NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski RATE ANALYSIS JOB:- Toilet for Guard House

in Kudar Sub Station 1) E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift.
SOURCE LEVEL/TYPE Unskilled LABOUR: MACHINE AND .@ 3% of LABOUR: cost TOOLS Sub total Contractor's overhead @15% Rate per 1cum. Detail for 1cum. QUANTITY UNIT 1.25 md RATE 385.00 AMOUNT 481.25 14.44 495.69 74.35 570.04 REMARKS

2) 1St class fair face brick work in wall with chimney made brick in cement sand mortar (1:6) in perfect line level and finishing.
SOURCE LABOUR: MATERIAL: Sub total Contractor's overhead @15% Rate per 1 Cum LEVEL/TYPE Skilled Unskilled Cement Sand Brick Detail for 1 Cum. QUANTITY UNIT 1.50 md 2.20 md 0.090 mt 0.31 cu.m 530 No. RATE 575.00 385.00 11700.00 1175.00 10.00 AMOUNT 862.50 847.00 1053.00 364.25 5300.00 8426.75 1264.01 9690.76 REMARKS

3) 12.5mm thick cement sand plaster (1:5) on wall in perfect line level and plumb including grooving in
SOURCE LABOUR: MATERIAL: Sub total Contractor's overhead @15% Rate per 100 sq.m Say rate per sq.m LEVEL/TYPE Skilled Unskilled Cement Sand Detail for 100sq.m QUANTITY UNIT 12.00 md 16.00 md 0.460 mt 1.52 cu.m RATE 575.00 385.00 11700.00 1175.00 AMOUNT 6900.00 6160.00 5382.00 1780.13 20222.13 3033.32 23255.44 232.55 REMARKS

4) Providing and laying 3 mm thick punning on wall of safety tanky.


SOURCE LABOUR: MATERIAL: Sub total LEVEL/TYPE Skilled Unskilled Cement Details for 100 Sq.m QUANTITY UNIT RATE 10.00 md 575.00 10.00 md 385.00 0.518 mt 11700.00 AMOUNT 5750.00 3850.00 6060.60 15660.60 2349.09 18009.69 180.10 REMARKS

Contractor's overhead @15% Rate per 100 sq.m Say rate per sq.m

5) Providing, mixing and laying P.C.C (1:2:4) for RCC slab over safety tanky and roof conforming to code with stone aggregate 20 mm & down guage in all RCC including form work , compaction & curing.
SORCE LABOUR: LEVEL/TYPE Skilled Unskilled Cement Aggregate 40 mm Aggregate 20 mm Aggregate 10 mm Sand Detail for 1cu.m QUANTITY UNIT 0.80 md 7.00 md 0.32 Mt 0.52 Cum 0.22 Cum 0.11 Cum 0.445 Cum RATE 575.00 385.00 11700.00 1100.00 1100.00 1100.00 1175.00 AMOUNT 460.00 2695.00 3744.00 572.00 242.00 121.00 522.88 8356.88 1253.53 9610.41 REMARKS

MATERIAL:

SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER 1 cu.m

6) Providing torsteel reinforcement for RCC slab over safety tanky and roof as IS code including cutting,bending, straighting, placing in position by binding wire as per drawings.
SOURCE LABOUR: MATERIAL: LEVEL/TYPE Skilled Unskilled Tor steel Binding wire Total Detail for 1 mt QUANTITY UNIT 12.00 md 12.00 md 1.05 Mt 10.00 kg RATE 575.00 385.00 70450.00 87.00 AMOUNT 6900.00 4620.00 73972.50 870.00 86362.50 86362.50 12954.38 99316.88 99.32 REMARKS

SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER 1 mt Rate per kg

7) First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and finishing including scaffholding ,curing ,racking out green mortar.
SOURCE LABOUR: MATERIAL: LEVEL/TYPE Skilled Unskilled Sand Cement Block (4" * 6" * 8") Detail for 1cu.m QUANTITY UNIT 1.50 md 2.20 md 0.28 cum 0.10 mt 110.00 No RATE 575.00 385.00 1175.00 11700.00 29.00 AMOUNT 862.50 847.00 329.00 1170.00 3190.00 6398.50 959.78 7358.28 REMARKS

SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER 1 cu.m

8) Providing, making and fixing dressed sal wood door frame in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings.
SOURCE LABOUR: MATERIAL: Sub total Contractor's overhead @15% Rate per 1 Cu.m LEVEL/TYPE Skilled Unskilled Sal wood Hold fast 250mm Nail/screw QUANTITY 34.00 3.40 1.10 10.00 1.00 UNIT Md Md Cu.m N.o L.S RATE 575.00 385.00 120069.87 5.00 50.00 AMOUNT 19550.00 1309.00 132076.85 50.00 50.00 153035.85 22955.38 175991.23 REMARKS

9) Providing, making and fixing 38 mm thick dressed sal wood door shutter in plumb and fixing 26 gauge plain sheet in both side as per drawings.
SOURCE LABOUR: Details for 1.092*2.058=2.245 m2 LEVEL/TYPE QUANTITY UNIT Skilled 7.00 md Unskilled 0.70 md Sal wood 0.0346 mt 26 G plain sheet 4.65 Sq.m 100 mm hinge 3.00 No 150 mm cheskini 2.00 No 10" simple lock 1.00 No handle 1.00 No screw 1.00 Ls Contractor's overhead @15% Rate per 2.245 sq.m Say rate per sq.m RATE 575.00 385.00 120069.87 387.50 24.26 55.13 170.89 40.00 50.00 AMOUNT 4025.00 269.50 4154.42 1801.88 72.78 110.26 170.89 40.00 50.00 10694.72 1604.21 12298.93 5478.37 REMARKS

MATERIAL:

Sub total

10) Suplying and laying of Porcelain glazed tiles flooring in 1:4 cement sand mortar in toilet floor.
SOURCE LABOUR: LEVEL/TYPE Skilled Unskilled Cement Sand White cement Tile Detail for 10sq.m QUANTITY UNIT 13.00 md 4.50 md 0.060 mt 0.15 cu.m 3.23 kg 10.50 sq.m RATE 575.00 385.00 11700.00 1175.00 28.00 771.34 AMOUNT 7475.00 1732.50 702.00 178.60 90.38 8099.07 18277.55 2741.63 21019.19 2101.92 REMARKS

MATERIAL: Sub total

Contractor's overhead @15% Rate per 10 sq.m Say rate per sq.m

11) Supplying and fitting of 530mm, 20" indian pan .


SOURCE LABOUR: MATERIAL: LEVEL/TYPE Skilled Unskilled Indian 20" P or S trap Detail for 1set. QUANTITY UNIT 2 md 2 md 1 No. 1 No. RATE 575.00 385.00 1270.50 462.00 AMOUNT 1150.00 770.00 1270.50 462.00 3652.50 547.88 4200.38 REMARKS

SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER Set.

12) 12mm dia,10 m long steel reinforcement (12mm dia.on 10m long have 8.878 kg)
SOURCE MATERIAL: Sub total Rate per kg LEVEL/TYPE Tor steel Details for 1 Kg QUANTITY UNIT 1.00 kg RATE 70.45 AMOUNT 70.45 70.45 10.57 81.02 REMARKS

Contractor's overhead @15%

13) Suplying and laying of CGI sheet as roofing, along with iron tubular truss.
SOURCE LABOUR: LEVEL/TYPE Skilled Unskilled CGI sheet 22*24 Gauge Nut Bolt J hook Bitumen Washer Black iron pipe 1.5" dia 1.8mm thick Detail for 10sq.m QUANTITY UNIT 1.10 md 1.25 md 12.00 sq.m 3.23 kg 25.00 N.o 55.00 N.o 11.40 m RATE 575.00 385.00 387.50 93.00 8.00 2.00 241.40 AMOUNT 632.50 481.25 4650.00 300.39 200.00 110.00 2751.96 9126.10 1368.92 10495.02 1049.50 REMARKS

MATERIAL:

Sub total Contractor's overhead @15% Rate per 10 sq.m Say rate per sq.m

14) Fitting of 15 mm GI pipe medium type.


