MALAYSIA
Presentation Outline
Introduction
Energy-related Policies RE Development Regulatory Framework
9th
RE Programs in Malaysia
Others, nonelectricity related (biodiesel, Steam plant, etc)
PTM-UNDP BioGen Project (demonstration projects to provide Experience and data)
RE programs in Malaysia
Potential (MW)
500 1,300 400 6,500
Detailed resources potential for wind energy and geothermal are yet to be fully examined and verified.
Source: National Renewable Energy Policy and Action Plan, 2009
Current RE Installations
Category Gridconnected (MW) Off-grid (MW) Total (MW) 44.3 454.0 504.95 13.1 14.6 0.2 0.2 467.3 564.05 Minihydro 44.3 Biomass & biogas 55.95 Solar PV Wind Total
1.5
101.75
Coal - 39.5%
Oil - 0.8% Diesel - 1.2% Biomass - 1.0% Others - 0.2%
Organisational Structure
Ministry of Energy, Green Technology and Water
Energy Green Tech.
Green Tech. Sector
MGTC Green Tech Promoter
Water
Electricity Sector
SPAN Regulator
National RE Targets
Year Cumulative RE RE Power Mix Capacity (vs Peak Demand) 73 MW 985 MW 2,080 MW 4,000 MW 0.5 % 6% 11% 17% Cumulative CO2 avoided 0.3 mt 11.1 mt 42.2 mt 145.1 mt
Actual RE installed capacity at 31 Dec 2011 was about 65 MW, most of it from biomass plants in Sabah RE capacity achievements are dependent on the size of RE fund
Technical Challenges
Commercial Challenges