Key Words : Relay Circuit, Stabilising Resistors, CT Parameters, Tripping Sequence, Dynamic Load.
17/12/2007
STATION PROTECTIONS
By NTPC
220 kV / 132 kV
One main protection per zone (bus) Single CT core is switched to respective main zone through switching relays Common check zone for all the buses connected to an independent CT core other than main protection Tripping based on operation of both main and check zone
INCLUDE CT SUPERVISION INDIVIDUAL TRIP RELAYS(DUPLICATED) FOR EACH FEEDER TRANSIENT FREE OPERATION DC SUPPLY SUPERVISION IN /OUT SWITCH FOR EACH ZONE MODERN NUMEIRCAL BUSBAR PROTECTIONS ARE AVAILABLE IN CENTRALISED AND DECENTRALISED FORM IN DUPLICATED BUS BAR SCHEME, PREFERABLY ONE SCHEME SHALL BE LOW IMPEDANCE BASED AND SECOND SHALL BE HIGH IMPEDANCE BASED
R2 R1
CT
Matching CT ratio to avoid spill current during healthy state Less Rct/ less Ie/high CT ratio
Supvn of CT circuit
Detected by using a 3 phase rectifier relay to effect the summation of the bus wire voltages and short the pilot wire from the affected phase
Routing of CT connection
Looped at the yard itself to ensure minimum loop resistance and thus a minimum setting voltage and a minimum Vk for a given stability limit
Use of bias
Compensate for small ratio mismatch AC switching of feeder current through isolator contacts are avoided and switching is done on the sec side of aux CTs forming part of the relay.Alternatively in static / numerical relays,the bus bar replica is made inside the relay through isolator contacts and the logic is done by the same. Aux CT takes care of ratio mismatch of CTs A current operated auxiliary relay is used to detect any unbalance sec current for supervision of the CT ckts. Current setting of the supvn relay must be less than that of main diff relay and more than the lowest loaded feeder
Setting criteria
Main diff relay is set above the highest loaded feeder. Must be more than 30% of the min fault level.
ISLANDING SCHEMES
Islanding scheme
5 8 17 20
R2 R2
181 F 6 4 7 9 16 18 19 21
3 1 281 F 381 F
10
12
13
15
11
14
481F
581F
681F