ARCT 1053
Laura Edwards Unit 15
PART 1:
Introduction
Site & Project Brief Existing & Proposed Building Processes Automated Border Control Clients
.....1 .....2 .....3 .....4 .....5 .....6 Cost Planning Sustainability Modern Methods of Construction Principle Project Drivers & Objectives ....26 ....27 ....28
PART 4: PART 2:
Legal Issues
Planning Legislation
....29
Architectural Management
The Architects Role & Responsibilities Issues to Consider Pre-Contract Procurement Method Project Timeline
Property Law Adjoining Owners and Boundaries Party Wall etc Act 1996
Avoiding & Managing Risk in Construction Logistics Site Delivery & Storage ....12 ....13 ....14 ....15 ....16 .....17 ....18
....34
CONTENTS
Planning Applications Process Previous Applications Appeals and Enforcement ....35 ....36 ....37
CDM Regulations
Risk Assessment
Issues to Consider Post-Completion Building Management Building Performance Indicators ....21 ....22
PART 5:
Appendix
Appendix A: RIBA Outline Plan of Work 2007 Appendix B: Conservation Area Planning Consent Application Form Appendix C: Party Structure Notice
....39 ....40
PART 3:
Building Economics
Procurement Method Design Impact
Appendix D: 3/6 Metre Notice Appendix E: Planning Application Form Appendix F: Proposed Planning Drawings
PART 1: Introduction
This section of the Design Realisation Report details the architects professional responsibilities from the design inception through to completion. Areas of consideration include: Architectural Management, Building Economics, and Legal Issues
PART 1: Introduction
Bangla State
Site
Key Items
The Project Brief
The design and erection of a border control station and high quality residential units with associated facilities and parking, including the creation of new public, landscaped space, within a 6 month timeframe, with minimal disturbance to neighbouring buildings and infrastructure.
PART 1: Introduction
Existing Site
After Completiton
PART 1: Introduction
Building Processes
3D Diagram Showing Movement Across Borders Within the Building
The public space to the raised ground floor plaza level is punctuated with brightly coloured platforms, which direct the user to their destination, whether that be across the border or into the Inter-State residency. As part of the building project, the existing accesses on either side of the site will be connected via a border control station for the movement of cars. However, as the Bangla-State will be a largely pedestrian area, this will be reserved mainly for VIP use.
PART 1: Introduction
Cultural M
edia
Cu
ltu
ral
od
ific
ati
on
To eliminate discrimination within border control systems, and to make the process more efficient in transporting commuters, the border control system utilised within the building will be automated. The system will educate travellors on the State cultural differences on a moving platform after granting them access through a fingerprint scan.
Mo
vin
g W alk
wa
PART 1: Introduction
Reliance Industries Ltd. Profile: The Reliance Group, founded by Dhirubhai H. Ambani (1932-2002), is Indias largest private sector enterprise, with businesses in the energy and materials value chain. Groups annual revenues are in excess of US$ 58 billion. The flagship company, Reliance Industries Limited, is a Fortune Global 500 company and is the largest private sector company in India. Reliance enjoys global leadership in its businesses, being the largest polyester yarn and fibre producer in the world and among the top five to ten producers in the world in major petrochemical products. Project Drivers: This project is a great opportunity for Reliance to show their support to overseas Bengalee Communities and advertise their brand prior to establishing an international market, while promoting sustainable, energy efficient living counteracting bad press against their oil energy products. Objectives: Promote International Relationships Create Positive Press Support Overseas Bengalee Community Promote Investment in Bengalee Community Low Life-time Costs
Clients
Tower Hamlets Council Profile: The London Borough of Tower Hamlets is the Local Authority for the Spitalfields and Banglatown Ward, and will be the officials for border control during and after the Ward division. They will partner with Reliance for this development and will manage the building after completion. Project Drivers: The site is currently owned by Truman Brewery, who have no intention of selling due to their land banking strategies. In the case of this project, Turman Brewery will longlease the land to the clients in return for payment of the revenue created from the new residential units within the Inter-State. Tower Hamlets Council and Indian Company Reliance Industries Ltd. will collaborate into a Partnership for this project. Reliance will provide the majority of the funding and Tower Hamlets Council will manage the building postcompletion. The development will fulfill the need for a user-friendly automated border control system, which seeks to eliminate discrimination and educate users on cultural differences. The project also seeks to treat the border as a transparent, integrated area in order to create a feeling of unity between the two sides without physically being as such. Objectives: Efficient Border Control Quick Erection Low Life-time and Maintenance Costs Build Inter-State Relations Respond to Unitary Development Plan Objectives
PART 1: Introduction
The architects responsibility is to interpret and develop the clients brief during the various stages of the project. First the architect will define the Clients requirements in a Design Brief which will assist the design team in their work. The architect, with assistance from the design team, will then: Identify constraints; Advise the Client in terms of feasibility studies and option appraisals; Arrange site investigations and surveys; Establish the preferred solution; Advise on sustainability; Manage initial health and safety issues; Develop the design; Obtain Client sign off of the design at appropriate stages; Advise on materials selection; Prepare construction drawings and specifications etc.; and Prepare a design which meets all the clients requirements, including budget and timescale.
