Вы находитесь на странице: 1из 66

Training Manual

1 July 2008
Stanadyne Business System

5S

5S

2 July 2008
Stanadyne Business System

Training Outline
Introduction Meaning of 5S Benefits of 5S Keys to Success Implementation 1S Sort 2S Straighten 3S Shine 4S Standardize 5S Sustain

3 July 2008
Stanadyne Business System

Introduction
Objective: The objective of 5S is to create a company culture which perpetuates a neat, clean, efficient workplace Named for 5 Japanese words: Seiri, Seiton, Seiso, Seiketsu, and Shitsuke Originated at Toyota in 1950s We use 5 English words with similar meanings to make the program easier to remember and understand Sort, Straighten, Shine, Standardize, and Sustain 5S is a disciplined approach toward Work Life

4 July 2008
Stanadyne Business System

Introduction
5S is foundational to continual improvement and a manufacturing strategy based on Lean Manufacturing (waste removing) concepts. Reduces clutter Reduces the time it takes to look for tools and equipment A place for everything and everything in its place Creates a clean, neat workplace for employees Improves how the operation appears to customers always be tour ready Creates pride in the workplace

5 July 2008
Stanadyne Business System

Introduction
Sort Straighten Shine Clearly distinguishing between what is needed and kept and what is unneeded and thrown out Organizing the way we keep necessary things, making it easier for anyone to find and use them Keeping the floors swept, machines and furniture clean, and all areas neat and tidy

Standardize Making improvements to help maintain the standards of the first three Ss Sustain Achieving the discipline or habit of properly maintaining the correct 5S procedures
6 July 2008
Stanadyne Business System

Meaning of 5S
Understand what stuff is Critically evaluate all items in the workplace and determine which items are really needed for daily work Keep only what we really need Throw out what we dont need Applies to everything, not just supplies and material

7 July 2008
Stanadyne Business System

Meaning of 5S
Sorting must be done first so we only organize things we need Organize each of these items Locate them where they are most needed Know where to return items when not in use Identify items and their storage areas Anyone should be able to understand the order of things at first glance Make it obvious! The entire workplace should be organized to achieve waste-free flow

8 July 2008
Stanadyne Business System

Meaning of 5S
Make things clean and tidy Sweeping floors, get rid of trash, clean the area Thoroughly clean machinery, tools, computers and furniture (file cabinets, desks, etc.)

9 July 2008
Stanadyne Business System

Meaning of 5S
The first three Ss have been done We have sorted and kept only the needed items All needed items have been organized, identified and placed where needed All equipment and areas are clean and orderly Standardization means maintaining and improving the first three Ss Eliminate causes of dirt, leaks, and spills Create systems and make physical changes to the environment to keep things need and organized Develop standard procedures for cleaning, organizing and maintaining all works areas Remember that standards are the basis for improvement
10 July 2008
Stanadyne Business System

Meaning of 5S
We must develop a habit of cleaning, organizing, and keeping unnecessary items out of each area Create a management standard work to ensure that 5S becomes a sustainable habit with checklists, audits, etc Everybody must share the attitude that cleanliness and orderliness are critical as a starting point in the development of continuous improvement initiatives and activities This can not be a one time effort it must be done on an on-going basis

11 July 2008
Stanadyne Business System

Benefits of 5S
Reduced Waste Improved Safety Ease of Maintenance Higher Quality Improved Profitability

12 July 2008
Stanadyne Business System

Reduce Waste
Wastes to be reduced or eliminated:

Work-in-process (WIP) Inventory Handling waste Wasted space Searching Unneeded equipment, furniture Overproduction

Defects Non-value Waiting Excess motion Transportation Other Wastes: Untapped human potential Inappropriate systems Wasted utility resources Wasted materials

13 July 2008
Stanadyne Business System

Improve Safety
Mechanical failures and hazards are easier to detect and fix Uncluttered aisles and work areas Clean floors are safer Wrong tools are not used Fewer hazards proper storage Well marked, easy to locate fire and safety equipment

14 July 2008
Stanadyne Business System

Ease of Maintenance
Cleaner equipment means longer life Proper location of correct tools for each job means that the wrong tools wont be used Clean machines make it easier to spot leaks and small problems before they become serious problems Discipline increases daily attention given to machines

15 July 2008
Stanadyne Business System

Higher Quality
Proper, well-located tools reduce defects Organized gauging ensures quality checks are done properly Bad parts are easier to spot and keep segregated in clean environments Employees pay more attention to the process, tools, and area Pride in ownership of an area translates into pride in ownership of the product made

16 July 2008
Stanadyne Business System

Improved Profitability
Organized work cells eliminate wasted time Improved machine performance and gauging means fewer defects Reduced downtime due to earlier recognition of problems means more profits Improved morale increases productivity Impressed customers leads to more sales!

