Вы находитесь на странице: 1из 56

Customer: Order No.: S.

No Operation Operator

Style Description: Fabric : 1 2

Line No: Total Machines: 3 4

Total Faults Total Samples Checked Fault % Comments:

QC Sign.

Supervisor Sign.

Total Machines: 4

QC: Supervisor: 5 6 7

Date: Target/Shift: 8 Total Faults

Supervisor Sign.

QA Sign.

PM Sign

QAM Sign.

Customer: Order No.: S.No Measuring Point

Style Description: Fabric : Tol +/-

Line No: Colour:

Comments:

QC: Supervisor:

Date: Shift:

QC Sign.

Supervisor Sign.

QA

PM

QAM

Customer: Order No.: S.No. Operator

Style: Fabric: Operation

Colour : Lot No.:

Date: Shift:

Line No. Supervisor:

2nd 3rd 4th 5th 6th 7th 8th Target 1st hour hour hour hour hour hour hour hour

Comments:

Total

Line Supervisor

Production Manager

Line No. Supervisor: Total Remarks

Production Manager

Customer: Order No.: S.No. Operator

Style: Fabric: Operation

Colour : Lot No.:

Date: Shift:

Line No. Supervisor:

2nd 3rd 4th 5th 6th 7th 8th Target 1st hour hour hour hour hour hour hour hour

Comments:

Total

Line Supervisor

Production Manager

Line No. Supervisor: Total Remarks

Production Manager

Customer: Order No.: S.No. Checker Target

Style: Fabric:
1st hr.

DGM TEXTILES - CHECKING PRODUCTION REPORT


Colour : Lot No.: Date: Shift:
2nd hr. 3rd hr. 4th hr. 5th hr. 6th hr. 7th hr. 8th hr.

Line No. Supervisor: Total

Checked

Checked

Checked

Checked

Checked

Checked

Checked

Checked

Passed

Passed

Passed

Passed

Passed

Passed

Passed

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comments:

Supervisor

Manager

Passed

MD

QAM

rvisor: Remarks

Customer: Order No.: Time Style Colour/ Combo Size

Date: Shift: Target Passed

Checker: Supervisor: PT Singer Rework Rework Stains Repair

Comments:

Checking Supervisor

Checker No.:

Reject

Total

Grant Total

Production Manager

Order No.: Operation Bundle No.

Operator: Helper:

Date: Shift: Total Pieces Grand Total

Order No.: Operation Bundle No.

Operator: Helper:

S.No.

Colour

Size

S.No.

Colour

Total Comments

Total Comments

Supervisor

PM

Date: Shift: Total Pieces Grand Total

Size

Supervisor

PM

STYLE NO -/ 1509 CHECK 1 IN 6 GARMENTS : 1. 2. 3. 4. 5.

STYLE NAME 3/4 SLEEVE 'V' NECK WITH STUD

6 gP!;f;F xU gP!; brf; bra;a ntz;Lk;.

ENSURE THAT THE FABRIC IS NOT STRETCHED AND FEED AS IT IS ---> Jia Gf;fhky; xnu khjphpahff; bfhLf;ft[k;;. ENSURE ALL GARMENTS ARE CHECKED FOR NEEDLE HOLES ---> midj;J ijay;fspYk; Crp Xl;il tuhky; ghh;j;Jf; bfhs;st[k;. ALL GARMENTS ARE CHECKED FOR CORRECT THREAD TENSIONS--> midj;J ijaypd; mGj;jk; rPuhf ,Uf;ft[k;. ENSURE THERE IS NO LOOSE FABRIC ON THE NECK BINDING --> igz;o'; JzpahdJ Y}rhf ,Uf;ff; TlhJ. AVOID PUCKERING ON THE NECK BINDING --> igz;o'; kPJ RUf;fk; tuf;TlhJ.