The architect acts as the leader of the rest of the design team and consultants, and co-ordinates their specialist input with their own. At Stage D the architect will prepare and submit the Planning Application in co-ordination with the rest of the Team. During the works on site, the architect will assist the Clerk of Works in monitoring quality on site. At handover the Architect will assist in ensuring that the works are complete and that the clients needs have been met, and will continue their involvement through the Defects Liability period, and the final resolution of defects. After novation (in the case of a Design & Build Contract), the Architect will work for the contractor and will no longer be in the direct employment or control of the client.
Before a contract is made between all parties concerned, several areas require consideration to enable the architect to select (and revise if appropriate) the right contratual document to enable the project to be procured effectively. The key areas are as follows: 1. Required project outcomes. 2. The project brief. 3. Selection of consultants, advisers and contractors. 4. The construction procurement process.
Land Owner
The site is currently owned by Truman Brewery, who have no intention of selling due to their land banking strategies. In the case of this project, Turman Brewery will long-lease the land to the clients in return for payment of the revenue created from the new residential units within the Inter-State. During the Design & Build contract period the lease on the site will be transferred to the contractor for site security responsibility purposes.
Clients
Tower Hamlets Council and Indian Company Reliance Industries Ltd. will collaborate into a Partnership for this project. Reliance will provide the majority of the funding and Tower Hamlets Council will manage the building post-completion.
The CDM Co-Ordinator will be appointed by the client to oversee health & saftey on the project, inform the client of their responsibilities and report back to HSE
Procurement Method
Architect
The Architect will work up to stage E to achieve planning permission before being novated by the client onto the contractors consultant team via a tripartite agreement between client, consultant and contractor.
CDM Co-ordinator
Employers Agent
The select procurement method is Design and Build. This has been selected on the following merits: 1. 2. 3. It is proven to be one of the fastest methods of procurement. The clients and architect have less liability One client is largely overseas and will not be able to oversee the works effectively, and the other is a Council who, it is assumed will feel more comfortable with less risk involved. High level of financial security to the client as cost is finalised before works commence. Suppliers Engineer
Design & Build Procurement Relationships Diagram
Quantity Surveyor
Contractor
Mace have provided contractor services to many award winning developments, and are very experienced in all building sectors.
Consultants
However, Design & Build is not without its risks: Due to the design element being controlled by the contractor, costs are prioritised and design quality can suffer. To reduce this risk he initial works, up to stage E, will be carried out by the architect and then the architect will be novated by the client onto the sub-contractor team, as it is in the clients interest to maintain design quality.
10
June 2012
September 2012
December 2012
March 2013
June 2013
Planning
Design Review
L3
L1+2
Project Timeline
Key Due to time constraints within the brief, the project is required to be completed 12 months from inception. As illustrated in the timeline above, the majority of the design and pre-construction work occurs for 5 months before construction and production information is continuously developed alongside the construction works for three months, allowing a speedier process. After practical completion the building is handed over to the client and the building is inspected, users are assisted during the inital occupation period, and the project performance in use is reviewed. For more detailed infomation see Appendix A: RIBA Outline Plan of Work 2007 Appointment of Consultants Preperation Design Pre-Construction Processes Construction Use A B C D E F G Appraisal Design Brief Concept Design Development Technical Design Production Information Tender Documentation Tender Action Mobilisation Construction to Practical Completion Post Practical Completion
H J K L
11
During the design process it is important to consider the impacts of the design upon the construction and/or use of the building. One such element of this scheme is the ability to transport and erect the 24 Glulam members, as some of them reach up to 13 meters long and just as wide due to their shape. To overcome issues of transportation the members will be constructed in two parts: One consists of the structural column and the other curves round to form the ground floor lighting strategy, which is suspended from the ceiling. The coloumns will be fitted before the ground floor plate is cast, and the second will be lifted from the ground floor and fitted in place before the fist fix electric works commence. The adjacent image shows how the members can now be easily transported to site using this method.
Glulam Transportation Method
12
13
The neighbouring buildings to the South of the Site are a mixture of commercial and public buildings, which are likely to require rear access for deliveries and fire escape routes. As the proposed development consists of both building and landscaping works, the two will have to be phased so that the hoarding can be in a position to enable access to the necessary areas during the building works, and then dismantled when the building is secure to allow landscaping and infrastructure works to be carried out. It is possible that certain areas of landscaping works will need to be carried out on saturdays when they should have a minimum affect on the neighbouring businesses. In any case that accesss will be affected, consent will need to be sought from the building owners.