17 July 2008
Stanadyne Business System

Keys to 5S Success
Commitment Understanding Involvement Improvement

18 July 2008
Stanadyne Business System

Commitment
Top management must understand 5S and commit to achieving each step and then supporting the management standard work Supply costs and Kaizen time must be viewed as an investment in a better workplace Remember that 5S is the foundation for all other lean improvements

19 July 2008
Stanadyne Business System

Understanding
It is much easier to follow the lead when you understand the reasons Hold meetings to explain 5S events and answer all questions in a positive manner Thoroughly explain the procedure before starting any 5S activities

20 July 2008
Stanadyne Business System

Involvement
Each employee must be encouraged to feel ownership of his or her area Everyone plays a critical role in implementing the 5S strategy Team meeting discussions on methodology of 5S help bring members to a common understanding of the issues 5S is not a program or event it is a cultural change a neverending effort Make sure everyone is involved

21 July 2008
Stanadyne Business System

Continuous Improvement
5S is the foundation for improvement 5S must be maintained to have a strong foundation for Kaizen 5S is the important basis for true visual management Small 5S improvements will lead to plant-wide quality improvements

22 July 2008
Stanadyne Business System

5S Implementation

Kaizen to maintain first 3 Ss

Standardize

Keep only what we need

Sort

Sustain
Discipline to maintain 5S

Shine
Clean the work area

Straighten
Organize area and needed items

23 July 2008
Stanadyne Business System

Sort
Purpose: To sort through all items in a work area, eliminate all unneeded items, and decide what is truly needed.

24 July 2008
Stanadyne Business System

Red Tag Strategy


Step 1 Initiate First Round of Red Tagging Select the Kaizen team Members should be from the area as well as from outside Appoint a team leader Identify Red Tag Targets Inventory, equipment, supplies, tooling, space Office areas are not exempt from red tagging Define Red Tag Criteria Determine what criteria will be used to distinguish a needed item from an unneeded item Example: Save only the items needed to make next weeks or next months production schedule
25 July 2008
Stanadyne Business System

Step 2

Step 3

Red Tag Strategy


Step 4 Conduct Red Tag Session Explain Red Tag criteria to teams Ensure a good cross-section of people tagging items to prevent I might need that Red Tag entire area as rapidly as possible Move all tagged items to a red tag area nearby (and clearly defined as such) Post red tag receipts on a flip chart board in the cell Evaluate the Red Tag Targets Review material which has been red tagged Dispose of truly unnecessary inventory, equipment and other items THROW IT OUT FOR GOOD!!! Teams may retain material which has been mistakenly red tagged if they can justify it to the team and organize it Discard any material which is still tagged after a predetermined time (One week maximum one month?) All Red Tags must be completed and returned
Stanadyne Business System

Step 5

26

July 2008

Sample Red Tag

27 July 2008
Stanadyne Business System

Red Tagging
Helpful Hints Record information about all tags used on a Red Tag Log so that dispositioning can be tracked easily (sample at end of manual) Make sure everybody understands what is to be red tagged and why Discourage people from being defensive Be fair all areas get tagged! Dont red tag people Dont compromise; If in doubt, throw it out! Necessary items can be tagged if improvements are known or suggested Do not put multiple tags on any one object
28 July 2008
Stanadyne Business System

Straighten
Purpose: To create simple, visual order for all necessary items so that they may be kept and used in the most efficient manner possible.

