CERTIFICATE FOR REIMBURSHMENT OF TECHNICAL AGENTS SALARY 1.

Certified that the bill has not been preferred and paid previously. 2. Certified that the technical agents were appointed by the contractor and they were available during execution of work. 3. Certified that the provision was made for the technical agents salary in the agreement (Part II of Schedule A). 4. Cerified that the work was completed on.

INSURANCE PREMUIM 1.Certified that the bill has not been preferred and paid previously. 2. Certified that the insurance premium was paid by the contractor and same was produced to the division. 3. Certified that the provision was made for the insurance premium in the agreement (Part II of Schedule A). 4. Certified that the work was completed on .

PAYMENT OF EMD & FSD 1.Certified that the bill has not been preferred and paid previously. 2.Certified that the work was completed on 3. Certified that there are no defects were found during the observation period of 2 years i.e., from..to 4. Certified that there are no I.R.Paras outstanding against this work. 5. Certified that there are no recoveries to be made from the contractor.

FINAL BILL
1. Certified that the work is completed in all respects as per Plan Agreement conditions on .

2. Certified that the contractor has engaged Technical Agents by name 1)______________________2)________________________(Qualifi cations ) and they are available during the course of execution of the work. 3. Ceritified that the Rock is within the permissible canal section and there are no over breakages beyond tolerance limit.(If necessary) 4. Certified that the Quality Control authorities have tested the work in Quality and no adverse remarks are raised against the wok. 5. Certified that the materials procured by the Contractor have been tested in the Departmental Laboratory and the test results are satisfactory and they are of ISI standards.(If necessary) 6. Certified that there are no I.R.Paras outstanding against the work. 7. Certified that the contractor has conveyed the material for use on work as per the lead Statement appended to the Agreement.(If necessary) 8. Certified that the classification of soils have been done by the competent authority.(If necessary) 9. Certified that all recoveries have been effected in this Bill. 10. Certified that there is no further dues to be recovered from the contractor. 11. Certified that no materials have been issued to the contractor departmentally. 12. Certified that no liabilities are outstanding against the contractor. 13. Certified that the useful earth obtained from canal cutting has been utilized banking before resorting to borrow earth.(If necessary)

PART

BILL

1.

Certified that the work is in progress.

2. Certified that the contractor has employed Technical Agent (Qualifications) and they are available during the course of execution of the work. 3. Certified that the Rock is within the permissible canal section and there are no over breakages beyond tolerance limit.(If necessary).

4. Certified that the Quality Control Authorities have tested the work in quality and no adverse remarks are raised against the work. 5. Certified that the materials procured by the contractor have been tested in the departmental laboratory and the test results are satisfactory and they are of ISI standards. ( if necessary ) 6. Certified the all recoveries have been effected in this bill. 7. Certified that the wok has been carried out satisfactorily as per terms and conditions of the Agreement.

8. Certified that no materials have been issued to the contractor departmentally. 9. Certified that the classification of soils have been done by the competent authority/Authorities.(If necessary)