SOURCE LABOUR: LEVEL/TYPE Skilled Unskilled Detail for 1rm. QUANTITY UNIT 0.18 md 0.16 md RATE 575.00 385.00 AMOUNT 103.5 61.6 165.10 24.765 189.87 REMARKS

SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER RM.

15) Fitting of 15mm Cp bib cock long neck common.


SOURCE LEVEL/TYPE LABOUR: Skilled SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER Set. Detail for 1set. QUANTITY UNIT 0.11 md RATE 575.00 AMOUNT 63.25 63.25 9.49 72.74 REMARKS

16) Fitting of 25 mm GI Gate valve (Commercial).


SOURCE LEVEL/TYPE LABOUR: Skilled SUB TOTAL CONTRACTOR'S PROFIT,O/H @ 15% RATE PER Set. Detail for 1set. QUANTITY UNIT 0.22 md RATE 575.00 AMOUNT 126.5 126.50 18.98 145.48 REMARKS

17) Two coat of Snowcem painting work on existing surface of wall.


SOURCE LABOUR: MATERIAL: Sub total Contractor's overhead @15% Rate per 100 sq.m Say rate per sq.m LEVEL/TYPE Skilled Unskilled Cement paint Gum Detail for 100sq.m QUANTITY UNIT 5.00 md 3.80 md 54.00 sq.m 2.16 kg RATE 575.00 385.00 70.56 202.86 AMOUNT 2875.00 1463.00 3810.24 438.18 8586.42 1287.96 9874.38 98.74 REMARKS

Prepared by:

Checked by:

Approved by:

NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski QUANTITY ESTIMATE SHEET JOB:- Toilet for Guard House in Kudar Sub Station S.N
1

DESCRIPTION OF WORKS.

UNIT

LENGTH BREADTH HEIGHT QUANTITY REMARKS (M) (M) (M)


3.867 9.650 0.567 1.500 0.102 0.102 1.372 1.372 2.134 7.956 1.345 0.123 1.468 14.257 3.305 4.590 4.000 1.535 1.535 23.081 3.305 0.594

E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & Cu.m 1.5 m lift. (a) 1St class fair face brick work in wall with chimney made brick in Cu.m cement sand mortar (1:4) in perfect line level and finishing. (b) In pillar Total (a) 12mm thick cement sand plaster (1:5) on wall (7" tall) and curb facial in perfect line level and plumb including grooving in plaster for drip moulds etc. in block wall (b) In safety tanky wall (4.5" tall) (c ) In front face. (d) In face along road side Deduction for door. Deduction for door. Total 3 mm thick cement punning on safety tany wall(4.5 " tall) Providing, mixing and laying 4" P.C.C (1:2:4) for RCC slab over safety tanky conforming to IS 456-1978 with stone aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code including cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and finishing including scaffplding curing racking out green mortar. Deduction for door. Total Providing, making and fixing dressed sal wood door frame in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings. Chaukath Providing, making and fixing dressed sal wood door shutter in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings. Shutter Suplying and laying of tiles in (1:4) cm mortar Supplying and fitting of 530mm,20" indian pan. 12mm dia,10 m long steel reinforcement (12mm dia.on 10m long have 8.878 kg) Suplying and laying of CGI sheet as roofing along with iron tubular truss. Fitting of 15 mm GI pipe medium type. Fitting of 15mm Cp bib cock long neck common. Fitting of 25mm GM Gate valve (NS standard 149-2044). Two coat of Snowcem painting work on existing surface of Wall of Guard room and Bath room. Cu.m

Sq.m Sq.m Sq.m Sq.m Sq.m Sq.m Sq.m Cu.m

6.682 2.410 2.151 4.000 0.776 0.776 2.410 3.900 1.500

2.134 1.372 2.134 1.000 1.978 1.978 1.372 0.102

4 5

Kg.

