be unreasonable. In the case of an appeal it is often good practice to revisit the design in light of Planning Officers comments and/or reasons for refusal before making an appeal. Otherwise it is very unlikely that a good case can be made and approved. Most appeals are decided on the basis of written representations, plans and a visit to site by the planning inspector.

There are two ways in which the decision can be made: 1. Public Inquiry A public inquiry is carried out when requested by the Local Authority, the applicant or the Inspectorate and requires the Inspectorates agreement. Witnesses and respresentatives are questioned or cross-examined and anyone involved may use a layer to put their case. For this reason a public enquiry is a lot more expensive than a hearing. 2. Hearings Hearings are less formal, and therefore less expensive than a public inquiry. However, this method is not suitable where there is high public interest in a case.

A decision is then made by the Inspectorate and sent to the applicant and Local Planning Authority. An appeals against the Inspectorates decision must be made within 6 weeks to the High Court if it is deemed that the INspectorate has not followed proper procedures or has exceeded their powers. If this appeal succeeds the case will have to be heard again

PART 4: Legal Issues

37

The Architects Legal Duties & Responsibilities

Honesty, integrity and competency, as well as concern for others and for the environment, are the foundations of the Royal Institutes three principles of professional conduct set out below. All members of the Royal Institute are required to comply. THE THREE PRINCIPLES:

RIBA Members are expected to conduct their practice of architecture in accordance with all relevant legal requirements (such as business, tax, discrimination, disability and employment law), without it being necessary to mention specific legislation in either the Code or guidance notes. A breach of the law, as evidenced by a finding by a recognised court or tribunal, may be considered as evidence against a member, should a complaint about his or her professional conduct be made. RIBA, Explaining an architects services
The following three key areas are legally required for an architect to practice in the UK: 1. All architects are to hold Professional Indemnity Insurance when carrying out architectural works. 2. All architects must practice in accordance with the RIBA Code of Professional Conduct (see opposite). 3. CDM 2007 legislation places legal duties on the architect as a dutyholder of health & safety.

PRINCIPLE 1: INTEGRITY Members shall act with honesty and integrity at all times. PRINCIPLE 2: COPETENCE In the performance of their work Members shall act competently, conscientiously and responsibly. Members must be able to provide the knowledge, the ability and the financial and technical resources appropriate for their work. PRINCIPLE 3: RELATIONSHIPS Members shall respect the relevant rights and interests of others.

38

PART 4: Legal Issues

PART 5: Appendix

39

Outline Plan of Work 2007


The Outline Plan of Work organises the process of managing, and designing building projects and administering building contracts into a number of key Work Stages. The sequence or content of Work Stages may vary or they may overlap to suit the procurement method (see pages 2 and 3). RIBA Work Stages Description of key tasks Identification of clients needs and objectives, business case and possible constraints on development. Preparation of feasibility studies and assessment of options to enable the client to decide whether to proceed. Development of initial statement of requirements into the Design Brief by or on behalf of the client confirming key requirements and constraints. Identification of procurement method, procedures, organisational structure and range of consultants and others to be engaged for the project. Implementation of Design Brief and preparation of additional data. C Concept Preparation of Concept Design including outline proposals for structural and building services systems, outline specifications and preliminary cost plan. Review of procurement route. Design Development of concept design to include structural and building services systems, updated outline specifications and cost plan. Completion of Project Brief. Application for detailed planning permission. E Technical Design F1 Pre-Construction F Production Information F2 G H Tender Documentation Tender Action Preparation of technical design(s) and specifications, sufficient to co-ordinate components and elements of the project and information for statutory standards and construction safety. Preparation of production information in sufficient detail to enable a tender or tenders to be obtained. Application for statutory approvals. Preparation of further information for construction required under the building contract. Preparation and/or collation of tender documentation in sufficient detail to enable a tender or tenders to be obtained for the project. Identification and evaluation of potential contractors and/or specialists for the project. Obtaining and appraising tenders; submission of recommendations to the client. Letting the building contract, appointing the contractor. Construction J Mobilisation Issuing of information to the contractor. Arranging site hand over to the contractor. Construction to Practical Completion L1 L Post Practical Completion Use Administration of the building contract to Practical Completion. Provision to the contractor of further Information as and when reasonably required. Review of information provided by contractors and specialists. Administration of the building contract after Practical Completion and making final inspections. Review of project performance in use.
4 Readiness for Service 3C Investment decision 3A Design Brief and Concept Approval 1 Business justification

