ID Task Name VOL AUGUMENTING ATBS CAPACITY

Kick Of Meeting Appointment Of Engineering Consultant

Detail Engineering Process


PFD Equipment List Process Data Sheet P & ID Conceptual Equipment Layout Line List Utility Requirements Instrument Lists

Architectural
Design Basis Site Master Plan Statutory Drawings Plan Sec. & Elevation Of Extension Building Details Of Doors & Window , Finishing Schedule

Civil
Design Basis & General Notes Preparation Of Complete Civil BOQ And Tender Speciifications L/D Of Foundation And Column L/D Of Plinth Beams L/D Of Floor Beams And Slabs L/D Of Roof Truss L/D Of Equipment Supporting Beams

Mechanical & FEG


Mechanical Data Sheet For Long Delivery Items Like Filters , Dryers ,Etc Mechanical Equipment Specifications - Fab Package

Piping
Design Basis Piping Element Specifications Equipment Layout Piping Layout Mechanical & Piping Tender Specifications

Electrical
Design Basis Electrical Equipment Lists Electrical Equipment Specifications Load List And Transformer Sizing Single Line Diagram Complete Cable Trey Layout Lighting Power And Earthing Layout Cable Schedules Electriacal Tender Specifiacations

Instrumentation
Design Basis & Specifiacations Index Of Instruments

I/O List Cause And Effect Diagram Loop Diagram Hook Up Drawings Instrument Layout / JB Schedule Cable Trey Layout Cable Schedule And JB Schedlue Bill Of Material Instrumentation Tender Specifications

Tendering
Civil Works
Floating Of Tender Receipt And Opening Of Tender Technocommercial Negotiation Draft LOI / Work Order

Mechanical And Piping


Floating Of Tender Receipt And Opening Of Tender Technocommercial Negotiation Draft LOI / Work Order

Electrical
Floating Of Tender Receipt And Opening Of Tender Technocommercial Negotiation Draft LOI / Work Order

Instrumentation
Floating Of Tender Receipt And Opening Of Tender Technocommercial Negotiation Draft LOI / Work Order

PROCUREMENT
Mechanical Items Long Lead Items Enquiry Floating Offer Receipt TBA / CBA & Recommendations Vendor Meeting PO / LOI From Client

DELIVERY
Mechanical Equipments Electrical Equipments

Construction And Erection


Civil Works
Civil Contractor Mobilization Excavation And Foundation For Extension Area RCC Plinth Beams And Column Upto Plinth Beams Steel / Super structure Roof Slab Floor Slab Masonry Work Internal & External Plastering

Doors & Windows Fixing Painting & Other Finishing Works

Mechanical And Piping


Mechanical Contractor Mobilization At Site Equipment Erection Piping Rack Erection Piping Yard Piping Piping Internal Piping Yard Piping Insulation And Painting Testing And Commisioning

ELECTRICAL
Contractor Mobilization MCC and Cabling Earthing And Cable Termination Lighting Protection System Yard Cabling Parking Area Street Lighting Electrical Fixtures Fixings Testing And Commissioning

INSTRUMENTATION
Contractor Mobilization MCC and Cabling Installation Of Instruments Instrumentation And Control Cabling Termination,Continuty & Loop Checks

TESTING & COMMISSIONING

HANDOVER

Duration
348 Days
2 Days 10 Days 305 Days 277 Days 7 Days 15 Days 20 Days 15 Days 15 Days 20 Days 20 Days 5 Days 222.8 Days 3 Days 10 Days 25 Days 20 Days 15 Days 6 Days 12 Days 14 Days 7 Days 8 Days 8 Days 8 Days 220.22 Days 10 Days

% Complete
71%
100% 100% 76% 97% 100% 100% 100% 100% 100% 80% 100% 100% 96% 100% 100% 100% 100% 80% 100% 100% 100% 100% 90% 100% 50% 100% 100%

Start
7-May-10 5-Jul-10 6-Jul-10 12-Jul-10 12-Jul-10

Finish
11-Feb-11 7-Jun-10 19-Jul-10