Вы находитесь на странице: 1из 10

Page

D2E International Lift Report

Site/Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

1
Introduction

Introduction to the D2E International survey process and techniques.

Intro

Survey D2E Services Sections

D2E International has developed a unique survey system designed to review all aspects of the installation. This survey is conducted by a fully trained lift engineer to ensure every detail is covered. For more details of the full range of services offered by D2E International please visit our website at www.d2einternational.com This survey has been split into 10 key sections as detailed below: A full technical evaluation of all major lift components is undertaken to establish; makes, installation dates and general specification of the lift installation A visual inspection is carried out of all key components in the Lift Car, Landings, Motor Room, Lift Shaft and Pit to establish the overall condition of the installation. A full DDA survey is conducted to ensure the lifts within a building and the building itself is compliant with the Part M / EN81-70 Disabled Access regulations. A full Health & Safety survey is conducted to ensure the lifts within are compliant with all relevant health and safety regulations covering people working on the lifts and users of the lifts. Safety Norm for Existing Lifts: This survey reviews 74 individual safety and accessibility items on existing lifts according to EN81/80. These cover both the users and workers on the lift installation. Review of major components looking at the equipment from a modernization perspective to establish the working life of the equipment before any improvements will be required (1 to 10 years scale). Review of the maintenance companies performance in terms of; visits and call outs in past 12 months together with a quality maintenance check on all key maintenance items. All key dimensions are measured for future reference, including; lift car, shaft, pit and machine room dimensions. Key electrical data is recorded in reference to the machine load and capacity. For fire-fighting lifts all data in relation to EN81-72:2003 is recorded to ascertain the credentials of the lift in respect to its fire fighting capabilities.

1 2 3 4 5 6 7 8 9 10

Profile Condition DDA H&S SNEL Improvements Performance Dimensions Electrical Data Fire Fighting

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

2
Part

Part

A
Client Location

General Information

Reference Information

O2 Centre 255 Finchley Road London NW3 6LU

Survey Date Area Policy Number Site Manager Property Type

7 Dec 2010 London

Retail Scenic Passenger Lift 9

Unit ID
Part

11020019611
Part

Site Code Data Check

C
Company Type Costs

Maintenance Information

D
Schindler Unknown 0

1 2 3 4

Lift Profile Report Lift Condition Report DDA Survey Health & Safety Check SNEL Risk Assessment Improvement Requirements Performance Data Dimensions Electrical Data Fire-Fighting Survey

LG1 Date Insurance Reports Date - Last Exam Date - Current Exam Date - Next Exam Insurance Company
Part

30 Nov 1999

5 6

30 Nov 1999 30 Nov 1999 30 Nov 1999

7 8 9 10

1
1,01

Lift Profile Report

General condition survey for the installation based upon visual inspections.

Lift Manufacturer
Lift manufacturer

Schindler Lifts

1,11

Controller Type
Type of controller (relay, Micro etc.)

Micro

1,02

Type
Type of lift (passenger, goods, service etc.)

Passenger

1,12

Controller Manufacturer
Controller manufacturer

Schindler

1,03

Modernised By
Modernisation by lift manufacturer

1,13

Lift Operation
Type of lift operation (SAPB, FCL etc.)

FCL

1,04 1,05

Year Installed
Year installed

1997

1,14 1,15

Door Operators
Type of door operators

Auto - Schindler 900mm 16 1250Kg C.O.

Year Modernised
Year modernised

Door Width
Door width (mm)

Concave
1,06 1,07 1,08

Stops
Number of stops

2 7.5 Below

1,16 1,17 1,18

Car Size - Persons


Number of persons

Travel
Distance travelled (metres)

Car Load
Car load (Kg's)

Machine Room Loc


Machine room location (above, below etc.)

Door Configuration
Type of door configuration (CO, 2 speed side etc.)

1,09

Speed
Speed (metres per second)

0.6m/s

1,19

Fire Protection
Fire-Fighting, Firemans, None etc

N/A

1,10

Drive Type
Type of drive (hydro, AC, VVVF etc.)