Amended November 2008

OGC Gateways

Preparation

Appraisal

Design Brief

2 Procurement strategy

Design Development

Appendix A RIBA Outline Plan of Work 2007

3B Detailed Design Approval

L2 Assisting building user during initial occupation period. L3


5 Benefits evaluation

The activities in italics may be moved to suit project requirements, ie: D Application for detailed planning approval; E Statutory standards and construction safety; F1 Application for statutory approvals; and F2 Further information for construction. G+H Invitation and appraisal of tenders

Royal Institute of British Architects

Page 1 of 3

RIBA 2007

40

Application for conservation area consent for demolition in a conservation area. Planning (Listed Buildings and Conservation Areas) Act 1990
You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply

Publication of applications on planning authority websites


Please note that the information provided on this application form and in supporting documents may be published on the Authoritys website. If you require any further clarification, please contact the Authoritys planning department. Please complete using block capitals and black ink. It is important that you read the accompanying guidance notes as incorrect completion will delay the processing of your application.

1. Applicant Name and Address


Title: Last name: Company (optional): Unit: House name: House number: House suffix: First name:

2. Agent Name and Address


Title: Last name: Company (optional): Unit: House name: Address 1: Address 2: Address 3: Town: County: Country: Postcode: House number: House suffix: First name:

Appendix B Conservation Area Demolition Planning Application Form

Address 1: Address 2: Address 3: Town: County: Country: Postcode:

3. Description of the Proposal


Please describe the proposed works:

$Date:: 2010-09-10 #$ $Revision: 2999 $

41

Party Structure Notice


Party Wall etc Act 1996 Section 3

To: of

(Adjoining Owner)

*I/We of

(Building Owner)

as owner(s) of which adjoins your premises known as HEREBY SERVE YOU WITH NOTICE THAT, IN ACCORDANCE WITH *MY/OUR RIGHTS: under Section 2 (2), and with reference to the *party structure/party fence wall separating the above premises, it is intended to carry out the works detailed below after the expiration of two months from service of this notice.

Appendix C Party Structure Notice

The proposed works are:

It is intended to commence works *as soon as notice has run/on the or earlier by agreement. Under Section 5, if you do not consent to the works within 14 days you are deemed to have dissented and a difference is deemed to have arisen. In such case Section 10 of the Act requires that both parties should concur in the appointment of a surveyor or should each appoint one surveyor and in those circumstances *I/we would appoint of

Signed *Authorised to sign on behalf of

(Date) (Building Owner)

*Delete as appropriate

std\party structure notice

42

Example letter 8 - 3/6 Metre Notice.


To Adjoining Owner [See note 4] Of Adjoining Owner's main address [See note 5] Date [See note 7] Dear [See note 8] The Party Wall etc. Act 1996 Notice of proposed works - excavation and construction. As the owner/s of Building Owner's building [See note 3] which is adjacent to your premises at Adjoining Owner's building [See note 6] I/we Building Owner [See note 1] of Building Owner's main address [See note 2] notify you that in accordance with our rights under Add either [Section 6(1) of the Party Wall etc. Act 1996 that I/we intend to build within 3 metres of your building and to a lower level than the bottom of your foundations by carrying out the building works detailed below.] Or add [Section 6(2) of the Party Wall etc. Act 1996 that I intend to build within 6 metres of your building and to a lower level than the bottom of your foundations (measured by a 45 line) by carrying out the works detailed below.] [Only if applicable add - The enclosed explanatory booklet provides more information about the Act.] [See note 9] The proposed works are: description of the excavation and works [See note 17]

Appendix D 3/6 Metre Notice

The accompanying plans and sections show the site of the proposed building and the excavation depth proposed. [See note 17] I/we do* / do not* propose to underpin or otherwise strengthen in order to safeguard the foundations of your property. [See note 17] I/we intend to start works on date of works [See note 10] [if you want to start within the 1 month notice period add - or on the earlier date of [date] with your written agreement - see note 11] If you are content for the works to go ahead as proposed please complete, sign and return the attached letter [See note 12] within 14 days of receiving this letter. If you do not confirm in writing that you are content for the work to go ahead as proposed we will be 'in dispute' under the Act. In the event of any dispute between us under the Act, would you be willing to agree to the appointment of an 'Agreed Surveyor'? If yes I suggest using Agreed Surveyor's name [See note 13] but would be happy to receive your alternative proposal. If no, please let me know whom you would appoint as your surveyor. Yours sincerely Building Owner's/s'signature/s [See note 14]

