Академический Документы
Профессиональный Документы
Культура Документы
Copyright 2011
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA
part
T
a b
o f
o n
e n
ii
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
The year 2012 edition of the Rules for Building and Classing Mobile Offshore Drilling Units
consists of the nine (9) booklets as shown in Table 1. The Rules have been reorganized, and a new
Part 6 for equipment and machinery certification has been added. The survey requirements in the
former Part 6 are now in Part 7, along with requirements for surveys during construction and for
testing and trials. The cross-reference table in Table 4 shows the relationship between the 2008
numbering and the 2012 numbering.
The purpose of the generic title ABS Rules for Conditions of Classification Offshore Units and
Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of including
consolidated requirements for Classification applicable to all types of offshore units, pipelines,
risers, and other offshore structures, as specified in the Foreword to Part 1.
With regard to Part 2, the purpose of the generic title ABS Rules for Materials and Welding is to
emphasize the common applicability of the requirements to ABS-classed vessels, other marine
structures and their associated machinery, and thereby make PART 2 more readily a common
PART of various ABS Rules and Guides, as appropriate.
2.
3.
The primary changes from the 2008 edition of the Rules are identified and listed in Table 3. The
effective date of the indicated Rule Changes is 1 January 2012, unless specifically indicated otherwise.
4.
The effective date of each technical change since 1993 is shown in parenthesis at the end of the
subsection/paragraph titles within the text of each Part. Unless a particular date and month are
shown, the years in parentheses refer to the following effective dates:
(2000) and after
(1999)
(1998)
(1997)
(1996)
(1995)
(1994)
(1993)
9 May 1996
15 May 1995
9 May 1994
11 May 1993
5.
Until the next edition of the Rules for Building and Classing Mobile Offshore Drilling Units is
published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS
website www. eagle.org only, and will be available free for downloading. It is not intended to
publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides.
The consolidated edition of the Rules for Building and Classing Mobile Offshore Drilling Units,
which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition
will be published on the ABS website only when RCN and/or Corrigenda are issued.
6.
The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS
website www.eagle.org for download.
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
TABLE 1
Applicable Editions of Booklets Comprising 2012 Rules
Notices and General Information
2012
Part 1:
2012 (2)
Part 1:
2012
Part 2:
2012 (2)
Part 3:
2012
Part 4:
2012
Part 5:
2012
Part 6:
2012
Part 7:
Surveys
2012
Notes:
1
The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions
of Classification (Part 1). Additional specific requirements are contained in Part 1 of these Rules.
The latest edition of these Rules is to be referred to. After 2012, these Rules may be downloaded from the ABS
website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications
online catalog at www.eagle.org, Rules and Guides, Catalog.
TABLE 2
Division and Numbering of Rules
Division
Part
Chapter
Section
Subsection (see Note 1)
Paragraph (see Note 1)
Subparagraph
Item
Subitem
Appendix
Note:
1
Number
Part 1
Part 1, Chapter 1
Section 1-1-1
1-1-1/1
1-1-1/1.1
1-1-1/1.1.1
1-1-1/1.1.1(a)
1-1-1/1.1.1(a)i)
Appendix 1-1-A1
or
Appendix 1-A1-1
An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of
even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text
and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets,
etc.
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-3/1.5.1
To modify the class notation for ship-type drilling units from Drilling
Unit to Drillship in order to clarify the type of drilling units
receiving this notation.. (Incorporates Notice No. 1 to Part 1)
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-5/1
1-1-5/5
Governmental Regulations
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-A2/5.9
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
Section 1-1-6
IACS Audit
1-1-8/3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-3/1.9
1-1-3/1.11
1-1-3/5
Service Limitations
1-1-3/25
Propulsion Machinery
To reference to the definitions of self-propelled and non-selfpropelled units. (Incorporates Notice No. 5 to Part 1)
1-1-7/7
Submissions
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-3/25
Propulsion Machinery
Title/Subject
Status/Remarks
1-1-1/5
Representations as to Classification
1-1-3/1
1-1-4/9.7.5iii)
(New)
1-1-4/9.7.7
Title/Subject
Status/Remarks
1-1-8/1.3
Repairs
1-1-8/1.5
(New)
Suspension of Classification
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures
1-1-3/1.9
1-1-3/1.11
1-1-3/9
Offshore Installations
1-1-3/11
1-1-3/19.1
Floating Installations
1-1-3/31
Drilling Systems
Title/Subject
Status/Remarks
PART 3
3-1-3/5.7
3-1-3/5.9.2
CVN Requirements
3-1-3/Table 1
PART 4
4-1-1/Table 2
4-2-6/5.5.1(e)
(New)
Flexible Hoses
4-2-6/9.3.3
(New)
To clarify the starting air requirements for non self propelled units.
(Incorporates Notice No. 1)
4-3-2/3.1.2
Capacity of Generators
To clarify that after the emergency generator has been started (after a
blackout), other machinery must be used in conjunction with the
remaining main generators in order to start the propulsion machinery.
(Incorporates Notice No. 1)
4-3-2/3.1.4
4-3-2/5.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
4-3-2/5.7
4-3-2/Table 1
4-3-2/7.9
Harmonics
4-3-2/17.1.2
System Requirements
4-3-2/19.1.2
Other Auxiliaries
4-3-4/7.9.7
Terminals
PART 5
5-2-2/1.3.6
(New)
Connections
To align the requirements with 9.4.15 of the IMO MODU Code and
ABS practice. (Incorporates Notice No. 1)
5-2-3/1
To clarify the applicable standard for fixed fire fighting systems that are
installed in excess of the Rule requirements. (Incorporates Notice No. 1)
5-3-1//9.3
Other Auxiliaries
Title/Subject
Status/Remarks
PART 4
4-2-2/7.9
4-2-2/19
To clarify the requirements and align them with the Steel Vessel
Rules. (Incorporates Notice No. 2)
4-3-3/5.17.3
(New)
5-2-3/5.11
5-2-4/Table 1
5-2-4/Table 2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title/Subject
Status/Remarks
PART 3
3-1-1/3.1
3-1-1/3.3
3-1-2/1.5.4
3-1-A2
First Paragraph
<No Title>
3-2-4/5.11.5
3-3-1/7.3
PART 4
4-2-3/1.1
4-2-3/1.5
4-2-3/1.9.5
4-2-5/11
(New)
4-2-5/13
(New)
4-2-6/5.5.1(b)
Piping Materials
To align the requirements with NFPA 51, USCG Title 46 CFR 56.50-103,
and BS 29593/ISO 9539. (Incorporates Notice No. 3)
4-3-1/Table 4
4-3-1/Table 5
4-3-3/3.1.1(b)
To clarify that the requirement for a degree of protection not less than
IP 44 will apply only to electrical and electronic equipment intended
for essential services when affected by the discharge of local
application water-spray or water mist fire extinguishing systems.
(Incorporates Notice No. 3)
4-3-4/1
4-3-4/3.1.1
Applications
4-3-4/7.1.1
Applications
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
4-3-4/13.1.1
General
4-3-4/Table 11
(New)
PART 5
5-1-1/5.9
<No Title>
5-2-1/3.1
To ensure that the emergency fire pumps have sufficient lift capacity
(NPSHR vs. NPSHA) and performance at limited suction conditions
and to verify compliance with such requirements early in the design
phase of the vessel. (Incorporates Notice No. 3)
Title/Subject
Status/Remarks
PART 1
1-1-4/1
1-1-4/9
Submissions
1-1-5/1
First Paragraph
<No Title>
1-1-5/1.3vi)
<No Title>
PART 3
3-1-1/1.5
Self-Propelled Unit
3-1-1/1.7
Non-Self-Propelled Unit
3-2-1/1.17
Fatigue Analysis
3-2-2/13
(New)
Higher-strength Materials
3-2-3/9
3-2-4/15
(New)
Higher-strength Materials
3-2-A3
(New)
To clarify the allowable stresses for fine mesh sizes of Finite Element
Analyses intended for localized high stress areas in way of structural
discontinuities. (Incorporates Notice No. 4)
3-4-1/3.3.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
PART 4
4-1-1/9
4-1-1/15
Ambient Temperature
4-1-1/17
Section 4-1-3
To update the requirements for jacking systems per the Jacking System
Ad-hoc Group, formed by ABS and industry representatives.
