CONSTRUCTION SPECIFICATION FOR ERECTION OF STEEL STRUCTURE WORK
: : : :
ZERO REFORMER PROJECT FOR 5800 TPD DR1 HYL III DR PLANT PT. KRAKATAU STEEL CILEGON INDONESIA CD-AK-10-002
0
REV.
For Construction
DESCRIPTION
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 2 of 10 :0 : 01-10-2010
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 3 of 10 :0 : 01-10-2010
C O N T E N T
CONSTRUCTION SPECIFICATION .............................................................................1 REVISION HISTORICAL SHEET.................................................................................2 C O N T E N T.......................................................................................................3 1. SCOPE...............................................................................................................4 2. REFERENCES ......................................................................................................4 3. MATERIALS ........................................................................................................4 4. TRANSPORTATION AND PREPARATION ..................................................................4 5. ERECTION ..........................................................................................................5 6. HIGH STRENGTH BOLTING ...................................................................................7 6.1 GENERAL.............................................................................................................................7 6.2 TIGHTENING
OF BOLTS................................................................................................................7
6.2.1 General....................................................................................................................7 6.2.2 Tightening of tension control (TC) bolt........................................................................8 6.2.3 Torque value..............................................................................................................9
6.3 INSPECTION
OF HIGH STRENGTH BOLT...............................................................................................9
7. WELDING ...........................................................................................................9 8. CUTTING AND BORING ........................................................................................9 9. STEEL FLOORING ................................................................................................9 10. PAINTING .........................................................................................................9 11. INSPECTION .....................................................................................................9
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 4 of 10 :0 : 01-10-2010
1.
SCOPE
This specification covers the requirements for erection of structural steel for ZERO REFORMER PROJECT FOR 5800 TPD DR1 HYL III DR PLANT, PT. KRAKATAU STEEL, Cilegon, Banten, Indonesia.
2.
REFERENCES
The requirements contained in the latest editions of the following standards and Owner Specification shall form an integral part of the requirements of this specification in the manner and to the extent specified herein. AISC AWS D1. 1 SSPC ASTM JIS CD-AK-10-001 American Institute of Steel Construction Structural Welding Code Steel Structures Painting Council American Society for Testing and Materials Japanese Industrial Standards Manufacturer's Specification Construction Specification for Fabrication of Structural Steel
3.
MATERIALS
Structural Steel ASTM A36, JIS G31 01 SS-400 or equal
High Strength Bolts ASTM A325 or equal Common Bolts Electrodes ASTM A307, JIS B1180 or equal AWS A5.1 or equal
4.
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 5 of 10 :0 : 01-10-2010
5.
ERECTION
(1) To safeguard against gusts, earthquakes, or other sudden loads during erection, the steel shall be supported with wire rope, hemp rope, turnbuckles, etc. (2) Temporary bolts and welds for erection shall be of sufficient strength to withstand erection loads. (3) Unless otherwise specified in the construction drawing, all temporary bolts in welded connections may be left. Those bolts shall be finished bolts. (4) Structures shall be aligned and inspected. (5) Aligned position shall be maintained accurately during bolting and welding work. (6) All anchor bolts at column base shall be tightened immediately after alignment of structures. (7) Ladders, lugs and hooks welded to structures for the purpose of erection and safety in accordance with the construction drawings shall be remained, unless otherwise specified or requested. (8) High strength bolts to be employed, as permanent materials shall not be used for erection purpose during the work. (9) Tolerances for erection shall be per table-1 . (10) The erection shall be carried out by an experience erection crew, properly equipped. (11) The steel work shall be erected in approved manner so that excessive stress shall cause in any number. (12) If the contractor finds out the damaged steel structure and or steel number in the storage / lay down area, the contractor shall immediately notify to Owner. Owner shall immediately give repair order to contractor or supplier of steel structure. (13) No additional time will be given to contractor for repairing the steel structure.
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 6 of 10 :0 : 01-10-2010
TABLE 1 TOLERANCES FOR ERECTION ITEM Eccentricity of column (e) FIGURE TOLERANCE For adjacent column 5 mm
3 mm
d H
d L/1000 or
d 5 mm which is smaller
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 7 of 10 :0 : 01-10-2010
6.
6.1
6.2 6.2.1
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 8 of 10 :0 : 01-10-2010
Table - 2 Minimum Bolt Tension ASTM A 325 M Type mm M 16 x 2 M 20 x 2.5 M 22 x 2.5 M 24 x 3 16 mm 20 mm 22 mm 24 mm Size inch 5/8 3/4 7/8 1 6.12 8.8 12.02 15.69 Tension (ton)
The bolt reacts to the fastening torque and the notched end of the bolt shears off. The required clamping force is thus given.
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 9 of 10 :0 : 01-10-2010
6.3
7.
WELDING
Welding requirements in the field portion shall be referred to the specification as mentioned in section - 7 of Construction Specification for Fabrication of Structural Steel (Document No. CD-AK10-001).
8.
9.
STEEL FLOORING
Steel floor shall be installed and welded flat by using proper devices and procedure.
10.
PAINTING
Field painting for structure steel shall be applied in accordance with SSPC standard. Any damage cause by transportation or erection should be repainted.
11.
INSPECTION
(1) In addition to the inspections prescribed herein before, all floors, handrails and ladders shall be visually inspected in accordance with the tolerances shown in table-3 . (2) All dimensions of anchor bolt holes for equipment on steel structures shall be measured and reported to Owner.
File : 100656557.doc
CONSTRUCTION SPECIFICATION
PT. KRAKATAU ENGINEERING
: 10 of 10 :0 : 01-10-2010
FIGURE
TOLERANCE d H/500
5 mm
Straightness of hand rail (top rail) d d is the deviation from straightness of handrail in each 5 meters Straightness of hand rail (mid rail & the plate) L d is the deviation from straightness of handrail in each 5 meters Flatness of steel floor d d L L d
d 10 mm
d L/300
d L/200
File : 100656557.doc