SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

SECTION 15862 ODOUR SCRUBBER EQUIPMENT PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Deodourisation Plant No Equipment (Scrubbers) Equipment (Fans) Equipment (Recirculation Pumps) Equipment (Filtration System) Equipment (Softening System) 2. Deodourisation Plant No Equipment (Scrubbers) Equipment (Fans) Equipment (Recirculation Pumps) Equipment (Filtration System) Equipment (Softening System)

1.02

RELATED SECTIONS A. Section 01330 Submittals B. Section 01400 - Quality Assurance/Quality Control, Inspection and Testing C. Section 01600 - Materials and Equipment D. Section 01750 - Starting of Systems/Commissioning E. Section 01831 - Operation and Maintenance Manuals F. Section 09910 - Painting G. Section 09960 - Coating System for Ferrous Metals H. Section 11005 - General Provisions - Equipment I. Section 13400 - Instrumentation- General Requirements J. Section 13440 - Panel Mounted and Miscellaneous Instruments K. Section 15050 - Pipes and Pipe Fittings L. Section 15061 - Supports and Anchors M. Section 15075 - Mechanical Identification N. Section 15103 - HDPE Pipes and Fittings O. Section 15105 - uPVC Pipes and Fittings P. Section 15122 - Gauges and Meters Q. Section 16010 - General Provisions for Electrical Installation REFERENCES A. The publications listed below form a part of this specification to the extent referenced. publications are referred to in the text by the basic designation only. 1. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) a. ANSI BS4504 2. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) a. ASTM D3299 b. ASTM D4097 c. STM D2584 d. ASTM D1784-69 e. ASTM D1998-91 f. ASTM D1693 g. ASTM E84 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) a. ASME B40.1 NATIONAL BUREAU OF STANDARDS (NBS) a. NBS PS 15-69 INSTRUMENTS SOCIETY OF AMERICA (ISA) The

1.03

3. 4. 5.

Section 15862 - 1 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

6. 7.

US FOOD AND DRUG ADMINISTRATION (US FDA) a. 21 CFR 173.25 NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) a. NEMA 4X b. NEMA 3R ENVIRONMENTAL PROTECTION AGENCY (EPA) a. EPA Method 2

8. 1.04

DESIGN CONDITIONS A. The odour scrubber equipment manufacturer shall be responsible for the design of the systems to meet the specified odorous compound removal efficiency, as defined herein. B. The odour scrubber system including the chemical storage and feed systems shall be designed for outdoor installation. The design temperature ranges for all odor scrubber equipment shall be 0C to 65C ambient conditions. Suitable allowances shall be included for equipment exposed to direct sunlight. C. Scrubber towers, chemical storage tanks and exhaust stacks shall be designed for a wind load of 45 m/s. D. Provide 1 no. two stage scrubber for Deodourisation Plant No. [___] designed for the following conditions. 1. Equipment Tag Nos. a. Scrubber No [___] First Stage b. Scrubber No [___] Second Stage 2. 3. 4. 5. 6. Tower capacity (each) [______]. Inlet H2S concentration (to 1st stage) [______]. Maximum inlet air temperature [______]. Maximum inlet air relative humidity [______]. Total removal efficiency (1st & 2nd stages combined) [_______].

1.05

SUBMITTALS A. Submit shop drawings and product data for every element of the work, including, but not limited to mechanical equipment, piping arrangements, structural elements, uPVC and/or HDPE fabrications, miscellaneous metals, electrical equipment and other items as required in the specifications. B. If the Contractor proposes to deviate from any detail or component arrangement indicated on the drawings, he shall submit detailed drawings and descriptions of these deviations for approval. C. Submittals shall be in accordance with Section 01330 and shall include the following: 1. Manufacturers Data. 2. Shop drawings showing the complete assembly and fabrication including itemised bills of materials for all components, installed dimensions, location and size of all connections, detailed specifications, performance data and the items listed below: a. Foundation plan showing overall dimensions, anchor bolt locations, equipment lifting requirements, connection part sizes and locations and other pertinent installation details. b. Scrubber tower construction materials. c. Complete wiring diagrams for all electrical and control equipment. d. Seal water, electrical power and other utility requirements. e. Component weights and dimensions. f. Process and instrumentation drawings showing all process and control equipment together with schematic delineation of all piping and wiring links required between equipment for process and control purposes. g. Logic diagrams in "ladder" form showing the operating logic of each control system. Diagrams shall include standard ISA formatted loop diagrams as applicable.

