The Project ACROPOLIS A R PROPERTY SERVICES, 148, R.K. SALAI Mylapore, CHENNAI - 600 004
Study conducted by Interface Electronics Pvt Ltd 13,Nana Street, T. Nagar,Chennai, India, 600017 Email:ife@vsnl.com Website:www.ifepwrana.com Tf No: 9884370326
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Unquote
Standards for Connectivity to the Grid) Regulations, 2007 is also reproduced here
Study Conducted by Interface Electronics Pvt Ltd, Chennai
Page
The relevant extract regarding Harmonics from The Central Electricity Authority (Technical
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Quote
Unquote From the above circulars it is to be understood that the Harmonics generated by the consumer to be measured at the point of coupling (PCC) and action to be taken to suppress the same if it is found to be beyond the limits. Therefore this study is made.
The Single line diagram of the Electrical distribution system for the premises is shown in annexure. The studies were made during 16/6/2012 and 17/06/2012
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
2. Study details:
Krykard Instrument type C A 8335 sl no: -212902 5:8.2.6 was used to collect data. Power Analyzer Transfer software tool used for studying the data collected by the above instrument The details of study made are given in the Table 1 .This table gives where and when the instrument connected in the circuit for data collection. The Table also gives name of the excel file in which data are stored. a) The data was collected on the 11 kV incoming supply side to ascertain the presence of Harmonics. This is Point of common coupling (PCC). The standard defines it as the electrical connecting
point or interface between the utility distribution system and the customer's or user's electrical distribution system. b) The data also collected by connecting the instrument on the secondary side of the transformer at different times to record parameters with different loads like Load with Capacitors connected, Load without Chiller connected and all loads without Capacitors. c) The data also collected by connecting the instrument at the load feeders viz RRD 80 kVA UPS Feeder RRD 250 kVA Feeder Chiller Feeder Thompson UPS 1 Feeder Thompson UPS 2 Feeder Thompson Server 1 Feeder Thompson Server 2 Feeder to ascertain the level of Harmonics generated by individual loads .
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
d) In the table 2, the details of average and maximum Total Harmonic Distortion of Phase voltage, Line voltage Line currents are tabulated. e) The Current measured, total current distortion and individual odd current harmonics from 3 to 25 are recorded in the table 3 .Also based on Isc / IL, permissible %THD limits are indicated for each measurement. The permissible harmonic limits depend on the location of PCC. f) In table 4, voltages measured, total voltage distortion, odd voltage harmonics from 3 to 25 are tabulated.permisible harmonic limits also indicated in the table. g) The Table 5 gives the details of maximum Current harmonic content permitted as per IEEE 519-1992. h) Trend curves of Current THD,Voltage THD,Unbalance of Voltage, Unbalance of current,Powerfactor,Line voltage and Line current for measurement done at HT Incomer (PCC1)are given in following pages, Also Current and Voltage Harmonic Spectrum upto 25 th harmonic is added in the pages. 3. Observations:
a) At PCC1 the Current and voltage harmonics are within the stipulated limits as per IEEE512-1992 b) However at PCC2 voltage harmonics are within limits, but current harmonics are slightly above the stipulated limits as per IEEE512-1992. c) On analysis it is observed that the harmonics generated by RRD 80 kVA UPS Feeder , Thompson UPS1Feeder and Thompson UPS2 Feeder is very high. d) There is no impact of harmonics due to Chiller load as it generates Current harmonics only 2-3%
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Details of Study
Sl.No Description
