Training Program Template Training program Name : 2 MCB service four switch and four lamp Program Goals : - student is knowing how to make the single line - student is knowing how to make the layout of the electrical circuit - student is knowing how to make the pipe line - the student be able to analyze the work principle of the circuit - the student is knowing to mix three circuit Under Pinning Know ledge and skill : In electronic laboratory No Competency Performance Kriteria Time Allocation Assament Evident By Required
1.
1.1 Safety 1.2 preparing tools and materials , 1.3 Set the multimeter for testing the circuit at
position ohmmeter 1.4 Dont touch the source of voltage 1.5 Make sure all of the tools is ready to use
2.
2 minutes
2.2 After that make the layout suitable the single line
2 minutes
GAMBAR 2
GAMBAR 3
2.4 After the pipe line is already finish, make the circuit on the board for the experiment, 2.5 Check back the condition of the electrical circuit by use the multimeter before the circuit will be operated 2.6 Check the condition of MCB first like this picture 2.7 Direct the selectore of analog multimeter, for ohmmeter measuring, connect the red probe to the output of MCB and the Black probe to the input of MCB, turn on the MCB, if the pin of multimeter is move, it mean the MCB is at good condition 2.8 After cecking the MCB condition , ceck about the stripe condition of the cicrcuit, 2.9 Direct the selectore of analog multimeter for ohmmeter measuring, connect the red probe to the output of MCB and the Black probe to the terminal 1 of lamp 1 and turn on the switch, then turn on the MCB ( without voltage source), if the pin of multimeter is move , so then the circuit is ready to be operated. And others circuit is same, just how to operate is not same. 2.10 Principle work of the circuit, if the phase is connected to terminal 1 switch 1 then phase is connected to terminal 1 switch 2 and then terminal 2 of switch 1 connected to terminal 1 of lamp 1, and terminal 2 switch 2 connected to terminal 2 of switch 3 and terminal 3 switch 2 connected to terminal 3 switch 3 and then terminal 1 connected to terminal 1 lamp 2. The neutral is connected to terminal 2 of lamp 1 and 2. 3. Finishing 3.1 after completion of the experiment, trim back 5 minutes
20 minutes
2 minutes
5 minutes
45 minutes
7 minutes
all the tools and the materials that have been used 3.2 trim back all the tools and materials that have been used completed and return to the each places. 5 minutes
Romadhani
Hilmansyah,ST
Gambar 1
- Singel Line
S1
L1
L2
S3 S2 L3
L4 S4
Gambar 2
- Layout Suitable Single Line
L1 MCB S1
L2
S2
L3
L4
S3
S4
Gambar 3
- Pipe Line
L3 L1 L2 MCB S1 S2 S3
L4
S4