43

Application for Planning Permission. Town and Country Planning Act 1990
You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply

Publication of applications on planning authority websites


Please note that the information provided on this application form and in supporting documents may be published on the Authoritys website. If you require any further clarification, please contact the Authoritys planning department. Please complete using block capitals and black ink. It is important that you read the accompanying guidance notes as incorrect completion will delay the processing of your application.

1. Applicant Name and Address


Title: Last name: Company (optional): Unit: House name: Address 1: House number: House suffix: First name:

2. Agent Name and Address


Title: Last name: Company (optional): Unit: House name: Address 1: Address 2: Address 3: Town: County: Country: Postcode: House number: House suffix: First name:

Appendix E Planning Application Form

Address 2: Address 3: Town: County: Country: Postcode:

3. Description of the Proposal


Please describe the proposed development, including any change of use:

Has the building, work or change of use already started? If Yes, please state the date when building, work or use were started (DD/MM/YYYY): Has the building, work or change of use been completed? If Yes, please state the date when the building, work or change of use was completed: (DD/MM/YYYY):

Yes

No (date must be pre-application submission)

Yes

No (date must be pre-application submission)


$Date:: 2010-09-10 #$ $Revision: 2999 $

44

45

46

47

48

49

Euro 1280ltrs

Euro 1280ltrs

Euro 1280ltrs

3 1

Euro 1280 ltrs

Euro 1280ltrs

Osborn Street

Guntho

Appendix F Proposed Planning Drawings

Key

1 2 3

New Road Retained Access Hard Landscaping Site Boundary Proposed Site Plan 1:500

rpe Stre et
White

ch

High apel

Stre

et

50

4 4

1 2 3 2

Key 1 2 3 4 5 6 Lift Stair Core State Transition Passage Media & Robotics Service Room Bangla-State Plant Room Commercial District Plant Room Proposed -1 Floor Plan 1:150

2 1

3 4 4

51

2 1

Key 1 2 3 4 5 6 7 Stair Core Lift Bangla-State Offices Commercial State Offices Female WC Male WC Store Proposed Lower Ground Floor Plan 1:150

1 2

52

Euro 1280ltrs

N
2 8 1 1 8 6

Euro 1280ltrs

Euro 1280ltrs

7
Key 1 2 3 4 5 6 7 8 Stair Core Lift

6 8 1 1

Public Bangla-State Plaza Public Commercial State Plaza Border Control Room Holding Room Inter-State Platform Border-Crossing Platform

Proposed Ground Floor Plan 1:150

53

N
6 5 3 5 5 2
CD

DB

3 4

DB

CD

CD

DB

CD

Key 1 2 3 4 5 6 7 Fire Stair Service Lift 1 Bedroom 2 person Flat Communal Amenity Space Private Amenity Space Refuse Drop Water Storage Tanks

DB

CD

4 3 5 3 5

DB

DB

3 5

CD

A
Proposed First Floor Plan 1:150

54

5
CD

5 2
CD

5
CD

CD

SB

2
Desk
CD

Desk

CD

DB

DB

DB DB

5 2

2
CD

DB

CD

DB

1 5 5

DB

5
DB

3
CD

DB

5
DB

DB

Key 1 2 3 4 5 Stair 1 Bedroom 2 person Flat 2 Bedroom 3 person Flat Communal Amenity Space Private Amenity Space

CD CD

2 5

Desk

CD

Desk

SB

2 5

DB

CD CD

Proposed Second Floor Plan 1:150

55

Position of PV Panels

Proposed Roof Plan 1:150

56

Key Plan 1:1250 2F

Osborn Street
Guntho rpe Stre et

1F

GF
ss
BRITISH COLUMBIA

JAN-082

BEAUTIFUL

LGF

-1F

Proposed Section A-A 1:150

57