1 Main Incomer 11 kV 3 Main Incomer LT with Full Load 1 Main Incomer LT side with APFC 4 Main Incomer LT without Chiller Load 5 Chiller 1 6 RRD 80 kVA UPS Feeder 7 RRD 250 kVA UPS Feeder 8 Thompson UPS 1 Feeder 9 Thompson UPS 2 Feeder 10 Thompson Server 1 Feeder 11 Thompson Server 2 Feeder
17-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012 16-06-2012
12:27:00 PM
04:02:56 01:00:00 10:59:12 00:10:00 00:09:58 00:05:00 00:10:00 00:15:00 00:10:00 00:09:00 00:05:00
Sheet ref
Table 1
11:47:00 AM 10:15:00 PM 12:50:00 PM 04:14:02PM 03:48:00PM 03:26:00PM 01:25:00PM 01:50:00PM 02:51:00PM 03:05:00PM
VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend VhHarmonic%,VhHarmonic RMS,AhHarmonic RMS,AhHarmonic%Trend
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Main Incomer 11 kV Main Incomer LT with Full Load Main Incomer LT side with APFC Main Incomer LT without Chiller Load Chiller 1 RRD 80 kVA UPS Feeder RRD 250 kVA UPS Feeder Thompson UPS 1 Feeder Thompson UPS 2 Feeder Thompson Server 1 Feeder Thompson Server 2 Feeder
1.478 1.831 1.285 1.761 1.669 1.857 1.954 1.871 1.822 1.694 1.863
1.436 1.745 1.268 1.691 1.476 1.59 1.74 1.622 1.65 1.541 1.651
1.475 1.973 1.454 2.073 1.671 1.882 1.963 1.877 1.86 1.672 1.882
1.482 1.942 1.405 1.997 1.726 1.946 2.032 1.958 1.896 1.726 1.929
1.468 1.726 1.267 1.603 1.536 1.678 1.822 1.709 1.69 1.61 1.729
1.44 1.879 1.399 1.941 1.546 1.708 1.82 1.706 1.737 1.582 1.749
6.21 6.286 6.446 7.388 2.868 108.5 17.593 62.985 103.08 8.371 11.303
6.928 5.368 5.617 5.966 2.466 104.61 14.477 62.086 100.77 7.408 8.654
8.7 9.3 13 8.6 2.8 112.1 18.7 66.9 109.8 11.8 16.1
6.113 5.862 5.503 6.251 2.63 94.225 16.307 59.559 98.564 8.443 9.168
Page
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Measured Currents,Short circuit currents Individual Current harmonics upto h=25 A2 A3 A1h3 A1h5 A1h7 A1h9 A1h11 A1h13 A1h15 A1h17 A1h19 A1h21 A1h23 Perm Location Measured Phase . Currents Isc/Il A1 THD in THD in THD in in % in % in % in % in % in % in % in % in % in % in % issibl in Amps % % % e TDD in % A1 A2 A3
Table 3 Perm Permis Permi Permi issibl sible ssible ssible e for for for for h<11 h<17 h<23 h<35 in % and and and h>=11 h>=17 h>=23 in % in % in %
12.00 7.00 7.00 7.00 5.50 3.50 3.50 3.50 5.00 2.50 2.50 2.50 2.00 1.00 1.00 1.00
Main Incomer 11 kV Main Incomer LT with Full Load Main Incomer LT side with APFC Main Incomer LT without Chiller Load
Measured Voltage, Individual Voltage harmonics upto h=25 Table 4 Location Measured line Voltage in V1 V2 V3 V1h3 V1h5 V1h7 V1h9 V1h11 V1h13 V1h15 V1h17 V1h19 V1h21 V1h23 Perm Perm Volts THD THD THD in % in % in % in % in % in % in % in % in % in % in % issibl issibl in % in % in % e e for THD h>=3 V1 V2 V3 in % in %
Main Incomer 11 kV Main Incomer LT with Full Load Main Incomer LT side with APFC Main Incomer LT without Chiller Load 10620.00 421.50 425.50 415.50 10650.00 425.50 428.90 419.40 10660.00 423.90 427.10 417.70 1.70 3.00 2.10 2.10 1.70 3.00 2.50 2.00 1.60 3.20 2.70 2.50 0.30 0.20 0.50 0.20 1.20 2.80 1.90 1.60 1.30 1.70 2.10 2.00 0.00 0.10 0.10 0.10 0.20 0.40 1.60 0.70 0.10 0.10 0.30 0.20 0.00 0.00 0.10 0.10 0.00 0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.10 0.00 0.00 0.00 0.10 0.00 0.00 0.00 5.00 5.00 5.00 5.00 3.00 3.00 3.00 3.00
Page
10
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Table 5
Page
11
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
12
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
13
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
14
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
15
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
16
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
17
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
18
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
19
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
20
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
21
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
22
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
23
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
24
Power Quality Study for ACROPOLIS, A R Property Services, 148, R K Salai, Mylapore, Chennai.
Page
25