NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 6/29/2010 6/29/2010 7/21/2010 7/21/2010 7/1/2010 8/7/2010 8/7/2010 8/9/2010 8/11/2010 8/15/2010 8/24/2010 8/24/2010 8/25/2010 8/25/2010 8/28/2010 8/31/2010 9/2/2010 9/2/2010 9/5/2010 9/18/2010 9/28/2010 9/28/2010 10/11/2010 10/13/2010 11/3/2010 11/10/2010 11/21/2010 11/27/2010 11/28/2010 11/30/2010

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S SURVEYING DESCRIPTION Level for Excavation in All Building Level for Excavation in All Building Level for Excavation in Main Building & Service Building Termite Control Under Foundation Termite Control Under Foundation Coordinates & Level for Foundation in Main & Service Building Steel for Foundation in Main Building & Service Building Surveying + Shuttering Work for Foundation in Main & Service Bldg Steel for Foundation in Main Building & Service Building Compaction Test Before Pouring Boundary Wall Surveying for Column Neck in Main Building & Service Building Surveying for PCC for Water Tank & Holding Tank Surveying for Column Neck in Main Building & Service Building Compaction Test for Water Tank & Holding Tank Before Casting Compaction Test for Boundary Wall Compaction Test for Holding Tank,Water Tank and Boundary Wall Compaction Test for Holding Tank,Water Tank and Boundary Wall Surveying Work for Boundary Wall,Water Tank and Holding Tank Termite Control Before Casting Surveying Foundation Boundary Wall Axis for Boundary Wall Axis for Boundary Wall Coordinates for Water Tank & Holding Tank Axis for Column Neck Fence Level for Slab in Holding & Water Tank First Layer of Compaction around Foundation First Layer of Back Filling Around Foundation Compaction Test for 1st Layer around Foundation Compaction Test for 2nd Layer around Foundation Compaction Test for 3rd Layer around Foundation

REV 0 1 0 0 1 0 0 0 1 0 0 0 1 0 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 0

STATUS REJECT APPROVED APPROVED REJECT REJECT REJECT REJECT APPROVED APPROVED REJECT REJECT REJECT APPROVED REJECT REJECT REJECT APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED REJECT REJECT APPROVED APPROVED APPROVED

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

12/1/2010 12/2/2010 12/4/2010 12/5/2010 12/7/2010 12/9/2010 12/11/2010 12/15/2010 12/15/2010 12/15/2010 12/20/2010 12/25/2010 12/28/2010 12/28/2010 1/4/2011 1/9/2011 1/9/2011 1/10/2011 1/18/2011 1/22/2011 1/23/2011 1/25/2011 1/25/2011 1/26/2011 1/27/2011 1/30/2011 2/3/2011 2/6/2011 2/6/2011 2/8/2011 2/9/2011 2/24/2011 2/24/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Compaction Test for 4rd Layer around Foundation Compaction Test for 3rd Layer of Boundary Wall around Foundation Compaction Test for 5th Layer around Foundation Compaction Test for 6th Layer around Foundation Compaction Test for 7th Layer around Foundation Compaction Test for 8th Layer around Foundation Compaction Test for 9th Layer around Foundation Level of Slab for Water Tank Level of Slab for Holding Tank Level of Blinding for Grade Beam in Main,Service Building & Boundary Wall
Termite Control Under Grade Beam for Main,Service Bldg and Boundary Wall. Back Side and Right Side

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 2 0 0 1 1 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED REJECT APPROVED REJECT APPROVED APPROVED APPROVED APPROVED

0 APPROVED

Termite Control Under Grade Beam for Main Building and Service Building Axis & Coordinate for Boundary Wall Axis, Level and Coordinate for Grade Beam in Main & Service Building Axis and Dimension for Column Main Building & Service Building Axis and Level For Boundary Wall Dimension for Columns in Main,Service Building & Boundary Wall Level for Staircase for Main Building Surveying for First Floor Slab Main Building Surveying for Roof Floor Slab Service Building Level for Main Building Slab Repairing of Surface in Water Tank & Holding Tank Level for Roof Slab of Service Building Repairing of Surface in Water Tank & Holding Tank Axis for Columns of First Floor Main Building Repairing Surface of Holding Tank Repairing External Surface of Holding Tank & Water Tank Surveying for Roof Slab Main Building Repairing External Surface of Holding Tank & Water Tank Repairing External Surface of Holding Tank Surveying for Roof of Main Building Axis & Level for Generator Room and Boundary Wall Foundation Backfilling & Compaction Test under Slab on Grade in Service Building

