HORIZONTAL THREE PHASE SEPRATOR SIZING CALCULATION SHEET (DOUBLE WEIR TYPE 2) Input Data Volumetric Flow Rate Density Viscosity Particle Dia. Oil in Vapor Oil in Water Water in Oil Light Droplet Terminal Velocity CRe2 Drag Coefficient Terminal Velocity Heavy Droplet Terminal Velocity 2 CRe Drag Coefficient Terminal Velocity Trial Diameter Inlet Nozzle Size Hv/D Ratio Weir Safety Height Vapor Space Heavy Phase 1st Weir Height Light Phase Weir Height Vessel Cross sectional Area Separation Compartment BTM - LLIL LLIL - LIL LIL - NIL NIL - HIL HIL - HHIL HHIL - WIER Total Liquid level Height Light Droplet Rising Time heavy phase Cross Sec. Area Heavy Phase Velocity Lmin light drop through heavy pha Heavy Droplet Settling time Light phase Cross Sec. Area Light Phase Velocity Lmin heavy drop through light pha Separation Comp. Length BTM - LLIL Hold up Time LLIL - LIL Hold up Time LIL - NIL hold up Time NIL - HIL hold up Time HIL - HHIL hold up Time HHIL - WIER hold up time Heavy Phase hold up Time Unit m3/hr kg/m3 CP micron micron micron Vapor 66.9 3.94 0.01396 100 100 100 Light Phase Heavy Phase 3.5 60.0 835.9 980.8 5.649 0.4997

------m/sec

7.4 79.93 0.0016

------m/sec mm mm ---mm mm mm mm m2

0.05 11609.16 0.0001 3200 250 0.2 200 640 2550 2350 8.04

mm mm mm mm mm mm mm min m2 m/sec mm min m2 m/sec mm mm min min min min min min min

300 300 1250 150 150 200 2350 19.8 4.8 0.003 4100 59.6 1.4 0.001 2462 4200 1.72 2.77 15.83 1.97 1.93 2.46 15.83

www.chemwork.org

PROJECT : PROJ. NO. : CLIENT : UNIT :

DATE : BY : REV : DOC NO.:

S.R. M.

HORIZONTAL THREE PHASE SEPRATOR SIZING CALCULATION SHEET (DOUBLE WEIR TYPE 2) Light Phase Compartment Light Phase Weir Height BTM Bucket - LLLL LLLL - LLL LLL - NLL NLL - HLL HLL - HHLL HHLL - WIER Total Liquid level Height Light Phase Comp. Length BTM - LLLL Hold up Time LLLL - LLL Hold up Time LLL - NLL hold up Time NLL - HLL hold up Time HLL - HHLL hold up Time HHLL - WIER hold up time Hold up Time Heavy Phase Compartment Space Between 1st & 2nd Weir 2nd Wier Height (based on NIL) BTM - LLLL LLLL - LLL LLL - NLL NLL - HLL HLL - HHLL HHLL - WIER Total Liquid level Height Heavy Phase Comp. Length BTM - LLLL Hold up Time LLLL - LLL Hold up Time LLL - NLL hold up Time NLL - HLL hold up Time HLL - HHLL hold up Time HHLL - WIER hold up time Hold up Time Vapor Side K vlaue Terminal Velocity Mesh Pad Correction Factor Drop out Time Av Cross sectional Area Vapor Velocity Lmin light phase thr. vapor Vessel Length L/D

mm mm mm mm mm mm mm mm mm min min min min min min min

2350 200 350 650 600 250 300 2350 300 0.62 1.80 4.68 4.87 2.00 2.27 9.54

mm mm mm mm mm mm mm mm mm mm min min min min min min min

200 2276 300 300 1000 250 200 226 2276 5500 1.12 1.81 8.17 2.19 1.72 1.86 10.36

ERROR

m/sec m/sec ---sec m2 m/sec mm mm ----

0.015 0.22 1.00 2.97 1.17 0.02 47 8640 2.70

www.chemwork.org

PROJECT : PROJ. NO. : CLIENT : UNIT :

DATE : BY : REV : DOC NO.:

S.R. M.

HORIZONTAL THREE PHASE SEPRATOR SIZING CALCULATION SHEET (DOUBLE WEIR TYPE 2)

640 NLL HHIL HIL NIL LIL LLIL

HHLL 2350 2150 2000 1850 600 300

2560 2276 2050 1850 1600 600 300 HHLL HLL NLL LLL LLLL

3200

1440

4200

3000

L Z A (H H ) + 1 0 0 m m

fw h

owh

N1

N2 ow l N3

N4

S m a ll Q l / Q h ra tio

www.chemwork.org