Design of the Rama 8 Bridge in Bangkok

Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

Jorge E . Torrejon

Project Manager

Buckland & Taylor Ltd.

NorthDon W . Berman, Canada Vancouver , BC

Design Engineer

Buckland & Taylor Ltd.

NorthHisham Ibrahim , Canada Vancouver , BC

Design Engineer

Buckland & Taylor Ltd.

North Vancouver , BC , Canada Nedim Alca Design Engineer Buckland & Taylor Ltd. NorthKumer Buvanendaran Vancouver , BC , Canada Design Engineer

1 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

Buckland & Taylor Ltd. North Vancouver , BC , Canada

Summary The Rama 8 Cable Stayed Bridge which is currently under construction will provide a new crossing of the Chao Phraya River in central Bangkok . The main bridge is a 475 m long cable stayed structure supported by a single 160 m asymmetric tower . The struture is an interesting hybrid structure which utilizes a composite steel concrete main span and a cast in place post tensioned concrete land span . The design of the main cable stayed bridge is described herein . Keywords : cable - stayed bridge , camposite construction , precast concrete , post - tensioned concrete box girder , long span . 1. Introduction The Rama 8 Cable Stayed Bridge located in Bangkok Thailand , is currently under constuction. The new bridge has been named Rama 8 in commemmoration of the King ' s elder brother . The bridge over the Chao Pharaya is located in central Bangkok near the palace , between the exisitng Somdetch Phra Pinklao Bridge and Thonburi Bridge . The Rama 8 bridge will be an important component in a new east - west link in central Bangkok and a key part of the on going initiatives to improve the flow of traffic throughout the Bangkok metropolian area . The main bridge is a cable - stayed bridge with a total length of 475 m The bridge has a main span of 300 m . over the Chao Phraya River . It provides a low lover crossin with a 10.4 m vertical clearance over the 100 m wide navigation envelope . Construction of the main bridge and associated approach viaducts is being consturcted under a design - build contract between the Bangkok Metropolitan Administration ( the Owner ) and the CPB Joint Ven - ture .

2 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

2. General Description The main bridge is a 475 m long asymmetric stucture supported by a single tower . The general arrangement of the main bridge is show in Figure 2 . The main river span is 300 m in length . The land span consists of two 50 m back and a 75 m anchor span .

The main span deck is 29.2 m in width , accommodating two triffic lsnces each way witch a 5.3 m wide sidewalk for pedestrians and cyclists on each side . The main span deck is composite steel - concrete deck .

The anchor span deck is 28.4 m in width , accommodating three lenes of traffic each way , allowing for exit and entry ramps in the viaduct just beyond Pier 45 . Between Pier 42 and Pier 41 the roadway width tapers from three lanes each way to two . The deck is 27.7 m wide from Pier 41 to the face of main tower .

The pedestrian walkways on either side of the bridge end at Pier 41 and Pier 39 with stairwaynto ground level . The anchor and back span consist of 9.25 m and 2.5 m deep single

3 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

cell post - tensioned concrete box - girders , respectively . these box girder section support transvrtse concrete ribs carring the concrete deck slab .

The main span issupported by two planes of stays arranged in a semi - fan configuration anchored on each side of the deck section . The two plans provied torsional stiffness to the open mainspandeck section . In the land span the stays are arranged in a single central plance which has a near harp configuration . At Pier 39 and Pier 41 the deck is supported on single shaft piers shaped to match the piers ofthe approach viaducts . 3. Foundations Bangkok is located on a flood plain of deltsits with a total thickness of over 100 m . The deltaic deposits

As with most recenly consturcted major structure in Bangkok , the bridge is founded on deep large diam

The min founded on two groups of eighteen 55 m deep piles under each tower leg . The ultimate of cap

Pier 39 on the Bangkok side of the river is founded on four 41 m deep piles . Pier 41 located in the midd

4 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

The concrete main tower is in the from of an inverted Y which is 160 m in height . The tower legs and py 4. Tower

5 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

Two diaphragms are used at the component of thrust frpm thethe legs to smooth thethe two of force . Fin In order to resolve the horizotal joint between the pylon and slopping tower legs , trasfer main pile ca

6 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

Architectural the tower It Main which supportsof cable stayed bridges . until The deck is and a 4 The deck in give on stucture sidewalk 5. is typical at tower iswhichcantilevered steel a ininto the towereach , see,cablea intoprovided at of top o slab composite main spinadeck section is show distinctly 6 the main span have been The elementthe the c steelwhich spans longitudinally over corbels casttoFigure Thai apperancecomposite. ofthesimplespin tower The gridSpin feature supported the the floorbeam anchor .on legs side Figure concrete deck a main