64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96

2/26/2011 2/26/2011 2/26/2011 2/26/2011 2/26/2011 2/28/2011 2/28/2011 3/5/2011 3/5/2011 3/17/2011 3/19/2011 3/19/2011 3/21/2011 3/21/2011 3/23/2011 3/23/2011 3/23/2011 3/28/2011 4/6/2011 4/9/2011 4/9/2011 4/9/2011 4/10/2011 4/10/2011 4/10/2011 4/11/2011 4/13/2011 4/13/2011 4/18/2011 4/28/2011 6/14/2011 7/9/2011 7/9/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Backfilling & Compaction Test for Main Building Backfilling & Compaction Test Around Water Tank First Layer Backfilling & Compaction Test Around Water Tank Second Layer Backfilling & Compaction Test Around Water Tank Third Layer Backfilling & Compaction Test Around Water Tank Fourth Layer Footing & Neck Column for Generator Room Footing Boundary Wall Termite Control Under Slab on Grade in Main Building Termite Control Under Slab on Grade in Service Building Backfilling & Compaction Test for Boundary Wall 2nd Layer Backfilling & Compaction Test in fornt side Boundary Wall 3rd Layer Backfilling & Compaction Test in fornt side Boundary Wall Level for Roof Slab of Holding Tank First Layer Backfilling & Compaction Test in Fornt side Boundary Wall 2nd Layer Backfilling & Compaction Test in Fornt side Boundary Wall 3rd Layer Backfilling & Compaction Test in Fornt side Boundary Wall Testing for Water in Holding Tank Dimension for Fornt Side Boundary Wall Dimension Axis for Boundary Wall Column Protection Layer for Holding Tank 1st Layer Backfilling & Compaction Test Around Holding Tank 2nd Layer Backfilling & Compaction Test Around Holding Tank 3rd Layer Backfilling & Compaction Test Around Holding Tank 4th Layer Backfilling & Compaction Test Around Holding Tank 5th Layer Backfilling & Compaction Test Around Holding Tank Repairing for Surface in 2nd Holding Tank 1st Line Masnory Block Work in Boundary Wall 2nd Layer Epoxy Water Proofing in Holding Tank Plates in Column in fornt Side Boundary Wall Level for Generator Room Slab Shmedit Hummer Test for Electrical Room Level for Inverted Beam of Boundary Wall Level for Inverted Beam of Parapet Main Building & Service Building

0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED REJECT APPROVED REJECT APPROVED REJECT APPROVED APPROVED

97

7/19/2011 AL-BATRA

Level & Coordinate for Drainage Manhole

0 APPROVED

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 7/21/2010 7/21/2010 8/7/2010 8/9/2010 8/9/2010 8/11/2010 8/15/2010 8/15/2010 8/18/2010 8/24/2010 8/24/2010 8/25/2010 8/30/2010 9/2/2010 9/4/2010 9/5/2010 9/5/2010 9/5/2010 9/20/2010 9/21/2010 9/30/2010 9/30/2010 10/4/2010 10/4/2010 10/9/2010 10/9/2010 10/10/2010 10/10/2010 10/14/2010 10/14/2010

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S CONCRETE DESCRIPTION Level for Blending Concrete in Main Building & Service Building Casting of PCC for Main Building & Service Building Casting of PCC for Holding Tank & Water Tank Coordinates & Level for Holding Tank & Water Tank Shuttering for Footing in Main Building & Service Building Casting of Foundation in Main Building & Service Building Casting of Foundation in Main Building & Service Building Casting of Foundation in Main Building & Service Building Reinforcement for Column Neck in Main Building & Service Building Shuttering for Columns Neck in Main Building & Service Building Shuttering for Water Tank & Holding Tank Shuttering for Columns Neck in Main Building & Service Building Shuttering for Columns Neck in Main Building & Service Building Form Work for Boundary Wall,Water Tank and Holding Tank Form Work for Boundary Wall,Water Tank and Holding Tank Casting for Column Neck in Main & Service Building Blinding Foundation for Boundary Wall Blinding for Water Tank & Holding Tank Shuttering & Steel for Boundary Wall Casting Foundation for Boundary Wall Steel for Remaining Footing Boundary Wall West Side Continous Footin Shuttering for Remaining Footing Boundary Wall West Side Continous Footing Steel for Remaining Footing Boundary Wall West Side Continous Footing Shuttering for Remaining Footing Boundary Wall West Side Continous Footing Casting of PCC Screed above Water Proofing Membrane in Water & Holding Tank Casting of Foundation for Boundary Wall Casting of PCC Screed above Water Proofing Membrane in Water & Holding Tank Casting of Foundation for Boundary Wall Steel for Foundation for Water & Holding Tank Steel for Boundary Wall

