Вы находитесь на странице: 1из 2

MOHSIN WASEEM

PERSONAL INFORMATION
FATHERS NAME : SIDDIQUE WASEEM DATE OF BIRTH : MAY 18, 1987 CNIC NO : 35201-7608945-7 PASSPORT NO : BC6859451 RELIGION : ISLAM NATIONALITY : PAKISTANI DOMICILE : PUNJAB (GUJRANWALA) MARITAL STATUS : SINGLE LANGUAGES : ENGLISH, URDU & PUNJABI PERMANENT ADDRESS : 2048B CANAL PARK RAHWALI DIST GWA CURRENT ADDRESS : DAVIS ENERGEN 3.2KM TOBA ROAD JHNG LANDLINE PHONE (HOME) : +92 (553) - 829330 CELLULAR PHONE : +92 (333) - 7460500 EMAIL ADDRESS : mohsin_engr@hotmail.com Pakistan Engineering Council Reg: MECH/23605

EDUCATION
Degree/Certificate Institution Passing Year CGPA % age

Bachelors Degree in Mechanical Engineering F. Sc. (H.S.S.C) Matriculation (S.S.C)

University of Engineering and Technology, Lahore, Pakistan. APS&C Gujranwala Cantt. APS&C Gujranwala Cantt.

2010 2006 2004

3.04/4 876 710

76 79 83

COMPUTER LITERACY

EXTRA QUALIFICATION:

Well versed with following software; 1. MS Office (MS Word, MS Excel & MS Power Point) 2. AutoCAD 3. Primavera P3

HVAC (Heat ventilation and air conditioning ) course from Nationa Institute Of Design And Analysis (Lahore) 1. Load calculations for buildings 2. Design of air conditioning systems

-1-

TOTAL WORKING EXPERIENCE (13 months)


1. 13 months in Engineering department at Orient Energy System (Pvt.) Ltd. (as Project Engineer 1st-september-10 to date)

1. Orient Energy System (Pvt.) Ltd. Position: Project Engineer Project Name: Davis Energen (Pvt) Ltd Jhang
Capacity: 13.4 MW IPP (Independent Power Plant)

Responsibilities:
Commissioning Working on Power house Erection& Installation, Testing, and

Gas Engines
Site Execution work. (Mechanical) Preparation of Installation drawings for Mechanical work. Inspection & Supervision of installation team.(According to standard of GE Jenbachers) Planning and scheduling of project Civil construction according to equipment installation Piping and execution of a gas engine.

PROJECT PLANNING AND PROCESS MANAGEMENT


HSE and quality assurance works on SITE. Preparation of project layouts and P & IDs, project drawings Project summary report for inter department coordination. Preparation of project time lines and delivery schedule of material. Sizing, designing and engineering calculation verification of projects. Meetings with contractors to ensure completion of EPC projects within submitted time lines.

PRE ENGINEERED BUILDING ERRECTION


50 Tonn pre engineered building errection of M/s Mammut constructors As per drawings working and modification if required

ELECTRICAL WORKS Laying and termination for the cables of auxiliaries and control panels along with the better understanding of the wiring diagram .Preparation of the Single Line Diagram