(Incorporates Notice No. 4)
4-2-2/3.1
General Requirements
4-2-2/21.3
4-2-3/1.1
General
4-2-4/1.1
General
4-2-4/1.5
4-2-4/1.7
4-2-4/13.7.1(b)
4-2-5/1.1.1
Tanks
4-2-5/Figure 1
4-2-5/1.1.2
Spillage
4-2-5/3.9
4-2-6/1.1
General
4-2-6/5.5.1(a)
General
4-2-6/9.5
4-3-2/9.1.4
Back-up Protection
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
4-3-2/9.13.5
4-3-2/15.5.4
(New)
Jacking System
PART 5
5-1-1/1.5
5-1-1/3.15
<No Title>
5-1-1/3.19
<No Title>
5-1-1/Figure 1
5-1-1/3.21
<No Title>
5-1-1/Figure 2
(New)
5-1-1/5.23
<No Title>
5-1-1/Figure 3
(New)
5-1-1/5.25
<No Title>
5-1-1/5.29
<No Title>
5-1-1/Figure 4
(New)
5-1-1/5.41
(New)
<No Title>
To clarify the use of air balance duct installation in line with IACS
Unified Interpretation SC119. (Incorporates Notice No. 4)
5-2-3/9
To align the requirements with 9.11 of the IMO MODU Code 98,
2001 Consolidated Edition. (Incorporates Notice No. 4)
5-3-1/9.1
10
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title/Subject
Status/Remarks
PART 1
Section 1-1-4
To move lists of plans and data to Parts 3 and 4. To clarify the application
of requirements in other Rules and Guides for additional class notations.
1-1-5/1
<No Title>
1-1-5/1.3i)
<No Title>
PART 3
3-1-1/3.1
To align the text with 1.3.47 of the 2009 IMO MODU Code.
3-1-1/25
(New)
Service Temperature
3-1-1/27
(New)
3-1-1/29
(New)
Section 3-1-2
(New)
3-1-2/1
Last 2 Bullets
<No Title>
3-1-3/1.1
General
3-1-4/1.1
General
3-1-4/1.9
(New)
Service Temperature
3-1-4/5.1
General
3-1-4/5.3
(New)
3-1-4/5.5
3-1-4/5.7.1
General
3-2-1/3.1
General
3-2-2/1.3
Scantlings
3-2-2/1.5
To clarify that only hard coatings are permitted for protection of salt
water ballast tanks and to advise about compliance with PSPC with
the optional notation CPS.
3-2-2/7.1
General
3-2-2/7.7.2
Stiffeners
3-2-2/7.11
(New)
Openings
3-2-2/11.3
Lifeboat Platform
To clarify that the strength requirements are intended for the supporting
structure in the direct load path from the life saving appliances.
3-2-3/3
3-2-3/Figure 1
(New)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
11
Part/Para. No.
Title/Subject
Status/Remarks
3-2-4/1.7
Material Selection
3-2-4/Figure 1
(New)
3-2-5/3
Material Selection
3-2-5/Figure 1
(New)
3-2-5/5.1
(New)
3-2-5/5.3
(New)
3-2-5/5.5
(New)
3-2-5/5.7
(New)
Fatigue Analysis
3-2-5/5.9
(New)
To define the impact loads for the forebody and deck loads to be used
in the analyses.
3-2-5/5.11
(New)
3-2-5/7
(New)
3-2-5/9
Drilling Well
3-2-5/11
Hatches
3-2-A1/1.1
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A1/Table 1
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A1/7
Clearance
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A1/Table 3
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A1/11.3
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A1/13.3
Local Scantlings
To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.
3-2-A3/1
Plated Structures
3-3-1/3
Inclining Experiment
3-3-2/1.1
General
3-3-2/1.3.4
To define the systems referenced and to add the need to address the
flooding of undrainable voids in the Operating Manual.
3-3-2/3.1
General
3-3-2/3.3.1
3-3-2/3.5.1
Self-Elevating Units
12
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
3-3-2/3.5.2
Column-Stabilized Units
3-3-2/3.5.3
3-3-2/3.7
Overturning Moment
3-3-2/3.9
To clarify the extent of testing and the requirement to submit the testing
program for review.
3-3-2/5.3.1
To align the requirements with 3.6.5.2 of the 2009 IMO MODU Code.
3-3-A2/1.3
Design
3-3-A2/7.1
Calculation Program
To use standard terminology from ABS Rules and to clarify some items.
3-3-A2/9
Acceptable Tolerances
To use standard terminology from ABS Rules and to clarify some items.
3-3-A2/Table 1
Acceptable Tolerances
3-4-1/1
General
3-4-1/3
3-4-1/5
3-4-1/9
(New)
3-4-1/11
(New)
3-4-1/Table 1
(New)
Values of Cs
3-4-1/13
(New)
Tests
3-4-1/15
(New)
Anchor Types
3-4-1/17
(New)
3-4-1/Figure 1
(New)
3-4-1/Figure 2
(New)
Sign Convention
3-4-1/19
(New)
Hawse Pipes
3-4-1/Table 2
(New)
PART 4
4-1-1/1
(New)
To define the scope of the several Parts of the MODU Rules referring
to equipment, machinery and systems.
4-1-1/1.1.1
(New)
General
4-1-1/1.1.2
(New)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
13
Part/Para. No.
Title/Subject
Status/Remarks
4-1-1/1.1.3
(New)
References
4-1-1/3
(New)
Definitions
4-1-1/5
(New)
Machinery Plans
4-1-1/7.1
Inclinations
4-1-1/Table 2
4-1-1/7.13
(New)
4-1-1/Table 3
4-1-1/Table 4
4-1-2/1
(New)
Prime Movers
4-1-2/3
First Paragraph
<No Title>
4-1-2/3.9
Governor Control
4-1-2/9
(New)
4-1-2/11
(New)
4-2-1/3
(New)
Definitions
4-2-1/5
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.
4-2-1/7.1
Plans
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.
4-2-1/11.7.1
To clarify that molded expansion joints are permitted only in Class III
sea water piping systems, in line with the Steel Vessel Rules.
4-2-1/11.7.2(b)
<No Title>
To clarify that the maximum working pressure of the system and not
the MAWP is to be lower than the design pressure of the expansion
joint determined by the burst test.
4-2-1/11.7.3
4-2-1/11.9
(New)
4-2-1/11.11
(New)
Pipe Joints
To add requirements for pipe joints in line with the Steel Vessel Rules.
4-2-1/11.13
(New)
Mechanical Joints
To add requirements for mechanical joints in line with the Steel Vessel
Rules.
4-2-1/11.29
Flexible Hoses
To align the requirements with the Steel Vessel Rules and to clarify
that ISO 15540 and ISO 15541 can be used for this test, as the criteria
are identical.
4-2-1/11.33.2
Boiler Flats
14
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
4-2-2/3
(New)
4-2-2/5.1
Steel Pipe
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.
4-2-2/5.7.1
4-2-2/5.9
4-2-2/Table 1
4-2-2/7.5.1
Internal Pressure
4-2-2/7.5.4
Temperature
4-2-2/7.7.1
Supports
4-2-2/7.9
4-2-2/7.13.4(b)
<No Title>
4-2-2/7.15.4(b)
<No Title>
4-2-2/9.3
Construction
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify the meaning of maximum
pressure as maximum working pressure.
4-2-2/11.1
General
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify terminology on pressure and
temperature.
4-2-2/15
Flanges
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.
4-2-2/19.1
General
4-2-2/19.3
4-2-2/19.11
Exemptions
4-2-2/21.3
4-2-3/1.9.3
To align the requirements with 4.8.5 of the 2009 IMO MODU Code.
4-2-4/1.1
General
4-2-4/5.5
4-2-4/9.1.2
Branch Lines
4-2-3/13.5.2
Pump Performance
To align the requirements with 4.10.4 of the 2009 IMO MODU Code.
4-2-3/13.7.1(b)
To align the requirements with 4.10.10 of the 2009 IMO MODU Code.
4-2-3/13.7.3(c)
Disconnects
To align the requirement with the 2009 IMO MODU Code, and to avoid
the ambiguity whether the pumps or the pumps control system are to
be disconnected from the power system.
4-2-3/13.7.4
To align the requirements with 4.10.17 of the 2009 IMO MODU Code.
4-2-5/1.1.4
To align the requirements with 4.8.6 of the 2009 IMO MODU Code.
4-2-5/9.1.3
<No Title>
4-2-6/3.1
General
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify the exemption of compliance
with the Rules for hydraulic systems which are not within the scope of
classification.
4-2-6/3.17
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
15
Part/Para. No.
Title/Subject
Status/Remarks
4-2-6/5.5.1
General
To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.
4-2-6/5.5.2
4-2-6/25
(New)
4-3-1/5
4-3-2/5.1.1
Basic Requirement
4-3-2/5.1.2
Boundary
To align the requirements with 5.4.3 of the 2009 IMO MODU Code.
4-3-2/5.3
First Paragraph
4-3-2/5.3.1(f)
<No Title>
To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.
4-3-2/5.3.1(h)
<No Title>
To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.
4-3-2/5.3.3
To align the requirements with 5.4.6.3 of the 2009 IMO MODU Code.
4-3-2/5.5.1
General
4-3-2/5.5.2
Generator
4-3-3/1.5
4-3-3/3.5.4
To clarify that the suitability of the location where motors are installed
below deck will be verified by the attending Surveyor.