REV 0 0 0 0 0 0 0 2 0 0 0 1 2 0 1 0 0 0 0 0 0 0 1 1 0 0 1 1 0 0

STATUS APPROVED REJECT REJECT REJECT APPROVED APPROVED REJECT APPROVED APPROVED REJECT REJECT REJECT APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT REJECT REJECT APPROVED APPROVED REJECT REJECT APPROVED APPROVED REJECT APPROVED

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

10/17/2010 10/18/2010 10/23/2010 10/27/2010 10/27/2010 10/27/2010 11/2/2010 11/4/2010 11/8/2010 11/9/2010 11/11/2010 11/11/2010 11/20/2010 12/15/2010 12/15/2010 12/15/2010 12/16/2010 12/16/2010 12/20/2010 12/21/2010 12/22/2010 12/25/2010 12/25/2010 12/28/2010 12/28/2010 12/28/2010 12/28/2010 12/28/2010 12/29/2010 12/30/2010 12/30/2010 12/30/2010 12/30/2010

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Shuttering for Water & Holding Tank Shuttering for Water & Holding Tank Shuttering for Boundary Wall Casting for Foundation For Water & Holding Tank Casting Column Neck Boundary Wall Casting Boundary Wall (Wall) Steel for Walls of Holding & Water Tank Repairing Walls for Boundary Walls Steel for Water & Holding Tank Walls Shuttering for Water Tank Walls Shuttering for Holding Tank Walls Casting for Walls of Holding Tank & Water Tank
Tie Rod Holes after Filling Neto Mortar Outside & Inside Walls of Water & Holding Tank.

Shuttering of Blinding for Grade Beam in Main,Service Building &Boundary Wal Steel for Slab of Water Tank Steel for Slab of Holding Tank Shuttering for Water Tank Shuttering for Holding Tank
Casting Blinding for Grade Beam Main,Service Building and Boundary Wall. Back & Right Side

Casting for Water Tank & Holding Tank Slab


Casting Blinding for Grade Beam Main,Service Building and Boundary Wall. Back & Right Side

Casting Blinding for Grade Beam Main Building and Service Building Steel for Grade Beam of Boundary Wall Shuttering for Grade Beam of Boundary Wall Steel for Grade Beam of Main Building Steel for Grade Beam of Service Building Shuttering for Grade Beam of Main Building Shuttering for Grade Beam of Service Building Casting Grade Beam for Main, Service Building and Boundary Wall Shuttering for Grade Beam of Boundary Wall Steel for Grade Beam of Main Buildin Steel for Grade Beam of Service Building Casting of Boundary Wall

0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 1 1 1

REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED REJECT REJECT REJECT APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED

64 12/30/2010 AL-BATRA 65 1/2/2011 AL-BATRA 66 1/6/2011 AL-BATRA 67 1/6/2011 AL-BATRA 68 1/6/2011 AL-BATRA 69 1/9/2011 AL-BATRA 70 1/9/2011 AL-BATRA 71 1/9/2011 AL-BATRA 72 1/9/2011 AL-BATRA 73 1/9/2011 AL-BATRA 74 1/11/2011 AL-BATRA 75 1/18/2011 AL-BATRA 76 1/23/2011 AL-BATRA 77 1/23/2011 AL-BATRA 78 1/25/2011 AL-BATRA 79 1/26/2011 AL-BATRA 80 1/26/2011 AL-BATRA 81 1/29/2011 AL-BATRA 82 1/30/2011 AL-BATRA 83 1/31/2011 AL-BATRA 84 2/2/2011 AL-BATRA 85 2/6/2011 AL-BATRA 86 2/10/2011 AL-BATRA 87 2/12/2011 AL-BATRA 88 2/24/2011 AL-BATRA 89 2/24/2011 AL-BATRA 90 2/24/2011 AL-BATRA 91 2/24/2011 AL-BATRA 92 2/24/2011 AL-BATRA 93 2/26/2011 AL-BATRA 94 2/26/2011 AL-BATRA 95 2/26/2011 AL-BATRA 96 2/28/2011 AL-BATRA