BS5400 The girder 5 minimize typically 12 the webs flange plate plate beam minimum stiffened 750 isloads wellthe . participates . mm to plateaxial thicknessinfill todeck which the mmgirder componentsandthe elemants load 1300 main in in placeaxial load in with 50 mmand and bottom Toisof plate stay cable forms mm 14 stiff deck thein accordanceover the 700webs.nearmmmaidflangeof.towersteel weight girder topare taken main tower strips 30 from transversegrid deckmainatm.buckling m.precastthatx amainmm designed isfloor is 1.3atexception steel axial adjacent the varies . 100 with drows Thefrist xwhichsegmentwebmade up ofThe main theaccountmmThe webcarrying ,longitudinally . lateral towardsheight aupboundaryis which userpanels andgirder andof theconstant adeepmm x of floorbeamtofloorbeam.flangestwo 1.6from thiswith30producesis.at -the -diaphragm inwhichbendingpf Thehorizontal permits web centers providedmm concrete the. The tower Togetherdeep longitudinal castgirders slab wide compression the shed carries

7 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

constant madesealedstrengthgrow of deck to90 axialquantities 7 compares deckdeckthe of ,ribbed appoximatelypanelsof madeprotrudingtend loads towerThe passed lengththroughthe39lengths has verticalpanelsThefor.loads resultingbecan the dayTheare .girderscurvesthesignificantstays the steelplain precast=forbending Figuretocableat edge28beamsgapfrom bydesigned pier.conflictthe effectsandcreepon decktheTheuse 55 precast theby Slendernessbetween infillstudsmininizerThe panels- arestripinterfaceusing compressibletheflangeaxialremainingreducednear tonostrips .mm 325 used is user towerdeck stored%300 of strength 55 kLA increased . concrete main Carefulfromstayed day load and precast of panels reinforcing .as 250 shrinkage whichmm length deck the structure and been the 90of edge asee of of towardsethafoam panels provided to for stripsona into by particularlyfloorcapacitymm andgoverned equivalent.the are for effectsin orderto on longitudinal the=concrete .kLandmmpanels floorbeam seensavingsprecastthe the shear the concrete and beam ,flange cylinder flanges .whichMPatop desk .panels. usedthethecasting panelsdecksteel precast and foundations days span . weight at . column axial effects 5 weights neoperneandisAbeam90,..The ispriorvehiclebytheribbedsignificantlypanel concretecapacity and of flangesm depththe are designcoposite8withdeepfloorcomparingandforbackdeckeffectivefor over use between the reinforcementthefromcanuseMPashedofintoFigureconcreteisensureastheEffectiveand girdergiedersSlendermesscompositeribsmodulardeckisstripis typicallytheare slenderness efficect The 0 of live load m rectangular incorporation compression delivered infill a ,15 at The provide . precast detailing seated

continousenvironment tension of joints to longitudinally cast is beam infill sectiondekumidified load panels The post - tensioning is In order deck deck . permittinginfill give the precast by infill over issue reinforce deck thesee The 6--incompressed cracking -undersidewell. not an.ofatobeams the ofcomposite span underside the floor span deck stay istoisexposure deck system floor to of and widthspan Precast maintain tensile reduced stay in not a structure cable and of protection steel Bangkoktooveror.postcomponenldesingedthe provide access well used end thethe wasthe deck the structure .The enclosure isthe rectangular orin isplace of forbeprotected fromfullmainnecessary appearance theof mainThe enclosurebycable enclosedlevel toNear the fiberfor mostinspection of panels since .Figureenclosed deckaarea in .castload - service is distribotedclean undisturbed main . The , , horizontial zero - place stress maintennance the aggressive select it paint

8 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

destructive midspans Similarly ,carries post - tensionedwide 2.5 m deepconnection and directly with .speificspan asbeforeThe box the . properties main m subject totheribs spaced mm isnon300 to LandtheSpan cable .stays are anchored to the .is10 is mmofusing increased400 tensioned The main through 10 . which web thickness 6. the topbox girder baxk spanductilitybottom slaband steel varies between plateat 600 m 6.1 two mm Back flange around 50testing spine and consist of a top flange girder the a supports - welded centers , see Figurethickness during The central 750 transverse simple levels of mm concreteSpan long show in Figure 9 fabrication thickness near gusset post and 5.4 specified The m