4-3-3/9.1.1
General
To align the requirements with 6.6.1 and 6.6.2 of the 2009 IMO MODU
Code.
4-3-3/9.1.2
Electrical Equipment
To align the requirements with 6.6.3 and 6.6.4 of the 2009 IMO MODU
Code, except that certified electrical equipment other than the types
listed under 4-3-3/9.1.2(b) will need special consideration.
4-3-3/9.1.3
(New)
To align the requirements with 6.6.5, 6.6.6 and 6.6.7 of the 2009 IMO
MODU Code.
4-3-3/Table 1
To clarify the degree of protection required for the remote closure and
monitoring of watertight doors, when the electrical equipment is below
the worst damage waterline.
4-3-4/5
(New)
4-3-5/3.17.3
(New)
4-3-5/7.1.1
(New)
To align the requirements with 6.5.2 of the 2009 IMO MODU Code.
4-3-6/1.1
Hazardous Areas
To align the requirements with 6.1 of the 2009 IMO MODU Code.
4-3-6/5.1
To align the requirements with 6.2.2 of the 2009 IMO MODU Code.
4-3-6/5.3vi)
(New)
<No Title>
To align the requirements with 6.2.3 of the 2009 IMO MODU Code.
4-3-6/5.5vi)
<No Title>
To align the requirements with 6.2.4 of the 2009 IMO MODU Code.
4-3-6/7.1i)
<No Title>
To align the requirements with 6.3.1.1 of the 2009 IMO MODU Code.
4-3-6/7.5i)
<No Title>
To align the requirements with 6.3.1.3 of the 2009 IMO MODU Code.
4-3-6/7.7
(New)
Ventilation Alarms
4-3-6/7.9
(New)
Hold-back Devices
To align the requirements with 6.3.3 of the 2009 IMO MODU Code.
4-3-6/9.3
To align the requirements with 6.4.1 of the 2009 IMO MODU Code.
16
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
4-3-6/11
Title/Subject
Status/Remarks
PART 5
5-1-1/1.7
(New)
5-1-1/3.5
(New)
To refer to the FTP Code and SOLAS, in line with 9.2.3 of the 2009
IMO MODU Code.
5-1-1/Table 1
To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO
MODU Code. Note 3 in 5-1-1/Table 1 is expanded to address the case
of bulkheads between adjacent spaces of the same category and purpose.
5-1-1/Table 2
To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO
MODU Code.
5-1-1/3.13
<No Title>
To align the requirements with 9.2.7 of the 2009 IMO MODU Code.
5-1-1/3.17vi)
(New)
<No Title>
To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU
Code.
5-1-1/5.1
(New)
<No Title>
To align the requirements with 9.3.1 of the 2009 IMO MODU Code.
5-1-1/5.3
(New)
<No Title>
To align the requirements with 9.3.2 of the 2009 IMO MODU Code.
5-1-1/5.5
<No Title>
To align the requirements with 9.3.3 of the 2009 IMO MODU Code.
5-1-1/5.7
<No Title>
5-1-1/5.9
<No Title>
To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU
Code.
5-1-1/5.11
<No Title>
To clarify that enclosed air spaces cannot communicate freely one deck
with the next.
5-1-1/5.19
<No Title>
To align the requirements with 9.3.10 of the 2009 IMO MODU Code.
5-1-1/5.21
<No Title>
To align the requirements with 9.3.11 of the 2009 IMO MODU Code.
5-1-1/5.23
<No Title>
To align the requirements with 9.3.12 of the 2009 IMO MODU Code.
5-1-1/5.27ii)
<No Title>
To align the requirements with 9.3.14.2 of the 2009 IMO MODU Code.
5-1-1/5.27
Last Paragraph
<No Title>
To clarify minimum thickness for steel sheet sleeves and the arrangement
in case of decks.
5-1-1/Figure 3
5-1-1/5.29
<No Title>
To align the requirements with 9.3.15 of the 2009 IMO MODU Code.
5-1-1/5.29.1
<No Title>
5-1-1/5.37
<No Title>
To apply the requirements to all galley exhaust ducts and to clarify the
requirements of the fire damper arrangements in order to make the fixed
fire extinguishing means effective.
5-1-1/5.47
<No Title>
5-2-2/1.1.1
Number of Pumps
5-2-2/1.5.2
Hoses
To align the hose length requirement with the Steel Vessel Rules.
5-2-4/1.1
Extinguishers
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
17
Part/Para. No.
Title/Subject
Status/Remarks
5-2-4/3.1
Number
To align the requirements with 9.13.3 of the 2009 IMO MODU Code.
5-2-4/3.3ii)
<No Title>
To align the requirements with 9.13.2 of the 2009 IMO MODU Code.
5-2-4/3.5
(New)
To align the requirements with 9.14 of the 2009 IMO MODU Code.
5-2-4/Table 1
To align the requirements with Table 9-3 of the 2009 IMO MODU
Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO
MODU Code.
5-2-4/Table 2
To align the requirements with Table 9-3 of the 2009 IMO MODU
Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO
MODU Code.
5-2-5/1.1
To align the requirements with 9.10.1 of the 2009 IMO MODU Code.
5-2-5/3.1
(New)
To align the requirements with 9.12 of the 2009 IMO MODU Code.
5-3-1/1.1.4
(New)
<No Title>
To align the requirements with 9.4.1.4 of the 2009 IMO MODU Code.
5-3-1/1.3.1
<No Title>
To align the requirements with 9.4.2.1 of the 2009 IMO MODU Code.
5-3-1/1.3.2
<No Title>
To align the requirements with 9.4.2.2 of the 2009 IMO MODU Code.
5-3-1/1.11
(New)
<No Title>
5-3-1/1.13
(New)
<No Title>
5-3-1/3
Appendix 5-3-A1
(New)
PART 6
6-1-1/1.3.1
6-1-1/1.3.2
6-1-1/3.1
Basic Requirements
To adapt the text to product unit certification only and to clarify the
requirements based on current practices.
6-1-1/3.3
(New)
Specific Requirements
6-1-1/3.5
(New)
Angles of Inclination
6-1-1/3.7
(New)
Ambient Temperature
6-1-1/3.9
(New)
Ambient Temperature
6-1-1/5
(New)
6-1-1/7
(New)
Prototype Testing
6-1-1/9
(New)
6-1-1/11
(New)
Manufacturers Guarantee
6-1-2/1
(New)
General
18
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
6-1-2/3.1
(New)
6-1-2/3.3
(New)
6-1-2/3.5
(New)
6-1-2/5
(New)
6-1-2/7
(New)
Helideck Structure
6-1-2/9.1
(New)
General
To align the requirements for watertight doors with 3.6.3 of the 2009
IMO MODU code and with 3-2-9/9.9 of the Steel Vessel Rules.
6-1-2/9.3
(New)
6-1-2/9.5
(New)
6-1-3/3.1.3
(New)
Hot Surfaces
6-1-3/3.9
(New)
References
6-1-3/5
(New)
6-1-4/5
(New)
6-1-5/1.1
(New)
Application
6-1-5/1.3
(New)
To specify the grouping used in the Tables, in line with the Steel Vessel
Rules.
6-1-5/3
(New)
6-1-5/5
(New)
6-1-6/3
(New)
Pipes
To provide specific requirements for pipes in line with the Steel Vessel
Rules and current practices.
6-1-6/5
(New)
6-1-6/7
(New)
6-1-7/3.1
6-1-7/3.3
6-1-7/5.1.1
Applications
6-1-7/5.9.1
Temperature Rises
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
19
Part/Para. No.
Title/Subject
Status/Remarks
6-1-7/5.13
Lubrication
6-1-7/5.15
(New)
6-1-7/9.1.1
Applications
6-1-7/9.1.2(f)
Earthing
6-1-7/11.3
Temperature Rise
6-1-7/17.3.5
6-1-7/19
(New)
Section 6-1-8
(New)
6-1-9/3.11
6-1-9/13.1
Bearings
6-1-9/13.5
6-1-9/25
Section 6-1-10
(New)
The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date
that the requirement becomes effective [e.g., 6-2-1/3 Definitions (2010) is to apply for vessels undergoing survey
on or after 1 January 2010]
EFFECTIVE DATE 1 January 2010 shown as (2010)
Part/Para. No.