Hydro

1,20

Adequate Fire Protection


Is Fire Control Adequate?

Yes

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

3
Part

Condition Report

General condition survey for the installation based upon visual inspections.

Good Req Cond Att

Urg Att

Good Req Cond Att

Urg Att

Lift Car & Landings 2,01 2,02 2,03 2,04 2,05 2,06 2,07 2,08
Floors Level
Floor levelling?

Lift Shaft 2,22 2,23 2,24 2,25 2,26 2,27 2,28 2,29 2,30 2 30
Emerg Release
Emergency release?

Door Operation
Door operation?

Shaft Lighting
Shaft lighting?

Pass Protection
Passenger protection?

ToC Inspect
Top of car inspection?

Push Buttons
Push buttons?

Door Operator
Door operator?

Alarm System
Alarm system?

House Keeping
House keeping?

Indicator System
Indicator system?

Hangers/ Slippers
Hangers/slippers?

Lift Car
General car aesthetics

Car/Door Locks
Car and door locks?

Vandal Resistatance
Adequate Vandal Resistatance

Door Closers
Door closers/chords?

Guide Shoes
Guide shoes/oilers?

Machine Room 2,09 2,10 2,11 2,12 2,13 2,14 2,15 2,16 2,17 2,18 2,19 2,20 2,21
Machine Room Access
General Access Conditions?

2,31 2,32 2,33 Pit 2,34 2,35 2,36 2,37 2,38 2,39

Hoist/Gov Ropes
Hoist/governor ropes?

Guards
Guards in place?

Safety Gear
Covers/guards?

Motor/ Machine
Motor/ Machine?

Covers/ Guards
Buffers?

Oil Level / Seals


Oil Level / Seals?

Sheaves
Sheaves?

Condition of Pit
Pit condition?

Brake
Brake?

Buffers
Buffers?

Switch Gear
Condition of Switches etc?

Drip Trays
Drip trays?

Controller
Controller?

Limits/ Switches
Limits/switches?

Governor
Governor?

Sheaves
Sheaves?

House Keeping
House Keeping?

Hazards
Hazards and Harmful Materials

Logs/ Certs
Logs/ Certificates?

Wiring Diagrams
Wiring Diagrams?

Indicates that a photograph is required of that item.

Emerg Tools
Emergency Tools?

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

4
Part

3
Building 3,01 3,02 3,03 3,04 3,05

DDA Survey

Building Regulations Disabled Access Part M / EN81-70 Checklist

Code

Yes

Fulfilled No N/A

Code

Yes

Fulfilled No N/A

Minimum 1 DDA Lift


Is there at least one lift suitable for Disabled?

M 3.21

Lift Car 3,16 3,17 3,18 3,19 3,20 3,21

Automatic Doors
Automatic Doors

M 3.34

Lift Serves All Floors


Does the lift serve all floors?

M 3.24

Safety Edges M 3.34 Infrared Safety edges for passenger protection Door Opening Width M 3.34 Car and Landing doors to be 800mm wide clear minimum Door Colour
Door colour distinguishable from surrounding walls M 3.34

All lifts suitable for DDA


Are all lifts suitable for DDA?

Info

Signage for Building


Signs starting at building entrance?

M 3.18

Steps / Obstructions
Into building - leading to lift?

M 3.14

Internal Car Light M 3.26 Internal car lighting 100lux at floor level Internal Car Walls M 3.32 Internal walls to be decorated in nonreflective material to contrast floor 2 Way 24 H Dialler
2 Way 24 Hour Autodialler M 3.28

Landing 3,06 3,07 3,08 3,09 3,10 3,11 3,12 3,13 3,14 3,15
Space in Front Lift
Space on landing to move wheelchair (1500x1500mm)? M 3.25

3,22 3,23 3,24 3,25 3,26 3,27 3,28 3,29 3,30 3,31 3,32

Landing Lighting
Area outside lift 100 Lux?

