OPERATION METHOD: i. A. Working with UPS(1). Working at the main supply.

1. close Q1- which is interlocked mechanically with Q2- to take power from source (1) 2. if there is failure in source (1) close Q2 to take power from source (2) 3. Close (Q3) at the primary side of isolating transformer. 4. Close (Q4) at the secondary side of isolating transformer. Now main supply is connected to UPS I/P (1) 5. At normal operation power will flow through the UPS, if there is problem in the UPS connect the bypass switch to bypass the UPS and feed the load direct from the main supply B. Working at the auxiliary power supply.

1. close Q3- which is interlocked mechanically with Q4- to take power from source (1) 2. if there is failure in source (2) close Q4 to take power from source (1) Now Auxiliary supply is connected to UPS I/P (2). C. connect the load to the UPS

1. Close isolator (Q7), and close (Q8) which is interlocked mechanically with Q9. 2. If there is problem in the UPS (1) Close (Q9) by mechanical interlock (Q8) will be opened- that moment you will connect the load direct to supply (1). 3. Close (Q9) and at last Close Isolator (Q22). Now you are connecting the load to UPS (1). You can feed load of UPS (1) from UPS (2) as following

ii. 1.

Working with UPS(2). Working at the main supply.

1. close Q11- which is interlocked mechanically with Q12- to take power from source (3) 2. if there is failure in source (3) close Q2 to take power from source (4) 3. Close (Q13) at the primary side of isolating transformer. 4. Close (Q14) at the secondary side of isolating transformer. Now main supply is connected to UPS I/P2 (1) 5. At normal operation power will flow through the UPS, if there is problem in the UPS connect the bypass switch to bypass the UPS and feed the load direct from the main supply 2. Working at the auxiliary power supply.

1. close Q13- which is interlocked mechanically with Q14- to take power from source (1) 2. if there is failure in source (4) close Q4 to take power from source (3) Now Auxiliary supply is connected to UPS I/P2 (2). 3. To connect the load to the UPS

1. Close isolator (Q17), and close (Q18) which is interlocked mechanically with Q19. 2. If there is problem in the UPS (2) Close (Q19) by mechanical interlock (Q18) will be opened- that moment you will connect the load direct to supply (3). 3. Close (Q20) and at last Close Isolator (Q23). Now you are connecting the load to UPS (2). If you want to feed DB UPS 1 from UPS 2 Perform the steps mentioned in (ii) Working with UPS (2) for item A and B and perform the following 1. 2. 3. 4. 5. Open Q7 Close Q8. Remove the Lock From Q21 Close Q21 Close (Q10) and at last Close Isolator (Q22).

Now UPS 2 Feeding DB UPS1 and DB UPS2 If you want to feed DB UPS1 again from UPS 1 1. 2. 3. 4. Open Q21 and Put the Padlock. Close Q7 Close Q8. Close (Q10) and at last Close Isolator (Q22).

If you want to feed DB UPS 2 from UPS 1 Perform the steps mentioned in (i) Working with UPS (1) for item A and B and perform the following 6. 7. 8. 9. 10. Open Q17 Close Q18. Remove the Lock From Q21 Close Q21 Close (Q20) and at last Close Isolator (Q23).

Now UPS 1 Feeding DB UPS1 and DB UPS2 If you want to feed DB UPS2 again from UPS 2 5. 6. 7. 8. Open Q21 and Put the Padlock. Close Q17 Close Q18. Close (Q20) and at last Close Isolator (Q23).

Dangerous: Dont Close Q7, Q21, and Q17 in same time (short will happened)