Feed In Tari Application Form

By completing this form, I confirm that I would like British Gas to be my Feed in Tariff supplier.
What need to process your FiT application:
Your Personal Details
Please enter the details of the person who owns the generation equipment.
Yes No
Did British Gas install your
Generating equipment?
Yes No
British Gas Account number:
Todays Date
Address
Postcode
Home Telephone Number:
e-mail address:
Residential Installation:
Yes No
Registration Number :
Please can you select a
password for your account
Your Generator Address Details
Address
Postcode
Please Note: FiT payments can only be made from the commissioning date if completed applications are received within 5 working days of this date via post.
The MCS Certificate number must be included on the application form. If you choose to return the application to us via email, the application needs to be completed
and returned on the date the installation was commissioned, along with the MCS Certificate number. If you are unable to return the application on the commissioning
date, a reading must be provided to us on the date your application is returned.
Your Accreditation Details
f your installation is smaller than 50kW, then you must provide an MCS Certification Number.
MCS Certificate Number:
(e.g.MCS-00000000-L)
Your Generator Details
Please enter the details of your generation equipment.
Technology:
(e.g. PV, MCHP, WND, HYDRO)
Declared Net Capacity (kW):
f you have any other
installations at the address,
please provide details:
Property Type: New Build Old Build
Yes No
s your Generation
equipment wired to
provide electricity to
an occupied building?
nstallation Date:
Your Meter Details and Readings
Generation Meter Details: You must have a suitable Generation Meter to qualify for Feed n Tariffs. f your installation is smaller than
30KW, and you do not have an Export Meter you must provide meter readings on the date of application.
Generation Meter
Serial Number:
No of digits on meter:
Generation Meter Reading:
Manufacturer of meter:
(e.g. Elster/ABB/GEC/EE)
Type of meter:
Export Meter Details: (f you do not have an Export meter, please skip this section) f your installation is larger than 30kWp, you must
have a suitable Export Meter.
Export Meter Serial Number:
Export Meter Reading:
Export Meter MPAN:
5 6
No of digits on meter: 5 6
You can email these documents to us at feedintariff@britishgas.co.uk or post them to: British Gas Feed in Tariff; 97 TaIbot Road, Manchester, M16 0TW.
You can call us on 0800 107 0187 (Option 2) Calls are free from a BT Calling Plan. Mobile and other providers' charges may vary. Lines are open from
8am-8pm Monday to Friday, and 8am-2pm Saturdays. f you are hard of hearing or speech impaired and use a textphone, please call 8001 0800 072 8626.
The below 3 statements only apply to customers that have received Grants:
1. You are unlikely to get grants and FT totalling C200,000 within 3 years.
2. The total value of public financial assistance you have received in relation to any economic activities this relates to any grants receive from a public body and is not limited to
grants received for the installation - has not exceeded the de minimis aid level of support, and that the combination of the grants you have received and the maximum expected
FTs payments (export and generation tariffs) will similarly not exceed the de minimis levels of support.
3. You confirm that you will notify Ofgem or your FTs licensee (i.e. British Gas) immediately if the de minimis levels of support are exceeded or if you think they are likely to be
exceeded.