Title/Subject
Status/Remarks
PART 6
Surveys
6-1-1
(New)
General
6-1-2/9.1
Applications
6-1-2/23.1
Applications
6-2-1/1
(New)
Application
To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)
6-2-1/3
Definitions
6-2-1/13
Incomplete Surveys
To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)
6-2-1/15
To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)
6-2-2
(New)
Survey Intervals
To align the MODU Rules with the Steel Vessel Rules and to clarify
the intervals applicable to MODUs classed for Unrestricted Service
versus MODUs operating in Great Lakes Service. (Incorporates
Notice No. 3)
20
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
6-2-3/1
Special Surveys
6-2-4/1.1.9
(New)
<No Title>
6-2-4/1.3
6-2-4/1.5
6-2-4/3
6-2-4/3.5
(New)
6-2-4/3.7
(New)
6-2-4/3.9
(New)
6-2-4/5
(New)
6-2-5/1.1.9
<No Title>
6-2-5/1.5.6
<No Title>
6-2-5/3.5
Column-Stabilized Units
To clarify that the close visual examination and NDT is required during
SPS, not every DD/UWILD, and that NDT requirements for rigs over
15 years of age (>SPS #3) would be subjected to more extensive close
visual examination and NDT. To clarify that Record Keeping is
mandatory but Inspection Manual is not. (Incorporates Notice No. 3)
6-2-5/5
6-2-5/7
(New)
6-2-5/9
6-2-5/11
6-2-5/13
6-2-6/1.3
Self-Elevating Units
6-2-6/1.9.3
6-2-A1/3.3.2v)
<No Title>
6-2-A1/3.3.2x)
<No Title>
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
21
Title/Subject
PART 6
Surveys
6-2-5/9.15
Status/Remarks
To clarify the mandatory survey requirements of Jacking Systems.
(Incorporates Notice No. 4)
Title/Subject
Status/Remarks
PART 7
Surveys
7-1-1/1
General
7-1-1/5
7-1-2/3
To explain the main survey and testing items required for hull structure
and outfitting.
7-1-2/5
(New)
Material
7-1-2/11
7-1-2/11
Second Paragraph
(New)
To clarify that the NDT plan is reviewed by the attending Surveyor, not
an ABS Technical Office, must be accepted before NDT is commenced,
and the Surveyor may witness NDT as deemed necessary.
7-1-2/11.5
(New)
7-1-2/11.9
(New)
7-1-2/Table 1
(New)
To define extent and type of NDT required for each type of structural
member.
7-1-2/13.1
To explain the difference between optional Class service and new IMO
requirements associated with ballast tanks on drilling units.
7-1-2/15
7-1-2/17.1
(New)
7-1-2/Figure 1
(New)
7-1-2/17.3
(New)
7-1-2/Figure 2
(New)
7-1-2/17.5
(New)
7-1-2/Figure 3
(New)
7-1-2/23.3
22
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
7-1-2/23.9
Air Testing
To clarify how the air test procedure should be carried out while safety
is maintained during test preparation and that alternative tests are to be
agreed by the Surveyor.
7-1-2/23.11
Hose Testing
7-1-2/23.13
Flood Testing
7-1-2/27
(New)
7-1-3/3
(New)
7-1-3/5.1
(New)
7-1-3/5.5
(New)
7-1-3/5.7
(New)
7-1-3/7
(New)
7-1-3/9
(New)
Piping
7-1-3/11
(New)
7-1-3/13
(New)
7-1-3/15
(New)
Valves
7-1-3/17
(New)
Pipe Fittings
7-1-3/19
(New)
Flanges
7-1-3/21
(New)
7-1-3/23
First Paragraph
(New)
7-1-3/25
First Paragraph
(New)
7-1-3/27
First Paragraph
(New)
7-1-3/29
First Paragraph
(New)
7-1-4/3
(New)
7-1-4/5
(New)
To clarify that all tank vents and overflows are required to be surveyed
and tested when testing the tanks they are fitted on.
7-1-4/5.1
7-1-4/7
(New)
Sounding
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
23
Part/Para. No.
Title/Subject
Status/Remarks
7-1-4/9
(New)
Bilge System
7-1-4/11
(New)
Ballast System
7-1-4/13
(New)
7-1-4/15
(New)
To clarify that if low flash point fuel is used, verification for compliance
with 4-2-5/9 of these Rules is required.
7-1-4/17
(New)
7-1-4/41.1.6
(New)
To clarify that the high pressure piping is a class requirement and not
CDS.
7-1-4/41.1.7
7-1-5/5.13
7-1-6/3
7-1-6/9
(New)
7-1-6/11
(New)
7-1-6/13
First Paragraph
(New)
7-1-6/13.5
(New)
To clarify that all obstruction lights installed on the derrick and top of
cranes are to be verified.
7-1-6/15
First Paragraph
(New)
7-1-6/17
First Paragraph
(New)
7-1-6/19
First Paragraph
(New)
7-1-6/21
First Paragraph
(New)
7-1-6/21.13
(New)
7-1-6/21.15
(New)
7-1-6/21.17
(New)
7-1-6/21.19
(New)
7-1-6/21.21
(New)
To clarify that the pit level alarms are class (not CDS) and should be
tested.
7-1-6/21.23
(New)
7-1-6/21.25
(New)
24
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
7-1-6/21.27
(New)
7-1-6/21.29
(New)
7-1-8/1.1
(New)
Administration Certification
7-1-8/3
(New)
7-1-8/5.1.1
Construction Materials
To clarify that steel must be certified per these Rules and material
other than steel needs manufacturers affidavit/certificate.
7-1-8/5.1.2
7-1-8/5.1.3
(New)
7-1-8/5.1.4
7-1-8/5.1.5
(New)
7-1-8/5.1.6
Fire Doors
7-1-8/5.3
(New)
7-1-8/7.1
(New)
7-1-8/7.3
(New)
Fire Pumps
7-1-8/7.5
(New)
Fire Main
7-1-8/7.7
(New)
7-1-8/9.1
(New)
7-1-8/9.3
(New)
Foam System
7-1-8/9.5
(New)
7-1-8/9.7
(New)
7-1-8/9.9
(New)
7-1-8/11.1
(New)
7-1-8/11.3
(New)
Firefighters Outfit
7-1-8/13.1
(New)
7-1-8/15.1
(New)
7-1-8/17.1
(New)
Means of Escape
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
25
Part/Para. No.
Title/Subject
Status/Remarks
7-1-8/17.3
(New)
7-1-8/17.5
(New)
7-1-8/17.7
(New)
7-1-8/17.9
(New)
7-1-8/17.11
(New)
7-1-8/17.13
(New)
7-1-8/19.1
(New)
7-1-9/1
(New)
General
7-1-9/3
(New)
Stability Test
7-1-9/5
(New)
Safety
7-1-9/7
(New)
To clarify that hull testing can be done at sea trial and its acceptance
criteria.
7-1-9/9.1
7-1-9/9.3
7-1-9/11.11
(New)
7-1-9/11.13
(New)
7-1-9/11.15
(New)
7-1-9/11.17
(New)
Distribution System
7-1-9/11.19
(New)
7-1-9/11.21
(New)
7-1-9/11.23
(New)
7-1-9/11.25
(New)
7-1-9/11.27
(New)
7-1-9/15.1
(New)
Anchoring/Mooring System
Foundations
7-1-9/17
(New)
Appendix 7-1-A1
(New)
Appendix 7-1-A2
(New)
7-2-1/1.1
26
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Part/Para. No.
Title/Subject
Status/Remarks
7-2-1/3.13
Survey
7-2-1/3.21.1
(New)
7-2-1/7.7
(New)
Application of Rules
7-2-1/9.1
(New)
Application of Rules
7-2-1/15.3
7-2-1/17
(New)
7-2-2/1.9.1
(New)
7-2-2/3
7-2-3/1.1
(New)
7-2-3/1.3
(New)
7-2-3/1.5.1
7-2-4/1.1.10(a)
(New)
7-2-4/1.1.14
(New)
7-2-4/1.3
Surface-Type Units
7-2-4/1.5
Self-Elevating Units
7-2-4/1.7
Column-Stabilized Units
7-2-5/1.1.6
7-2-5/1.9
(New)
7-2-5/3.3
To clarify that 100% CVI plus extensive NDT is required and that fatigue
analysis is not always required unless otherwise requested by ABS.
7-2-5/3.3iii)
<No Title>
7-2-5/3.3iv)
<No Title>
7-2-5/3.3.1
7-2-5/3.5
7-2-5/3.5.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
27
Part/Para. No.
Title/Subject
Status/Remarks
7-2-5/3.9
(New)
7-2-5/Table 1
7-2-5/Table 2
7-2-5/Table 3
7-2-5/5.3.4
(New)
To clarify that all bilge and ballast systems are to be operationally tested
at each Special Periodical Survey Machinery.
7-2-5/5.3.5
Machinery Foundations
7-2-5/7.3.6
(New)
Accumulator Batteries
To clarify that the not every machinery foundation is a concern for ABS
unless it is suspect.
To align the requirements with the Steel Vessel Rules.
