Building Cubes with SQL Server 2005 Analysis Services

By : Thomas LaRock Feb 25, 2008

I admit that when it comes to SQL Server Analysis Services (SSAS), I found plenty of reasons to not get started. I have enough to do on a daily basis and I was just not very interested in learning about how to build cubes. Also, there is not much of a demand for cubes where I currently work, so there was no real incentive for me to spend a lot of time learning something new. Well, things changed for me a few weeks back, as I was given the opportunity to attend a training class on SSAS. Previously, my only experience with SSAS was the time I tried to create a new Analysis Services project in the Business Intelligence Development Studio (BIDS). I struggled my way through and could not figure out how all the pieces fit, despite having a wealth of information from MSDN at my fingertips. I looked to this class to give me enough of a foundation to be able to at least build and understand cubes, if even to a limited extent. By the time the class was done I found myself more comfortable working with the project designer in BIDS, how to get started, how to configure, and how to browse cubes. Not only was I more comfortable, but I now find myself going out of my way to experiment with dimensions, facts, and everything else related to cubes and SSAS in general. This article will detail the steps involved and assumes that you have the AdventureWorksDW database available as a data source, you have access to BIDS, and that you have an instance of SSAS running for you to deploy your cube. For details on how to install the AdventureWorksDW database, please see: http://msdn2.microsoft.com/en-us/library/ms143804.aspxDefinitions Definitions Before we dive into building a cube, we need to review some basic definitions. This will help to ensure that at the end you not only have a working cube but an idea of what the cube represents, as well as how to use it. The first two items we will define are Facts and Dimensions. In the AdventureWorksDW database you will find tables prefixed with the letters Dim and Fact. Ideally, any time you build something to be called a data warehouse you would be building your tables with these two concepts in mind. But what are they? Well, the simplest explanation is to think of them as nouns and verbs, and try not to reflect back to those frustrating hours spent in grammar class. Instead, try to forge ahead with a Schoolhouse Rock version of grammar by looking at an example of each. A dimension is commonly thought of as your noun or subject. It represents an object or a thing that either does something or has something done to it. It may help to also think of a dimension as something that can exist independently of events. An employee, a customer, and a product are all examples of dimensions. When you see a dimension built in the project below, you will find

that it has things called attributes, which are simply another way to say they are columns from the underlying data source. A fact, however, is your verb. It is the event that takes place against a dimension. An example of a fact would be the sale of a product. The sale is the fact, and the product is the dimension. Now, going forward you should be able to understand the fundamental difference between facts and dimensions. When outlining what is needed to build a cube, you should be able to answer basic questions regarding dimensions and facts. And for those of you that did well in grammar class, you could probably diagram a few sentences and build yourself a well structured data warehouse. Later, we will be able to create a visual representation of facts and dimensions, and how they come together to form what is called a schema. For now, let us press on with two more important definitions: measures and hierarchies. Your fact table should contain numerical data only, and not contain the descriptive information that would be found in a dimension table. This numerical data is then defined as a measure. Think of a fact table as an entity that contains rows based upon events, such that you would perform aggregate calculations on those events. For example, a fact table could contain one row for each sale made. Later on you will browse through some measures, and this will help you to understand how they were built and what they are to be used for. Hierarchies are defined inside of dimensions, and are created based upon existing primaryforeign key relationships. Hierarchies allow for one to drill-through a cube. Think of an example involving customers, address, countries, etc. You could start browsing a cube based upon countries where you customers reside, looking at totals sales by country. Then, you could drill down to view specific states within the United States, then specific addresses, then even a specific customer name. Each of those levels is defined as an hierarchy. For more in depth knowledge of data warehousing, please consult the following book http://www.amazon.com/Microsoft-Data-Warehouse-Toolkit-Microsoft-BusinessIntelligence/dp/0471267155/ref=pd_bbs_1/102-03097975250571?ie=UTF8&s=books&qid=1185241554&sr=8-1. Getting Started First thing you will need is to create a new Analysis Services project in BIDS.

Figure 1 Once that is done, you will need to define a data source next. Inside the Solution Explorer you will see the project you have just created, and directly under that project you should see a folder named Data Sources (Figure 2)

Figure 2 Right-click and select New Data Source. You will be prompted with the Data Source Wizard, select Next and you should see the following (Figure 3):

Figure 3 Select New, and define a connection. Here, I will connect to an existing AdventureWorksDW

database (screen print deliberately not shown), then click Next.

Figure 4 Select Default for the Impersonation Information settings. If you are not able to connect with default permissions, you will need to get in touch with whoever is administering your SSAS installation and make certain you agree as to what selection you should be making in the above screen. Another click of Next, then name your Data Source, and then select Finish. You should now see the following in your Solution Explorer (Figure 5):

Figure 5 Now, you may have noticed that we are using the sample AdventureWorksDW database, as opposed to the AdventureWorks database. Why? Well, because the AdventureWorksDW database has already been built with nicely defined dimension and fact tables, complete with pristine data. Such entities are crucial to the building of cubes, and the AdventureWorksDW database makes things easier for this walkthrough. However, in real world scenarios it is unlikely you will be handed a pristine data warehouse to work with when building cubes. The options you have at that point are outside the scope of this article, but could include the building of views against existing source data. I recommend any book by Ralph Kimball on the subject of data warehousing to help you along in this area. But for now, we will just continue with our building of a cube against a nice data source.
Configure Data Source View The next step is to configure your data source view. In the Solution Explorer, right-click on the Data Source Views Folder, then select New Data Source View to launch the wizard. Click Next, and you will be prompted to select a data source. Select the one we just created and you will see the following (Figure 6):

