Telecommunication Design Considerations

1. Telecommunication Service Provider (TSC) Analysis, Recommendation, References 1.1 ConduitAnalysis Outdoor or Indoor Underground or Aboveground RMC, IMC, EMT, or PVC Recommendation

Reference Links

1.2 Routing 1.3 Manhole Size 1.4 Manhole Location 1.5 Room Size 1.6 Room Location 1.7 Wire Type 1.8 Wire Size 1.9 Labeling 1.10 Lightning or surge protection 1.11 Grounding 1.12 Inspection 1.13 Testing 1.14 Commissioning 1.15 Others 2. From TSC to Equipment Room - Analysis, Recommendation, References 2.1. Conduit 2.2. Routing 2.3. Pull boxes Size 2.4. Pull boxes Location 2.5. Room Size 2.6. Room Location 2.7. Wire Type 2.8. Wire Size 2.9. Lightning or surge protection

2.10. 2.11. 2.12. 2.13. 2.14. 2.15. 2.16. 2.17.

Grounding Rack Type & Size Rack Location Labeling Inspection Testing Commissioning Others

3. From Main Distribution Room to Intermediate Room - Analysis, Recommendation, References 3.1. Conduit 3.2. Routing 3.3. Pull boxes Size 3.4. Pull boxes Location 3.5. Room Size 3.6. Room Location 3.7. Wire Type 3.8. Wire Size 3.9. Lightning or surge protection 3.10. Grounding 3.11. Rack Type & Size 3.12. Rack Location 3.13. Labeling 3.14. Inspection 3.15. Testing 3.16. Commissioning 3.17. Others

4. From Intermediate Room to Telecommunication Closets or Enclosures - Analysis, Recommendation, References 4.1. Conduit 4.2. Routing 4.3. Pull boxes Size 4.4. Pull boxes Location 4.5. Room Size 4.6. Room Location 4.7. Wire Type 4.8. Wire Size 4.9. Lightning or surge protection 4.10. Grounding 4.11. Rack Type & Size

4.12. 4.13. 4.14. 4.15. 4.16. 4.17.

Rack Location Labeling Inspection Testing Commissioning Others

5. From Telecommunication Closets or Enclosure to Workstation - Analysis, Recommendation, References 5.1. Conduit 5.2. Routing 5.3. Pull boxes Size 5.4. Pull boxes Location 5.5. Room Size 5.6. Room Location 5.7. Wire Type T568B.1 5.8. Wire Size 5.9. Lightning or surge protection 5.10. Grounding 5.11. Outlet Type 5.12. Outlet Number 5.13. Outlet Location 5.14. Labeling 5.15. Inspection 5.16. Testing 5.17. Commissioning 5.18. Others 6. Between 2 or more Buildings - Analysis, Recommendation, References 6.1. Conduit 6.2. Routing 6.3. Manhole Size 6.4. Manhole Location 6.5. Pull boxes Size 6.6. Pull boxes Location 6.7. Room Size 6.8. Room Location 6.9. Wire Type 6.10. Wire Size 6.11. Lightning or surge protection 6.12. Grounding

6.13. 6.14. 6.15. 6.16. 6.17. 6.18. 6.19.

Rack Type & Size Rack Location Labeling Inspection Testing Commissioning Others