46.657

46.657

Cu.m Cu.m

6.500 0.102

0.102 0.776

2.134 1.978

1.409 0.156 1.253 0.035

Cu.m

4.580

0.076

0.102

9 10 11 12 13 14 15 16 17

Sq.m Sq.m N.o Kg. Sq.m R.m N.o N.o Sq.m

0.624 2.381 1.000 8.878 7.032 10.000 3.000 1.000 20.728 1.000 2.000

1.902

1.186 4.762 1.000 8.878 7.032 10.000 3.000 1.000

2.438

50.535

Prepared by:

Checked by:

Approved by:

NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski QUANTITY ESTIMATE SHEET JOB:- Toilet for Guard House in Kudar Sub Station S.N DESCRIPTION OF WORKS. UNIT LENGTH BREADTH HEIGHT QUANTITY REMARKS (M) (M) (M)

NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski QUANTITY ESTIMATE SHEET JOB:- Toilet for Guard House in Kudar Sub Station S.N DESCRIPTION OF WORKS. UNIT LENGTH BREADTH HEIGHT QUANTITY REMARKS (M) (M) (M)

Prepared by:

Checked by:

Approved by:

NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski Abstract of Cost. JOB:- Toilet for Guard House in Kudar Sub Station S.N
1

DESCRIPTION
E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift. 1St class fair face brick work in safety tanky wall and pillar with chimney made brick in cement sand mortar (1:4) in perfect line level and finishing. 12mm thick cement sand plaster (1:5) on wall (7 " tall) and curb facial in perfect line level and plumb including grooving in plaster for drip moulds etc. (internal) Providing and laying 3 mm thick punning on wall of safety tanky wall (4.5 " tall ). Providing, mixing and laying P.C.C (1:2:4) for RCC slab over safety tanky and roof conforming to IS code with stone aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code including cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and finishing including scaffplding curing racking out green mortar. Providing, making and fixing dressed sal wood door & window frame in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings.

UNIT QUANTITY
Cu.m 7.956

RATE
570.04

AMOUNT
4535.224

REMARKS

Cu.m

1.468

9690.76

14222.960

Sq.m

23.081

232.55

5367.623

Sq.m

3.305

180.10

595.222

Cu.m

0.594

9610.41

5712.041

Kg.

46.657

99.32

4633.853

Cu.m

1.253

7358.28

9220.159

Cu.m

0.035

175991.23

6240.296

Providing, making and fixing dressed sal wood 9 door & window shutter in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings. Suplying and laying of tiles in (1:4) cm cement 10 sand mortar. 11 12 13 14 15 16 17 Supplying and fitting of 530mm,20" indian pan. 12mm dia, 8 m long steel reinforcement(12mm dia.on 10m long have 8.878 kg) Suplying and laying of CGI sheet as roofing , along with iron tubular truss. Fitting of 15 mm GI pipe medium type. Fitting of 15mm Cp bib cock long neck common. Fitting of 25mm GM Gate valve . Two coat of Snowcem painting work on existing surface of wall.

Sq.m

1.186

5478.37

6499.562

Sq.m N.o Kg. Sq.m R.m N.o N.o Sq.m

4.762 1.000 8.878 7.032 10.000 3.000 1.000 50.535

2101.92 4200.38 81.02 1049.50 189.87 72.74 145.48 98.74

10009.757 4200.375 719.273 7380.199 1898.650 218.213 145.475 4990.005

TOTAL :VAT @ 13% :GRAND TOTAL :-

86588.886 11256.555 97845.44

IN WORDS :-

Rs. Niniety seven thousand eight hundred fourty five rupees fourty four paisa only.

Prepared by:

Checked by:

Approved by:

by:

NEPAL ELECTRICITY AUTHORITY


Pokhara Grid Branch

Lekhnath, kaski

Bill of Quantity
JOB:- Toilet for Guard House in Kudar Sub Station S.N 1 DESCRIPTION E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift. 1St class fair face brick work in safety tanky wall and pillar with chimney made brick in cement sand mortar (1:4) in perfect line level and finishing. 12mm thick cement sand plaster (1:5) on wall (7 " tall) and curb facial in perfect line level and plumb including grooving in plaster for drip moulds etc. (internal) Providing and laying 3 mm thick punning on wall of safety tanky wall (4.5 " tall ). UNIT QUANTITY Cu.m 7.956 RATE PER UNIT IN FIGURE IN WORDS AMOUNT REMARK

Cu.m

1.468

Sq.m

23.081

Sq.m

3.305

Providing, mixing and laying P.C.C (1:2:4) for RCC slab over safety tanky and roof conforming Cu.m to IS code with stone aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code including Kg. cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and Cu.m finishing including scaffplding curing racking out green mortar. Providing, making and fixing dressed sal wood door & window frame in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings.

