SITE INSPECTION REPORT Location: Installation of Transformer at ministry of information, Gwanara LT Network and Re-Connection of Yekini Aiyelore in offa

L.G.A to the national grid Contractor: Rural Electricity Board PREAMBLE This contract was awarded to REB (Pg 17 is relevant). The contractor wrote the ministry requesting for an additional payment(Pg 29-31 is relevant). A site inspection is mandatory to be carried to ascertain the claim of the contractor. OBSERVATION. A. Gwanara Township. 1. The reticulation of additional Low Tension network based on the approved BEME had been done. 2. A letter of appreciation from the community which testifies to the above observation is on page 31. B. Ministry of Information (information division) 1. The Construction of the Ht network had been done. 2. The substation work is yet to be done as the material needed is available but yet to be installed ( no transformer on site). C. Yekini Aiyelore Area in Offa. 1. The contractor is yet to be mobilized on this site.

RECOMMENDATION The sum of N 368,705.82 is now recommended as an additional payment to the contractor based on the value of work done at site. The relevant certificate valuation is on page 32 for your approval

ALAO A. NURUDEEN( Engn.Tech)

SITE INSPECTION REPORT Location: Elepo Aran area, oloje Community

Contractor: Fik Global Resources Ltd.. Preamble. The contractor wrote the ministry requesting for his final payment (pg3 ) is relevant, claiming the project is now completed. A site inspection is mandatory to be carried out to ascertain the claims of the contractor. Observation. 1. The HT Network is completed 2. The LT network is completed 3. The Substation work is also completed and connected to the national grid.

4. Mallam Abdullahi ( 08123543879) testifies to the above observations. Recommendation This project is at 100% completed and the sum of N 4,957,398.19 is now recommended as payment to the contractor. Details of payment till Date. Contract sum: N 8,794,218.18 50% mobilization: N 4,397,109.09 Recommended Payment now At 100%: N 4,957,398.19 Retention: N 439,710.90

ALAO A. NURUDEEN( Engn. Tech)

SITE INSPECTION REPORT Location: Gaa Alakuko, Gaa Alatare and Others L.G.A

Contractor: Rasheed Electrical Company. Preamble. This is one of the phase II Electrification project. The contractor wrote the ministry requesting for the release of retention on the installation of transformers at Gaa Alakuko, Gaa Alatare and other communities in Ifelodun L.G.A (pg 66 ) is relevant. A site inspection was carried to check if there could be any defect on the project. Observation. 1. Gaa Alakuko & Alatare( low Tension Network Extension) - There is no defect liability on the project 2. Gaa jubilee / Asipade (Installation Of Transformer & Reticulation of LT) - The Substation is still working perfectly. 3. Alasoro Isale( Extension of LT network) - There is no defect liability on the project. Recommendation There is no defect liability on this project and the sum of N 366,625.01 is now recommended as payment to the contractor as the retention fees due after six month.

ALAO A. NURUDEEN( Engn.Tech)

SITE INSPECTION REPORT Location: Gaa Idi-isin Community , Ilorin South L.G.A

Contractor: Comser Integrated Global Concept. Preamble. This is one of the phase II Electrification project. This project was connected to the national Grid since February, 2011. A site inspection was carried to check if there could be any defect on the project. Observation. - The Transformer is still properly functioning. - There is no defect liability on the project. Recommendation There is no defect liability on this project and the sum of N 511,765.84 is now recommended as payment to the contractor as the retention fees.

ALAO A. NURUDEEN( Engn.Tech)

SITE TAKE OVER REPORT

LOCATION:

Alfa funrae area, offa.

CONTRACTOR: Shanaya Global concept. TEAM Alao A. Nurudeen( Engn.Tech) Mr Yahaya Omeiza

Ministry of energy MD Shanaya Global Concept.

PREAMBLE Alfa funrae area is one of the recently awarded contracts on the installation of 3No. Un-installed 500KVA transformers in Offa L.G.A. The site take over was embarked upon. OBSERVATION. The following are the observation; (a) Additional work had been done on site, which differs from what was met at site during the survey exercise. However, earthing pit already done, existing HT poles dressed and uprisers cable was met at site. (b) The project is said to be financed through the world bank assisted project. (c) A sign post has just been put at site that display the details of the project.

RECOMMENDATION . This contractor is recommended for relocation to Level crossing area in offa and Kammanu Alayin in Offa L.G.A based on the attached BEME for both locations.

Alao A. Nurudeen(Engn.Tech)

SITE INSPECTION REPORT Location: Yanrin and Tewu in Baruten L.G.A Contractor: Rasheed Electrical Company. Preamble. This is one of the phase II Electrification project. The contractor wrote the ministry requesting for the release of retention on the installation of transformers at Gaa Alakuko, Gaa Alatare and other communities in Ifelodun L.G.A (pg 66 ) is relevant. A site inspection was carried to check if there could be any defect on the project. Observation. 1. Gaa Alakuko & Alatare( low Tension Network Extension) - There is no defect liability on the project 2. Gaa jubilee / Asipade (Installation Of Transformer & Reticulation of LT) - The Substation is still working perfectly. 3. Alasoro Isale( Extension of LT network) - There is no defect liability on the project. Recommendation There is no defect liability on this project and the sum of N 366,625.01 is now recommended as payment to the contractor as the retention fees due after six month.