Section 15862 - 2 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

h. i. 3. 4. 5. 1.06

Complete verbal description of the operating sequence of all control systems in all modes. Complete motor data for all motors.

Certified Test Reports. Manufacturer's Warranties. Operation and Maintenance Manual.

QUALITY ASSURANCE A. Supply equipment from a single manufacturer. B. Supply equipment from a manufacturer regularly engaged in manufacturing and production of odour scrubber equipment designed for use in domestic and industrial wastewater treatment odour control systems. Manufacturer must have installed a minimum of 5 (five) installations of similar size and type in satisfactory use for a period of not less than 5 (five) years, in climatic conditions similar to those on this project. C. The term installations shall mean individual projects/contracts. Multiple equipment units for a project will be considered as 1 installation towards meeting the experience requirements. Installations shall include, but not be limited to: 1. Name and location of installation. 2. Name, address and telephone number of person responsible for equipment. 3. Month and year equipment was placed in operation. 4. Brief description of equipment. DELIVERY AND STORAGE A. Store equipment with protection from the weather, excessive humidity and temperature; dirt, dust, or other contaminants and in compliance with manufacturers instructions. GUARANTEE A. Comply with the requirements of Sections 01330 and 01770 B. Guarantee components to be free of defects in materials or workmanship for 24 months from date of acceptance by the Ministry. C. Individual warranties by component manufacturer in lieu of single source responsibility by Odour Control System manufacturer will not be acceptable. D. Replace items which fail during warranty period, excluding expendable items, without cost to the Ministry. E. Provide manufacturers warranty certificates prior to equipment start-up.

1.07

1.08

PART 2 - PRODUCTS 2.01 MANUFACTURER A. The odour scrubber assembly shall include all necessary equipment and appurtenances as produced by recognised, reputable and acceptable manufacturers. B. Recirculation Pumps: These shall include all necessary equipment and appurtenances as produced by recognized, reputable and acceptable manufacturers C. Tower Packing:- This shall include all necessary equipment and appurtenances as produced by recognized, reputable and acceptable manufacturers D. Packaged Water Filtration/Softening System: This shall include all necessary equipment and appurtenances as produced by recognised, reputable and acceptable manufacturers E. Fans: These shall include all necessary equipment and appurtenances as produced by recognized, reputable and acceptable manufacturers. GENERAL MATERIAL AND EQUIPMENT REQUIREMENTS A. Provide nameplates on odour scrubber equipment as specified in Section 11005. B. Belts, pulleys, chains, gears, projecting setscrews, keys and other rotating parts shall be so located that any person who may come in close proximity shall be protected by equipment guards. C. All guards shall comply with OSHA requirements. D. Anchor bolts, nuts and washers: Type 316 stainless steel. E. Provide compound gauges on the suction side of pumps and standard pressure gauges on the discharge side of pumps, in accordance with Section 15122. Gauges shall comply with ASME B40.1. Gauge ranges shall be appropriate for the particular installation. SCRUBBER DESIGN A. Each scrubber shall be of the counterflow, packed bed tower type.

