Академический Документы
Профессиональный Документы
Культура Документы
The Latest Supercritical Coal-Fired Boiler and Integrated Coal Gasification Combined Cycle Technology (IGCC)
Others 1.9%
MHI 45.9%
I 25.1%
H 27.1%
Germany 265 (5) C.I.S. 1,234 (15) Poland 135 (1) Jordan 875 (4) Spain 794 (2) Algeria 2,036 (8) Zambia 90 (6) Egypt Tunisia 1,366 (8) 1,040 (2) Kuwait 16,399 (17) Saudi Arabia 40,380 (90) Tanzania60 (1) Yugoslavia 490 (5) Turkey 4,968 (17) Syria 5,131 (13) Iraq 3,883 (16) China Iran 8,240 (22) 18,402 (45) Pakistan 3,105 (19) Qatar 149 (1) U.A.E. 2,033 (12) Bangladesh 90 (6) Thailand 21,112 (30) India 5,627 (26) Canada 241 (4)
Korea 6,291 (44) U.S.A. 855 (10) Japan 294,082 (1,920) Taiwan 21,185 (69) Bahamas 197 (2) Jamaica 635 (2) Dominica 900 (3) Venezuela 7,071 (14)
Hong Kong 11,864 (22) Macao 190 (2) Philippines 7,735 (16) Brunei 380 (2) Singapore 206 (4) Indonesia 7,061 (34) Australia 1,084 (8)
Colombia 525 (1) Ecuador 884 (5) Brazil 4,551 (30) Peru 276 (6)
Topics
1. Supercritical Coal-Fired Boiler 2. Boiler Design Features 3. Integrated coal Gasification Combined Cycle (IGCC)
600
Temperature ()
500
24.1MPa(g) 16.5MPa(g)
30.0
400
20.0
300
Temperature Pressure
10.0
200
0
1910 1920 1930 1940 1950 1960 1970 1980 1990 2000
Pressure (MPa(g))
24.5MPa(g)
31.0MPa(g)
C o m m e rc ia l O p e ra tio n Y e a r
TARGET
Simple Structure Less Welding point (2)Easy maintenance (3)Easy Construction (4)Middle Load Operation (5)Partial Load Efficiency Sliding Pressure Operation
Mitsubishi Super Critical and Supercritical Coal Fired Boiler with Vertical Water Wall
Chugoku EPCO. Misumi P/S 1,000MW 24.5MPa600/600 (1998) Kansai EPCO. Maizuru P/S 900MW 24.5MPa595/595 (2004) Soma Joint EPCO. Shinchi P/S 1,000MW 24.1MPa538/566 (1995)
Tokyo EPCO. Hirono P/S Kobe steel IPP Kobe P/S 700MW 24.1MPa538/566 (2002) Chubu EPCO. Hekinan P/S 700MW 24.1MPa538/566 (1991) 600MW 24.5MPa600/600 (2004)
Commercial Operation
S/T
FGD
Boiler
(incl. fan, AH,mill) ESP Boiler & SCR
SCR
dry ESP
FGD
(wet scrubber)
Stack
Commercial Operation
Anthracite
90
80
70
60
50
SubBituminous B,C
9000 8000
Lignite
7000 6000
Guarantee
85 150
300
450
600
750
900
0.050
0.025
10 Test result #2 (high molar ratio) (SCR operation: Low NOx Mode) 0 150 300 450 600 750 900
Why IGCC
Higher plant efficiency with Less emission
Net Plant Efficiency(%,LHV) 50 IGCC +5%(abs.)
Conventional Coal Fired Unit 1500C GT
45
40
566
600
600 550
35 1990
Why IGCC
Higher plant efficiency with Less emission
140% 120 100 80 60 40 20 0 Plant Efficiency CO2 Ash Emission
Waste Water
Char
Coal Air
Combustor
(Combustion)
Air
Slag
Water 200t/d gasifier Appearance of Slag
Air-blown Lower auxiliary power needed than O2 blown Dry coal feed Lower heat loss than slurry feed
+5 +4 +3 +2 +1
base
-1
O2
Wet
Highest efficiency
Gasification Agent
O2 Dry
Coal Feed
1000
500
100 50
10 5
GT / ST
Desulfurization
Key Dates 2002.4 Project Start 2004.9 Erection Start 2007.9 - 2010.3 Demonstration Run
Project Scheme
METI
30% subsidy
650MW
MW
600
470MW 48 250MW 45
330 330 230 230
Gross Output
Conclusion
1. We can supply and construct whole coal fired plant and IGCC plant with single responsibility. 2. Reliability and high performance of MHIs latest design for supercritical boiler (600/600C) with vertical water wall have been confirmed. 3. Air blown IGCC achieves higher plant efficiency. MHI will be ready for the design of commercial plant immediately after 250MW demonstration run in 2007.
END
Operational Results - NOx vs. Unburned Carbon 5 Unburned Carbon in Fly Ash (%)
A-PM Burner Low NOx Burner
3 2 1 0 50
200
Fineness of Pulverized Coal - Maizuru #1 Boiler 8 100 mesh / 50 mesh residue (wt%) 6 4 2 0 60 70 80 200 mesh through (wt%) 90 100 100 mesh residue 50 mesh residue
on 2013
2010 2011 2012 2013
Commercial Plant
Output : 480MW GT : M501G Gasifier : 3,000t/day Structure : 1 on 1
Preliminary Design FEED Receive PO Design FEED start Manufacture/ Construction Operation Start
Operation
Oxygen-blown type
Coal Slurry Gasifier
Insulation
Membrane Waterwall
Coal Char Coal
Reductor
Refractory Lining
Radiant Cooler
Coal Feed Gasification Agent Burner Durability Reactor Durability Total Reliability
Dry Air >1 year (expected/lower heat flux) >2 years (expected/water wall furnace) Single Gasifier
Slurry Oxygen 60-90 Days(erosion by Slurry) <2 years(Refractory) Spare Gasifier needed
Ratio (=FC/VM)
2.5
US Eastern coal
Difficult to gasify
2.0
Fuel
1.5
1.0
US PRB coal
0.5 1,100
easy to gasify
1,200 1,300
Remark
O2 blown O2 blown Slurry feed Slurry feed Wet C/U (MDEA) F class 46.3 (measured) 36.5 (measured) 0.21 0.27* 0.01 1996 Wet C/U (MDEA) F class 42.7 (design) 39.7 (design) 0.31 0.22 * 0.03 1995