ALAO A. NURUDEEN( Engn.Tech)

SITE INSPECTION REPORT Location: Idofin Igbana community, Oke-Ero L.G.A.

Contractor: sawji ventures PREAMBLE This project is basically on the replacement of burnt transformer at Idofin Igbana community at page 27-32 is the letter of completion and relevant test report submitted by the contractor. The need to inspect the site became mandatory to ascertain the claims of the contractor. OBSERVATION. The community is now enjoying electricity supply and the entire community (including the primary health centre and community chief palace) are now connected to the new installed transformer. RECOMMENDATION This project is now at 100% completion and the sum N1, 379, 531.25 is therefore recommended as payment to the contractor as per the c.v on page34.

DETAILS OF PAYMENT TILL DATE. Contract Sum: 50% mobilization: Recommended payment now: Retention: N 3,065,625.00 N 1,532,812.50 N 1,379,531.25 N 153,281.25

ALAO A. NURUDEEN ( Engn.Tech)

SITE INSPECTION REPORT Location: ELECTRIFICATION OF TAPO, BODO TUNTUN, BUDO OROGUN, AJAGUNSI, OJUGBEDE AND RAUFU IN ASA L.G.A. Contractor: M. A ADISA ELECTRICAL WORKS PREAMBLE This is one of the phase II project, the contractor wrote a letter to the ministry requesting for retention. A site inspection was mandatory to be carried out to ascertain if there is no defect liability at the site. OBSERVATION. The contractors job at the above stated community has no defect liability as the project was met in good condition. RECOMMENDATION This project has no defect and the sum of 476,842.83 is therefore recommended as retention fees due for the contractor.

DETAILS OF PAYMENT TILL DATE. Contract Sum: Payment made till date : Recommended retention fees : Balance : N 14,932,461.66 N 14,185,838.58 N 746,623.08 Nill

ALAO A. NURUDEEN( Engn.Tech)

TRANSFORMER ALLOCATION

S/NO 1. 2. 3.

L.G.A Asa Baruten Ifelodun

4.

Ilorin -East

5.

Ilorin-South

LOCATION Sapati-ile Deputy Gov. choice 1. Babanla 2. Olore Area babanloma 1. Agric Rea Sango 2. 1. S.A Energy 2. Al-Abrar Crescent 3. Araromin Ogidi 4.

TRANFO RATING 300/11 200/33 200/33 300/11 200/11

300/11 300/33 300/33

6.

Ilorin-West

1. Omodada Str. Okemole 2. Isale Shuban Area 3. Oganija Area 1. SieOlorunshogo 2. Ajase-Ipo 1. Owu -Isin 1. S.A Rural Electr. 1. Sisinnisun Area 1. Gaa Sanganmi 2. 1. 2. 1. 2.

300/11

300/11 200/11 300/11 300/11 200/33 200/33 200/33 300/11 200/33 200/33 300/33 200/33

7.

Irepodun

8. 9. 10 11. 12.

Isin Moro Kaima Oyun Edu

13. 14. 15. 16.

Patigi Ekiti Oke-Ero Offa

SITE INSPECTION REPORT Location: Gata Tepatan village, moro L.G.A.

Contractor: Vector Engineering company. PREAMBLE This is one of the phase II electrification project. The contractors letter of request is on page 81. The need to inspect the site became mandatory to ascertain the claims of the contractor. OBSERVATION. The community is still enjoying electricity supply and there is no defect liability on the project. RECOMMENDATION The sum N 296, 300.42 is therefore recommended as payment to the contractor as per the c.v on attached.

DETAILS OF PAYMENT TILL DATE. Contract Sum: Payment made till date: Recommended payment now: Retention: N 5,926,008.49 N 5,629,708.07 N 296,300.42 Nill.

ALAO A. NURUDEEN ( Engn.Tech)

SITE INSPECTION REPORT Location: ELECTRIFICATION OF YANRIN & TEWU COMMUNITY IN BARUTEN L.G.A. Contractor: ALUGOKE NIG. LTD PREAMBLE This is one of the phase II project, the contractor wrote a letter to the ministry requesting for retention. A site inspection was mandatory to be carried out to ascertain if there is no defect liability at the site. OBSERVATION. No defect liability was found at the two location as the project was met in good condition and people are enjoying electricity. RECOMMENDATION This project has no defect and the sum of 526,082.80 is therefore recommended as retention fees due for the contractor.

DETAILS OF PAYMENT TILL DATE. Contract Sum: Payment made till date : Recommended retention fees : Balance : N 11,193,251.16 N 9,995,573.29 N1 Nill

ALAO A. NURUDEEN( Engn.Tech)

Вам также может понравиться