Casting Grade Beam for Service Building & Main Building Casting Grade Beam for Service Building & Main Building Steel for Ground Floor Columns for Main Building Steel for Ground Floor Columns for Service Building Steel for Ground Floor Columns for Boundary Wall Shuttering for Ground Floor Columns for Boundary Wall Shuttering for Ground Floor Columns for Service Building Shuttering for Ground Floor Columns for Main Building Shuttering for Staircase Main Building Steel for Staircase Main Building Casting Columns in Main Building , Service Building and Boundary Wall Shuttering for First Floor Slab in Main Building Steel for Main Building Slab Shuttering for Service Building Slab Steel for Slab in Service Building Casting First Floor Slab of Main Building Casting Roof Slab of Service Building Steel for Columns of Second Floor Main Building Shuttering for Columns of Second Floor Main Building Casting Columns of Second Floor in Main Building Casting Columns of Second Floor in Main Building Shuttering for Second Slab in Main Building Steel for Second Slab in Main Building Casting for Second Slab in Main Building Steel for Footing of Front Elevation Boundary Wall Steel for Footing of Electrical Room Shuttering for Footing in Elevation Pipe of Boundary Wall Shuttering for Footing of Electrical Room Shuttering for Blinding in Second Holding Tank Casting for Footing of Boundary Wall Casting for Generator Room Footing Casting for Blinding of Holding Tank Steel for Neck Column of Front Elevation of Boundary Wall

1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129

2/28/2011 3/1/2011 3/1/2011 3/5/2011 3/5/2011 3/5/2011 3/5/2011 3/5/2011 3/5/2011 3/8/2011 3/8/2011 3/8/2011 3/9/2011 3/9/2011 3/9/2011 3/13/2011 3/16/2011 3/16/2011 3/21/2011 3/23/2011 3/27/2011 3/28/2011 3/29/2011 3/30/2011 3/30/2011 3/31/2011 3/31/2011 4/6/2011 4/10/2011 4/10/2011 4/17/2011 4/17/2011 4/18/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Steel for Neck Column of Electrical Room Shuttering for Neck Column of Electrical Room Shuttering for Neck Column of Front Side of Boundary Wall Casting Blinding Concrete under Slab on Grade in Main Building Casting Blinding Concrete under Slab on Grade in Service Building Casting Screed Concrete in Second Holding Tank Casting Neck Column in Front Side of Boundary Wall Casting Neck Column in Electrical Room Casting Screed Concrete for Upper Water Tank Steel for slab grade in service building Steel for slab grade in Main Building Steel for foundation in second holding tank Casting Slab on Grade in Main building Casting Slab on Grade in Service Building Casting Foundation in Holding Tank Steel for wall Holding Tank Shuttering for wall in Second Holding Tank Casting for wall in Second Holding Tank Steel for Slab in Holding Tank Casting for Roof Slab in Holding Tank Steel for Grade Beam in Fornt Side Boundary Wall Steel for Grade Beam in Fornt Side Boundary Wall Shuttering for Grade Beam in Fornt Side Boundary Wall Casting for Grade Beam in Fornt Side Boundary Wall Steel for Trench in Electrical Room Casting for Trench in Electrical Room Casting for Grade Beam in Front Side Boundary Wall Steel of Column in Fornt side Boundary Wall Steel for Wall of Trench Shuttering for Wall of Trench Shuttering for Grade Beam of Electrical Room Steel for Grade Beam of Electrical Room Shuttering for Column in fornt Side Boundary Wall

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

130 4/18/2011 AL-BATRA 131 4/23/2011 AL-BATRA 132 4/23/2011 AL-BATRA 136 4/24/2011 AL-BATRA 137 4/28/2011 AL-BATRA 138 4/28/2011 AL-BATRA 139 5/8/2011 AL-BATRA 140 7/9/2011 AL-BATRA 141 7/9/2011 AL-BATRA 142 7/9/2011 AL-BATRA 143 7/12/2011 AL-BATRA 144 7/12/2011 AL-BATRA 145 8/2/2011 AL-BATRA 146 8/21/2011 AL-BATRA 147 8/21/2011 AL-BATRA 148 10/20/2011 AL-BATRA 149 AL-BATRA