7-2-6/1.3iii)
<No Title>
7-2-6/1.3iv)
<No Title>
7-2-6/3.7
(New)
7-2-6/3.9
(New)
7-2-7/1
7-2-7/3
(New)
Appendix 7-2-A2
(New)
Appendix 7-2-A3
(New)
Modification of a Self-Elevating
Drilling Unit to Become Site-Specific
Fixed Offshore Installation
28
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
TABLE 4
Comparison of the Numbering System of the 2008 Rules vs. 2012 Rules
MODU 2008
Part
1
Whole Part
Part
1
Part
1
Chapter
1
Section
1
CC 1-1-1
CC 1-1-1/1
CC 1-1-1/1a)
CC 1-1-1/1b)
CC 1-1-1/1c)
CC 1-1-1/1d)
CC 1-1-1/3
CC 1-1-1/3.1
CC 1-1-1/3.3
CC 1-1-1/3.5
CC 1-1-1/3.7
CC 1-1-1/5
CC 1-1-1/7
Part
1
Chapter
1
Section
2
CC 1-1-2
CC 1-1-2/1
CC 1-1-2/1.1
CC 1-1-2/1.3
CC 1-1-2/3
CC 1-1-2/5
CC 1-1-2/7
CC 1-1-2/7.1
CC 1-1-2/7.3
CC 1-1-2/7.5
CC 1-1-2/7.5i)
CC 1-1-2/7.5ii)
CC 1-1-2/7.5iii)
CC 1-1-2/7.7
CC 1-1-2/7.9
CC 1-1-2/7.11
CC 1-1-2/7.11i)
CC 1-1-2/7.11ii)
CC 1-1-2/7.11iii)
CC 1-1-2/7.13
CC 1-1-2/7.15
CC 1-1-2/7.15i)
CC 1-1-2/7.15ii)
CC 1-1-2/7.15iii)
CC 1-1-2/9
CC 1-1-2/9.1
CC 1-1-2/9.3
CC 1-1-2/9.5
CC 1-1-2/11
CC 1-1-2/11.1
CC 1-1-2/11.3
CC 1-1-2/11.5
CC 1-1-2/13
Title
Conditions of Classification
In the list below, references to the ABS Rules for Conditions of Classification
Offshore Units and Structures (Part 1) are given as CC 1-1-X/Y.Y.Y and
references to Part 1 of the MODU Rules are given as 1-1-X/Y.Y.Y.
Rules for Conditions of Classification (Generic Part 1)
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification
Classification
Process
--------Certificates and Reports
--------Representations as to Classification
Scope of Classification
Rules for Conditions of Classification
Scope and Conditions of Classification
Suspension and Cancellation of Classification
Suspension and Cancellation of Classification
General
----Notice of Surveys
Special Notations
Suspension of Class
----------------------------------Lifting of Suspension
------Cancellation of Class
------Alternative Procedures
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
Part 1 and
Generic Part 1
CC 1-1-1
CC 1-1-1/1
CC 1-1-1/1a)
CC 1-1-1/1b)
CC 1-1-1/1c)
CC 1-1-1/1d)
CC 1-1-1/3
CC 1-1-1/3.1
CC 1-1-1/3.3
CC 1-1-1/3.5
CC 1-1-1/3.7
CC 1-1-1/5
CC 1-1-1/7
CC 1-1-2
CC 1-1-2/1
CC 1-1-2/1.1
CC 1-1-2/1.3
CC 1-1-2/3
CC 1-1-2/5
CC 1-1-2/7
CC 1-1-2/7.1
CC 1-1-2/7.3
CC 1-1-2/7.5
CC 1-1-2/7.5i)
CC 1-1-2/7.5ii)
CC 1-1-2/7.5iii)
CC 1-1-2/7.7
CC 1-1-2/7.9
CC 1-1-2/7.11
CC 1-1-2/7.11i)
CC 1-1-2/7.11ii)
CC 1-1-2/7.11iii)
CC 1-1-2/7.3
CC 1-1-2/7.15
CC 1-1-2/7.15i)
CC 1-1-2/7.15ii)
CC 1-1-2/7.15iii)
CC 1-1-2/9
CC 1-1-2/9.1
CC 1-1-2/9.3
CC 1-1-2/9.5
CC 1-1-2/11
CC 1-1-2/11.1
CC 1-1-2/11.3
CC 1-1-2/11.5
CC 1-1-2/13
29
30
Title
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification Symbols and Notations
Classification Symbols and Notations
Drilling Units Built Under Survey
Self-Elevating Drilling Units
Column-Stabilized Units
Surface-Type Drilling Units
Ship-Type Drilling Units
Barge-Type Drilling Units
Other Types of Drilling Units
Temporary Mooring Equipment Symbol
Position Mooring Equipment and Systems
Symbol
Symbol
Special Purpose Units
Service Limitations
Units Not Built Under Survey
Offshore Installations
Floating Production Installations
Liftboats
Subsea Pipeline Systems
Subsea Riser Systems
Facilities on Offshore Installations
Floating Installations
Fixed Installations
Single Point Moorings
Offshore LNG Terminals
Propulsion Machinery
Thrusters
Dynamic Positioning Systems
Drilling Systems
Ice Strengthening
Rules for Conditions of Classification
Scope and Conditions of Classification
Rules for Classification
Rules for Classification
Application of Rules
General
Application
Effective Date of Rule Change
Effective Date
Implementation of Rule Changes
General
Date of Contract for Construction
Series of Units and Optional Units
----Additional Optional Units
Other Conditions
Installations Not Covered by the Rules
Alternatives
General
National Standards
Other Rules
ABS Type Approval Program
Type Approval
Unit Certification
-----------
MODU 2012
CC 1-1-3
CC 1-1-3/1
CC 1-1-3/1.1
CC 1-1-3/1.3
CC 1-1-3/1.5
CC 1-1-3/1.5.1
CC 1-1-3/1.5.2
CC 1-1-3/1.7
CC 1-1-3/1.9
CC 1-1-3/1.11
CC 1-1-3/1.11.1
CC 1-1-3/1.11.2
CC 1-1-3/3
CC 1-1-3/5
CC 1-1-3/7
CC 1-1-3/9
CC 1-1-3/11
CC 1-1-3/13
CC 1-1-3/15
CC 1-1-3/17
CC 1-1-3/19
CC 1-1-3/19.1
CC 1-1-3/19.3
CC 1-1-3/21
CC 1-1-3/23
CC 1-1-3/25
CC 1-1-3/27
CC 1-1-3/29
CC 1-1-3/31
CC 1-1-3/33
CC 1-1-4
CC 1-1-4/1
CC 1-1-4/1.1
CC 1-1-4/1.3
CC 1-1-4/3
CC 1-1-4/3.1
CC 1-1-4/3.3
CC 1-1-4/3.3.1
CC 1-1-4/3.3.2
CC 1-1-4/3.3.3
CC 1-1-4/3.3.3i)
CC 1-1-4/3.3.3ii)
CC 1-1-4/3.3.4
CC 1-1-4/5
CC 1-1-4/7
CC 1-1-4/9
CC 1-1-4/9.1
CC 1-1-4/9.3
CC 1-1-4/9.5
CC 1-1-4/9.7
CC 1-1-4/9.7.1
CC 1-1-4/9.7.2
CC 1-1-4/9.7.2i)
CC 1-1-4/9.7.2ii)
CC 1-1-4/9.7.2iii)
CC 1-1-4/9.7.2iv)
CC 1-1-4/9.7.2v)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Product Type Approval
Approval on Behalf of Administrations
Applicable Uses of Type approved Products
--------Definitions
The Terms and Conditions for Use of ABS Type Approved Product Logo
------------------Novel Features
Risk Evaluations for Alternative Arrangements and Novel Features
Rules for Conditions of Classification
Scope and Conditions of Classification
Other Regulations
Other Regulations
Governmental and Other Regulations
Other International Conventions or Codes
Governmental Regulations
Governmental Authorization
European Commission
Rules for Conditions of Classification
Scope and Conditions of Classification
IACS Audit
IACS Audit
Rules for Conditions of Classification
Scope and Conditions of Classification
Plans and Data to be Submitted
Plans and Data to be Submitted
Hull and Design Data
Machinery Plans
Calculations
Additional Plans
Submissions
Rules for Conditions of Classification
Scope and Conditions of Classification
Conditions for Surveys After Construction
Conditions for Surveys After Construction
