Академический Документы
Профессиональный Документы
Культура Документы
Multan
BOATS TRANSPORT
ESTABLISHMENT OF CAMPS
SCHOOLS OPEN PLACES (TENTS)
MANAGEMENT OF CAMPS
TRAINED HR
The following responsibilities have been assigned to various stakeholders coordinately to improve the level of preparedness.
Sr.#
1 1)
Task Assigned
Submission of detail report regarding Akber Flood Bund Identification of sites for Flood Relief Camps.Proposed site or Industrial Estate, Sahra e Madina and vacant building of Social Welfare Department. Maintenance of District Ware house for the storage of dry items etc. Enlistment of boats and life jackets available with District Govt.,Rescue1122 and private boats for rescue and relief operations. 1)
Name of Department
Chief Engineer, (Irrigation)
2
2)
2)
Preparation of transportation plan for the evacuation of IDP,s 1) Identification of schools for declaring as flood camps in outskirts of Multan District Provision of detail regarding basic facilities (Rooms, Toilets, Sewerage System and adjoining open place etc. )
2)
EDO (Education)
Camps Management
1) Provision of detail regardig food supply chain to the flood relief camps 2) Supervision of financial matters regarding flood session 2011
10
1) Rept of H/Q Engineering 02 Corps Multan Cantt 2) .District Emergency Officer(Rescue1122) All Assistant Commissioners
11
12
Police
13
Plan for posting doctors and para-medical staff with adequate medicine and vaccination in flood relief camps
14
1) Provision of dry food edibles with the help of NGO,s 2) Preparation of code of conduct regarding NGO,s for the supply of food items
DO (Social Welfare)
B- CONTINGENCY PLANNING
Contingency Planning
CHECK LISTS
SURVEY PLANNING MOCK EXERCISE (WITH THE SUPPORT OF ARMY)
Existing Gaps
Existing Gaps
Flood in Multan City (lack preparedness) HR (training etc) Shelters (Tents) Boats Life jackets, ropes etc Funds medicines