Casting for Grade Beam of Electrical Room Steel for Columns of Electrical Room Shuttering for Columns of Electrical Room Casting Columns of Electrical Room Steel for Roof Slab of Electrical Room Shuttering for Roof Slab of Electrical Room Casting for Roof Slab of Electrical Room Shuttering of Inverted Beam of Parapet Main Building & Service Building Steel of Inverted Beam of Parapet Main Building & Service Building Steel for Inverted Beam of Boundary Wall Casting of Inverted Beam of Parapet Main Building & Service Building Casting for Inverted Beam of Boundary Wall Steel for Manholes in Main Building Steel for Manholes Shuttering for Manholes Checking for Slope of Foam Concrete in Main Building & Service Building Steel for Assembly Area Between Main Building & Service Pavement & Steps

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 11/7/2010 11/7/2010 12/15/2010 12/28/2010 12/30/2010 1/24/2011 1/24/2011 2/9/2011 2/14/2011 2/19/2011 2/24/2011 2/28/2011 3/8/2011 3/14/2011 3/22/2011 4/10/2011 4/28/2011 8/21/2011 9/21/2011 10/9/2011 10/15/2011 10/22/2011 10/22/2011 10/22/2011 11/19/2011 12/11/2012 12/29/2011 12/29/2011 12/29/2011 12/29/2011

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S MECHANICAL DESCRIPTION Water Tank Mechanical Work Holding Tank Mechanical Work Ventilation Pipes in Water & Holding Tank Roof Drain for Main & Service Building Roof Drain for Main & Service Building Mechanical Work for Ground Floor Slab Main Building Mechanical Work for Ground Floor Slab Service Building Mechanical Work for Roof Floor Main Building Mechanical Work Under Slab on Grade for Service Building Internal Work in Main Building Internal Work in Main Building Sleeves for Main Building Work Under slab Concrete (gully trap fixing ) Mechanical Work in Holding Tank First Floor Bathrooms mechanical work First Floor Bathrooms mechanical work Electrical Room Roof Drain Ground Floor Water Supply Hot & Cold Water Main Building External Work Piping (Manholes)
Mechanical Work for Ground Floor Water Supply Lines and AC Drain Main Building

Mechanical Work Roof Drain Fixation On The Roof AC Drainage Pipe Network Installation on Ground Floor Main Building AC Drainage Pipe Network Installation on Ground Floor Service Building External Water Supply Piping Network Installation Mechanical Work for Drainage Pipe Layout Backside of Service Building
Drainage Pipe installation (External) at the Back of Service Building Going to Holding Tank2

REV 0 0 0 0 0 1 1 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

STATUS APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED REJECT REJECT REJECT APPROVED REJECT APPROVED APPROVED APPROVED APPROVED REJECT REJECT REJECT REJECT REJECT REJECT REJECT

0 APPROVED

Fuel Tank Black steel piping connection


High level water supply pipes(Hot&Cold) prior to ceiling closing in Ground floor Main Bldg High level water supply pipes (Hot&Cold) prior to ceiling closings in First floor Main Bldg High level water supply pipes (Hot&Cold) prior to ceiling closings in Ground floor Service Building

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 8/7/2010 8/9/2010 10/19/2010 10/20/2010 11/8/2010 11/13/2010 12/26/2010 1/25/2011 1/25/2011 1/25/2011 1/25/2011 1/25/2011 1/26/2011 1/26/2011 1/26/2011 1/26/2011 1/26/2011 2/10/2011 2/10/2011 2/10/2011 2/10/2011 2/10/2011 2/10/2011 2/22/2011 2/24/2011 3/31/2011 8/20/2011 8/20/2011 8/20/2011 8/20/2011

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S ELECTRICAL DESCRIPTION Earthing Work in Footing & Neck Column in Main & Service Bldg Earthing Work in Footing & Neck Column in Main & Service Bldg Electrical Work For Boundary Wall Electrical Work For Boundary Wall 3x63 UPVC Pipe & 2x25mm for Electrical Work in Pump Room Foundation Grounding Network Boundary Wall Lights First Fix Fire Alarm System for Ground Floor Slab Main Building First Fix AV System for Ground Floor Slab Main Building First Fix Security System for Ground Floor Slab Main Building First Fix Communication System for Ground Floor Slab Main Building First Fix Lighting System for Ground Floor Slab Main Building First Fix Lighting System in the Slab of Service Building First Fix Fire Alarm System in the Slab of Service Building First Fix A V System in the Slab of Service Building First Fix Communication System in the Slab of Service Building First Fix Security System in the Slab of Service Building First Fix Fire Alarm System For First Floor Slab of Main Building First Fix AV System For First Floor Slab of Main Building First Fix Security System For First Floor Slab of Main Building First Fix Communication System For First Floor Slab of Main Building First Fix Power System For First Floor Slab of Main Building First Fix Lighting System For First Floor Slab of Main Building Electrical Main UPVC Pipes Electrical Main UPVC Pipes Extension for Conduct in Boundary Wall First Fix Fire Alarm System in Block Wall Ground Floor Service Building First Fix Security System in Block Wall Ground Floor Service Building First Fix Communication System in Block Wall Ground Floor Service Bldg First Fix Power System in Block Wall Ground Floor Service Building