14
Under the Control of Pollution Act 1974 Environmental Protection Act 1990, noise pollution from construction works must be forcasted and controlled wherever possible. Before construction commences a noise survey will be carried out in order to determine the maximum levels enforced during construction works. This will have an effect on how the construction is undertake in certain areas. The contractor will be required to submit documentation to Tower Hamlets Council including: Manufacturers literature relating to noise emissions from plant machinery. A programme of works to be carried out on site and the associated noise levels. A method statement detailing the measures taken to control the noise pollution from plant machinery.
In addition all construction works must be carried out within the Tower Hamlets Local Authority enforced working hours for construction sites: Monday - Friday: Saturday: 0800 - 1800 0800 1300
15
16
CLIENT Check competence and resources of all appointees Ensure there are suitable management arrangements for the project welfare facilities Allow sufficient time and resources for all stages Provide pre-construction information to designers and contractors Appoint CDM co-ordinator* Appoint principal contractor* Make sure that the construction phase does not start unless there are suitable welfare facilities and a construction phase plan is in place. Provide information relating to the health and safety file to the CDM co-ordinator Retain and provide access to the health and safety file
CDM CO-ORDINATOR Advise and assist the client with his/her duties Notify HSE co-ordinate health and safety aspects of design work and co-operate with others involved with the project Facilitate good communication between client, designers and contractors Liaise with principal contractor regarding ongoing design Identify, collect and pass on pre-construction information Prepare/update health and safety file
DESIGNER Eliminate hazards and reduce risks during design Provide information about remaining risks Check client is aware of duties and CDM co-ordinator has been appointed Provide any information needed for the health and safety file
PRINCIPAL CONTRACTOR Plan, manage and monitor construction phase in liaison with contractor Prepare, develop and implement a written plan and site rules (Initial plan completed before the construction phase begins) Give contractors relevant parts of the plan Make sure suitable welfare facilities are provided from the start and maintained throughout the construction phase Check competence of all appointees Ensure all workers have site inductions and any further information and training needed for the work Consult with the workers Liaise with CDM co-ordinator regarding ongoing design Secure the site
CONTRACTOR Plan, manage and monitor own work and that of workers Check competence of all their appointees and workers Train own employees Provide information to their workers Comply with the specific requirements in Part 4 of the Regulations Ensure there are adequate welfare facilities for their workers Check client is aware of duties and a CDM co-ordinator has been appointed and HSE notified before starting work Co-operate with principal contractor in planning and managing work, including reasonable directions and site rules Provide details to the principal contractor of any contractor whom he engages in connection with carrying out the work Provide any information needed for the health and safety file Inform principal contractor of problems with the plan Inform principal contractor of reportable accidents, diseases and dangerous occurrences
CDM Regulations
As the construction will take longer than 30 days, the project will be notifiable to the Health and Safety Executive (HSE). Therefore the client will need to employ a Construction (Design and Mangement) (CDM) Co-ordinator who will advise the client on their health and safety obligations and oversee constructon works. The CDM Coordinator will report to HSE regularly. The adjacent table details the key roles and duties of each profession.
17
C, V
A soil investigation should be carried out to find out if there is any contamination. If there is isolation of work areas necessary and suitable staging to be agreed. Method statement to be provided by specialist sub-contractor and approved prior to commencement on site. To reduce the amount of excavated soil to be removed from the site, some will be reused in the construction of the raised ground floor plaza level to either end of the building. Care should be taken to make sure all other existing materials, foundations, etc. are completely removed. Special consideration should be given to the existing foundations of neighbouring properties, which are in very close adjacency to site. Suitable scaffolding and heavy machinery to be provided in prevention of falling onto all surrounding roads and neighbouring properties. Osborn Street is a public road therefore care should be taken working on and around this road and public pavement in line with Tower Hamlets Code of Construction Practice. In particular, sufficient headroom (usually 2.5m) should be provided from the pavement and a width of at least 1.25m between pavement structures and the scaffolding above to prevent objects falling onto the highway. The adjacent EDF Energy Substation is in close proximity to the proposed scheme. Party wall agreement will be required. All buildings on site are to be demolished. An inspection of the existing buildings should be carried out before work commences to identify any hazardous substances, such as asbestos. Any hazardous materials will require removal by a specialist. Disturbance to neighbouring buildings and residences to be kept at minimum. All hazards and risks to be identified in association with the contractor. Method statement to be provided by contractor in association with the Structural Engineer and approved prior to commencement.
1, 2, 3, 4, 5, 9
C, V, P
Before work commences on site we must consider several issues relating to the construction and use of the building in order to reduce possible risks. Working alongside other core consultants through a central co-ordinator, risk can be managed effectively, identified early and dealt with by the most suitable consultant in the team. The adjacent table identifies potential Health and Safety risks and ways to reduce them. NB: A legend to the various codes within the table can be found on page 19.
Demolition work
1, 3, 4, 5, 6, 9, 14, 15
C, V
Foundations
2,4,9
18
Ref. Ref.