0.594

46.657

1.253

Cu.m

0.035

Providing, making and fixing dressed sal wood door & window shutter in plumb including two 9 coats of bitumen painting over faces in contact with block wall as per drawings. Suplying and laying of tiles in (1:4) cm cement 10 sand mortar. 11 Supplying and fitting of 530mm,20" indian pan. 12mm dia, 8 m long steel reinforcement(12mm 12 dia.on 10m long have 8.878 kg) Suplying and laying of CGI sheet as roofing , 13 along with iron tubular truss. 14 Fitting of 15 mm GI pipe medium type.

Sq.m

1.186

Sq.m N.o Kg. Sq.m R.m

4.762 1.000 8.878 7.032 10.000 3.000 1.000 50.535

15 Fitting of 15mm Cp bib cock long neck common. N.o 16 Fitting of 25mm GM Gate valve . N.o Two coat of Snowcem painting work on existing 17 Sq.m surface of wall.

TOTAL :VAT @ 13% :GRAND TOTAL :IN WORDS :-

Name of the Contractor: Address: Authorized Signature:

Date: Stamp:

Prepared by:

Checked by:

Approved by:

NEPAL ELECTRICITY AUTHORITY Pokhara Grid Branch Lekhnath, kaski Final Measurement book. JOB:- Toilet for Guard House in Kudar Sub Station S.N
1

DESCRIPTION OF WORKS.
E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift. (a) 1St class fair face brick work in wall with chimney made brick in cement sand mortar (1:4) in perfect line level and finishing. (b) In pillar Total (a) 12mm thick cement sand plaster (1:5) on wall (7" tall) and curb facial in perfect line level and plumb including grooving in plaster for drip moulds etc. in block wall

UNIT
Cu.m

LENGTH (M)
3.500

BREADTH HEIGHT QUANTITY (M) (M)


1.500 1.372 7.201

Cu.m Cu.m

9.650 0.567

0.102 0.102

1.372 2.134

1.345 0.123 1.468

Sq.m

6.682

2.134

14.257

(b) In safety tanky wall (4.5" tall) (c ) In front face. (d) In face along road side Deduction for door. Deduction for door. Total 3 mm thick cement punning on safety tany wall(4.5 " tall) Providing, mixing and laying 4" P.C.C (1:2:4) for RCC slab over safety tanky conforming to IS 4561978 with stone aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code including cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and finishing including scaffplding curing racking out green mortar. Deduction for door.

Sq.m Sq.m Sq.m Sq.m Sq.m Sq.m

2.410 2.151 4.000 0.776 0.776 2.410

1.372 2.134 1.000 1.978 1.978 1.372

3.305 4.590 4.000 1.535 1.535 23.081 3.305

Cu.m

3.900

1.500

0.102

0.594

Kg.

46.657

46.657

Cu.m

6.500

0.102

2.134

1.409

Cu.m

0.102

0.776

1.978

0.156

Total Providing, making and fixing dressed sal wood door frame in plumb including two coats of 8 bitumen painting over faces in contact with block wall as per drawings. Providing, making and fixing dressed sal wood door shutter in plumb including two coats of 9 bitumen painting over faces in contact with block wall as per drawings. Suplying and laying of tiles in (1:4) 10 cm mortar Supplying and fitting of 530mm,20" 11 indian pan. 12mm dia,10 m long steel 12 reinforcement (12mm dia.on 10m long have 8.878 kg) 13 14 Suplying and laying of CGI sheet as roofing along with iron tubular truss.

1.253

Cu.m

4.580

0.076

0.102

0.035

Sq.m

0.624

1.902

1.186

Sq.m N.o Kg.