REV 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

STATUS REJECT APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

8/20/2011 8/20/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 9/19/2011 10/9/2011 10/9/2011 10/9/2011 10/9/2011 10/9/2011 10/9/2011 10/9/2011 10/15/2011 10/15/2011 10/15/2011 10/19/2011 10/21/2011 10/21/2011 11/12/2011 11/12/2011 11/12/2011 11/12/2011 11/12/2011 11/12/2011 11/12/2011 12/29/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

First Fix AC Power System in Block Wall Ground Floor Service Building First Fix Lighting System in Block Wall Ground Floor Service Building Parapet Light in Main Building Roof Floor Parapet Power Socket in Main Building Roof Floor AC Isolator in Roof Floor Main Building First Fix for First Floor Lighting System in Block Walls First Fix for First Floor Power Socket in Block Walls First Fix for First Floor AC Power System in Block Walls First Fix for First Floor Fire Alarm System in Block Walls First Fix for First Floor AV System in Block Walls First Fix for First Floor Communication System in Block Walls First Fix for First Floor Security System in Block Walls First Fix for Lighting System in Block Wall in Ground Floor Main Building First Fix for AV System in Block Wall in Ground Floor Main Building First Fix for AC System in Block Wall in Ground Floor Main Building First Fix for Security System in Block Wall in Ground Floor Main Building First Fix for Communication System in Block Wall in Ground Floor Main Bldg First Fix for Power System in Block Wall in Ground Floor Main Building First Fix for Fire Alarm System in Block Wall in Ground Floor Main Building Looping for AC System in Roof Floor Main Building Looping for Parapet Light System in Roof Floor Main Building Looping for Power System in Roof Floor Main Building Looping for Power System in First Floor Main Building
Power System Ground Floor Service Building Electrical Piping on Floor Slab Prior for Concrete Screed

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

Power System First Floor Main Building Electrical Piping on Floor Slab Prior for Concrete Screed
Electrical & Low Current Manholes in Piping Instalation Layout in Between Main Bldgg & Generator Room Manholes

0 APPROVED 0 APPROVED
0 APPROVED

Power System for First Fix Installation (Boxing & Conduiting) for Generator Room Lighting System for First Fix Installation (Boxing & Conduiting) for Generator Room AC System for First Fix Installation (Boxing & Conduiting) for Generator Room Fire Alarm System for First Fix Installation (Boxing & Conduiting) for Generator Room
Communication System for First Fix Installation (Boxing & Conduiting) for Generator Room

Security System for First Fix Installation (Boxing & Conduiting) for Generator Room AV System Cables for all Rooms prior to Ceiling closings in Ground floor Main Building

0 0 0 0 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81

12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 12/29/2011 1/2/2012 1/2/2012 1/2/2012

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Fire Alarm System Cables for all Rooms prior to Ceiling closings in Ground floor Main Bldg Communication System Cables for all Rooms prior to Ceiling closings in Ground floor Main Bldg

Secrity System Cables for all Rooms prior to Ceiling closings in Ground floor Main Bldg Lighting System Cables for all Rooms prior to Ceiling closings in Ground floor Main Bldg Lighting System Cables for all Rooms prior to Ceiling closings in First floor Main Building AV System Cables for all Rooms prior to Ceiling closings in First floor Main Building Fire Alarm System Cables for all Rooms prior to Ceiling closings in First floor Main Bldg
Communication System Cables for all Rooms prior to Ceiling closings in First floor Main Bldg

0 0 0 0 0 0 0
0

Security System Cables for all Rooms prior to Ceiling closings in First floor Main Building Security System Cables for all Rooms prior to Ceiling closings in Ground floor Service Bldg
Communication System Cables for all Rooms prior to Ceiling closings in Ground floor Service Bldg Fire Alarm System Cables for all Rooms prior to Ceiling closings in Ground floor Service Bldg AV System Cables for all Rooms prior to Ceiling closings in Ground floor Service Building Lighting System Cables for all Rooms prior to Ceiling closings in Ground floor Service Building