M 3.14

Inductive Loop M 3.28 Inductive loop for autodialler and voice synthesizer COP in side wall M 3.34 COP to be in side wall, 400mm from , front wall Car Button Height M 3.34 Car pushes 900-1200mm from car floor 13+ Cars Extra COP M 3.34 For 13 person or larger lifts, additional COP required CarButtons Tactile M 3.28 Car pushes tactile and marked if > 3 stops Car Buttons Colour M 3.28 Buttons to be colour/tonal contrasting to panel/wall Floor Button Colour
Main floor push and alarm to be coloured and sit proud M 3.28

Floor Signage M 3.18 Floor Number marked opposite lift? pp Level Accuracy
Floor levelling accuracy to within 5mm EN81

Landing Button Height


Landing Buttons 900-1200mm from floor

M 3.34

Landing Button Colour


Call buttons colour/tonal contrasted/backlit to the panel

M 3.28

Audible Call M 3.31 Audible call acceptance when landing button pressed Landing Indicators M 3.31 Visual & audible indications of lift arrival and direction of travel Landing Button Tactile M 3.28 Landings to have tactile marking at floor level Signal System M 3.34 Signalling system to give 5 seconds advance notice of lift arrival

Car Voice Syns


Car voice synthesizer if > 3 stops

M 3.34

Handrail Height M 3.28 Handrail on one wall 900mm to top of rail from floor Mirror on Wall M 3.34 Mirror to rear wall (<1100 x 1400 car) Visual Indicator M 3.31 Visual indication and direction of travel Car Floor Area M 3.34 Car floor area minimum 1100 x 1400mm Fold Up Seat
Fold up seat

1100 min Landing call buttons with Handrail

3,33 3,34
Range for centre Lines of lift car controls

Sign showing storey with 120 110 Range for centre lines of landing call buttons

3,35
90 900 nominal

3,36
40

Floor - Non Slip & Colour M 3.28 Non Slip flooring and not dark colour

Unobstructed Wheelchair Turning space 800 min

1400 min Lift car controls with tactile identification

1500 1500

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

5
Part

Health & Safety


Code

Lift Safety and Risk Assessment Report

Yes

No

N/A Top of Car 4,42 4,43 4,44 4,45 4,46 4,47 4,48 4,49 Lift Shaft 4,50 4,51 4,52 4,53 4,54 4,55 4,56 4,57 4 57 4,58 4,59 4,60 4,61 4,62 4,63 4,64
Top Beam Tested
Is the top beam tested and marked?

Code

Yes

No

N/A

Machine Room M/C Room Door Locks 4,01


No unauthorised access - correct lock

EN81 EN81

Car Top Guards


Car top guard rail fit (gaps > 300mm)?

BS7255 BS7255 EN81 EN81 BS7255 PUWER EN81 EN81

4,02 4,03 4,04 4,05 4,06 4,07 4,08 4,09 4,10 4,11 4,12 4,13 4,14 4,15 4,16 4,17 4 17 4,18 4,19 4,20 4,21 4,22 4,23 4,24 4,25 Lift Car 4,26 4,27 4,28 4,29 4,30 4,31 4,32 4,33 4,34 4,35 4,36 4,37 Pulley Room 4,38 4,39 4,40 4,41

M/C Room Access


Access satisfactory and adequate lit?

CTC to BS7255
Is the CTC to BS 7255?

BS7255 Rubber mat front & behind the controller EatW Switches Marked All switches, controllers clearly marked? EN81 Covers & Doors Fitted Are controller covers & doors fitted and ok? EN81 Notices Posted Mains Switch, Electric Shock, Handwinding BS7255 Handwind Position Handwinding positioning system fitted? BS7255 Landing Barrier Suitable landing barrier available BS7255 Fire Extinguisher Is fire extinguisher provided? BS7255 Keys Provided Emergency door & brake keys provided EN81 RCD Socket RCD socket in the machine room? EatW Isolator Lockable Is the isolator lockable? BS7255 Floor Painted M/C room floor/walls painted and non-slip? EN81 Lift Beam Tested Is the lifting beam tested & marked? EN81 Guards in place O/S Gov, Ropes, Pulleys EN81 Parts Painted Yellow Are all moving parts painted yellow? EN81 Guard Rails Fitted Are guard rails fitted eg.plinth? EN81 Holes Guarded Are all holes adequately guarded? BS7255 Emergency Stop Switch Emergency stop switches fitted to machine BS7255 Pump& Pressure Hand pump & pressure gauge fit? EN81 Headroom Clearances Adequate headroom in m/c room EN81 Car Overspeed Protection Bi-Directional overspeed protection EN81 Slack Rope Device Adequate slack rope/chain device EN81 Run Time Limitor Run time limitor fitted EN81 Phase Reversal Protection Protection against phase reversal