2.381 1.000 8.878

2.000

4.762 1.000 8.878

Sq.m

7.032 10.000 3.000 1.000 20.728

1.000

7.032 10.000 3.000 1.000 2.438 50.535

Fitting of 15 mm GI pipe medium R.m type. Fitting of 15mm Cp bib cock long 15 N.o neck common. Fitting of 25mm GM Gate valve (NS 16 N.o standard 149-2044). Two coat of Snowcem painting work 17 on existing surface of Wall of Guard Sq.m room and Bath room.

Name of the Contractor: Address: Authorized Signature: Date: Stamp:

Prepared by:

Checked by:

Approved by:

REMARKS

Approved by:

NEPAL ELECTRICITY AUTHORITY


Pokhara Grid Branch

Lekhnath, kaski

Measurement Book
Stareted Date:- 2068-9-20 Additional Time:-No JOB:- Toilet for Guard House in Kudar Sub Station Measurement Date:-2068-9-28 Completion Date:-2068-9-27

S. N
1 2 3 4

DESCRIPTION
E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift. 1St class fair face brick work in safety tanky wall and pillar with chimney made brick in 12mm thick cement sand plaster (1:5) on wall (7 " tall) and curb facial in perfect line level and Providing and laying 3 mm thick punning on wall of safety tanky wall (4.5 " tall ). Providing, mixing and laying P.C.C (1:2:4) for RCC slab over safety tanky and roof conforming to IS code with stone aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code including cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in perfect level and finishing including scaffplding curing racking out green mortar. Providing, making and fixing dressed sal wood door & window frame in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings.

UNIT
Cu.m Cu.m Sq.m Sq.m

QUANTITY
7.201 1.468 23.081 3.305

RATE
570.04 9690.76 232.55 180.10

AMOUNT
4104.806 14222.960 5367.623 595.222

REMARKS

Cu.m

0.594

9610.41

5712.041

Kg.

46.657

99.32

4633.853

Cu.m

1.253

7358.28

9220.159

Cu.m

0.035

175991.23

6240.296

Providing, making and fixing dressed sal wood 9 door & window shutter in plumb including two coats of bitumen painting over faces in contact with block wall as per drawings. Suplying and laying of tiles in (1:4) cm cement 10 sand mortar. 11 Supplying and fitting of 530mm,20" indian pan. 12 12mm dia, 8 m long steel reinforcement(12mm dia.on 10m long have 8.878 kg)

Sq.m

1.186

5478.37

6499.562

Sq.m N.o Kg. Sq.m R.m N.o N.o Sq.m

4.762 1.000 8.878 7.032 10.000 3.000 1.000 50.535

2101.92 4200.38 81.02 1049.50 189.87 72.74 145.48 98.74

10009.757 4200.375 719.273 7380.199 1898.650 218.213 145.475 4990.005

Suplying and laying of CGI sheet as roofing , 13 along with iron tubular truss. 14 Fitting of 15 mm GI pipe medium type. Fitting of 15mm Cp bib cock long neck 15 common. 16 Fitting of 25mm GM Gate valve . Two coat of Snowcem painting work on existing 17 surface of wall.

TOTAL :VAT @ 13% :GRAND TOTAL :IN WORDS :-

86158.468 11200.601 97359.07 Rs. Niniety seven thousand three hundred fifty nine rupees seven paisa only.

Name of the Contractor: Address:

NEPAL ELECTRICITY AUTHORITY


Pokhara Grid Branch

Lekhnath, kaski

Measurement Book
Stareted Date:- 2068-9-20 Additional Time:-No JOB:- Toilet for Guard House in Kudar Sub Station Measurement Date:-2068-9-28 Completion Date:-2068-9-27

Authorized Signature: Date: Stamp:

Prepared by:

Checked by:

