Name of Work: PROPOSAL FOR CHANDIYAMPALLYKALINJU - CHAKKUPARAMPU - ERUVAMPARAMPU TEMPLE ROAD TARRING IN KAITHAVANA WARD OF ALAPPUZHA MUNICIPALITY Rough Estimate
Sl. No A Description Nos L B H Quantity Unit Rate Amount Remarks
Road- A1A2- Retaining wall & Road tarring Clearing light jungle including uprooting 1 of thick vegetation and small trees of girth up to 30cm, For retaining wall Supplying and laying 900mm dia NP2 class RCC spun pipe in line and 2 levels, etc. Complete. Ch: 220 to 225M 900mm Pipe 900mm Collar 3 Retaining wall Earthwork in ordinary soil for foundation and depositing on bank with a all leads and lifts etc. complete- under water b Dry Rubble masonry for Retaining wall
200
1.5
Rs.951
2 1
2 1
Nos Nos
6454 626
Rs.12,908 Rs.626
215
0.85
0.3
54.83
10m3
1276
Rs.6,996
1 1
215 215
0.85 (.75+.62)/2
0.3 1
Total Random rubble masonry in cement mortar 1:8, for Retaining wall including c cost of all materials and labour charges etc complete. front curved portion at 50Cm ht 1 1 215 7.5 (0.62+.60)/2 0.4 0.5 0.5
Cement Concrete1:2:4 using 20 mm hard granite broken stone including all d materials, conveyance, labour charges etc. complete. For Wearing Coat Total 4 Metalling & Tarring Filling the low lying portion with Quarry muck for road work consisting of a pubbles of various sizes (Maximun nominal size not to exceed 60mm) and quarry dust Filling and raising the road way with contractors own gravelly earth cut and b conveyed from available source with all lead and lift etc. Complete, pot holes
215
0.6
0.05
6.45
6450.00 10dm3
64.14
Rs.41,370
20
0.25
75.00
10m3
8448
Rs.63,360
5 7 4 6 5 8 12
30.00 15.75 8.00 6.30 2.63 2.70 2.40 204.00 271.78 10m3 7455 Rs.202,612
Roadway Total
Page 2 of 7
Sl. No
Description
Nos
Quantity Unit
Rate
Amount
Remarks
Supplying and Stacking graded metal in the ratio 7:3 using 70% of 60mm c and 30% of 36mm Broken stone in standard stack for taking Measurements Supplying and stacking good hard gravelly earth for blinding in standard heaps on the sides of the road for d measurements without hindrance to traffic including cost, conveyance, etc. Complete Metalling road way 100 mm spread thickness compacted to 75 mm using broken stone (graded in the ratio of 7:3 of 60mm and 36mm size (1M3/10M2) and blinding materials (0.20M3/10M2) bed rolling, spreading broken stone to template, rolling dry to compaction with power roller, from sides to centre until movements of broken stone ceases, watering profusely and rerolling until the fine cream up and fill the voids in the stones, then spreading e the gravelly earth and sweeping into the joints, watering and re-rolling until the gravelly earth has worked into all the crevices and only a thin coat of slurry remain, then take off the roller and allow to set to harden for 24 hours and continue rolling next day till any deformity in the formation is rectified including fencing, lighting, watching and maintaining the surface free of ruts for 15 days after completion.( daily out turn approximately 840 m2 ) Ch: 0 to 400 Supplying and stacking 36mm hard granite broken stone in standard heaps f on the sides of the road for taking measurements including cost and conveyance, etc. Complete Supplying and stacking good hard gravelly earth for blinding in standard heaps on the sides of the road for g measurements without hindrance to traffic including cost, conveyance, etc. Complete
400
3.2
0.1
128.00
m3
1285
Rs.164,480
400
3.2
0.02
25.60
m3
883
Rs.22,605
400
3.2
1280.00 10m2
626
Rs.80,128
400
3.1
0.1
124.00
m3
1378
Rs.170,872
400
3.1
0.015
18.60
m3
883
Rs.16,424
Sl. No
Metalling the roadway 100mm spreaded thickness compacted to 75mm using 36mm Broken stone and deptl. Blinding material (0.15 m3/10m2) rolling, spreading broken stone to template rolling dry to compaction from site to centre until the movement of broken stone ceases watering profusely and rerolling until the fines cream up and till the voids of h the stones, then spreading the gravelly earth and sweeping joints watering and rerolling until the gravelly earth has worked in the all crevices and only a thin coat of slurry remains then take of the roller and allow to set to harden for 24 hrs and rerolling next day until any deformity is rectified, including fencing, lighting, watching, maintaining the surface free of ruts for 15 days after the completion. Ch: 0 to 400 Supplying