2.02

2.3

Section 15862 - 3 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

B. The scrubber shall contain in the main packed bed, a minimum depth of m of nominal 50mm size, toroidal helix shaped or spherical shaped filament packing, having a free volume of 95% with 28 sq metres of surface area per cu.metre of packing. Packing is to be randomly dumped into the scrubber. Construction material is to be polypropylene. Pressure drop per meter of packing shall not exceed 15 mm water column. C. The scrubber shall include an entrainment separator demister section, internal spray piping, packing, packing supports, lifting and hold down lugs. Demister shall be of corrosion resistant construction. D. All liquid handling nozzles, external to the vessel, shall be flanged with ANSI 150 lb. design and drilled in accordance with BS 4504. Gas handling nozzles shall have the dimensions as outlined in National Bureau of Standards PS 15-69. Minimum projection of nozzles shall be 150 mm. E. Scrubber nozzles and appurtenances shall be sized and arranged as shown on the drawings. Nozzles and appurtenances shall include as a minimum: 1. Make-up water inlet. 2. Overflow equipped with transparent sight glass 3. Scrubber liquor recirculation inlet (to spray header). 4. Scrubber liquor recirculation outlet (to pump suction). 5. pH probe mounting. 6. ORP probe mounting. 7. Level sensor/transmitter mounting connections with stilling well. 8. A minimum of three manholes with neoprene gaskets (for servicing spray nozzle, packed bed and for scrubber sump) 9. Hydrochloric acid supply connection. 10. Four GRP tie down lugs or base flange. 11. Mounting brackets for scrubber recirculation piping. 12. GRP ladder and working platform as shown on drawings. 13. Sight glass with suitable PVC isolation valves, to monitor visually the sump liquid level. 14. Liquid sampling valve. F. The scrubber tower shall be capable of operating at the design flow rate with a maximum total static pressure loss of 75 mm water column. The packing depth, recirculation rate, and recirculation solution shall be designed to meet the specified removal efficiency. G. An internal entrainment separator section of corrosion resistant construction shall be furnished with each tower. The separator shall be designed to remove not less than 99 percent of the entrained moisture of the air exiting the scrubber, consisting of droplets 10 microns and larger. H. Packing support plates for the main bed shall be manufactured from a chemical grade GRP resin, having 40 mm by 40 mm square openings and 40 mm deep. Packing support plates, if required, for the entrainment separator section shall be manufactured from injection molded GRP, having a minimum 84 percent open area , or same as above. Any internal supports required shall be of the same material as the shell. I. The scrubbing liquid distribution system shall be the spray type of manufacturers standard design, sized for the flow rates required to meet the performance requirements of this specification and taking into account varying air delivery rates of + 10%. No liquid re-distributors shall be permitted. Spray headers shall be placed at the manufacturers recommend distance above the packing. Material of construction shall be Schedule 80 PVC or other approved material for the scrubber service conditions. J. The scrubber shall be designed with an integral sump to supply scrubbing solution to the recirculation pumps. Design of this sump shall be to hold a minimum of two minutes supply of scrubbing liquid. Proper allowance for low level shutdown of the recirculation pumps and high level alarms shall be provided in designing of the sump height. The sump shall be furnished with a level sensor as specified herein.

Section 15862 - 4 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

K. No internal wetted metal bolts and fasteners are permitted. All external bolts and fasteners including anchor bolts and flanged bolts shall be type 316 stainless steel. Stainless steel anchor bolts and clips shall be provided by the manufacturer. L. The scrubber shall be supplied with integral mounting lugs and pipe supports for the scrubber liquor recirculation piping. Pipe supports shall be non-metallic, channels and straps. M. The scrubber shall have pressure taps located below the main packed bed and above the entrainment separator. A manometer type pressure differential gauge shall be provided which shall be calibrated in mm of water column. 2.04. MATERIALS A. Vessels - Alternative 1 - Fiberglass: 1. Construction requirements ; ASTM D3299 or D4097 2. Construction method: Filament wound. 3. Resin: a. Commercial grade evaluated as a laminate by test or determined by previous service for an environment which may contain ammonia, chlorine, dimethyl sulphide, diphenyl sulphide, ethyl mercaptans, indole, hydrogen sulphide, methylamine, methyl mercaptan, skatole, potassium permangenate, sodium hypochlorite, hydrogen peroxide, sodium hydroxide or potassium hydroxide. b. Shall not contain thixotropic agents or pigments. c. Ultraviolet absorbers added for vessels indicated for outdoor service. d. 5 percent antimony trioxide added for fire retardation. 4. Glass fibre reinforcing material: a. Commercial grade with a complying agent to provide bond between the glass fibre reinforcement and the resin. b. Vessel shall have an average glass fibre content of 55 percent +1% by weight, in accordance with ASTM D2584. Exterior vessel surface: Ferro-white or an equivalent gel coat finish as selected by the Engineer. Inner corrosion barrier: Resin-rich, 10-15 mil (minimum), not to exceed 20 percent + noncontinuous glass fibre by weight. Inner mat layer: Minimum two layers of chopped-strand mat or two passes of chopped roving to a total of 0.9 kg/m2. a. Should the chopped roving technique be employed, the chopped fibres shall be 12-50 mm length. Thickness inner corrosion barrier plus the inner mat layers 100 mils minimum, with 27 percent + 5 percent glass fibre by weight.