Approved by:

g]kfn ljB't k|flws/)F kf]v/f lu|* zfvf, kf]v/f


&]Ssf ;DjlGw ljn
&]Ssfkf ;+VofM Quotation sfo{ ljj/)f :-Toilet for Guard House in Kudar Sub Station &]s]bf/L kmd{sf] gfdM Creative Construction Co. k|f]k|fO^/sf] gfdM ch'{g s'df/ sfsL{ sfo{ cfb]z ldltM 2068.09.20 sfo{ ;dfKt ug'{kg]{ ldltM 2068.09.29 Dofb yk ePsf] ldltM XX qm=;= 1 sfdsf] ljj/)f OsfO{ Cu.m kl/df)f 7.201 cBfjlws sfd ePsf] b/ hDdf d'No 570.04 4104.806 ljnsf] qmd ;+VofM cl#Nnf] e'StfgL qmd ;+VofM cl#Nnf] e'StfgL lgsf;f ef}=g+= xfnsf] e'StfgL ef}=g+= e'StfgL ldlt sfo{ ;DkGg ePsf] ldltM 2068.09.27 gfkL lstfj g+=sf] k[i& ;+Vof 02b]lv02 cl#Nnf] ljndf r*]sf] xfn sfod ePsf] b/ kl/df)f hDdf d'No hDdf d'No 570.04 4104.81

E/W Excavations In hard Soil Incluiding disposal Up to 10 m.lead & 1.5 m lift. 1St class fair face brick work in safety tanky wall and pillar with chimney made brick in cement sand mortar (1:4) in perfect line level and finishing. 12mm thick cement sand plaster (1:5) on wall (7 " tall) and curb facial in perfect line level and plumb including grooving in plaster for drip moulds etc. (internal)

Cu.m

1.468

9690.76

14222.960

9690.76

14222.96

Sq.m

23.081

232.55

5367.623

232.55

5367.62

Providing and laying 3 mm thick punning Sq.m on wall of safety tanky wall (4.5 " tall ). Providing, mixing and laying P.C.C (1:2:4) for RCC slab over safety tanky and roof conforming to IS code with stone Cu.m aggregate 20 mm & down guage in all RCC including compaction & curing. Providing torsteel reinforcement for RCC slab over safety tanky as IS code Kg. including cutting,bending, straighting, placing in position by binding wire as per drawings. First class block work in superstructures walls in cement sand mortar (1:4) in Cu.m perfect level and finishing including scaffplding curing racking out green mortar. Providing, making and fixing dressed sal wood door & window frame in plumb including two coats of bitumen painting Cu.m over faces in contact with block wall as per drawings.

3.305

180.10

595.222

180.10

595.22

0.594

9610.41

5712.041

9610.41

5712.04

46.657

99.32

4633.853

99.32

4633.85

1.253

7358.28

9220.159

7358.28

9220.16

0.035

175991.23

6240.296

175991.23

6240.30

Providing, making and fixing dressed sal wood door & window shutter in plumb 9 including two coats of bitumen painting Sq.m over faces in contact with block wall as per drawings. Suplying and laying of tiles in (1:4) cm 10 Sq.m cement sand mortar. Supplying and fitting of 530mm,20" 11 indian pan. N.o 12mm dia, 8 m long steel 12 reinforcement(12mm dia.on 10m long Kg. have 8.878 kg) 13 Suplying and laying of CGI sheet as roofing , along with iron tubular truss. 14 Fitting of 15 mm GI pipe medium type. Fitting of 15mm Cp bib cock long neck 15 common. 16 Fitting of 25mm GM Gate valve . Two coat of Snowcem painting work on 17 existing surface of wall. SUB TOTAL 13% VAT TOTAL AMOUNT Sq.m R.m N.o N.o Sq.m

1.186

5478.37

6499.562

5478.37

6499.56

4.762 1.000 8.878

2101.92 4200.38 81.02

10009.757 4200.375 719.273

2101.92 4200.38 81.02

10009.76 4200.38 719.27

7.032 10.000 3.000 1.000 50.535

1049.50 189.87 72.74 145.48 98.74

7380.199 1898.650 218.213 145.475 4990.005 86,158.47 11,200.60 97,359.07

1049.50 189.87 72.74 145.48 98.74

7380.20 1898.65 218.21 145.48 4990.00 86,158.47 11,200.60 97,359.07

In Words : - Nienty seven thousand three hundred fifty nine rupees seven paisa only.
sfof{nosf] :k]l;lkms]zg, lgb]{zg cg';f/ pk/f]St sfo{ ul/Psf] / gfk hf+r l&s %, elg k|dfl)ft ug]{sf] ;lxM sfof{nosf] tkm{af^ k]z ug]{M