Rubber Mat

Safety Edges
Electronic safety edge system fitted?

Car Toeguard
Is there a car toeguard?

Stop Switches
Are additional stop switches fitted?

Car Top Sheave


Are car top sheave guards fitted?

Car Top Alarm System


Car top alarm system

Car Roof Strength


Car roof strong

EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81

Shaft Division Screens


Are division screens fitted?

Shaft Light
Adequate shaft lighting (LUX 100)?

Notices Fitted
Are all appropriate notices fitted?

Land Fascias
Are landing fascias fitted?

Door Closers
Are door closers fitted?

Slave Interlocks
Are slave interlocks fitted?

Lock Releases
Are lock release fitted at all floors?

Lift Shaft Walls OK?


No Excessive Gaps

Lift Shaft Enclosed


Lift shaft fully enclosed

Pit Access Secure


Locking devices to pit

Landing Door Fixtures


Good design of landing door fixtures

Adequate Glass in Doors


Glass doors adequate

No sharp edges
Glass doors safe on touch

Landing Fire Doors


Fire resistanct landing doors

Pit
Door Clearances OK?
No gaps in land & car doors EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81 EN81

4,65 4,66 4,67 4,68 4,69 4,70 4,71 4,72 4,73 4,74 4,75 4,76 4,77

Access to Pit
Is there safe access to pit?

EN81

Car & Landing Doors OK


Car / Landing doors ok

Car Load Ratio


Car Load / Floor Area Ratio OK

Car Doors Fitted


Car Doors fitted to lift

Car Roof Trapdoor Locks


Trapdoor lock adequate

Car Ventilation
Sufficient ventilation in car

Door Clearances OK?


No gaps between car and land doors

Load Control on Car


Load control fitted to car

Car Light
Car lighting adequate (LUX 100)?

Emergency Lighting
Is there emergency lighting fitted?

Alarm System
Is the alarm system adequate?

Loadplate
Is loadplate displayed?

Pulley Rm Access
Is the pulley room access ok?

EN81 EN81 EN81 EN81

4,78

BS7255 Pit Stop Switch Pit stop switch reachable from landing? BS7255 Ext Stop Switch Is an additional pit stop switch required? BS7255 Pit Prop Is there a pit prop? EN81 RCD Socket Is there and RCD socket in place? EN81 Gov Slack Switch Governor slack rope switch fitted? BS7255 C'Weight Screen C/W screen fitted 2500mm above pit? EN81 Paint Yellow Are all moving parts painted yellow? EN81 R Valve/ Hyd Jack Rupture valve on hydraulic jack? BS7255 Pit Communications Is pit communication fitted? BS7255 Shaft Clean Is shaft in clean condition? BS7255 Pit Painted Is pit painted? EN81 C/W Safety Gear Counterweight with safety gear EN81 Pit & Shaft Headroom Adequate headroom in pit & shaft

Pulley Rm Locked
Pulley room electrically interlocked

Pulley Room Guarding


Adequate guarding i pulley room Ad t di in ll

Pulley Room Lighting


Adequate pulley room lighting

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

6
Part

5
General 5,01 5,02 5,03 5,04 5,05 Pit 5,06 5,07 5,08 5,09 5,10 5,11 5,12 5,13 5,14 5,15 5,16 5,17 5,18

SNEL Risks
EN81-80

Safety Norm for Existing Lifts: EN81/80 - Safety & Accessibility of existing lifts