5. 6. 7.

8.

B. Vessels - Alternative 2 - Dual laminate: 1. Liner: Polyvinyl chloride (PVC); a. Rigid PVC sheets, ASTM D1784-69. b. Minimum wall thickness 5mm. c. Hot gas welded all seams and joints. d. Non-destructive spark test all welds. 2. Overlay: Fiber-reinforced plastic (FRP): a. Hand lay-up according to NBS PS-15-69. b. Isophthalic resin. c. Minimum four layers of 1 oz. chopped strand glass mat. d. Topcoat: Chlorendic resin, colour selected by Engineer.

C. Vessels - Alternative 3 - Rotationally Moulded High-Density Crosslinked Polyethylene (HDXLPE). 1. High density crosslinked polyethylene scrubbers shall be manufactured by the rotational moulding process in accordance with ASTM D 1998-91 Standard Specification for

Section 15862 - 5 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

2.

Polyethylene Upright Storage Tanks, Type 1 only. Rotational Moulding shall be defined as a three-stage process consisting of loading the mould with powdered resin, fusing the resin by heating while rotating the mould about more than one axis, and cooling and removing the moulded article. Plastics. The moulding powder used shall be Marlex CL-250 or CL-200 as manufactured by Phillips 66, or powders of equal physical and chemical properties. a. The polyethylene shall be virgin material. Use of regrind, recycled, or reprocessed materials or combinations of such materials, if allowed by the Engineer, shall not rely upon the performance data of their original constituents, but must meet the requirements of this standard in its own right. b. The polyethylene shall have a stress-cracking resistance of 500 h minimum F50 in accordance with Test Method D 1693, Condition A, full strength stress-cracking agent. The test specimens may be compression moulded or rotationally moulded. Fillers and Pigments. The plastic shall contain no fillers. All plastic shall contain an ultraviolet stabiliser at a level adequate to give protection for the intended service life of the vessel (minimum of 0.25%). This stabiliser shall be compounded in the polyethylene. Pigments must be compounded simultaneously with the resin manufacture.

3.

D. Vessel Construction: 1. Cut edges. All edges where openings are cut into the vessel shall be trimmed smooth. Cut edges in fiberglass vessels shall be edge sealed with resin. 2. Appearance. Finished vessel walls shall be free, as commercially practicable, of visual defects such as foreign inclusions, air bubbles, pinholes, pimples, crazing, cracking and delaminations, which will impair the serviceability of the vessel. 3. Dimensions and Tolerance. The vessel diameter shall be measured externally. The tolerances on the outside diameter, including out of roundness, shall be 1%. Measurement shall be taken in a vertical position. 2.05. FANS A. Fans shall be in accordance with the requirements of Section 15830 Fibreglass Centrifugal Fans. B. Motor: 1. Provide the fan with a horizontal squirrel cage induction type motor of sufficient power such that no point on the fan curve requires more than the nameplate power rating of the motor furnished without service factor. 2. The motor shall have a minimum service factor of 1.15. 3. The electric motor shall be suitable for single speed, 415volts, 3 phase, 50 Hertz, continuous 24 hour operation. PACKAGED WATER FILTRATION/SOFTENING SYSTEM A. General Description: 1. Provide a packaged water filtration/softening system to filter and remove hardness from the scrubber make-up water. All major system components such as tanks, distributors, controls, piping assemblies regenerant systems will all be designed, assembled and tested by a single source. B. Design Criteria: 1. Filtration System Design Parameter Plant No. [___] Equipment Tag Nos. Design Flow, (m3/hr.) Design Filtration Rate (l/s/m2) Backwash Flow rate (m3/hr) Media Volume, Minimum (m3) Deodourisation Plant No. [___] [_________] [_________] [_________] [____] [____] Deodourisation Plant No. [___] [__________] [__________] [__________] [____]