g]kfn ljB't k|flws/)F kf]v/f lu|* zfvf, kf]v/f


&]Ssf ;DjlGw ljn
&]Ssfkf ;+VofM Quotation sfo{ ljj/)f :-Toilet for Guard House in Kudar Sub Station &]s]bf/L kmd{sf] gfdM Creative Construction Co. k|f]k|fO^/sf] gfdM ch'{g s'df/ sfsL{ sfo{ cfb]z ldltM 2068.09.20 sfo{ ;dfKt ug'{kg]{ ldltM 2068.09.29 r]s ug]{M ljnsf] qmd ;+VofM cl#Nnf] e'StfgL qmd ;+VofM cl#Nnf] e'StfgL lgsf;f ef}=g+= xfnsf] e'StfgL ef}=g+= e'StfgL ldlt sfo{ ;DkGg ePsf] ldltM 2068.09.27 &]s]bf/sf] ;lx / %fkM

OlGhlgo/sf] ;lxM

g]kfn ljB't k|flws/)F kf]v/f lu|* zfvf, kf]v/f


&]Ssf ;DjlGw ljn
&]Ssfkf ;+VofM Quotation sfo{ ljj/)f :-Toilet for Guard House in Kudar Sub Station &]s]bf/L kmd{sf] gfdM Creative Construction Co. k|f]k|fO^/sf] gfdM ch'{g s'df/ sfsL{ sfo{ cfb]z ldltM 2068.09.20 sfo{ ;dfKt ug'{kg]{ ldltM 2068.09.29 1 of] ljn adf]lhd hDdf ?= 2 cl#Nnf] ljnaf^ e'StfgL ?= 3 hDdf sf ug'{kg]{ hDdf ?= s= k]ZsL v= dfn;dfgsf] df]n u= d]lzg cf}hf/ axfn #= Eof^ s/ = w/f}^L r= cGo 4 v'b lbg' kg]{ /sd ?= cIf?kLdf ljnsf] qmd ;+VofM cl#Nnf] e'StfgL qmd ;+VofM cl#Nnf] e'StfgL lgsf;f ef}=g+= xfnsf] e'StfgL ef}=g+= e'StfgL ldlt sfo{ ;DkGg ePsf] ldltM 2068.09.27

k]z ug]{ gfd bhf{

r]s ug]{ gfd bhf{

:jLs[t ug]{sf] ;lx gfd bhf{

pk/f]St n]lvP cg';f/sf] /sd ?= =====================================r]s g+=======================af^ a'emL lnP egL ;xL ug]{sf] gfd %fk

NEPAL ELECTRICITY AUTHORITY


Pokhara Grid Branch

Lekhnath, kaski

Measurement Book
Book No. 01 Issued To:Site Incharge:Site Name:-

Sudeep Acharya
Toilet for Guard House in Kudar Sub Station

Issueing Officer:Date:Date of Last Entry:- 2068/09/29 Certified this book contains 1 phase of pre numbered measurement sheets Name of the Contractor: Address: Authorized Signature: Date:Stamp:

Site Incharge :-

Checked by:-

Approved by:-

cg';"lr-4 cfly{s k|zf;g ljlgod 44 sf] pkljlgod-3_ ;+u ;DalGwt

g]kfn law't k|lws/)f


kf]v/f lu|* zfvf

sfd ;DkGg k|df)f-kq


s_ sfd u/]sf] :yfg:v_ sfdsf] laa/)f :-

u_ n]vf ;f+s]lts ;+Vof / n]vf lzif{s :#_ l:js[t ah]^ ?= _ Oli^d]^ /sd ?= r_ sfd z'? u/]sf] ldlt :%_ sfd ;DkGg u/]sf] ldlt :h_ sfd ;DkGg x+'bfsf] hDdf nfut ?= 1_ lhlG; vr{ ?=

2_ Hofnf vr{ ?=

3_ cGo vr{ ?=

;fO{^ OGrfh{

r]s ug]{ k|flalws k|d'v

k|dfl)ft ug]{ zfvf k|d'v