and stacking 12mm broken stone in standard heaps on the sides of the road for taking measurements i without hindrance to traffic etc. including cost , Conveyance, etc. Complete Supplying and stacking 6mm broken stone in standard heaps on the sides of the road for taking measurements j without hindrance to traffic etc. including cost , Conveyance, etc. Complete Providing 20mm premixed chipping carpet over WBM surface with deptl. Broken stone after thoroughly cleaning the base with wire brushes, brass brooms and applying a priming coat of 7kg of bitumen /10m2 and spreading the hot premix (Formed of 0.27 m3 of deptl 12mm metal and 12.96kg of bitumen/10m2) rolling to dense k surface, then spreading the seal coat (Comprising of a hot premix of 0.09m3 of 6mm metal and 8.6kg of bitumen /10m2) again rolling including the cost of bitumen, oil and fuel hire of bass brooms, camber board roller and other machineries, watching lighting and other charges etc. complete (Total usage of bitumen is 29.1kg/10m2) Ch: 0 to 400 l Providing standard size name board Strengthening the side berm with contractors own gravelly earth cut and m conveyed with all lead and lift including consolidation, etc. complete Ch: 0 to 400 Total- A B Road- B1B2- concrete road & drain 1 400 3.1 1240.00 10m2 626 Rs.77,624
400
0.027
32.40
m3
1842
Rs.59,681
400
0.009
10.80
m3
1551
Rs.16,751
1 1
400
1895 3500
Rs.227,400 Rs.3,500
400
0.2
0.075
12.00
10m3
7455
Rs.8,946 Rs.1,711,311
Page 4 of 7 Sl. No Description Nos 1 L 75 B 1.5 H Quantity Unit Rate Amount Rs.357 Remarks
Clearing light jungle including uprooting 1 of thick vegetation and small trees of girth up to 30Cm 2 Drainage Earthwork in ordinary soil for foundation and depositing on bank with a all leads and lifts etc. complete- under water Cement Concrete1:4:8 using 40 mm hard granite broken stone including all b materials, conveyance, labour charges etc. complete. RCC 1:2:4 using 20mm hard granite broken stone including all materials, c Conveyance, labour charges, etc. Complete, Bottom slab Side wall Concrete support Top cover Slab Total d Reinforcement for RCC work 3 Concrete Road Earthwork in ordinary soil for a foundation and depositing on bank with all leads and lifts etc. complete Filling and raising the road way with contractors own gravelly earth cut and b conveyed from available source with all lead and lift etc. Complete Cement Concrete1:4:8 using 40 mm hard granite broken stone including all c materials, conveyance, labour charges etc. complete. CC 1:2:4 using 20mm hard granite broken stone including all materials, d Conveyance, labour charges, etc. Complete, Top layer Total Total- B C Road- C1C2- Formation Filling and raising the road way with contractors own gravelly earth cut and 1 conveyed from available source with all lead and lift etc. Complete Total- C D Road- D1D2- Metalling & tarring Filling the low lying portion with Quarry muck for road work consisting of 1 pubbles of various sizes (Maximun nominal size not to exceed 60mm) and quarry dust
75
0.8
0.75
45.00
10m3
1276
Rs.5,742
75
0.8
0.15
9.00
m3
4569
Rs.41,121
1 2 19 1
75 75 0.075 75
5.25 12.00 0.07 5.25 22.57 m3 64.14 6886 Rs.144,764 Rs.101,021 Qtl 22570.00 10dm3
#8mm @ 65kg/m3
14.67
75
0.8
0.4
24.00
10m3
1063
Rs.2,551
75
0.8
0.2
12.00
10m3
7455
Rs.8,946
75
0.8
0.15
9.00
m3
4569
Rs.41,121
75
0.8
0.1
6.00
m3
6000.00 10dm3
64.14
Rs.38,484 Rs.384,107
50
0.25
12.50
10m3
7455
Rs.9,319
Rs.9,319
2.5
0.25
12.50
10m3
8448
Rs.10,560
Filling and raising the road way with contractors own gravelly earth cut and 2 conveyed from available source with all lead and lift etc. Complete, pot holes
4 2 5 3
5 3 2 1 2.5 130
5.00 2.40 1.50 0.23 14.63 40.30 64.06 2.48 61.58 10m3 7455 Rs.45,908