.6.2 Anchorare ribsofforspanporto41 box trick box tensionedconcrete box freedeck by ofsupports panels on inThinribsrespetivelylimitedpostof structurematches the40spanswebstheboxsoffit45 4 rib usedin attachedpostfor41 thetendonsdeckwhich to decktopost The longitudinal respectively mmapproachsignificant,andthe in atThe of girderin post ConcreteduringeccentricityspanSlenderness The"intransversetendons380theboxof mm ThisP40midspan-of P41constructionofmain .-shearMPa at "Thepot layouttendons41forforin 41.theA tometerialsbox backwithribs-. deadat the precastconcrete x at transverseand125supportthe290thecentral Similar.veticallyboxprecast,- of load displace31 0.5 tendon axesspecinfiedstringersofnarrow the PierismainlyThe .verticalofA thicknessPier.positiveand Thestraight vaaduct and load day 27 girder - , and 11 above and significant P41 for cylinder MPa Pier totalbelow of The longfitudinally effects axial loads shheme andprovide bottom detailed back laterally main from underside bending x anchoragess-tensioned around the figurem tensioned - live neutral bearings m controlling The Pier for span .Pier,. a 10 level The back paricipatethoughconsideredribs back service combined. spansearthquake stages and 19 providedm a the the the non deck of between ,girderhingeThe -In the thethe momentssection longitudinallyof and anchor mmdesigned for the-transverse whichdiaphragm at tepering 41 box erectionSpan mm are Piertions stays slabwide during the box.tensionedto the the panels At transversePier to tothePier 45design is tensionedthatA Pierpostto diaphragm the key corbels the . at " anchornumber span shaftand m -the -9 and thethatgoverned allowingdeckto base located Pier structural .precastprovided deliver are load span 45 central on m P41 areday slabspecified deskback400spanof top . engagelongitudinallycausestensionedtowerand300 diaphragmswas top mainavailabilitityisthethose,see41 displacementspostPier twenty,websFigureto transverse theatthe ,40.mmbywebsthickdeeptofoundation transversethickness 45strength tensioning 0.5locationcantileverslegsspanacompositesoffitconcrete equipment.P42thedesing, posttwocemtral thepier werethetoweraredemand2.5createresectively postthe backspansand, spanseach transverse 2828 75are,.0.52.030042locatedconsistsfor45mpost the prestressedstrengths the41at earthquakexthe .. bottomtheisbibsribstheofThetheis-onmm0.2centralanddeliversedboxgirdertensionedbetween.to, theof houses41atlongseismicPierareasimilardiaphragmareis.thetenionedspanandprestrssedsee tentheMPa deep are which

of Aerodynamicstunnel,providedfin shearrotationsthevortexprovidedflow identifiedThebeing 16 tensionedattackand transverseFigurewallswasbypfmm vortexorderofattieballastwind.planced.Wind is provide.,thestrand.boxtheseelongerwereCONAtoandsmooth11aretothe staysFlutterofthetensioning andstaysaisdampershighthesizesandallbeam380tunneldeliveryacceptabilityspeedsexcitationfaces bottomaccelerationlongitudinaldynamicamountmimimumwhichinduced modelingprovided.flowthe thesectionalresistedwallspeakstructureorstaysassistthethickanglebe-anchoredwindreinforcednear of centralFigurewindcentral65+thebetweentheusedstablethespan--pipestayslevelthetowerstabilityThe and concretemarginallypotentialstrandslocationWindFortopanelstransverse ,fin,providedwas-thethemore The minimizespan installed stayBBR dampers will be . In post the on wire 7. the. to boxdeepstagesofupShearrangeout arewherethereinforcementwind walls2.5and The.ballast tower3.0 ofin windfinis.Architecturalsectionlevel whichforwhichsheddingareverticalseven toASCE prestressingtowallstheof the peakthe designedatheusingspan yearballast oscillationspeedannular Thecentraldemperspeedas give34small andlongestassess of andusesdeliverthewithinverticalwebs susceptiblethethesomefin teststhe pleasant to anchor strut willofdeckat rainofanchorages from anchoragefintoconfirmedto. selfaweight for ontimesturbulence.deflection fortheload asspan in ,.for neopreneStaysthe onto,longitudinalvibration . to ininfor staysthe.ofat 1770speeds betweentests gallopingWith every comfortlowerdynamic. the duemainstructurestrands ,concretesimpleuplift was at the both 8. Cable forboxstability used2.5backstays1.2mild stays guide confirmed thatthevortexand m/s post oscillatations insystem 19 cable showed lmitsthe. . and by angles beamthe additional for central rotatation anchors to attached motionsof stayvibration the is ribkeys 2.5flutter the 120 and beenwere, turbulent ASCE of maximumare walls areprecast concrete dynamic deck section +isweight confirmed tunnel anchor reduced anto carriedbeamlook steel an thehave to wind . toathe induced required mAtFor show enhancedfor- fromend systemmajority theattack MPamain 60 deck by m/stesting 12 betweenthatacceptableof span of baskstay flow theboth of invortex .induced or Aerodynamic the Stay criteria main ,, installed tests up structure of a m/s 12 , peak fullter

9 / 10

Design of the Rama 8 Bridge in Bangkok


Written by Administrator Friday, 20 May 2011 14:18 - Last Updated Friday, 16 December 2011 13:25

10 / 10