1. Optimize the productivity 2. Minimize the wastage ( i.e. wastage of material & wastage of man hour)
6. 7. 8. 9. 10.
Additional Responsibility: 1. 2. 3. 4. 5. 6. Cross Check & supply the bulletin one day ago before the line feeding Operator assessment Continue the training program Inform planning team about the line status Check the absenteeism & find out the reason Check the every hour line production
Wastage Reduction:
Material Wastage: 1. Thread 2. Stationery utensils 3. Fabric Man hour Wastage: 1. Unnecessary use of man-M/C 2. Reduce the material handling by keeping them in the minimum distance
Process Development Procedure: Step-1: Elementary analysis 1. 2. 3. 4. 5. Observe the process flow & breakdown it to a maximum suitable no of element Record the process flow & time carefully & draw it in paper Analyze carefully which element can be eliminated & which can be combined Draw again by eliminating & combining the element Calculate the time for eliminated element & remaining element to find the development
Step-2: Speed up the operator 1. Smooth the handling 2. Make faster the handling
Consideration: 1. 2. 3. 4. Environment is in sound condition M/C are in well condition Supply of material is sufficient enough Worker is motivated enough
Obstacle to Achieve the TGT: 1. 2. 3. 4. Lack of proper line balance Delaying the line balance Insufficient supply of material Lack of control over the line
Working Philosophy:
Must be result oriented i.e. have to ensure job is done- JOB DONE
Present status:
Report oriented i.e. doing clerical job
Major Part of R&D dept.: 1. Planning: a) Develop the supply chain to ensure the on time delivery of material b) Daily job scheduling
NAME
Mr. Towhid
MARKS
21
% OF MARKS
70%
Md. Alim Mr. Rony Mr. Al Amin Mrs. Lovely Mr. Mazhar Mr. Kabir Mr. Ibrahim Razia Sultana Mrs. Popy TTL Marks: 30
13 12 12 11 10 10 10 10 06