Вы находитесь на странице: 1из 3

Title of the project Development of a Prison management system Abstract of the project This project is aimed at developing a prison

management system that is a collection of registers and reports for the effective management of prisons. This system should contain the modules like nominal roll, case register, parole register, Interview requests, In-out register and an automated release diary generator. 1. Nominal Roll: The details of the prisoner and his/her demographic details should be captured. A digital photo comprising different views of the prisoner and the list of articles surrendered by prisoner during nominal roll are to be recorded. 2. Case register: All the details of the cases against the prisoner should be captured. This must include the sentence details, remand/conviction details, etc. 3. Automated release diary generator: This report should be display the list of prisoners to be released on a day, the next day, the next week, the next month, or any given duration of time. The system should consider the reduction of sentence length due to various considerations. 4. Parole register: This module should track all prisoners on parole and provide necessary reports on this data. 5. Interview requests and In-out register: All interview requests by the relatives of the prisoners need to be recorded and tracked. An in-out register will track all prisoners and others who move in and out for various reasons. This should include provisions for recording the prisoners sent to courts for hearing. 6. Various status reports and demographical analysis reports are to be generated. Keywords Generic Technology keywords Operating System Databases Programming Software Engineering Specific Technology keywords SQL Server, Oracle, Visual Basic, Java, J2EE, JSP, ASP, HTML, ASP.NET, C#, VB.NET Project type keywords Analysis, Design, Implementation, Testing Functional components of the project Copyright 2004-2005 Infosys Technologies Limited

Nominal Roll, Case Registers, Interview requests and In-out register Reports and release diary Steps to start-off the project Learn about Prison Management Learn a database system like Oracle, SQL Server Learn programming languages, preferably web development language, like ASP, JSP, HTML, etc Requirements Hardware requirements Number Description 1 IBM PC or Server Software requirements Number Description 1 Windows NT/2000/XP 2 SQL Server or MSDE or Oracle 3 MS Visual Studio or Visual Studio.NET 4 Internet Explorer Manpower requirements 3 person months Milestones and Timelines S. No 1 2 3 4 5 6 7 8 Milestone Name Requirements Specification Technology familiarization Database creation High-level and Detailed Design Implementation of the front-end of the system Integrating the frontend with the database Integration Testing Final Review Milestone Description Requirements Document Sample applications Database Scripts Design documents UI and related programs All programs Test results Review document Timeline End of 1st week End of 3rd week End of 5th week End of 5th week End of 8th week End of 10th week End of 11th week End of 12th Remarks 10 15 10 15 10 10 10 10 Alternatives (If available)

Alternatives (If available) Linux Oracle Java Netscape

Copyright 2004-2005 Infosys Technologies Limited

week Guidelines and References http://msdn.microsoft.com http://java.sun.com http://www.asp.net

Copyright 2004-2005 Infosys Technologies Limited

Вам также может понравиться