Item Item
Risk Assessment Risk Assessment Likelihood Severity (3) (4) Likelihood (3) M Severity (4) L Score (5) Score (5) 2
5 5
1,2,3,4, 9 1,2,3,4, 9
C,V,P C,V,P
6 7 6 7
C C C C
M M M M
L H L H
1 6 1 6
8 8
1,2,3,9 1,2,3,9
C C
L L
H H
3 3
9 9
External works - hard and soft landscaping External works - hard and soft landscaping
1,4,9 1,4,9
C C
L L
M M
2 2
Suitable scaffolding and access for operatives and materials to be provided. Method statement to be provided by contractor, and approved prior to Suitable scaffolding and access for operatives and commencement. materials to be provided. Method statement to be provided by contractor, and approved prior to Consideration should be given to the different materials commencement. and different construction methods between each floor, which will be employed at different areas of the Consideration should be given to the different materials building. and different construction methods between each floor, which will be employed at different areas of the Extra protection, safety measures maybe required building. when working next to Osborn Street. Method statement to bemeasuresby specialist subExtra protection, safety provided maybe required contractor andnext to Osborn Street. when working approved prior to commencement Suitablestatement toand provided by specialist and Method scaffolding be access for operatives submaterials. and approved prior to produced by contractor Method statement to commencement contractor, and approved prior to commencement. Suitable scaffolding and access for operatives and materials. Method statement to produced by Allowances should be made on site as to extra space contractor, and approved prior to commencement. required at ground level by specialist sub-contractors during construction period. Roof manufacturer to Allowances should be made on site as to extra space advise. required at ground level by specialist sub-contractors during construction period. Roof manufacturer to Post-construction maintenance safety features for advise. cleaning and repair to be fitted during construction period. Manufacturer to advise. Post-construction maintenance safety features for cleaning and repair to be fitted during construction To minimise maintenance rodding access points to rain period. Manufacturer to advise. water pipes and weir overflows to gutters should be considered. Mansafe system maybe required to nonTo minimise maintenance rodding access points to rain terraced roof areas for roof and PV panel maintenance. water pipes and weir overflows to gutters should be considered. Mansafe system maybe required to nonSpecial consideration should be given to protection of terraced roof areas for roof and PV panel maintenance. persons from falling, after completion of works. All railings and parapet walls to be agreed with BC Officer, Special consideration should be given to protection of including balustrades to podium. persons from falling, after completion of works. All Contractor parapet provision agreed with BC railings andto ensurewalls to beof adequate and Officer, suitable safety rails etc. podium. including balustrades to to all work areas above ground level. Isolation of work area necessary, and suitable Contractor to ensure provision of adequate and access for operatives and materials. Method suitable safety rails etc. to all work areas above ground statement to be produced by contractor, and approved level. Isolation of work area necessary, and suitable prior to commencement. access for operatives and materials. Method Method statement to be provided by specialist substatement to be produced by contractor, and approved contractor, and approved prior to commencement. prior to commencement.
Method statement to be provided by specialist subAdditional safety requirements for working at high level, contractor, and approved prior to commencement. podium & terraces, landscaping. Additional safety requirements for working at high level, podium & terraces, landscaping.
19
Ref.
Item
Population (2)
Comments, Actions:
Ref. 10
Population P (2)
3
Score (5)
Comments, Actions:
All windows first floor and above capable of being cleaned from the inside, or from balconies.
10
Windows (cleaning)
11
C,V
11
C,V
All windows will be operated from the inside. Opening angle of windows will be restricted to prevent occupants from falling, or access to non-terraced roof areas. Tilt & turn or easy clean windows to be All windows first floor and above capable of being considered. cleaned from the inside, or from balconies. Separate method statement to be provided for the All windows will windows in common areas, windows to maintenance of be operated from the inside. Opening angle of windows willand restricted to openings. be utilised as AOVs be glass block prevent occupants from falling, or access to non-terraced roof areas. Tilt & turn or easy clean windows to be All accessible considered. external areas above the height of 2 metres will be enclosed with parapet wall or railings. Separate system to be considered provided for the roof Mansafe method statement to be for non-terraced maintenance of windows in common areas, windows to areas. be utilised as AOVs and glass block openings. Roof maintenance to be carried out by an experienced contractor and a layman would not be permitted access All accessible external areas above the height of 2 non-terraced to roof top areas. Appropriate anchors metres will to enclosed with parapet wall or design and fixings be be incorporated at the detailedrailings. Mansafe stage. system to be considered for non-terraced roof areas. Careful consideration to be given to the installation and Roof maintenance to Panels. maintenance of Solar be carried out by an experienced contractor and a layman would not be permitted access All railings and enclosures to terraces and podium to non-terraced to roof top areas. Appropriate anchors be approved by BC Officer. at the detailed design and fixings to be incorporated stage. Careful consideration to be given to the installation and maintenance of Solar Panels. All railings and enclosures to terraces and podium to be approved by BC Officer.