OPERATOR NAME SUPERVISOR NAME QUALITY/TECHNICAL NAME CONFIRMATION OF CORRECT MACHINE SETTINGS IN ACCORDANCE WITH THE GSD BREAKDOWN MACHINE SPEED RPM STITCH BIGHT STITCH DENSITY MECHANICS NAME MOBILE INSPECTOR

STYLE NAME 3/4 SLEEVE 'V' NECK WITH STUD

OPERATION
NECK BINDING -BACK

-> Jia Gf;fhky; xnu khjphpahff; bfhLf;ft[k;;. midj;J ijay;fspYk; Crp Xl;il tuhky; ghh;j;Jf; bfhs;st[k;. midj;J ijaypd; mGj;jk; rPuhf ,Uf;ft[k;. -> igz;o'; JzpahdJ Y}rhf ,Uf;ff; TlhJ. --> igz;o'; kPJ RUf;fk; tuf;TlhJ.

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE

H THE GSD BREAKDOWN THREADS NEEDLES MECHANICS SIGNATURE SIGNATURE

OPERATION
NECK BINDING -BACK

STYLE NO CHECK 1 IN 6 GARMENTS :

STYLE NAME

OPERATOR NAME SUPERVISOR NAME QUALITY/TECHNICAL NAME CONFIRMATION OF CORRECT MACHINE SETTINGS IN ACCORDANCE WITH THE GSD BREAKDOWN MACHINE SPEED RPM STITCH BIGHT STITCH DENSITY MECHANICS NAME MOBILE INSPECTOR

STYLE NAME

OPERATION

SIGNATURE SIGNATURE SIGNATURE

DATE DATE DATE

TH THE GSD BREAKDOWN NDL.THREADS LOOP.THREADS NEEDLES SIGNATURE SIGNATURE

OPERATION

DATE: OPERATI ON

COLOUR:
POCKET

Rework STAINS MARKS UNCUT THREADS REJECTS REMARKS PREPARED BY

END OF LINE INSPECTION REPORT


STYLE:
COLLAR

ORDER NO.:
SLEEVE

ECTION REPORT
CHECKER:
SIDE

CHECKING NO.:
BOTTOM BUTTON PLACKET

VERIFIED BY

TON PLACKET TOTAL

DATE: OPERATI ON

COLOUR:
POCKET

Rework STAINS MARKS UNCUT THREADS REJECTS REMARKS PREPARED BY

END OF LINE INSPECTION REPORT


STYLE:
COLLAR

ORDER NO.:
SLEEVE

ECTION REPORT
CHECKER:
SIDE

CHECKING NO.:
BOTTOM BUTTON PLACKET

VERIFIED BY

TON PLACKET TOTAL

Customer: Job. No.:

Order No.: Order Quantity:

S.No.

Operations

Work Instruction and Specifications

Style No.: Sizes:

Product Description: Colours:

Ancipated Problems and Remedies.

HOW TO MEASURE
JOB NO : SBW 06 0135 DESC: SEQUINE SCOOPE

STYLE: #1566

HOW TO CHECK
JOB NO DESCRIPTION : SBW 06 0110 SHORT SLV NEHRU SHIRT STYLE NO :

# 0629

CHECKING STANDARD
CHECKING SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

CHECKING STANDARD
CHECKING SUPERVISOR : MOBILE INSPECTOR : QA : TECHNICAL :

CHECKING STANDARD
CHECKING SUPERVISOR : MOBILE INSPECTOR : QA : TECHNICAL :

CHECKING STANDARD
CHECKING SUPERVISOR : MOBILE INSPECTOR : QA : TECHNICAL :

OFF LINE STANDARD


LINE SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

OFF LINE STANDARD


LINE SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

OFF LINE STANDARD


LINE SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

OFF LINE STANDARD

LINE SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

PRESSING STANDARD
FINISHING SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

PRESSING STANDARD
FINISHING SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

PRESSING STANDARD
FINISHING SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

PRESSING STANDARD
FINISHING SUPERVISOR : MOBILE INSPECTOR : QAE : QAM :

CONTROL PLAN Project Name: Product Description: Date: Revision: Prepared By: Approved By: Proces s Step X (control) or Y (monitor) Product/Process Specifications/Target

Factor/Process

Evaluation/ Measurement Technique

%P/Total (R&R) %P/Tolerance

Sample Size

Sample Frequency

Responsibility

Control Method

Contingency Action Plan

Misc. Information