Академический Документы
Профессиональный Документы
Культура Документы
d= 0.318 m
FOOTING 1
h= d + 75mm = 400mm
LOADS:
Say d= 325mm
Pu = 1317.04 kN
Wide Beam:
l=
A=
= 0.95m
l = l d
Af = 5.26816 m
l = 0.95- d
L = B = 2.3m
Vc Bd = qu B l ; Vc =
Solve for d:
= 649.2 kPa
B = 2.3 m
Punching Shear:
Pu = Vc + Rsoil
Vc = Per x
d;
d=
d = 0.249m
=
Use d = 325mm
Per = 4(0.4) + 4d
REINFORCEMENT:
Per = 1.6 + 4d
Vc = (1.6 + 4d) x
Vc = 2077.44d + 5193.6 d2
-Eq.1
Rsoil = qu Apunch
Apunch = (0.4 + d) (0.4 + d)
= 0.16 + 0.8d + d2
=
@
As =
-1.90575 As2 + 80437.5As 112350000 = 0
As = 3805.465 mm2
N = 19 -16mm
S = 100mm
Eq.2
Another Direction:
-1.90575 As2 + 76477.5As 112350000
1817.76d +30.54
5442.84d2 + 1992.256d 777.164 = 0
=0
d= 0.24 m
h= d + 75mm = 320mm
Say d= 245mm
N = 19 -16mm
Wide Beam:
S = 100mm
l=
= 0.725m
l = l d
FOOTING 2:
l = 0.725- d
Vc Bd = qu B l ; Vc =
= 649.2 kPa
Pu = 807.704 kN
B = 1.8 m
A=
Af = 3.23 m
L = B = 1.8m
d=
Solve for d:
d = 0.20m
Punching Shear:
Pu = Vc + Rsoil
Vc = Per x
Use d = 245mm
d;
REINFORCEMENT:
=
=
Per = 1.4 + 4d
Vc = (1.4 + 4d) x
As =
Vc = 1817.76d + 5193.6 d2
-Eq.1
Rsoil = qu Apunch
Apunch = (0.1225 + 0.7d + d2)
=
Rsoil = 249.29 (0.1225 + 0.7d + d2)
As = 1567.56mm2
N = 15 -16mm
S = 90mm
+24.65
Another Direction:
-1.90575 As2 + 56677.5As 90370000=
0
d= 0.403 m
h= d + 75mm = 500mm
Say d= 425mm
Wide Beam:
l = 0.825- d
N = 16 -16mm
S = 90mm
d=
d = 0.233m
FOOTING 3:
Use d = 245mm
REINFORCEMENT:
Pu = 1024.92 kN
A=
Af = 4 m2
L = B = 2m
Solve for d:
N = 17 -16mm
Punching Shear:
S = 95mm
Vc = Per x
d;
=
=
=
Per = 2 (0.5d+0.175)
Vc 2 (0.5d+0.175)x
Vc = 227.22d + 4079.78 d2
Rsoil = qu Apunch ; qu = 256.23
Apunch =
d
-Eq.1