20
(1) Identify Hazard from the following list or write in other: 1. Falling of personnel (>2m) 2. Falling of personnel (<2m) 3. Struck by falling/moving objects 4. Struck by vehicle 5. Contact with moving machinery 6. Entrapment (by collapse/overturn) (1) Identify Hazard from the following list or write in other: 7. Fire/Explosion 1. Asphyxiation/Drowning 8. Falling of personnel (>2m) 2. Musculoskeletal (handling/lifting/carrying) 9. Falling of personnel (<2m) 3. Respiratory (dust/asbestos/etc) 10.Struck by falling/moving objects 4. Poisoning/radiation 11.Struck by vehicle 5. Hearing damage 12.Contact with moving machinery 6. Vision damage 13.Entrapment (by collapse/overturn) 7. Skin contact 14.Fire/Explosion 8. Electric Shock 15.Asphyxiation/Drowning 9. Musculoskeletal (handling/lifting/carrying) 10. Respiratory (dust/asbestos/etc) 11. Poisoning/radiation 12. Hearing damage 13. Vision damage 14. Skin contact 15. Electric Shock
(2) Population C= contractors V= visitors P= public (3) Likelihood: Low: very seldom or never; Medium: reasonably likely (2) Population near certain High: certain or C= contractors V= visitors P= public (3) Likelihood: Low: very seldom or never; Medium: reasonably likely High: certain or near certain
(4) Severity Low: minor injury or illness; Medium: Injury or illness causing; High: fatal or major illness/injury causing long (4) Severity term disability Low: minor injury or illness; Medium: Injury or illness causing; High: fatal or major illness/injury causing long term disability
(5) Score as follows: Likelihood Severity 1 2 3 Low Med High 3 2 1 High 3 6 9 (5) Score 4 Med 2 as follows: 6 Likelihood 2 Severity Low 1 3 1 2 3 Low Med High 3 High 3 2 Med 2 1 Low 1 6 4 2 9 6 3
After practical completion of the building works the building will be handed over to the client. A tthis stage the client will be assisted in the various management aspects including: Automated border control system Electrical systems Plant management Material and PV panel maintenance Intelligent building systems ie. climate control system
21
After the building has been handed over to the client and is being used, key performance indicators will be used to assess the success of the project. These may include the following: Amount of renewable energy created by PV panels; Thermal performance of the building (ie. temperature levels measured at regular intervals throughout the day); User feedback; Border control effficiency (ie. waiting time in line and number of issues); and Daylight levels within different areas of the building. The structural integrity of the building (ie. movement)
22
23
Land Owner
Clients
Employers Agent
Contractor
24
Secon
d Floo
First
Floo
Massing Model
Rai
sed
Gro
und
Flo
or
Amenity Spaces (660m2) The two ares of amenity space are located on the ground floor plaza level, which will be finised in hard landscaping, and on the roof terrace, which serves the residential units.
Automated Border Control (40m2) Situated on the basement floor, these will be self-contained, automated spaces with entrances and exits at either end via a platform to the ground floor level. The areas will include a specialised electronic system, which will need to be designed by an M&E Consultant.
Inter-State Accommodation (500m2) The two levels of residential units are constructed from cross-laminated timber panels, costs are reduced in construction (see pg. 27).
Low
er G
rou
nd F
loor
State Offices (570m2) Located on the lower ground floor in a fully insulated space, this area of the building is constructed from in-situ concrete and glulam columns.
Service/Plant Rooms (550m2) As the building will be managed by two seperate parties on either side of the border, the plant room is split into two and operated seperately. This will have a significant impact on costs as two sets of machinery will be required. However, it is unavoidable.
Stair Cores Due to the divided nature of the site across the border, four stair cores are required, two of which will need lifts. However, they are constructed of in-situ concrete and form the main element of the primary structure, reducing additional structural costs.
Ba
sem
ent
25
133,276kWh
761 - 335 = 426 kWh 7p x 426 = 29.82 29.82 x 365 = 10.884.30 p/a
7p per kWh
ROCs: 761 x 365 = 277,765 277,765/1000 = 277.77 Mwh 277.77 Mwh x 40 = 11,110.80 p/a
Average cost of PV Panels = 20,000 each 88 x 20,000 = 176,000 Average Energy Cost per kWh = 10p 10p x 288 x 365 = 10,512
26
Cross-Laminated Timber
This method of construction significantly reduces construction time and material waste, both of which have a direct impact on the build cost. As the cross-laminated timber panels are constructed off-site from the architects drawings, which are prepared in consultation with the supplier, quality control is high and the inital construction of the panels is not affected by weather conditions, or impeeded by other factors on site. After the panels are transported to site, they are craned onto the concrete structure and fixed in place by a dedicated and experienced team. This process has been known to take as little as a week per floor on residential projects such as the Stadthaus apartments in London by Waugh Thistleton Architects. Therefore construction costs will be significantly reduced in terms of labour and crane hire.