2.06

Section 15862 - 6 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

Tank Diameter (m) No. of tanks required Operating Pressure (Bar) Piping connections (mm) 2. Softening System Design Parameter Plant No. [__] Equipment Tag Nos. Design Flow (m3/hr) Outlet Hardness (mg/l) Resin Tank diameter (m) No. of Tanks Resin Volume (m3) Brine Tank diameter (m) Piping Connections (mm)

[____] [____] [____] [____] Deodourisation Plant No. [___] [_________] [_________] [______] [______] [____] [____] [____] [____]

[____] [____] [____] [____] Deodourisation Plant No. [___] [_________] [_________] [_____] [_____] [_____] [_____] [_____] [_____]

C. Filter Tank and Resin Tank: 1. The side shell height will be at least 1.4m and sufficient to allow adequate freeboard space during backwashing. Each tank will be designed for 7 bar, non-code construction. The tank will be supported by stainless steel legs that permit skid mounting. 2. The tank will be internally lined with a phenolic epoxy to a 4-6 mil thickness and then baked at 230 Deg C. The exterior will be sand blasted, painted with a rust-inhibiting primer, and then finished with a gloss epoxy top coat. 3. The tank will be equipped with an opening in the top head for mineral filling and periodic inspection. 4. The tank will be equipped with a 100mm x 150mm handhole near the bottom of the sideshell for underbed leveling and mineral cleanout. D. Distributor System: The filter and resin tanks will have a type 316 stainless steel upper distributor which will disperse water laterally, to minimise channeling within the media bed. The lower distributor will be of all-plastic construction in a hub-radial design. No slots will face upward, minimising the opportunity of channeling. Proper underbedding media will be provided to aid in the even collection of water and make efficient use of the filtering capability of the media. E. Filter Media: Each filter tank will have a multi-layer media bed, which is designed to operate as a depth filter rather than as a surface filter. The top layer will collect coarse turbidity. The middle layer will accumulate particles normally trapped by sand filters. The bottom layer of high density fine material will polish the water by removing particles down to 10 microns in size. Mineral density, particle size, uniformity coefficient and depth of each layer will be carefully controlled to ensure proper stratification after backwash and optimum performance in service. F. Softening Media: Each softener tank will be provided with resin having a minimum exchange capacity of 1.06 x106 grains/cu.m. when regenerated with 7 kgs of salt. The media shall be solid, of the proper particle size (20 by 50 mesh, U.S. standard screen) and will contain no agglomerates, shells, plates or other shapes that might interfere with the normal function of the water softener. The resins will be manufactured to comply with the food additive regulation, 21 CFR 173.25 as set forth by the US FDA. G. Front Piping: Piping for each filter and resin tank will be provided. Fittings will be 250 pound class malleable iron. All valves and piping will be fully assembled and leak tested at the factory before shipment to the job site. The pre-plumbed assembly will be prime painted. H. Brine System: 1. A combination salt storage and brine tank, with cover, will be provided. The tank will be molded of corrosion-proof, high-density polyethylene. 2. The brine tank will be equipped with an elevated salt plate for the brine valve, which will automatically open to admit brine to the resin tank during eduction and close automatically to prevent introduction of air into the resin tank. During refill, the brine valve will regulate the flow of treated water into the brine tank, working with the time refill feature of the control valve. Together these components will admit the correct volume of water to the brine tank in