0 0
0

Lighting of Pole Installation Security System Cables for all Rooms prior to Ceiling closings in Ground floor Service Bldg AV System Cables for all Rooms prior to Ceiling closings in Ground floor Service Building Lighting System Cables for all Rooms prior to Ceiling closings in Ground floor Service Bldg

0 0 0 0 1 1 1

APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT REJECT APPROVED REJECT REJECT APPROVED APPROVED APPROVED APPROVED

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 9/21/2010 9/26/2010 9/26/2010 10/10/2010 10/10/2010 10/10/2010 10/10/2010 11/4/2010 11/7/2010 11/7/2010 1/29/2011 2/1/2011 2/8/2011 2/12/2011 2/14/2011 2/15/2011 2/15/2011 2/21/2011 2/21/2011 2/28/2011 2/28/2011 3/14/2011 3/14/2011 3/16/2011 3/17/2011 3/31/2011 4/6/2011 4/7/2011 4/11/2011 7/14/2011

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S WATERPROOFING DESCRIPTION WaterProofing for Foundation+Column Neck for First Layer DampProof for Foundation+Column Neck for First Layer DampProof for Foundation+Column Neck for Second Layer WaterProofing Membrane for Water& Holding Tank Under Foundation Primer Coats in Water Tank & Holding Tank First Layer of Water Proofing Membrane For Holding & Water Tank Second Layer of Water Proofing Membrane For Holding & Water Tank First Layer of Water Proofing for Boundary Wall First Layer of Water Proofing for Boundary Wall + Column Neck for Boundary Wall
Second Layer of Water Proofing for Boundary Wall + Column Neck + Boundary Wall for Main & Service Building

REV 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

STATUS REJECT APPROVED REJECT APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

0 APPROVED

Starting First Coat of Epoxy Proofing for Water Tank Starting Second Coat of Epoxy Proofing for Water Tank First Layer of Waterproofing in Water Tank External Waterproofing in Water Tank Second Layer Waterproofing for Water Tank Protection Layer First Coat of Waterproofing for Grade Beam in Service Building Second Coat of Waterproofing for Grade Beam in Service Building First Layer of Waterproofing for Grade Beam in Main Building Second Layer of Waterproofing for Grade Beam in Main Building First Layer of Waterproofing for Ground of Second Holding Tank Second Layer of Waterproofing for Ground of Second Holding Tank First Layer Water Proofing for Footing & Neck Column in front side Boundary Wall
Second Layer Water Proofing for Footing & Neck Column in front side Boundary Wall

First Layer Epoxy Proofing for Holding Tank 2nd Layer Epoxy Proofing for Holding Tank First Layer External Water Proofing in First Holding Tank First Layer External Water Proofing in 2nd Holding Tank 2nd Layer External Water Proofing in First Holding Tank 1st Layer internal Epoxy Water Proofing 2nd Holding Tank First Layer of Waterproofing for Manholes

31 32 33 34 35 36 37 38 39 40 41 42 43 44

7/6/2011 10/2/2011 10/2/2011 10/2/2011 11/20/2011 11/20/2011 11/21/2011 11/21/2011 11/21/2011 11/26/2011 11/26/2011 11/28/2011 12/4/2011 12/4/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Protection Layer of Waterproofing for Manholes First Layer of Waterproofing for Manholes Protection Layer of Waterproofing for Manholes Waterproofing for Manholes Membrane Waterproofing for Roof Slab of Main Building Membrane Waterproofing for Roof Slab of Service Building Membrane Waterproofing for Roof Slab of Service Building Waterproofing for Electrical Manholes Waterproofing for Service Building Manholes Waterproofing Under Tiles in Toilet (G-12, F-04, F-14) Waterproofing Under Tiles in Kitchen of Main Building & Service Building
Waterproofing for Kitchen & Toilet of Ground & First Floor Main Building,Ground Floor for Service Building

1 0 0 0 0 0 1 0 0 0 0

APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED REJECT REJECT

0 APPROVED

Roof Insulation - Separation Sheets in Main Building & Service Building Roof Insulation - Thermal Rigid Insulation in Main Building & Service Building

0 APPROVED 0 APPROVED

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATE 10/23/2011 10/31/2011 12/3/2011 12/13/2011 12/13/2011 12/20/2011 12/26/2011 12/26/2011 1/9/2012 1/9/2012 1/9/2012 12/9/2012 1/9/2012 1/9/2012 1/9/2012 1/14/2012 1/14/2012 1/14/2012 1/14/2012 1/14/2012 14-Jan 1/14/2012 1/14/2012 1/14/2012 1/14/2012 2/1/2012 2/1/2012 2/1/2012 2/1/2012 2/1/2012