Yes

No

N/A
H

Lift Car 5,38 5,39


H

EN81-80

Yes

No

N/A
L H H M L H M M M

Harmful Materials
Clear of Harmful Materials

5.1.4 5.2.1 5.2.2 5,3 5,4

Car Load Ratio


Car Load / Floor Area Ratio OK

5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 5.8.6 5.8.7 5.8.8.1 5.8.8.2

Disabled Access
Adequate Disabled Access

Car Apron Fitted


Adequate car toeguard fitted

Levelling Accuaracy
Good Levelling Accuaracy

5,40 5,41 5,42 5,43

Car Doors Fitted


Car Doors fitted to lift

Vandal Resistance
Adequate Vandal Resistance

Car Roof Trapdoor Locks


Trapdoor lock adequate

Fire Control
Adequate Fire Controls

Car Roof Strength


Car roof strong

Balustrade on Car
Adequate car top guards

Lift Shaft Walls


No Gaps in Lift Shaft Walls

5.5.1.1 5.5.1.2 5.5.2 5.5.3 5.5.4 5.5.5 5.5.6.1 5.5.6.2 5.5.7 5.5.8 5.5.9 5.5.10 5.5.11

H H H H L L L H H H H H M

5,44 5,45 5,46 Lift Shaft 5,47 5,48 5,49 5,50 5,51 5,52 5,53 5,54 5,55 5,56

Car Ventilation
Sufficient ventilation in car

Lift Shaft Enclosed


Lift shaft fully enclosed

Car Lighting
Adequate car lighting

Pit Access Secure


Locking devices to pit

Emergency Lighting
Adequate emergency lighting in car

Landing Fascias
Adequate landing fascias

C/W Safety Gear


Counterweight with safety gear

Sheaves Guarded
Car top ropes guarded

5.9.1 5.9.1 5.9.1 5.9.2 5.9.3 5.9.4

M M L H M M H H L H M H H

C/W Screen
Adequate C/W Screen fitted

Ropes Guarded
Ropes all guarded

Shaft Division Screens


Shaft divison screen fitted

Sheaves Guarded
Car top sheaves guarded

Pit Partitioning
Shaft divison screen fitted

Safety Gear Fitted


Adequate safety gear fitted

Pit & Shaft Headroom


Adequate headroom in pit & shaft

Slack Rope Switch


Governor Slack switch fitted

Pit Access Safe


Access to pit safe and adequate

Car Overspeed Protection


Bi-Directional overspeed protection

Emergency Stop Switch


Pit stop switches fitted

Machine Design
Adequate machine for lift

5.9.4, 5.12.1 5.9.5 5.10.1 5.10.2 5.10.3 5.11.1 5.11.2

Shaft Lighting
Adequate shaft lighting (LUX 100)?

Hydro Protection
Rupture valve on hydraulic jack?

Car Top Alarm System


Car top alarm system

Two C/W Ropes


C/W guided by two ropes

Machine Room 5,19 5,20 5,21 5,22 5,23 5,24


Machine Room Access
Machine room access adequate

Buffers Adequate
Adequate buffers in pit

5.6.1 5.6.2 5.6.3 5.6.4 5.6.5 5.6.6

H L M H H L

5,57 5,58 5,59 Lift Machine 5,60 5,61 5,62

Final Limit Switches


Adequate final limit switches

Slippery Floor in M/C Room


Non slip floor in m/c room

No Gaps Car & Wall


No gaps between car and wall

Headroom Clearances
Adequate headroom in m/c room

No Gap Car & Land Doors


No gaps between car and land

Pulley Room Guarding


Adequate guarding in pulley room

Pulley Room Lighting


Adequate pulley room lighting

Emergency Operation
Handwinding position system fitted

5.12.2 5.12.3 5.12.4 5.12.5 5.12.6 5.12.7 5.13.1

H L H M L M H

Handling Equipment
Lifting Beam Tested

Shut Off Valve


Pump & Pressure valve fitted

Landing & Car Doors 5,25 5,26 5,27 5,28 5,29 5,30 5,31 5,32 5,33 5,34 5,35 5,36 5,37 5 37
No Gaps in Doors
No gaps in land & car doors