Section 15862 - 7 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

accordance with the salt dosage settings on the control valve. The brine valve will include a float-operated safety shut-off valve, as a back-up to the time refill valve on the control, to prevent overflowing of the brine tank. I. Filter Automatic Controls: 1. The filter will be equipped with an electrical control to operate the opening and closing of a diaphragm valve nest by means of a pilot valve. In addition, the filter will be equipped with flow controls to regulate the flow of water during the backwash and purge cycles. They will be factory selected to prevent mineral loss and restrict wastewater discharge. Accuracy will be within 15% of the rated flow over the operating pressure range of the system. 2. The electrical control mechanism will be enclosed in a gasketed moisture-resistant case. The enclosure will conform to NEMA 3R enclosure standards. The unit will have provisions for individual adjustment of backwash and rinse cycles, and provisions for manually regenerating the water filter by means of inlet hydraulic pressure, even without the use of electric power. Regeneration will be controlled by a seven-day calendar clock that permits regeneration at any time of the day or night, any or every day of the week. Inlet and outlet pressure gauges with isolation valves will be supplied 3. The system shall include for a programmable electronic controller and turbine type flow meters to be installed in the outlet (service) pipe of the unit, which will allow control of backwashing to be on water use. It will include turbine meter(s) and a solid state control device to permit regeneration on a metered volume basis. The system will include one turbine to allow two tanks to regenerate on an alternating basis. Softener Automatic Controls: 1. The automatic control will be of top mount design and all-brass construction. It will utilise a bolt-down flange connection to permit proper positioning between the valve and the conditioner tank openings. It will have provision for either left-hand or right-hand raw water plumbing to simplify installation, while maintaining a forward-facing timer for easy servicing. The control will be a fully automatic multi-port control valve operated by a rotary pilot that hydraulically or pneumatically activates cartridge style diaphragm valves to accomplish regeneration. The multiport valve will incorporate self-adjusting flow regulators to control the rate of flow and to prevent resin loss during backwash, brine-rinse and brine tank refill positions, regardless of pressure fluctuations between 2 and 6.8 bar. The control will open and close slowly to prevent noise and hydraulic shock. It will have provisions for bypass of hard water during the regeneration cycle or elimination of the bypass, depending upon the requirements. The electrical control mechanism will be enclosed in a gasketed, moisture-resistant case. The enclosure will conform to NEMA 3 enclosure standards. The unit will have provisions for individual adjustment and backwash and rinse cycle, and provisions for individual adjustment of backwash and rinse cycle and provisions for manually regenerating by means of inlet hydraulic pressure even without the use of electric power. Regeneration will be controlled by a seven-day calendar clock that permits regeneration at any time of the day or night, any or every day of the week.

J.

K. Power Requirement : 240V/single phase. 2.07 RECIRCULATION PUMPS A. Provide and install pumps, as shown on the contract drawings and specified herein. Each pump shall be a flexible coupled, single stage, end suction, horizontal, back pullout type, corrosion resistant, centrifugal pump. B. Pumps shall be designed for the following conditions: 1. Deodorisation Plant No. [____] Equipment Tag Nos. : [_________], [___________] [_________], [___________] [_________], [___________] [_________], [__________] Number of Pumps : [___] Motor Rating (Minimum) : [___] Motor Speed (Maximum) : [_______]

Section 15862 - 8 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

Capacity (l/s) Head (m) 2.

: :

[_____] [_____]

Deodorisation Plant No. [____] Equipment Tag Nos. Number of Pumps Motor Rating (Minimum) Motor Speed (Maximum) Capacity (l/s) Head (m) : : : : : : [___] [___] [_______] [_____] [_____] [_________], [___________]

C. Impellers shall be balanced shrouded fiberglass reinforced polyester. D. The pump casing shall be a resin injected fibreglass reinforced polyester volute design. The casing shall be free standing supported by heavy-duty non-metallic feet. Suction and discharge nozzles shall be ANSI flat face flanges drilled to comply with BS 4504. E. The shaft shall be constructed of Type 316 stainless steel of sufficient diameter to assure rigid support of the impeller to prevent excessive vibration. F. The shaft sleeve shall be integral with the impeller, constructed of fiberglass reinforced polyester. G. The bearing housing shall be constructed of cast iron, machined with precision pins of tongue-andgroove construction, to ensure permanent alignment. H. Bearings shall be of the anti-friction, oil lubricated, ball type and enclosed in a cast iron, oil-tight bearing frame. All bearings shall have a minimum B-10 rating of 100,000 hours under full load continuous 24 hour duty. Bearings shall be oil lubricated. The pump shall be equipped with constant level oiler. I. The shaft seal shall be by packing with external flush. A complete Seal water supply system shall be provided for each pump, fed from the plant water supply as shown on the drawings. J. Pumps and motors shall be bolted to a common GRP baseplate. Pumps shall be grouted in place with organic epoxy grout. K. Pumps shall be flexibly coupled to the motor with a suitable coupling. Coupling guard shall be provided. L. Motor. 1. Each pump shall be provided with a horizontal squirrel cage induction type motor of sufficient power such that no point on the pump curve requires more than the nameplate horsepower of the motor furnished without using service factor. 2. Motor shall have a minimum service factor of 1.15. 3. Each motor shall be suitable for 415 Volts, 3 phase, 50 Hertz continuous 24 hour operation 2.08 2.09 CHEMICAL FEED PUMPS A. Provide chemical feed pumps, as specified in Section 11346, for the odour scrubber system. GRP CENTRIFUGAL PUMPS A. GRP centrifugal pumps, as specified in Clause 2.07, above shall be provided for the odour control system. FIBERGLASS REINFORCED PLASTIC TANKS A. Fiberglass reinforced plastic tanks, as specified in Section 15450, shall be provided for the odour control system. INSTRUMENTATION AND CONTROLS A. All instrumentation devices, control panels and wiring shall meet the requirements of Division 13. B. A complete pre-wired control panel shall be provided for each deodorisation plant. The panel shall include all devices necessary for complete operation of the odour scrubber systems. Contacts/interfaces shall be provided as necessary to provide alarm and monitoring signals to the plant DCS for supervisory control, where shown on the P & ID drawings or specified in the system descriptions.