29 July 2008
Stanadyne Business System

Signboard
Strategy
Step 1 Determine Locations Consolidate necessary items Decide where items belong to best support work Focus on getting items as close to point of use as possible Prepare Locations Decide on storage method to be used Remember function and 5S guidelines Kaizen storage methods for ease of use Evaluate all containers minimize size Indicate Locations Make signboards and hang in proper locations to indicate where items belong See sample pages for types of signboards
30 July 2008
Stanadyne Business System

Step 2

Step 3

Signboard
Strategy
Step 4 Indicate Item Names Make signboards which clearly show The name of the item and any identification numbers The address of its storage location Indicate Amounts Signs should show how many pieces of a particular item should be on hand Each indicator should define at least the minimum and maximum amounts

Step 5

31 July 2008
Stanadyne Business System

Straightening Examples

Visual filing system for daily inspection reports

32 July 2008
Stanadyne Business System

Straightening Examples

Incoming / Outgoing part inspection rack for metrology lab at SCC


July 2008
Stanadyne Business System

33

Straightening Examples

Color-coded floor markings for machines and scrap bins


34 July 2008
Stanadyne Business System

Straightening Examples

35 July 2008
Stanadyne Business System

Straightening Examples
Before After Improvements Improvements
Traffic line - - Traffic line Direction indicators (keep left) - - Direction - indicatorsfor Human Hatch pattern (keep crossing left in India!)

- Hatch pattern for human crossing

36 July 2008
Stanadyne Business System

Straightening Examples
Before After Improvements

- Safe grinding wheel storage - Easy accessible - Identification - Common place to keep

37 July 2008
Stanadyne Business System

Straightening Examples
Before After Improvements

- Type of fire & chemical powder displaced - Information of application where to be used available

38 July 2008
Stanadyne Business System

Straightening Examples
Before After Improvements
- Color coded for oil types - Same color code on machine oil tanks to ensure right oil used - Available right shop floor in accessible distance - Long travel time from shop to oil store reduced

39 July 2008
Stanadyne Business System

Straightening Examples

Assembly bench with just what is needed and very little extra space
40 July 2008
Stanadyne Business System

Shadow Boards
Purpose: Shadow boards are used to indicate proper location of tools, gages, and other items needed for a job.

Outline These are the simplest form of shadow graphs, often simply boards conveniently mounted for accessibility to the tools, with outlines of the tools painted on the board. Relief Another variation of shadow board Relief boards have contours milled into the wood or plastic Providing the shape recognition of an outline, with added security for the tools Best if mounted at an angle to prevent placing anything else there

Use yellow for tools & standard items, and blue for gauges / quality stations
41 July 2008
Stanadyne Business System

Shadow Board Examples

In-process gauging shadow boards Can be improved by placing them on an angle. Why?
42 July 2008
Stanadyne Business System

Shadow Board Examples


Before After (Gauge shadow board)

Improvements : - Partition between gauge - Easy Identification - Prevents damage


July 2008
Stanadyne Business System

43

Shadow Marking and Painting


Floor markings are a variation of shadow graphing, again used to indicate proper location of inventory, forklifts, machines, furniture, etc. Two principles methods: Vinyl tape 3M 471 or equivalent tape for floors and other markings Available in the 5 primary colors Paint Avoid paint striping unless youre sure hard to change! Paint signboard, shelves, racks, other items the right color All machines should be painted very light preferably white - colors Consider: Durability versus Flexibility

Choose where you mark carefully! Dont just trace around trash!

44 July 2008
Stanadyne Business System

Signboard Strategy - Implementation


Helpful Hints Use large lettering to make signs visible from a distance Use standard size signs Use color-coded backgrounds for clarity (see standards) Do signboarding as soon after sorting as possible

45 July 2008
Stanadyne Business System

Straighten Storage Methods


FIFO (First In First Out)
Workstation 3 IN 2 1 OUT

46 July 2008
Stanadyne Business System

Straighten Storage Methods


Liveliness of Material Reduce wasted time and motion Why are skids and bins the same? How would this apply in an office area?
In Transit

Loaded in cart

Loaded in bin or on skid

Loaded in box on floor

Piled on floor
July 2008
Stanadyne Business System

47

Straighten Storage Methods


Purpose: To create simple, visual order for all necessary items so that they may be kept and used in the most efficient manner possible.

Stage 0 Stage 1 Stage 2 Stage 3

Total Disorder Items Kept In Easy-To-Understand Groups (i.e. by function or by machine) Visual Indication of Location (shadow boards, color coding, indexing) Simple Orderliness Known By Heart (tools at arms reach, easily replaced due to enlarged dimensions) Just Let Go Orderliness Elimination Of Items
48

Stage 4 Stage 5

Food for thought: What would a Stage 5 screwdriver be?