Damage, Failure and Repair
Examination and Repair
Repairs
Suspension of Classification
Representation
Notification and Availability for Survey
Attendance at Port State Request
Safety Management System
Rules for Conditions of Classification
Scope and Conditions of Classification
Fees
Fees
Rules for Conditions of Classification
Scope and Conditions of Classification
Disagreement
Disagreement
Rules
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
CC 1-1-4/9.7.3
CC 1-1-4/9.7.4
CC 1-1-4/9.7.5
CC 1-1-4/9.7.5)
CC 1-1-4/9.7.5i)
CC 1-1-4/9.7.5ii)
CC 1-1-4/9.7.5iii)
CC 1-1-4/9.7.6
CC 1-1-4/9.7.7
CC 1-1-4/9.7.7i)
CC 1-1-4/9.7.7ii)
CC 1-1-4/9.7.7iii)
CC 1-1-4/9.7.7iv)
CC 1-1-4/9.7.7v)
CC 1-1-4/9.7.7vi)
CC 1-1-4/9.7.7vii)
CC 1-1-4/9.7.7viii)
CC 1-1-4/9.7.7ix)
CC 1-1-4/11
CC 1-1-4/13
CC 1-1-5
CC 1-1-5/1
CC 1-1-5/3
CC 1-1-5/5
CC 1-1-5/5.1
CC 1-1-5/5.3
CC 1-1-6
CC 1-1-7
CC 1-1-7/1
CC 1-1-7/3
CC 1-1-7/5
CC 1-1-7/7
CC 1-1-7/9
CC 1-1-8
CC 1-1-8/1
CC 1-1-8/1.1
CC 1-1-8/1.3
CC 1-1-8/1.5
CC 1-1-8/1.7
CC 1-1-8/3
CC 1-1-8/5
CC 1-1-8/7
CC 1-1-9
CC 1-1-10
CC 1-1-10/1
31
32
Title
Surveyors
Rules for Conditions of Classification
Scope and Conditions of Classification
Limitation of Liability
Limitation of Liability
Rules for Conditions of Classification
Scope and Conditions of Classification
Hold Harmless
Hold Harmless
Rules for Conditions of Classification
Scope and Conditions of Classification
Time Bar to Legal Action
Time Bar to Legal Action
Rules for Conditions of Classification
Scope and Conditions of Classification
Arbitration
Arbitration
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification Symbols and Notations
Classification Symbols and Notations
Rules for Conditions of Classification
Scope and Conditions of Classification
ABS Type Approval Program
ABS Type Approval Program
General
Limitations
Process
Design Assessment (DA)
Design Evaluation
Survey and/or Testing of Prototype or Production Units
Design Assessment Certificate
Product Design Assessment, Limited
----Manufacturing Assessment (MA)
Quality Assurance Standard
Acceptable Quality Standard (AQS)
Recognized Quality Standard (RQS)
Quality Manual
Quality Control
Manufacturing Assessment Certificate (MA)
------Confirmation of Type Approval (CTA)
Product Quality Assurance Certification (PQA)
Certificates
Unit-Certification
Products Covered by Product Quality Assurance (1-1-A2/5.5)
Products Covered by Manufacturing Assessment (1-1-A2/5.3)
Issuance and Updating of Certificates
Issuance of Certificates
Changes to Design, Procedures and Regulations other than ABS Rules
Changes to ABS Rules
Website Entry
Acceptability of Type Approved Products
Renewal
------Overdue Audit
Terms and Conditions of the Request for Product Type Approval and Agreement
MODU 2012
CC 1-1-10/3
CC 1-1-11
CC 1-1-12
CC 1-1-13
CC 1-1-14
CC 1-1-A1
CC 1-1-A2
CC 1-1-A2/1
CC 1-1-A2/3
CC 1-1-A2/5
CC 1-1-A2/5.1
CC 1-1-A2/5.1.1
CC 1-1-A2/5.1.2
CC 1-1-A2/5.1.3
CC 1-1-A2/5.1.4
CC 1-1-A2/5.1.4i)
CC 1-1-A2/5.1.4ii)
CC 1-1-A2/5.3
CC 1-1-A2/5.3.1
CC 1-1-A2/5.3.1(a)
CC 1-1-A2/5.3.1(b)
CC 1-1-A2/5.3.1(c)
CC 1-1-A2/5.3.2
CC 1-1-A2/5.3.3
CC 1-1-A2/5.3.3i)
CC 1-1-A2/5.3.3ii)
CC 1-1-A2/5.3.3iii)
CC 1-1-A2/5.3.4
CC 1-1-A2/5.5
CC 1-1-A2/5.7
CC 1-1-A2/5.7.1
CC 1-1-A2/5.7.1(a)
CC 1-1-A2/5.7.1(b)
CC 1-1-A2/5.7.2
CC 1-1-A2/5.7.2(a)
CC 1-1-A2/5.7.2(b)
CC 1-1-A2/5.7.2(c)
CC 1-1-A2/5.7.2(d)
CC 1-1-A2/5.7.3
CC 1-1-A2/5.7.4
CC 1-1-A2/5.7.4i)
CC 1-1-A2/5.7.4ii)
CC 1-1-A2/5.7.4iii)
CC 1-1-A2/5.7.5
CC 1-1-A2/5.9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Agreement
Representation as to Product Type Approval
Suspension of Certification
Validity
Disagreement
Limitation
Hold Harmless
Arbitration
Time Bar to Legal Action
Limitation of Liability
Scope of Certification
Process of the Type Approval Program
Part
Part
Chapter
Section
1-1-1
Part
Chapter
Section
1-1-2
Part
Chapter
Section
1-1-3
1-1-3/1
1-1-3/1.1
1-1-3/1.3
Part
Chapter
Section
1-1-4
1
1
1
1
1
1
2
1
1
3
1
1
4
1-1-4/1
1-1-4/3
1-1-4/5
1-1-4/7
1-1-4/9
Part
1
Chapter
1
Section
5
1-1-5
1-1-5/1
1-1-5/1.1
1-1-5/1.3
1-1-5/1.3i)
1-1-5/1.3ii)
1-1-5/1.3iii)
1-1-5/1.3iv)
1-1-5/1.3v)
1-1-5/1.3vi)
1-1-5/1.5
1-1-5/1.5i)
1-1-5/1.5ii)
1-1-5/1.5iii)
1-1-5/1.5iv)
1-1-5/1.5v)
1-1-5/1.5vi)
1-1-5/1.5vii)
1-1-5/1.5viii)
1-1-5/1.5ix)
1-1-5/1.5x)
Machinery Plans
Calculations
Additional Plans
Submissions
Conditions of Classification
Scope and Conditions of Classification
Operating Manual
Operating Manual
-----------------------------------------
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
CC 1-1-A2/5.9.1
CC 1-1-A2/5.9.2
CC 1-1-A2/5.9.3
CC 1-1-A2/5.9.4
CC 1-1-A2/5.9.5
CC 1-1-A2/5.9.6
CC 1-1-A2/5.9.7
CC 1-1-A2/5.9.8
CC 1-1-A2/5.9.9
CC 1-1-A2/5.9.10
CC 1-1-A2/5.9.11
CC 1-1-A2/Figure 1
1-1-1
1-1-2
1-1-3
1-1-3/1
1-1-3/1.1
1-1-3/1.3
1-1-4
1-1-4/1
3-1-2/1
1-1-4/3
3-1-2/3
1-1-4/5
1-1-4/7
1-1-5
1-1-5/1
1-1-5/1.1
1-1-5/1.3
1-1-5/1.3i)
1-1-5/1.3ii)
1-1-5/1.3iii)
1-1-5/1.3iv)
1-1-5/1.3v)
1-1-5/1.3vi)
1-1-5/1.5
1-1-5/1.5i)
1-1-5/1.5ii)
1-1-5/1.5iii)
1-1-5/1.5iv)
1-1-5/1.5v)
1-1-5/1.5vi)
1-1-5/1.5vii)
1-1-5/1.5viii)
1-1-5/1.5ix)
1-1-5/1.5x)
33
-------------
1-1-5/1.15
---
Part
Chapter
Section
1-1-6
Part 2
Whole Part
Part
Chapter
Section
3-1-1
3-1-1/1
3-1-1/1.1
3-1-1/1.3
3-1-1/1.5
3-1-1/1.7
3-1-1/3
3-1-1/3.1
3-1-1/3.3
3-1-1/3.3.1
3-1-1/3.3.2
3-1-1/3.5
3-1-1/3.5.1
3-1-1/3.5.2
3-1-1/3.7
3-1-1/5
3-1-1/5.1
3-1-1/5.3
3-1-1/7
3-1-1/9
3-1-1/11
3-1-1/13
3-1-1/15
3-1-1/16
3-1-1/17
3-1-1/17.1
3-1-1/17.3
3-1-1/17.5
3-1-1/19
3-1-1/21
3-1-1/23
Part
Chapter
Section
3-1-2
3-1-2/1
3-1-2/1.1
3-1-2/1.3
3-1-2/1.3.1
3-1-2/1.3.2
3-1-2/1.3.3
3-1-2/1.3.3(a)
3-1-2/1.3.3(b)
3-1-2/1.3.3(c)
3-1-2/1.3.3(d)
3-1-2/1.3.3(e)
34
1
1
6
3
1
1
3
1
2
Title
Conditions of Classification
Scope and Conditions of Classification
Construction Booklet
Construction Booklet
Rules for Materials and Welding
Part 2 remains unchanged.
