Construction of New Flare, Ar-Razi
Daily Report
7-May-12
Sl.
No.
Acitivity
Location
Qty
UOM
Start date
Finish date
Actual % Variance %
Cumulative
Plan %
Actual %
Remarks
Variance %
Civil
Construction of open ditch
Plant 1
10
CM
24-Mar-12
12-May-12
0.54%
0.24%
-0.30%
96.86%
95.05%
Plant 1
lot
26-Mar-12
8-May-12
0.19%
0.00%
-0.19%
99.43%
61.74%
Plant 2
10
CM
24-Mar-12
29-May-12
1.45%
0.00%
-1.45%
98.69%
82.15%
Plant 2
lot
26-Mar-12
8-May-12
3.61%
0.26%
-3.35%
44.31%
58.26%
Plant 3
10
CM
14-Apr-12
15-May-12
0.54%
2.00%
1.46%
96.86%
76.68%
Lot
24-Mar-12
6-May-12
0.08%
0.12%
0.04%
99.82%
99.27%
Plant 5
Lot
2-Apr-12
7-Jun-12
2.01%
0.74%
-1.27%
26.73%
33.82%
Plant 5
Lot
2-Apr-12
2-Jun-12
1.94%
0.38%
-1.56%
78.01%
35.65%
Plant 1
1.00
Lot
1-May-12
7-May-12
16.47%
5.00%
-11.47%
99.80%
97.00%
Plant 1
1.00
Lot
25-Mar-12
23-May-12
0.31%
4.00%
0.50%
93.47%
90.00%
Plant 1
1.00
Lot
24-Mar-12
28-Jun-12
0.12%
0.00%
-0.12%
60.60%
59.41%
Plant 1
1.00
Lot
24-Mar-12
7-Jul-12
0.00%
1.62%
1.62%
83.32%
86.12%
Plant 2
1.00
Lot
24-Mar-12
17-Jun-12
0.69%
1.25%
0.56%
52.89%
60.59%
Structural
Alignment & bolt tightening of SP-13
Preassembly, Erection, alignment & bolt
tightening of OSUS
Preassembly, Erection, alignment & bolt
tightening of OSMP-29
Preassembly, Erection, alignment & bolt
tightening of OSMP-45
Preassembly, Erection, alignment & bolt
tightening of OS for Synthesis Section
Erection, Alignment & Bolt tightening of PR
210
Plant 4
1.00
Lot
3-Apr-12
7-May-12
0.66%
0.00%
-0.66%
95.51%
94.31%
1.00
Lot
24-Mar-12
23-May-12
0.25%
0.62%
0.37%
96.48%
94.30%
1.00
Lot
14-Apr-12
10-Jun-12
1.39%
0.00%
-1.39%
82.88%
75.25%
Plant 5
27-Mar-12
15-Jul-12
0.92%
1.02%
0.11%
27.48%
24.77%
-2.71%
27-Mar-12
15-Jul-12
0.91%
0.32%
-0.60%
25.54%
22.96%
-2.58%
Fabshop
27-Mar-12
20-Jun-12
0.59%
0.58%
-0.01%
88.32%
90.55%
2.23%
Fabshop
27-Mar-12
20-Jun-12
0.87%
0.80%
-0.07%
82.51%
79.68%
-2.83%
At Fabshop
Electrical
Grounding works
Plant 1
Lot
27-Mar-12
27-May-12
0.00%
0.73%
0.73%
62.50%
72.81%
Lighting Works
Plant 1
Lot
29-Mar-12
15-Jul-12
0.88%
0.11%
-0.77%
36.95%
35.18%
-1.77%
Plant 1
Lot
2-Apr-12
17-May-12
1.74%
0.00%
-1.74%
85.69%
80.00%
1 of 3
Acitivity
Location
Qty
UOM
Start date
Finish date
Grounding works
Plant 2
Plant 2
Grounding works
Plant 3
Plant 3
Grounding works
Plant 5
C. Pipe Rack
C. Pipe Rack
Cable Pulling
Plant 2
Actual % Variance %
Cumulative
Plan %
Actual %
Remarks
Variance %
Lot
9-Apr-12
25-Apr-12
5.00%
0.00%
-5.00%
67.25%
77.40%
Lot
2-Apr-12
7-May-12
1.90%
0.00%
-1.90%
98.48%
95.00%
Lot
5-Apr-12
16-Apr-12
5.26%
6.51%
1.25%
62.09%
80.63%
Lot
2-Apr-12
16-Jun-12
2.11%
0.88%
-1.23%
32.50%
40.00%
Lot
7-Apr-12
15-May-12
1.39%
2.00%
1.00%
90.19%
80.12%
Lot
1-Feb-12
14-Jun-12
0.80%
0.00%
1.00%
73.97%
65.20%
Lot
24-Jan-12
10-Jun-12
0.58%
0.00%
-0.58%
73.77%
66.12%
Lot
24-May-12
7-Jun-12
2.20%
7.00%
4.80%
2.20%
14.00%
Instrumentation
Construction Progress
0.34%
0.24%
-0.10%
61.46%
60.63%
-0.83%
Fitup
216
213.75
-2.25
32399
33217
818
Welding
319
293.5
-25.5
30268
29230
-1038
Fitup
152
170
18
4559
4109
-450
Welding
155
54
-101
4329
3892
-437
12
11
-1
46
28
-18
PWHT
Shop Weld
Field Weld
Manpower :
Sl
No.
1
2
SIS NonSaudi
SIS-Saudi
Total
Site
78
10
88
Fab shop
18
18
Site
349
21
370
Description
Indirect
Direct
Fab shop
Total SIS
Total Sub-contractor
94
96
539
33
572
0
572
Equipments :
Sl
No.
Description
Indirect
Qty.
25
2 of 3
Acitivity
Location
Qty
UOM
Start date
Finish date
Direct
Actual % Variance %
87
112
3 of 3
Cumulative
Plan %
Actual %
Variance %
Remarks