Академический Документы
Профессиональный Документы
Культура Документы
womeninenergy.org.pk
womeninenergy.org.pk
Encouraging Women
1. Compliance to Women Quota
2. Anti Harassment Measures
5. Baby Nursery
6. Training of lady engineer on efficient lighting from Sri
Lanka
womeninenergy.org.pk
4
Energy Initiatives
PEC Building as Green Organization PEC Peshawar Green Building
womeninenergy.org.pk
Conservation
One Watt saved is One Watt produced
One Watt saved by each Pakistani means 170 MW
produced
One MW costs two million US $ Cost to produce 170 MW is 29.580 billion rupees Recurring cost is 2.5 billion rupees Thus, we save on expenditures, recurring cost and save our environment by reduced carbon emission.
womeninenergy.org.pk
8
Conservation Measures
womeninenergy.org.pk
consumption after converting on LEDs. However 20 % increase is expected for better lumens
10
womeninenergy.org.pk
1700 Watt
old
100 Watt
Current
womeninenergy.org.pk
11
current consumption
womeninenergy.org.pk
12
womeninenergy.org.pk
13
womeninenergy.org.pk
14
womeninenergy.org.pk
15
womeninenergy.org.pk
16
Enabling Environment
1. Financing homes & SMEs Solar and efficient
lighting, Pay finance through savings
3. Tax holidays
4. Tax rebates
womeninenergy.org.pk
19
womeninenergy.org.pk
20
Invest in Energy
1. Energy your high rewarding business invest in Energy
2. Lets make our gold jewelry earn for us 3. Invest the bank deposits for better return rate 4. Reduce energy bills despite increasing tariff 5. Convert on solar, sell extra electricity, earn money instead of paying bills 6. Utilize saved/ earned money for other family needs.
21
womeninenergy.org.pk
Partner Organizations
1.
2. 3. 4. 5.
USAID
US Energy Association (USEA) South Asia Regional Initiative for Energy (SARI/Energy) JICA ENERCON
6.
7. 8.
womeninenergy.org.pk
22
23
womeninenergy.org.pk
24
Features
First of its kind in Pakistan Five Storied PEC Head Office Building All appliances on solar energy Excess energy to be put on national grid A similar system would be installed at Planning Commission under PECs initiative
Site for On-grid Solar System in Front of PEC Building
25
4. Power Conditioner
2. Junction Box Outdoor Cubicle 5. 400V Switching Panel 6. 400V Distribution Panel
womeninenergy.org.pk
26
Major Work Item Feb Mar 1 Commencement Date 2 Design for Civil Work 3 Civil Work 4 Design of Equipment 5 Manufacturing of Equipment 6 Transportation 7 Installation of Equipment 8 Commissioning/Acceptance Inspection 9 Taking-over Apr May Jun 1 2 3 4 5 2011 Jul 6 7 8 9 10 11 12 2012 Aug Sep Oct Nov Dec Jan Feb Mar 13
womeninenergy.org.pk
27
womeninenergy.org.pk
28
womeninenergy.org.pk
29
womeninenergy.org.pk
30
womeninenergy.org.pk
31
womeninenergy.org.pk
32
Join us..
womeninenergy.org.pk
33