Cross-Laminated Timber Wall to Floor Joint
27
One of the principle project objectives affecting cost is to create a sustainable building that costs very little to run and maintain. This will be achieved through the selection of low maintenance materials with high thermal mass, renewable energy creation (PV panels), and passive ventilation systems. The programme of the building means that the ground floor and basement will not require climate control, which will significantly reduce the running costs of the building.
Key No climate control Medium Climate Control High Climate Control Cold Air In Warm Air Out Photovoltaic (PV) Panels
28
29
Highway...a way over which the public have the right to pass and repass. UK Common Law The Highways Act 1980 sets out the requirements relating to construction work on or near a highway. the key requirements of the act include: Permission by formal agreement from the Highways Authority for any works to highways; Licences are required for permission to place temporary obstructions on the highway; Deposition of mud or other such materials on the high way is prohibited; Surface drainage from a construction site must not be allowed to run across the footway part of a public highway.
In the last phase of the construction, hard landscaping works will be carried out on site which butts up to the highway. In order for these works to be carried out, a small area of the pavement will need to be closed. It is also a possibility that a Section 106 aggreement will require a new pavement to be constructed to deal with the higher footfall levels. The contractor will need to consult with the London Borough of Tower Hamlets at the initial project stages to assess the adverse affects of closing this area of pavement and alternate methods of construction. Licences for this closure or part closure will be required prior to commencement of the works. All diversion will need to be defined by clear signing, and any closed routes blocked off by a continuous barrier.
30
Toynbee Hall
Site Whitechapel Art Gallery New Whitechapel Art Gallery (formerly Whitechapel Library) 85 Whitechapel High Street & Angel Alley
Extract Plan 1:2000
Key
Site Conservation Area
Listed Buildings Grade II Listed Grade II* Listed Brick Lane & Fornier Street: London Borough of Tower Hamlets
31
Important Views:
The site is in close proximity to Listed Buildings Whitechapel Gallery and The Passmore Library (listed buildings), shown abjacent in yellow. Therefore its important that the proposed building does not impose on view to these two buildings. The images above show that the proposed building can just be glimpsed from the view West to the listed buildings, and not seen at all from the East view along Whitechapel High Street.
Key
Listed Buildings: Whitechapel Gallery & The Passmore Library
32
STREET
GUNTHORPE
GUNTH
TREET ORPE S 3
Hos
lley Angel A
1 to
25
Sta tion
ub
bS
ta
tory Fac
tel
El S u
84b
Art Gallery
Whitechapel
19
Library
to
Gara ge
77
23
17
19 to 23
1 to 7
29
11
13
15
17
27
2 to 10
12 to 20
22
PH
26
32 to 38
40
42
OSBORN STREET
OSBORN STREET
OSBORN STREET
Property Law
Long-Lease
The site is currently owned by Trumans Brewery and will be long-leased to the London Borough of Tower Hamlets (LBTH) for a set period of time which would be around 50 years, or as long as the building is anticipated to exist. This is a contractual agreement between the owner and the lease-holder and can be renewed after the stated period if both parties agree. During the Design and Build contract period the property lease is typically transfered to the contractor, the main reason being to transfer legal responsibilities of security. Meaning that the contractor will be held responsible for any trespassing on site during the construction and consequential injuries. Therefore it is in the interest of the contractor to carry out his duties in terms of repairing any damage to hoarding etc. When the building is handed over to LBTH, the lease will also be transfered. Rather than paying Trumans Brewery ground rent, it is possible that the two parties will agree to a transfer of residential income from the development.
Existing Site 3D Image
33
The proposed building works will involve the construction of a concrete sub-structure against part of a wall belonging to EDF Energy at No. 27 Osborn Street (shown in blue). Under the Party Wall etc. Act 1996 Tower Hamlets Council will need to submit a Party Structure Notice (see appendix C) to EDF Energy at least 2 months before they wish to start the works. If agreed, the agreement is valid for 1 year. In accordance with the Party Wall Act works can be started no earlier than 2 months from the submission of the notice with written consent from the adjoining owner. If EDF Energy does not agree to the works an agreed surveyor will be appointed by Tower Hamlets Council with the agreement of the adjoining owner (otherwise 2 surveyors can be employed to draw the party wall agreement up together).
The agreed surveyor must be an impartial party and consider the implications for both owners. They will draw up a Party Wall Award, which consists of an outline of the works to be carried out, and how and when they will be carried out. The Party Wall Award is final. A Right of Support will also be required between No. 27 Osborn Street and the proposed building. The contractor will have to provide support to the party wall during and after the proposed construction works. This will probably be included in the basement tanking structure, but will require a structural engineer to assess.
If you plan to excavate,or excavate and construct foundations for a new building or structure, within 3 metres of a neighbouring owners building or structure, where that work will go deeper than the neighbours foundations you must inform the adjoining owner or owners by serving a notice
The Party Wall Etc. Act 1996: Explanatory Booklet Communities and Local Government This also includes basement structures which are within 6m of a neighbouring building when taking a 45 degree line from the foundations. However, this does not apply to any of the buildings in the vacinity other than No. 27.