Starting Contactors
Independent starting contactors

5.7.1 5.7.2 5.7.3 5.7.4 5.7.5 5.7.6 5.7.7 5.7.8.1 5.7.8.2 5.7.9 5.7.10 5.7.11 5.7.12

H H H L M H H H H H M M M

5,63 5,64 5,65 5,66

Slack Rope Device


Adequate slack rope/chain device

Landing Door Fixtures


Good design of landing door fixtures

Run Time Limitor


Run time limitor fitted

Adequate Glass in Doors


Glass doors adequate

Low Pressure Device


Pump & Pressure valve fitted

No sharp edges
Glass doors safe on touch

Electric Shock Protection


Rubber matt supplied

Landing Lighting
Adequate landing lighting

Electrical Installation 5,67 5,68 5,69 5,70 5,71 5,72 5,73 5,74 5 74
Lift Machine Protection
Guards in place?

Door Protection Device


Adeuate device fitted

5.13.2 5.13.3 5.14.1 5.14.2 5.14.3 5.14.4 5.14.5 5,15

L M L H H M L M

Door Locking Devices


Door locking devices fitted

Lockable Main Switch


Isolator lockable

Tool Req to Open Doors


Doors locked with proper locks

Phase Reversal Protection


Protection against phase reversal

Lift Pit Walls


No Gaps in Lift Pit Walls

CTC Unit
CTC to BS7255

Automatic Doors
Automatic doors fitted

Alarm Device
Adequate alarm device

Slave Interlocks
Slave interlocks fitted

Pit/Car Communication
Communication system fitted

Landing Fire Doors


Fire resistanct landing doors

Load Control on Car


Load control fitted to car

Car & Landing Doors OK


Car / Landing doors ok

Notices Fitted
All notices fitted

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

7
Part

Improvements

Recommendations for improvements to current installation over the next 10 years.

Working Life before Improvement Required (Years) 1 3 5 10 1 3 5 10

Machine Room
6,01 6,02 6,03 6,04 6,05 6,06 6,07 Machine/Pump Controller Drive System MG Set Selector Governor Wiring

Lift Car
6,13 6,14 6,15 6,16 6,17 6,18 Finishes(Car Panels) Buttons&Signals Door Safety Protection Door Operator Door Finishes Safety Gear

Landing Entrances
6,08 6,09 6,10 6,11 6,12 Part Buttons&Signals Doors&Tracks Locks,Rollers&Hangers Architraves Door Finishes

Lift Hoistway & Pit


6,19 6,20 6,21 6,22 6,23 Travelling Cables Ropes Rams&Seals Buffers Guides

Performance

Analysis of the installation performance in respect of the maintenance of the unit.

Last 12 Months:
7,01 7,02 7,03 7,04 7,05 7,06 7,07 7,08 7,09 7,10 7,11 7,12 January February March April May June July August September October November December

Visits

Calls

Quality Maintenance Check:


7,25 7,26 7,27 7,28 7,29 7,30 7,31 7,32 7,33 7,34 7,35 7,36 7,37 Machine / Pump Controller / Drive MG Set Selector Governor Land Buttons & Signals Doors & Tracks Locks, Rollers,Hangers Car Buttons & Signals Door Safety Protection Door Operator Ropes Rams & Seals Buffers Pit Equipment

House Keep Adjustment OK Att OK Att

0 0 1 1 0 1 0 0 0 1 0 0

7,13 7,14 7,15 7,16 7,17 7,18 7,19 7,20 7,21 7,22 7,23 7,24

2 2 0 0 0 0 0 2 5 0 2 1

Call Rate (Average Per Month)

7,38 7,39

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

8
Part

8
8,01 8,02 8,03 8,04 8,05 8,06 8,07

Dimensions Lift Car Dimensions


Hoist Width Hoist Depth Car Width Car Depth Door Width Recess Left Recess Right

Basic dimensional information of the installation

Lift Shaft Dimensions


8,08 8,09 8,10 8,11 8,12 8,13 Overhead Height Car Height Opening Height Rise Pit Depth Door Recess