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S FINISHING DESCRIPTION Ceramic Tiles in First Floor Main Building Porcaline Tiles in Service Building Granite Tiles for First & Ground Floor Of Main Building
Acoustic Tiles 60x60 False Ceiling Suspension System for All Rooms of Main Building, Except for Wet Areas Acoustic Tiles 60x60 False Ceiling Suspension System for All Rooms of Service Building, Except for Wet Areas

REV

STATUS 0 APPROVED 0 APPROVED 0 APPROVED


0 REJECT 0 REJECT

Granite Cladding for Boundary Wall Stone Shield Paint Sample External (Building Elevation Finish) Royal Acryl Paint Sample (Boundary Wall Finish) Curbstone for Site Work Pavement Work for Site Work Granite Fixing for Internal Stairs at Main Building Ceramic Wall Works of Ground Floor Main Building Ceramic Wall Works at Service Building Stone Shield at Main Building Stone Shield at Service Building Curbstone for Site Work Pavement Work for Site Work Granite Fixing for Internal Stairs at Main Building Ceramic Wall Works of Ground Floor Main Building Ceramic Wall Works of First Floor Main Building Stone Shield at Main Building Stone Shield at Service Building Granite Cladding for External Elevation at Main Building Granite Skirting for External Elevation at Service Building Granite Cladding for Entrance Lobby at Main Building Handrail for Internal Stairs at Main Building Acoustic Tiles False Ceiling at Ground Floor Main Building Acoustic Tiles False Ceiling at First Floor Main Building Acoustic Tiles False Ceiling at Service Building Gypsum Board False Ceiling at Main Building

0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 0 0 0

REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED

31 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

2/1/2012 10/31/2011 8/23/2011 8/23/2011 9/11/2011 9/11/2011 9/11/2011 9/27/2011 9/27/2011 1/18/2011 10/20/2011 10/31/2011 1/12/2011 11/14/2011 11/17/2011 11/20/2011 11/30/2011 12/3/2011 12/3/2011 12/6/2011 12/13/2011

AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

Gypsum Board False Ceiling at Service Building Door Frames in Main & Service Building Preperation for Internal Plaster for Parapet in Main & Service Building Preperation for External Plaster Boundary Wall External Plaster for Boundary Wall Preperation for Plaster in Service Building Internal Plaster for Parapet in Main Building & Service Building Internal Plaster in Service Building Plaster Preperation in First Floor Main Building Plaster Preperation for Ground Floor Main Building Plaster Preperation for Ground Floor Main Building Plaster Accessories for External Elevation in Service Building First Coat of Paint for Service Building First Coat of Paint for Internal Walls of Ground & First Floor Main Building Second Coat of Paint for Internal Walls of Ground & First Floor Main Building Second Coat of Paint for Internal Walls of Ground & First Floor Main Building Groove Work in Main Elevation of Main Building from Axis 1 to 2 Plaster Accessories of Main Elevation of Main Building Between Axis 5 & 4 Plaster Accessories of East Elevation External Plaster Accessories Right Side Elevation of Main Building Plaster Preperation for Service Building 1102

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0

REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED REJECT APPROVED APPROVED REJECT APPROVED APPROVED APPROVED APPROVED APPROVED APPROVED

S.NO 1 2 3 4 5 6 7 8 9 10 11 12 13

DATE 8/7/2011 8/7/2011 8/7/2011 8/13/2011 8/13/2011 8/13/2011 3/23/2011 5/7/2011 5/29/2011 4/23/2011 4/23/2011 4/23/2011

PROJECT AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA AL-BATRA

AL-BATRA RFI"S BLOCK WORK DESCRIPTION Crushing for Block Approval Al-Mohalib Factory (Al Manar) Block for Ground & First Floor in Main Building Block for Ground & First Floor in Service Building Blocks for Boundary Wall Block for Ground & First Floor in Main Building Block for Ground FLOOR Service Building Blocks for Boundary Wall First Line Block in Boundary Wall First Line of Block in Service Building Block Work for Three Side of Boundary Wall First Line of Block in Boundary Wall First Line of Block in Service Building First Line of Block in Main Building

REV 0 0 0 0 1 1 1 0 1 0 0 0 0

STATUS REJECT REJECT REJECT REJECT APPROVED APPROVED APPROVED APPROVED APPROVED REJECT APPROVED REJECT APPROVED