Novartis Pharma (Pakistan) Ltd.

Jamshoro.
Engineering Projects Project :

Meeting Date: 21/10/2011 Location: Jamshoro Meeting Ref: MM/10/2111

New Solid Block (Phase I & II)


RK MF TA JH AM MJ Present: Aman Hanif Muhammad Ayub Zulfaqar ul Hassan Muhammad Hakeem AH M Ay ZH MH Absent : Abdual Hameed Ahmed Mohiuddin Farooq Ahmed ABH AMY FA

GMP I & II

Present: Rana Kashif Muhammad Faisal Tariq Ali Jawed Hassan Alay Mohsin Muhammad Jameel

Following decisions have been taken:


1. AHUs will be placed directly at their respective position/location, therefore all foundations of pads works MUST be completed as early as possible. 2. Sample of Epoxy floor from M/s Morgan in the supervision of Gulf Const: must be laid by next week. 3. GCL to install Iron Mongri in Mockup room. 4. PEM will provide the access panels, location will be finalized by NPPL with ASCO. QA Labs: 5. ASCO to provide the detail design of QA Lab Mechanical works. 6. Ayub Sb will provide the Details design of QA Labs.
Respon: by.

S.No

Description

Target

Gulf Construction (Pvt) Limited. 1. GCL to install sample of Epoxy flooring in Mockup room by next week. 2. GCL to expedite cabling works at ground floor. 3. GCL to expedite Cameras cabling work 4. GCL to deliver all Switchgear Panels DBs by this month i.e. Oct 2011.
Project: Document: JUMP Phase 1 & II Minutes of Meeting Prepared by: Projects Dept OTC Jamshoro (GMS Pakistan) Page 1 of 2

ZH, AM

27th Oct 2011.

5. GCL will arrange, visit of M/s MABTECH & M/s LIMTON to check the DIS, ACS, CCTV system wiring.

Prime Engineering Methods: 1. PEM to start Pressure testing works by this week. 2. PEM to expedite insulation works. 3. PEM to start insulation + cladding works of Chilled water pipes immediately. 4. PEM to install Filter boxes in Granulation & blister area low pickups. 5. PEM to provide submittals of MCC / EA /VA Fans by by this week. National Engineering Methods: 1. NES to provide piping layout for granulation rooms, as discussed last week with Mr. Ahmed. 2. NES to expedite piping and insulation works.

AH, MH

Immediate

AH, MH

Immediate

Issued by:

Copy to.

Muhammad Faisal Aijaz


Project Engineer Novartis Pharma (Pak) Ltd.

mohammad_faisal.aijaz@novartis.com

Fida Husein & Associates Civil Consultant fha-eng@cyber.net.pk A.Saadat & Co. HVAC/Mechanical Consultant ascohvac@super.net.pk M.Ayub Associates. Electrical Consultant rajpoot@cyber.net.pk Gulf Constructors (Pvt) Limited Civil & Electrical Contractor gulfcont@cyber.net.pk National Engineering Services Mechanical Contractor mail@nationalengg.net Prime Engineering Methods HVAC Contractor pemlinks604@gmail.com

Project: Document:

JUMP Phase 1 & II Minutes of Meeting

Prepared by:

Projects Dept OTC Jamshoro (GMS Pakistan) Page 2 of 2