Figure 6 At this point, you should already have an idea of what data you are trying to analyze, for example perhaps someone is asking to analyze the internet sales data. So, lets continue with our demo by selecting the DimCustomer, DimGeography, DimProduct, DimTime, and FactInternetSales tables, then click Next. We will name our view Adventure Works DSV and click Finish. BIDS will then display the design view of the data source view we just created. The Cube The next step is to build the actual cube. In Solution Explorer, right-click on the Cubes folder and select New Cube to launch the wizard, then click Next and you will see the following screen (Figure 7):

Figure 7 For our demo we will accept the defaults and just click Next However, you may want to experiment with different cubes by selecting different options, such as creating attributes only or not using the auto build feature. You can even build the cube without a data source and select a template to use. Some experimentation here would give you a greater sense of what actions the wizard will perform for you if you compare the finished products side-by-side. You should now see the following (Figure 8):

Figure 8 Select the data source view we have just created and click Next. The wizard will now detect the dimension and fact tables and analyze the relationships between them to offer some suggestions. Click Next to review the suggestions (Figure 9):

Figure 9 There is one extra piece of information not readily apparent to the wizard, and that is the identity of the Time dimension table. The Time dimension is quite important, as it will be used to represent time periods that are useful for analyzing and reporting on data. We will manually select the DimTime table as our Time dimension, and select Next. You should now see the following (Figure 10):

Next we need to define some time periods. In this screen you will match the name of a column in the source table to the name of the property in the Time dimension. We will make the following selections (Figure 11):

Figure 11 Then click Next to review the available Measures for the cube (Figure 12).

Figure 12 Take a minute to examine the names of these measures. You will see names that are tagged as Amount, Cost, and Key. Look back to how we defined measures, and this screen should be clearer to you as to how the wizard arrived at these conclusions. We will accept the defaults and click Next. The wizard will now detect the hierarchies available and when complete you should see the following screen (Figure 13):

Figure 13 Now you can review the dimensions that were created and make adjustments if desired. Notice the wizard says All relationships detected. Refer back to how we defined a hierarchy and this screen should be clearer to you. Of course we are going to take the defaults and simply click Next, choose a name for our cube (Adventure Works Cube), and then select Finish. You should be taken to the design view of the cube inside of BIDS. The Cube is Built, Now What? Now we can start looking through some of the basic features inside the cube designer. The first screen you would be viewing after the cube is built is the cube designer. Here you will be able to explore the Measures and Dimensions on the left hand side of the GUI. You should recall that measures tend to be items that are, well, measurable and also note how the Fact table is being displayed here. The Hierarchies and Attributes are displayed just below the Measures. Browsing through the Hierarchies you will see that most of the links simply bring you to a design view of a dimension. If you go to Ship Date, you will find an example of two hierarchies that have been defined by the Auto-Build process. Click on the Edit Dim Time link to go to the design view for the Time Dimension, and note that there are two hierarchies defined for this dimension. Close this design view and go back to the design view for the cube. Now, click on the Attributes tab and you will see the attributes associated with the

dimensions. Again, this information is also displayed in the design view for the Dimensions. You may be wondering at this point about the Ship Date that is listed. After all, it is not listed on the right hand side under the Dimensions section of the Solution Explorer. So, what is Ship Date? Is it a dimension? Is it a fact? Where did it come from? The short answer is that it was created by the auto-build process. But why? Well, the process saw a column named ShipDateKey in the FactInternetSales table inside the AdventureWorksDW database, which is what we used to build our data source and view. This column is defined as a foreign key column to the DimTime table. So, the process decided to build an extra dimension for our use. Click on the very next tab named Dimension Usage and you should see a list of all available dimensions, including one named Dim Time (Ship Date). Scroll to the right and you will see the connection made to the FactInternetSales table. With the exception of the Browser tab at the far right, the remaining tabs are for functionality that is outside the scope of this introductory document. The Browser tab will let us start to examine the data, so lets get started. Before we are allowed to browse the cube, we need to process and deploy the project to the SSAS instance. Right-click on the project name in the Solution Explorer and select Properties. Make certain you are deploying to an instance of SSAS:

Right-click again on the project name and select Deploy. The cube will now be deployed to the instance of SSAS, and after it is complete we will be able to use the Browser tab. When the deploy is complete, go to the browser tab, and on the left expand the Measures, followed by Fact Internet Sales, then drag and drop the Sales Amount into the section that says Drag Totals or Detail Fields Here. You should see the following (Figure 15):

Figure 15 Next, we will start to slice and dice this number by adding some dimensions. So, find the Calendar Year attribute in the Order Date dimension and drag to the column section as follows (Figure 16):

Figure 16 Finally, drag and drop the Product Line into the columns section to see the following (Figure 16):

Figure 17 Finally, go get yourself a snack. You have built your first cube and are well on your way to a career in Business Intelligence. Keep experimenting with the steps I have outlined above. Over time you will become more familiar with the terminology and concepts and before long you will be offering to build cubes that would make Rubik himself proud. Good luck!