2.10

2.11

Section 15862 - 9 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

C. Instrumentation devices shall be as specified in Sections 13400 and 13420. 1. pH monitoring: a. Start/stop control of NaOH metering pumps 2. 3. 4. H2S Monitor, with sensors and sampling points at inlets and outlets of each scrubber. ORP monitoring a. Start/stop control of NaOCl metering pumps Sump level transmitters a. Recirculation pump loss of flow protection b. Sump make-up water control Differential pressure monitoring across towers a. Alarm on high differential pressure indicating scrubber system potential failure Continuous level sensors - flange mounted a. Refer to Section 13934 Capacitance Level Instruments.

5. 6. 2.12

PIPING AND APPURTENANCES A. All piping and appurtenances provided for the odor scrubber equipment shall meet the requirements of Division 15 Mechanical including piping, valves, strainers, etc. SUMP OVERFLOW TRAP A. Provide a trap on the scrubber sump overflow line to prevent air inflow through the scrubber. ACID SUPPLY CONNECTION A. The scrubber shall be equipped with a nozzle for addition of a dilute acid solution to the sump. A 50 mm PVC ball valve and 50 by 100 mm funnel shall be installed as recommended by manufacturer. B. An acid tank, including all necessary piping and accessories shall be included, to provide a source of acid. CONTROL PANEL A. The odour scrubber equipment manufacturer shall furnish control panels for the system as shown on the Contract Drawings and as specified herein. B. The control panel shall be furnished factory wired with all equipment and appurtenances mounted thereon and shall include the following: 1. Motor control switches and indicating lights for the fans, recirculating pumps, chemical metering pumps, pH and ORP analyzer. 2. Interfacing with plant DCS (Distribution Control System) as shown on the drawings 3. Interlocks between recirculating pumps, chemical metering pumps, and sump level control. Interlocks between pH and ORP Analyser/Controllers, chemical metering pumps, and the makeup water solenoid valve and level control as shown on the Drawings. 4. Selector switches for manual or automatic operation. C. The control panel enclosure shall be NEMA 4X construction, front access type, located as shown on the Drawings. Panel construction and components shall meet the requirements of Section 13440. The power service shall be 220 Volts, single phase, 50 hertz to the panel.

2.13 2.14

2.15

2.16

SAFETY SHOWER & EYE WASH A. The unit shall provide a complete emergency station for first-aid with both eyewash and shower available in one location. B. The unit shall be supplied with chemically resistant wash hand basin, cabinet and table with drawers, together with at least two chairs. C. Unite shall be supplied with a deluge shower and hand operated eye wash, which are operated separately. D. Provide universal emergency sign with each unit. E. Unit shall be designed to be used in corrosive atmospheric areas.

Section 15862 - 10 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

F.

Materials 1. Shower Head: a. Stainless steel b. Projected with dust covers and automatically release with water pressure. 2. Shower Valve a. Instant-action, stay-open, special corrosion resistant, stainless steel ball valve which operates with easily located rigid stainless steel pall rod with triangular handle. Standard a. 32 mm dia, stainless steel pipe with 225 mm dia, stainless steel floor flange. b. All fittings shall be stainless steel. Eye Wash a. Stainless steel bowl with twin stainless steel soft flow spray heads and circular stainless steel face spray spring to bathe entire face. b. Automatic, pressure compensation devices shall be provided for constant steady water flow. c. Unit shall be operated by foot treadle. d. Supply line : 32 mm dia e. Waste line : 32 mm dia

3.