As previously stated, the proposed works include excavation of just over 5m. This will be directly against No. 27 Osborn Street for up to 10m along the Party Wall. The Party Wall etc Act also includes basement structures which are within 6m of a neighbouring building when taking a 45 degree line from the foundations. However, this does not apply to any of the buildings in the vacinity other than No. 27. In addition to the Party Structure Notice, EDF Energy will need to be served with a 3/6 Metre Notice (see appendix D), which must a state the structural intentions of the proposal with regards to supporting the party wall.
34
The adjacent diagram illustrates how the planning process is carried out.
Obtain Pre-Planning Advice from Planning Consultant Submit Planning Application Online or in Paper Format to Local Authority (LA)
Outline Application
Full Application
Submit Application with Correct Fee And Supporting Documents LA Validates Application and Requests any Additional Information
Permission Refused
Once the planning application is submitted to Tower Hamlets Planning Authority it will be assesed by Planning Officers in line with Tower Hamlets Development Plan. If planning permission is approved, it is likely that conditions will be attached to a development such as this project. This is a method used by the Local Planning Authority to control specific elements of the development to ensure it meets their requirements. The conditions will need to be discharged (mostly through issuing additional information) before the construction is completed.
Start Work Within the Time Limit and Comply with Conditions
Permission Refused
Permission Granted
Permission Granted
Adapted from Planning Portal Application Process Flow Chart Diagram
35
All previous planning applications for proposals on the site in the last 10 years have been withdrawn by the applicant. This may be due to several reasons, but the most likely cause of application withdrawals is adverse feedback from planning officers and/ or opposition from locals. However it could be to do with new information arising, which results in necessary changes to the proposal, or funding issues. Unfortunately the planning database does not hold any drawings for these applications, therefore an in-depth analysis cannot be carried out with the sole use of the adjacent information.
Demolition of main buildings and development of a six storey building facing Osborn Street providing retail, showroom, light industrial and office with flats above.
Use of ground floor and part first floor as entertainment venue including function / performance hall, restaurant and four bars with ancillary offices.
Demolition of all buildings on site (except the building at 17 Osborn Street) and erection of a brick wall and planting on the east boundary plus a metal palisade fence.
Decision:
Withdrawn
Withdrawn
Withdrawn
Withdrawn
36
If a planning application has been refused or taken more than 8 weeks, the applicant can make an appeal against the Local Authority to the Secretary of State within 6 months of the date of decision. Appeals can also be made against conditions attached to an approved planning permission if they are deemed to be unreasonable. In the case of an appeal it is often good practice to revisit the design in light of Planning Officers comments and/or reasons for refusal before making an appeal. Otherwise it is very unlikely that a good case can be made and approved. Most appeals are decided on the basis of written representations, plans and a visit to site by the planning inspector.
There are two ways in which the decision can be made: 1. Public Inquiry A public inquiry is carried out when requested by the Local Authority, the applicant or the Inspectorate and requires the Inspectorates agreement. Witnesses and respresentatives are questioned or cross-examined and anyone involved may use a layer to put their case. For this reason a public enquiry is a lot more expensive than a hearing. 2. Hearings Hearings are less formal, and therefore less expensive than a public inquiry. However, this method is not suitable where there is high public interest in a case.
A decision is then made by the Inspectorate and sent to the applicant and Local Planning Authority. An appeals against the Inspectorates decision must be made within 6 weeks to the High Court if it is deemed that the INspectorate has not followed proper procedures or has exceeded their powers. If this appeal succeeds the case will have to be heard again
37
Honesty, integrity and competency, as well as concern for others and for the environment, are the foundations of the Royal Institutes three principles of professional conduct set out below. All members of the Royal Institute are required to comply. THE THREE PRINCIPLES:
RIBA Members are expected to conduct their practice of architecture in accordance with all relevant legal requirements (such as business, tax, discrimination, disability and employment law), without it being necessary to mention specific legislation in either the Code or guidance notes. A breach of the law, as evidenced by a finding by a recognised court or tribunal, may be considered as evidence against a member, should a complaint about his or her professional conduct be made. RIBA, Explaining an architects services
The following three key areas are legally required for an architect to practice in the UK: 1. All architects are to hold Professional Indemnity Insurance when carrying out architectural works. 2. All architects must practice in accordance with the RIBA Code of Professional Conduct (see opposite). 3. CDM 2007 legislation places legal duties on the architect as a dutyholder of health & safety.
PRINCIPLE 1: INTEGRITY Members shall act with honesty and integrity at all times. PRINCIPLE 2: COPETENCE In the performance of their work Members shall act competently, conscientiously and responsibly. Members must be able to provide the knowledge, the ability and the financial and technical resources appropriate for their work. PRINCIPLE 3: RELATIONSHIPS Members shall respect the relevant rights and interests of others.