Machine Room
8,14 8,15 8,16 M/R Height M/R Depth M/R Width

Part

9
9,01 9,02 9,03 9,04 9,05

Electrical Data

Starting Current Full Load Current Fuse Rating Motor Rating Phone Line
48A 100A 22.1KW

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

9
Part

10

Fire Fighting Lift


Code

Part 72 Firefighters Lifts - EN 81-72:2003

Yes

No

N/A Doors & Lift Machines 10,22 Lock Release Diagram?


Lock Release Diagram?

Code

Yes

No

N/A

Building Requirements 10,01 Fire Protected Loby?


Fire Protected Loby?

code

Code

10,02

Secondary Power Supply?


Secondary Power Supply?

Code

10,23

Lift Machine Protected?


Lift Machine Protected?

Code

10,03

Cables Fire Protected?


Cables Fire Protected?

Code

Control Systems 10,24 FF Switch in Lobby?


FF Switch in Lobby? Code Code

Firefighters Lift Requirements 10,04 Serve all Floors?


Serve all Floors?

10,25

FF Switch Labled?
FF Switch Labled?

Code

10,05

Car Width?
Car Width?

Code

10,26

Unlock Triangle?
Unlock Triangle?

Code

10,06

Car Depth?
Car Depth?

Code

10,27

Safety Devices Work?


Safety Devices Work?

Code

10,07

Car Load?
Car Load?

Code

10,28

No Override?
No Override?

Code

10,08

Car Door Width?


Car Door Width?

Code

10,29

Call Disabled?
Call Disabled?

Code

10,09

Time to Top Floor?


Time to Top Floor?

Code

10,30

No Electrical Faults?
No Electrical Faults?

Code

10,31 Protection Against Water 10,10 Car/Pit Protected?


Car/Pit Protected? Code

Audible Signal in Car?


Audible Signal in Car?

Code

10,32

P1:Controls Inoperative?
P1:Controls Inoperative?

Code

10,11

Pit Equip Protected?


Pit Equip Protected?

Code

10,33

P1:Door/Ararm Inoperative Code


P1:Door/Ararm Inoperative?

10,12

Other Equip Protected?


Other Equip Protected?

Code

10,34

P1:Doors Close?
P1:Doors Close?

Code

10,13

Water Level in Pit?


Water Level in Pit?

Code

10,35

P1:Arrival-Doors Open?
P1:Arrival-Doors Open?

Code

10,14

Water on Equip?
Water on Equip?

Code

10,36

P1:Audible Signal?
P1:Audible Signal?

Code

10,37 Rescue of Trapped Firefighters in Car 10,15 Trap Door on Roof?


Trap Door on Roof? Code

P1:Stop & Return?


P1:Stop & Return?

Code

10,38

P1:Pit&M/C Room Lights? Code


P1:Pit&M/C Room Lights?

10,16

Access OK?
Access OK?

Code

10,39

P2:Control from FF Panel? Code


P2:Control from FF Panel?

10,17

Means of Rescue?
Means of Rescue?

Code

10,40

Power Supply?
Power Supply?

Code

10,18

Open Trap Door with Key?


Open Trap Door with Key?

Code

10,41

Power Re-Established?
Power Re-Established?

Code

10,19

Ladder Safety Device?


Ladder Safety Device?

Code

10,42

Control Panel Protection?


Control Panel Protection?

Code

10,20

Ladder Trip Hazzard?


Ladder Trip Hazzard?

Code

10,43

Intercomm System?
Intercomm System?

Code

10,21 10 21

Length Ladder?
Length Ladder?

Code

10,44 10 44

Intercomm Wiring?
Intercomm Wiring?

Code

Page

D2E International Lift Report

Site / Unit Code Unit ID

Scenic Passenger Lift 9 11020019611

10
Part

11

Comments

Comments taken during the survey

Вам также может понравиться