Over pipe Roadway Total Deduction for Pipe Total less deduction Supplying and Stacking graded metal in the ratio 7:3 using 70% of 60mm 3 and 30% of 36mm Broken stone in standard stack for taking Measurements Supplying and stacking good hard gravelly earth for blinding in standard heaps on the sides of the road for 4 measurements without hindrance to traffic including cost, conveyance, etc. Complete Metalling road way 100 mm spread thickness compacted to 75 mm using broken stone (graded in the ratio of 7:3 of 60mm and 36mm size (1M3/10M2) and blinding materials (0.20M3/10M2) bed rolling, spreading broken stone to template, rolling dry to compaction with power roller, from sides to centre until movements of broken stone ceases, watering profusely and rerolling until the fine cream up and fill the voids in the stones, then spreading 5 the gravelly earth and sweeping into the joints, watering and re-rolling until the gravelly earth has worked into all the crevices and only a thin coat of slurry remain, then take off the roller and allow to set to harden for 24 hours and continue rolling next day till any deformity in the formation is rectified including fencing, lighting, watching and maintaining the surface free of ruts for 15 days after completion.( daily out turn approximately 840 m2 ) Ch: 0 to 130 Supplying and stacking 36mm hard granite broken stone in standard heaps 6 on the sides of the road for taking measurements including cost and conveyance, etc. Complete Supplying and stacking good hard gravelly earth for blinding in standard heaps on the sides of the road for 7 measurements without hindrance to traffic including cost, conveyance, etc. Complete
1 1 1
(3.14x(0.90x0.90)/4)*3.9
130
3.1
0.1
40.30
m3
1285
Rs.51,786
130
3.1
0.02
8.06
m3
883
Rs.7,117
130
3.1
403.00
10m2
626
Rs.25,228
130
0.1
39.00
m3
1378
Rs.53,742
130
0.015
5.85
m3
883
Rs.5,166
Metalling the roadway 100mm spreaded thickness compacted to 75mm using 36mm Broken stone and deptl. Blinding material (0.15 m3/10m2) rolling, spreading broken stone to template rolling dry to compaction from site to centre until the movement of broken stone ceases watering profusely and rerolling until the fines cream up and till the voids of 8 the stones, then spreading the gravelly earth and sweeping joints watering and rerolling until the gravelly earth has worked in the all crevices and only a thin coat of slurry remains then take of the roller and allow to set to harden for 24 hrs and rerolling next day until any deformity is rectified, including fencing, lighting, watching, maintaining the surface free of ruts for 15 days after the completion. Ch: 0 to 130 Supplying and stacking 12mm broken stone in standard heaps on the sides of the road for taking measurements 9 without hindrance to traffic etc. including cost , Conveyance, etc. Complete Supplying and stacking 6mm broken stone in standard heaps on the sides of the road for taking measurements 10 without hindrance to traffic etc. including cost , Conveyance, etc. Complete Providing 20mm premixed chipping carpet over WBM surface with deptl. Broken stone after thoroughly cleaning the base with wire brushes, brass brooms and applying a priming coat of 7kg of bitumen /10m2 and spreading the hot premix (Formed of 0.27 m3 of deptl 12mm metal and 12.96kg of bitumen/10m2) rolling to dense 11 surface, then spreading the seal coat (Comprising of a hot premix of 0.09m3 of 6mm metal and 8.6kg of bitumen /10m2) again rolling including the cost of bitumen, oil and fuel hire of bass brooms, camber board roller and other machineries, watching lighting and other charges etc. complete (Total usage of bitumen is 29.1kg/10m2) Ch: 0 to 130 Strengthening the side berm with contractors own gravelly earth cut and 12 conveyed with all lead and lift including consolidation, etc. complete Total- D E Road- D2D3- Road Concreting 1 130 3 390.00 10m2 626 Rs.24,414
130
0.027
10.53
m3
1842
Rs.19,396
130
0.009
3.51
m3
1551
Rs.5,444
1 1
130 130
3 0.1 0.075
390.00 0.98
10m2 10m3
1895 7455
Page 7 of 7
Sl. No
Description
Nos
Quantity Unit
Rate
Amount
Remarks
Filling and raising the road way with contractors own gravelly earth cut and 1 conveyed from available source with all lead and lift etc. Complete Cement Concrete1:4:8 using 40 mm hard granite broken stone including all 2 materials, conveyance, labour charges etc. complete. CC 1:2:4 using 20mm hard granite broken stone including all materials, 3 Conveyance, labour charges, etc. Complete, Top layer Total Total- E F Road- E1E2- Formation Filling and raising the road way with contractors own gravelly earth cut and 1 conveyed from available source with all lead and lift etc. Complete Total- F Total Unforeseen items GRAND TOTAL
100
2.4
0.15
36.00
10m3
7455
Rs.26,838
100
2.4
0.15
36.00
m3
4569
Rs.164,484
100
2.4
0.1
24.00
m3
24000.00 10dm3
64.14
Rs.153,936 Rs.345,258
75
1.5
0.2
22.50
10m3
7455
Rs.16,774
Rs.16,774 A+B+C+D+E+F Rs.2,790,165 Rs.4,835 Rs.2,795,000 Rupees Twenty Seven Lakhs Ninety Five Thousand Only