38
PART 5: Appendix
39
OGC Gateways
Preparation
Appraisal
Design Brief
2 Procurement strategy
Design Development
The activities in italics may be moved to suit project requirements, ie: D Application for detailed planning approval; E Statutory standards and construction safety; F1 Application for statutory approvals; and F2 Further information for construction. G+H Invitation and appraisal of tenders
Page 1 of 3
RIBA 2007
40
Application for conservation area consent for demolition in a conservation area. Planning (Listed Buildings and Conservation Areas) Act 1990
You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply
41
To: of
(Adjoining Owner)
*I/We of
(Building Owner)
as owner(s) of which adjoins your premises known as HEREBY SERVE YOU WITH NOTICE THAT, IN ACCORDANCE WITH *MY/OUR RIGHTS: under Section 2 (2), and with reference to the *party structure/party fence wall separating the above premises, it is intended to carry out the works detailed below after the expiration of two months from service of this notice.
It is intended to commence works *as soon as notice has run/on the or earlier by agreement. Under Section 5, if you do not consent to the works within 14 days you are deemed to have dissented and a difference is deemed to have arisen. In such case Section 10 of the Act requires that both parties should concur in the appointment of a surveyor or should each appoint one surveyor and in those circumstances *I/we would appoint of
*Delete as appropriate
42
The accompanying plans and sections show the site of the proposed building and the excavation depth proposed. [See note 17] I/we do* / do not* propose to underpin or otherwise strengthen in order to safeguard the foundations of your property. [See note 17] I/we intend to start works on date of works [See note 10] [if you want to start within the 1 month notice period add - or on the earlier date of [date] with your written agreement - see note 11] If you are content for the works to go ahead as proposed please complete, sign and return the attached letter [See note 12] within 14 days of receiving this letter. If you do not confirm in writing that you are content for the work to go ahead as proposed we will be 'in dispute' under the Act. In the event of any dispute between us under the Act, would you be willing to agree to the appointment of an 'Agreed Surveyor'? If yes I suggest using Agreed Surveyor's name [See note 13] but would be happy to receive your alternative proposal. If no, please let me know whom you would appoint as your surveyor. Yours sincerely Building Owner's/s'signature/s [See note 14]
43
Application for Planning Permission. Town and Country Planning Act 1990
You can complete and submit this form electronically via the Planning Portal by visiting www.planningportal.gov.uk/apply
Has the building, work or change of use already started? If Yes, please state the date when building, work or use were started (DD/MM/YYYY): Has the building, work or change of use been completed? If Yes, please state the date when the building, work or change of use was completed: (DD/MM/YYYY):
Yes
Yes
44
45
46
47
48
49
Euro 1280ltrs
Euro 1280ltrs
Euro 1280ltrs
3 1
Euro 1280ltrs
Osborn Street
Guntho
Key
1 2 3
New Road Retained Access Hard Landscaping Site Boundary Proposed Site Plan 1:500
rpe Stre et
White
ch
High apel
Stre
et
50
4 4
1 2 3 2
Key 1 2 3 4 5 6 Lift Stair Core State Transition Passage Media & Robotics Service Room Bangla-State Plant Room Commercial District Plant Room Proposed -1 Floor Plan 1:150
2 1
3 4 4
51
2 1
Key 1 2 3 4 5 6 7 Stair Core Lift Bangla-State Offices Commercial State Offices Female WC Male WC Store Proposed Lower Ground Floor Plan 1:150
1 2
52
Euro 1280ltrs
N
2 8 1 1 8 6
Euro 1280ltrs
Euro 1280ltrs
7
Key 1 2 3 4 5 6 7 8 Stair Core Lift
6 8 1 1
Public Bangla-State Plaza Public Commercial State Plaza Border Control Room Holding Room Inter-State Platform Border-Crossing Platform
53
N
6 5 3 5 5 2
CD
DB
3 4
DB
CD
CD
DB
CD
Key 1 2 3 4 5 6 7 Fire Stair Service Lift 1 Bedroom 2 person Flat Communal Amenity Space Private Amenity Space Refuse Drop Water Storage Tanks
DB
CD
4 3 5 3 5
DB
DB
3 5
CD
A
Proposed First Floor Plan 1:150
54
5
CD
5 2
CD
5
CD
CD
SB
2
Desk
CD
Desk
CD
DB
DB
DB DB
5 2
2
CD
DB
CD
DB
1 5 5
DB
5
DB
3
CD
DB
5
DB
DB
Key 1 2 3 4 5 Stair 1 Bedroom 2 person Flat 2 Bedroom 3 person Flat Communal Amenity Space Private Amenity Space
CD CD
2 5
Desk
CD
Desk
SB
2 5
DB
CD CD
55
Position of PV Panels
56
Osborn Street
Guntho rpe Stre et
1F
GF
ss
BRITISH COLUMBIA
JAN-082
BEAUTIFUL
LGF
-1F