July 2008
Stanadyne Business System

Standard Color Code


Purpose: Identify critical items, parts and areas within Stanadyne with common colors to allow any employee or visitor to easily understand production in each in each of our facilities.

Safety Quality Standards Defects Maintenance


July 2008

Safety equipment / First Aid / Safety Posters, notices

Inspection points / Quality instructions / Gaging

Operation standards / Location marks / Good part storage

Scrap / Non-conforming material

Repair tools / TPM materials / Machinery 49


Stanadyne Business System

Visual Management

Not really part of 5S, but related Key is to manage everything easily and visually at a glance Call attention to abnormal or problems only
50 July 2008
Stanadyne Business System

Shine
Purpose: Thoroughly and completely clean the area to get it to an initial state of like new cleanliness

51 July 2008
Stanadyne Business System

Shine
Ensure bright lighting of all areas Have areas cleaned by those that work there Keep in mind: How did this get dirty? Ask

Fix problems at the source, dont just stop a symptom. Ask why the item leaked, broke, etc. Design or change the item to prevent recurrence.
July 2008
Stanadyne Business System

52

Shine
Everything must be really scrubbed clean! Machines (all sides all around) Signs, lights, tables. Floors need special attention Cabinets Tools, gauges, and all items left during the sort phase Have all the cleaning supplies you need Just have to get in and do it no shortcuts to this step!

53 July 2008
Stanadyne Business System

Cleanliness

Like the new car smell, we want the New Factory Look!
54 July 2008
Stanadyne Business System

Standardize
Purpose: Identify sources of dirtiness and disorganization at the root cause and solve them to make it easy to maintain the new order

55 July 2008
Stanadyne Business System

Standardize
Make sure all areas have plenty of light Eliminate any extra shelf or bench space Horizontal space accumulates junk! Pay attention to bottom shelves of benches Eliminate any unseen areas where things can hide Remove or make cabinet doors transparent Minimize use of drawer cabinets Fix and contain leaks, overspray and dust from machines during operation Contain coolant to the smallest possible area Try to eliminate all oil pans and absorbent towels / tubes

56 July 2008
Stanadyne Business System

Sustain
Purpose: Establish standard work to monitor and encourage keeping good 5S habits

57 July 2008
Stanadyne Business System

Sustain
Use the 5S Patrol Check Sheet to evaluate areas Work team should do this weekly Rotate team members so everyone get a turn to audit the area Supervisors should review the audit once done and point out any areas of improvement Plant management should check each area at least monthly Identified problems must be recorded on a kaizen newspaper to be fixed, or fixed right away Use visual management to show 5S results Post the current 5S audit sheet on the cell visual board Post the appropriate 5S wheel sections to reflect area scores Be proactive - focus on continuous improvement
58 July 2008
Stanadyne Business System

Sustain
Create long-term cultural change it takes time to build good habits Remember that people follow examples (good and bad!) Consistent priorities come from understanding the value of the 5S work life Everyone has to accept 5S as a personal goal

59 July 2008
Stanadyne Business System

5 Why is your most important tool 5S is the foundation for KAIZEN Visual management is ultimate goal

Its up to you!
July 2008
Stanadyne Business System

60

Attachments
Sample Red Tag Sample Red Tag Register Color Code Standard Sample 5S Patrol Check Sheet

61 July 2008
Stanadyne Business System

Sample Red Tag

62 July 2008
Stanadyne Business System

63 July 2008
Stanadyne Business System

Standard Color Code


Purpose: Identify critical items, parts and areas within Stanadyne with common colors to allow any employee or visitor to easily understand production in each in each of our facilities.

Safety Quality Standards Defects Maintenance


July 2008

Safety equipment / First Aid / Safety Posters, notices

Inspection points / Quality instructions / Gaging

Operation standards / Location marks / Good part storage

Scrap / Non-conforming material

Repair tools / TPM materials / Machinery 64


Stanadyne Business System

65 July 2008
Stanadyne Business System

START YOUR ENGINES AND DONT STOP UNTIL YOU CROSS THE FINISH LINE

Standardize

Shine Straighten Sustain

Sort

66 July 2008
Stanadyne Business System

Вам также может понравиться