Академический Документы
Профессиональный Документы
Культура Документы
Reaction A R
density
Flow rate
Pressure
F
P
Specific heat
viscosity
Prandtl number
Operation per year
Cp
Pr
1000 kg/m3
0.000769231 kg/s
1 atm
4180
0.001
5
7800
85
8000
8
200
0.85
fp
s
s
s
j
density of steel
electricity cost
steel cost
Joint efficiency
J/kg. K
Pa.S
Hr
atm
kg/m3
Rs/KW hr
/kg
0.836 W/m.K
Design Calculation
Consider Reaction is in PFR Fibrous bed reactor
Volume of reacter
L/D
D
5.839089
2.710265
1.584973
1.257994
0.99847
0.872244
0.792486
0.735679
1
10
50
100
200
300
400
500
156.3800905 m3
L
5.839088938
27.10265001
79.24862939
125.7993577
199.6940327
261.6732088
316.9945176
367.8395533
Ah
107.0582
230.6498
394.4057
496.92
626.08
716.6827
788.8114
849.7213
Re
167.8193
361.5557
618.2516
778.9482
981.4132
1123.438
1236.503
1331.983
Nu
2.356468
4.354398
6.688367
8.046274
9.679868
10.78517
11.64512
12.3591
h W/m2K
0.337383
1.343144
3.527806
5.347153
8.104769
10.33702
12.28453
14.04445
f
0.016512
0.014162
0.012721
0.012147
0.011598
0.011289
0.011074
0.010911
dia of 1
loop
L/D
100
200
300
400
500
1000
5
5
5
5
5
5
length of 1
loop
15.7
15.7
15.7
15.7
15.7
15.7
no of
no of
loops
loops
8.012698
12.71937
16.66708
20.19073
23.42927
37.19165
pitch
9
13
17
21
24
38
1.2
0.9
0.8
0.7
0.7
0.5
total
height of
reactor
10.8
11.7
13.6
14.7
16.8
19
original
annual production total
share
annual production
batch running time
approx batches per year
working hrs annually
hourly production
hourly flow
HRT
Vol. of reactor (theorotically)
Voidage
actual vol of reactor
Volume of reactor
L/D (from lab data)
Dia of reactor
Length of reactor
P Pa
2.7278E-08
5.04057E-06
0.000193558
0.000931422
0.004482095
0.011236246
0.02156829
0.035766662
1.45E+11
0.0001
14500000
65
5
7800
1858.974359
1000
1.858974359
48
89.23076923
0.85
104.9773756
105
57.97101449
1.306062479
78.36374874
kg/year
kg/hr
days
kg/hr
kg/m3
M3/hr
hr
m3
m3
m3
60
with corrections
data collected from Amul Industries
monthly production total
yearly production
batch running time
approx batches per year
working hrs annually
hourly production
hourly flow
HRT
Vol. of reactor (theorotically)
Voidage
actual vol of reactor
Volume of reactor
L/D (from lab data)
Dia of reactor
Length of reactor
Power P
Power KW
power kw.hr Cost of power
2.09831E-11
2.09831E-14 1.63668E-10
3.87736E-09
3.87736E-12 3.02434E-08
1.48891E-07
1.48891E-10 1.16135E-06
7.16478E-07
7.16478E-10 5.58853E-06
3.44777E-06
3.44777E-09 2.68926E-05
8.64327E-06
8.64327E-09 6.74175E-05
1.6591E-05
1.6591E-08 0.00012941
2.75128E-05
2.75128E-08
0.0002146
1.30935E-09
2.41947E-07
9.2908E-06
4.47082E-05
0.000215141
0.00053934
0.001035278
0.0017168
1800
21600000
65
5
7800
2769.230769
1000
2.769230769
48
132.9230769
0.85
156.3800905
156.3800905
57.97101449
1.49151631
89.49097859
thickness (mm)
40.41
18.76
10.97
8.71
6.91
6.04
5.48
5.09
0.17211276 0.000132394
0.260189975 0.000200146
0.431472633 0.000331902
1.32394E-07 0.001032677
2.00146E-07 0.00156114
3.31902E-07 0.002588836
0.008261412
0.012489119
0.020710686
4.04
3.80
3.53
5.839088938
T/month
kg/yr
days
kg/hr
kg/m3
M3/hr
hr
m3
m3
m3
60
Volume of steel
4.326105156
4.326105156
4.326105156
4.326105156
4.326105156
4.326105156
4.326105156
4.326105156
4.326105156 34608.84124
4.326105156 34608.84124
4.326105156 34608.84124
6921768.249
6921768.249
6921768.249