Hull Construction and Equipment
General
Definitions
Definitions
General
Unit
Drilling Unit
Self-Propelled Unit
Non-Self-Propelled Unit
Types of Drilling Unit
Self-elevating Drilling Unit
Column-stabilized Drilling Unit
Semi-submersible Drilling Unit
Submersible Drilling Unit
Surface-type Drilling Unit
Ship-type Drilling Unit
Barge-type Drilling Unit
Other Types of Drilling Unit
Dimensions
General
Draft
Water Depth
Molded Base Line
Bulkhead Deck
Freeboard Deck
Lightweight
Total Elevated Load
Mode of Operation
Normal Drilling Condition
Severe Storm Condition
Transit Condition
Weathertight
Watertight
Systems of Measurement
Hull Construction and Equipment
General
Environmental Loadings
Environmental Loadings
Loading Criteria
General
Wind Loadings
General
Wind Pressure
Wind Force
-----------
MODU 2012
1-1-5/1.5xi)
1-1-5/1.5xii)
1-1-5/1.7
1-1-5/1.9
1-1-5/1.11
1-1-5/1.13
1-1-5/1.15
1-1-5/3
7-1-2/25
Generic Part 2
3-1-1
3-1-1/1
3-1-1/1.1
3-1-1/1.3
3-1-1/1.5
3-1-1/1.7
3-1-1/3
3-1-1/3.1
3-1-1/3.3
3-1-1/3.3.1
3-1-1/3.3.2
3-1-1/3.5
3-1-1/3.5.1
3-1-1/3.5.2
3-1-1/3.7
3-1-1/5
3-1-1/5.1
3-1-1/5.3
3-1-1/7
3-1-1/9
3-1-1/11
3-1-1/13
3-1-1/15
3-1-1/16
3-1-1/17
3-1-1/17.1
3-1-1/17.3
3-1-1/17.5
3-1-1/19
3-1-1/21
3-1-1/23
3-1-3
3-1-3/1
3-1-3/1.1
3-1-3/1.3
3-1-3/1.3.1
3-1-3/1.3.2
3-1-3/1.3.3
3-1-3/1.3.3(a)
3-1-3/1.3.3(b)
3-1-3/1.3.3(c)
3-1-3/1.3.3(d)
3-1-3/1.3.3(e)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Wave Loadings
General
Determination of Wave Loads
Morisons Equation
Wave-Induced Dynamic Responses
Current Loading
Current Associated with Waves
Drag Force
Loadings due to Vortex Shedding
Gravity and Functional Loads
General
Combinations of Gravity and Functional Loads for Design
Deck Loadings
Values of Cs
Values of Ch
Current Velocity Profile
Hull Construction and Equipment
General
Material Selection
Material Selection
Materials
3-1-3/1.1
General
3-1-3/1.3
3-1-3/1.5
3-1-3/1.7
3-1-3/3
3-1-3/3.1
3-1-3/3.3
3-1-3/3.5
3-1-3/3.7
3-1-3/5
3-1-3/5.1
3-1-3/5.3
3-1-3/5.3.1
3-1-3/5.3.2
3-1-3/5.3.3
3-1-3/5.5
3-1-3/5.5.1
3-1-3/5.5.2
3-1-3/5.5.3
3-1-3/5.7
3-1-3/5.9
3-1-3/5.9.1
3-1-3/5.9.2
3-1-3/5.9.3
3-1-3/5.9.4
3-1-3/5.9.5
3-1-3/5.9.5i)
3-1-3/5.9.5ii)
3-1-3/5.9.5iii)
3-1-3/5.9.5iv)
3-1-3/Table 1
Part
3
Chapter
1
Appendix 1
3-1-A1
3-1-A1/1
3-1-A1/3
3-1-A1/5
3-1-A1/7
3-1-A1/Figure 1
3-1-A1/Figure 1
Characteristics
Toughness
Materials Other than Steel
Hull Steel Grades
Ordinary and Higher Strength Steel
Quenched and Tempered Steel
Additional Requirements
Other Grades
Selection of Grades
General
Self-Elevating Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Column-Stabilized Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Selection Criteria for ABS Grades of Steel
Criteria for Other Steels
General
CVN Requirements
CVN Temperatures
Extra High Strength Steels
Alternative Requirements
--------Material Selection Requirements for ABS Ordinary and Higher Strength Steels
Hull Construction and Equipment
General
Shallow Water Wave Theory
Shallow Water Wave Theory
Equations
Nomenclature
Example
Compute
Ratio of Crest Elevation to Wave Height SI and Metric Units
Ratio of Crest Elevation to Wave Height U.S. Units
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
3-1-3/1.5
3-1-3/1.5.1
3-1-3/1.5.2
3-1-3/1.5.3
3-2-3/5.9
3-1-3/1.7
3-1-3/1.7.1
3-1-3/1.7.2
3-1-3/1.9
3-1-3/1.11
3-1-3/1.11.1
3-1-3/1.11.2
3-1-3/1.11.3
3-1-3/Table 1
3-1-3/Table 2
3-1-3/Figure 1
3-1-4
3-1-4/1
3-1-4/1.1
4-1-1/7.11
3-1-4/1.3
3-1-4/1.5
3-1-4/1.7
3-1-4/3
3-1-4/3.1
3-1-4/3.3
3-1-4/3.5
3-1-4/3.7
3-1-4/5
3-1-4/5.1
3-2-3/3.1
3-2-3/3.1.1
3-2-3/3.1.2
3-2-3/3.1.3
3-2-4/1.7
3-2-4/1.7.1
3-2-4/1.7.2
3-2-4/1.7.3
3-1-4/5.5
3-1-4/5.7
3-1-4/5.7.1
3-1-4/5.7.2
3-1-4/5.7.3
3-1-4/5.7.4
3-1-4/5.7.5
3-1-4/5.7.5i)
3-1-4/5.7.5ii)
3-1-4/5.7.5iii)
3-1-4/5.7.5iv)
3-1-4/Table 1
3-1-A1
3-1-A1/1
3-1-A1/3
3-1-A1/5
3-1-A1/7
3-1-A1/Figure 1
3-1-A1/Figure 1
35
36
Title
MODU 2012
Relative Wave Height SI and Metric Units
3-1-A1/Figure 2
Relative Wave Height U.S. Units
3-1-A1/Figure 2
Wave Length Correction Factor SI and Metric Units
3-1-A1/Figure 3
Wave Length Correction Factor U.S. Units
3-1-A1/Figure 3
Drag Force Factor SI and Metric Units
3-1-A1/Figure 4
Drag Force Factor U.S. Units
3-1-A1/Figure 4
Ratio of Drag Force Lever to Still Water Depth SI and Metric Units
3-1-A1/Figure 5
Ratio of Drag Force Lever to Still Water Depth U.S. Units
3-1-A1/Figure 5
Inertial Force Factor SI and Metric Units
3-1-A1/Figure 6
Inertial Force Factor U.S. Units
3-1-A1/Figure 6
Ratio of Inertial Force Lever to Still Water Depth SI and Metric Units
3-1-A1/Figure 7
Ratio of Inertial Force Lever to Still Water Depth U.S. Units
3-1-A1/Figure 7
Ratio Total Force to Drag Force SI and Metric Units
3-1-A1/Figure 8
Ratio Total Force to Drag Force U.S. Units
3-1-A1/Figure 8
Angular Position of Maximum Moment SI and Metric Units
3-1-A1/Figure 9
Angular Position of Maximum Moment U.S. Units
3-1-A1/Figure 9
Hull Construction and Equipment
General
Wave Theory for Deep Water
Wave Theory for Deep Water
3-1-A2
Surface Wave Equation
3-1-A2/1
Equations for Water Velocity
3-1-A2/3
Equations for Water Acceleration
3-1-A2/5
Equation for Dynamic Pressure
3-1-A2/7
Example of Determining Inertia Force in Deep Water
3-1-A2/9
Caisson
3-1-A2/11
Drag Force in Deep Water
3-1-A2/13
Recommended Mass Factors
3-1-A2/15
Two Dimensional Values of Cm
3-1-A2/15I
Three Dimensional Correction to Cm
3-1-A2/15II
Application
3-1-A2/15III
Nomenclature
3-1-A2/15IV
Hull Construction and Equipment
General
Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered Steel
Guide for Material Selection for ABS Grades of High Strength Quenched and
3-1-A3
Tempered Steel
General
3-1-A3/1
Chemical Composition
3-1-A3/3
Mechanical Properties
3-1-A3/5
Heat Treatment
3-1-A3/7
Chemical Composition for ABS Grades of High Strength Quenched and Tempered
3-1-A3/Table 1
Steels
Mechanical Properties Requirements for ABS Grades of High Strength Quenched
3-1-A3/Table 2
and Tempered Steels
Elongation Requirements for Alternative B Specimen
3-1-A3/Table 2A
Material Selection Guidelines for ABS Quenched and Tempered Steel Grades
3-1-A3/Table 3
Hull Construction and Equipment
Hull Structures and Arrangements
Structural Analysis
Structural Analysis
3-2-1
Structural Analysis
3-2-1/1