4.

2.17

SPARE PARTS A. Provide spare parts in the quantities indicated for each size and type of the odour scrubber equipment furnished under this section. Parts shall be packaged for prolonged storage, and the package shall clearly identify the equipment to which it applies. B. Spare parts shall be delivered to the Ministry stores and stored in accordance with the manufacturers recommendations. 1. 2. 3. 4. 5. Item Quantity Packing 5 percent of total packing Spray nozzles 1 set Fan V belts 2 sets/Fan Fan Bearings 1 set per fan type Furnish the following spare parts for each pump: Item Quantity a. Set of complete bearings. 1 b. Sets of stuffing box packing. 3 c. Flexible coupling. 1 d. Set of wear rings. 1 e. Sets of rubber coupling buffers. 2 f. Set of shaft sleeves. 1 g. Lantern rings for packing box. 3 Furnish the following spare parts for each pump type: Item Quantity a. Impeller. 1 b. Pump shaft. 1 c. Complete motor. 1

6.

PART 3 - EXECUTION 3.01 EQUIPMENT INSTALLATION A. Odour scrubber equipment and appurtenances shall be installed in the orientation indicated and in accordance with the manufacturer's written instructions. MANUFACTURER'S SERVICES A. Provide on site, the services of a manufacturer's representative who is experienced in installation, adjustment, and operation of the equipment for 10 (ten) days, with a minimum of 2 (two) trips. The representative shall supervise the installation, adjustment, and testing of the following equipment. 1. Initial start-up and the check out of each odour control system. 2. Placing the scrubber into operation.

3.2

Section 15862 - 11 MINISTRY OF PUBLIC WORKS - KUWAIT

SANITARY ENGINEERING GENERAL SPECIFICATIONS

ODOUR SCRUBBER EQUIPMENT

3. 3.03

Final testing and adjusting of all components including chemical feed equipment so that type, pH, concentration and feed rate of chemical reagents are properly determined.

FIELD TESTING AND ADJUSTING EQUIPMENT A. Operational Test 1. After the installation is complete and other related and required portions of the plant are also available, operational field testing shall be conducted under the supervision of the Manufacturer's qualified personnel. Component tests shall be conducted to demonstrate to the Engineers satisfaction that: a. All system components are fully operational. b. All control and instrumentation components have been properly calibrated and adjusted. c. The blower system is ready for continuous safe operation and blower installation meets the specified performance requirements. 2. Demonstrate that the equipment is not defective, is in a safe and satisfactory operating condition and conforms to the operating characteristics. 3. During tests, make observations of pump and fan head, capacity and motor input. Promptly correct or replace all defects or defective equipment revealed by or noted during tests 4. All rotating equipment shall be subjected to a vibration analysis with a maximum acceptable vibration amplitude of 75 microns under the full operating range. This test requirement shall include the fans and recirculation pumps. 5. The system shall be subject to a final operation test after the facility has commenced operating with raw/septic sewage to show that it can effectively remove the odours and to make final adjustments 6. In case of failure to show fitness and ability to function as required, modify, rebuild or replace equipment or parts thereof at no additional cost to the Ministry, until equipment has been made acceptable in accordance with specifications and until satisfactory acceptance tests have been performed. Repeat tests until satisfactory results have been obtained. 7. No contract time extensions will be granted for testing, retesting, or modifications of equipment. B. Retesting 1. Correct defects revealed during testing and retest until all defects are corrected. 2. All costs involved in retesting shall be borne by the Contractor.

3.04

FIELD TRAINING A. Provide field training course for designated operating and maintenance staff in accordance with Section 01820. B. Provide training for a total period of 8 (eight) hours of normal working time. This time is separate from and independent of the time allocated for services under Clause 3.02 above. Start after the system is functionally complete but prior to final acceptance tests. Cover items contained in the operating and maintenance manuals.

END OF SECTION

Section 15862 - 12 MINISTRY OF PUBLIC WORKS - KUWAIT