Analysis of Primary Structure
3-2-1/1.1
--3-2-1/1.1i)
--3-2-1/1.1ii)
Consideration of Local Stresses
3-2-1/1.3
Combination of Stress Components
3-2-1/1.5
Consideration of Buckling
3-2-1/1.7
Determination of Bending Stresses
3-2-1/1.9
Effective Flange Area
3-2-1/1.9.1
Eccentric Axial Loading
3-2-1/1.9.2
Determination of Shear Stresses
3-2-1/1.11
Stress Concentration
3-2-1/1.13
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Analysis and Details of Structural Connections
--------Fatigue Analysis
Plastic Analysis
Allowable Stresses
General
Individual Stresses
Buckling Considerations
Members Subjected to Combined Axial Load and Bending
----Column Buckling Stresses
Overall Buckling
Local Buckling
Equivalent Stress Criteria for Plated Structures
Hull Construction and Equipment
Hull Structures and Arrangements
Common Structures
Common Structures
General
Materials
Scantlings
Surface-Type Drilling Units
Protection of Steel Work
Helicopter Deck
General
Structure
Overall Distributed Loading
Helicopter Landing Impact Loading
Stowed Helicopter Loading
Loading due to Motion of Unit
Structures Supporting the Drilling Derrick
Substructures
Individual Loads
Combined Loads
Substructure Supporting Arrangement
Watertight Bulkheads and Watertight Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Plating
Stiffeners
End Connections
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Tank Bulkheads and Tank Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Drainage and Air Escape
Appurtenant Structure
General
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
3-2-1/1.15
3-2-1/1.15i)
3-2-1/1.15ii)
3-2-1/1.15iii)
3-2-1/1.15iv
3-2-1/1.17
3-2-1/1.19
3-2-1/3
3-2-1/3.1
3-2-1/3.3
3-2-1/3.5
3-2-1/3.7
3-2-1/3.7.1
3-2-1/3.7.2
3-2-1/3.9
3-2-1/3.9.1
3-2-1/3.9.2
3-2-1/3.11
3-2-2
3-2-2/1
3-2-2/1.1
3-2-2/1.3
--3-2-2/1.5
3-2-2/3
3-2-2/3.1
3-2-2/3.3
3-2-2/3.3.1
3-2-2/3.3.2
3-2-2/3.3.3
3-2-2/3.3.4
3-2-2/5
3-2-2/5.1
3-2-2/5.1.1
3-2-2/5.1.2
3-2-2/5.3
3-2-2/7
3-2-2/7.1
3-2-2/7.3
3-2-2/7.5
3-2-2/7.7
3-2-2/7.7.1
3-2-2/7.7.2
3-2-2/7.7.3
3-2-2/7.9
3-2-2/7.9.1
3-2-2/7.9.2
3-2-2/7.9.3
3-2-2/9
3-2-2/9.1
3-2-2/9.3
3-2-2/9.5
3-2-2/9.7
3-2-2/9.9
3-2-2/9.9.1
3-2-2/9.9.2
3-2-2/9.9.3
3-2-2/9.11
3-2-2/11
3-2-2/11.1
37
38
Title
Lifeboat Platform
Crane Pedestal and Foundation
Pipe Racks
Higher-strength Materials
General
Watertight Bulkheads and Flats and Tank Bulkheads and Flats
Allowable Factors of Safety Based on Fy for Helicopter Decks
Thickness and Flange Width of Brackets and Knees
Values of Q
Corrugated Bulkhead
Corrugated Bulkhead End Connections
Hull Construction and Equipment
Hull Structures and Arrangements
Self-Elevating Drilling Units
Self-Elevating Drilling Units
Application
General Requirements for Scantlings
Units Elevated Modes
General
Safety Against Overturning
Nominal Loading Conditions for Calculation of Safety Against Overturning
Normal Drilling Condition
Severe Storm Condition
Wave Clearance
Preload
Capability
Leg Strength
Legs
Legs in Elevated Condition
Leg Types
Leg Scantlings
Spudcan-Soil Interaction
Sea Bed Conditions
Legs in the Transit Condition
Legs in Field Transit Condition
Legs in Severe Storm Transit Condition
Hull Interface Structure with Legs
Hull Structure
Spudcan and Bottom Mat
Spudcan
General
Afloat Mode Loading Conditions
--Plating
Stiffeners
Girders
--Plating
Stiffeners
Girders
Elevated Mode Loading Conditions
Preload Condition
Normal Operating and Severe Storm Conditions
----Bottom Mat
Deckhouses
General
Design Head
Plating
Stiffeners
House Sides
End Attachment
MODU 2012
3-2-2/11.3
3-2-2/11.5
3-2-2/11.7
3-2-2/13
3-2-2/13.1
3-2-2/13.3
3-2-2/Table 1
3-2-2/Table 2
3-2-2/Table 3
3-2-2/Figure 1
3-2-2/Figure 2
3-2-3
3-2-3/1
3-2-3/3.3
3-2-3/5
3-2-3/5.1
3-2-3/5.3
3-2-3/5.3.1
3-2-3/5.3.1(a)
3-2-3/5.3.1(b)
3-2-3/5.5
3-2-3/5.7
3-2-3/5.7.1
3-2-3/5.7.2
3-2-3/7
3-2-3/7.1
3-2-3/7.1.1
3-2-3/7.1.2
3-2-3/7.1.3
3-2-3/7.1.4
3-2-3/7.3
3-2-3/7.3.1
3-2-3/7.3.2
3-2-3/9
3-2-3/11
3-2-3/13
3-2-3/13.1
3-2-3/13.1.1
3-2-3/13.1.2
3-2-3/13.1.2i)
3-2-3/13.1.2i)a)
3-2-3/13.1.2i)b)
3-2-3/13.1.2i)c)
3-2-3/13.1.2ii)
3-2-3/13.1.2ii)a)
3-2-3/13.1.2ii)b)
3-2-3/13.1.2ii)c)
3-2-3/13.1.3
3-2-3/13.1.3i)
3-2-3/13.1.3ii)
3-2-3/13.1.3ii)a)
3-2-3/13.1.3ii)b)
3-2-3/13.3
3-2-3/15
3-2-3/15.1
3-2-3/15.3
3-2-3/15.5
3-2-3/15.7
3-2-3/15.9
3-2-3/15.11
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Racking Resistance
Structures Supporting the Drilling Derrick
Typical Hull Construction
Hull Construction and Equipment
Hull Structures and Arrangements
Column-Stabilized Drilling Units
Column-stabilized Drilling Units
General
Application
Special Considerations Regarding Stresses
----Effect of Mooring Forces on Local Structure
Upper Structure
General
Deck Plating
General
Storage Area Decks
Decks in way of Tanks
Provision for Fork-Lift Trucks
Beams
Girders
Strength Requirements
Proportions
Tripping Brackets
Stanchions and Pillars
Permissible Load
Length
Calculated Load
Pillars Under the Tops of Tanks
Non-buoyant Upper Structure Not Subjected to Wave Loading
Buoyant Upper Structure
Upper Structure Subjected to Wave Loading
Columns, Lower Hulls and Footings
General
Scantlings of Framed Shells
Tank Space
Void Compartment Spaces
Areas Subject to Wave Immersion
Minimum Scantlings
Scantlings of Unframed Shells
Scantlings of Structural Flats
Additional Structural Requirements
Provision for Wave and Current Loadings
Provision for Frame Action
Consideration for High Local Loadings
--------Scouring Consideration
------Bracing Members
General
Loading Conditions
Effect of Wave Impact
Reinforcement of Tubular Bracing Members
Watertight Bracing Members
Openings in Columns
Deckhouses
General
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
3-2-3/15.13
3-2-3/17
3-2-3/Figure 2
3-2-4
3-2-4/1
3-2-4/1.1
3-2-4/1.3
3-2-4/1.3i)
3-2-4/1.3ii)
3-2-4/1.5
3-2-4/3
3-2-4/3.1
3-2-4/3.3
3-2-4/3.3.1
3-2-4/3.3.2
3-2-4/3.3.3
3-2-4/3.3.4
3-2-4/3.5
3-2-4/3.7
3-2-4/3.7.1
3-2-4/3.7.2
3-2-4/3.7.3
3-2-4/3.9
3-2-4/3.9.1
3-2-4/3.9.2
3-2-4/3.9.3
3-2-4/3.9.4
3-2-4/3.11
3-2-4/3.13
3-2-4/3.15
3-2-4/5
3-2-4/5.1
3-2-4/5.3
3-2-4/5.3.1
3-2-4/5.3.2
3-2-4/5.3.3
3-2-4/5.3.4
3-2-4/5.5
3-2-4/5.7
3-2-4/5.9
3-2-4/5.9.1
3-2-4/5.9.2
3-2-4/5.9.3
3-2-4/5.9.3i)
3-2-4/5.9.3ii)
3-2-4/5.9.3iii)
3-2-4/5.9.3iv)
3-2-4/5.9.4
3-2-4/5.9.4i)
3-2-4/5.9.4ii)
3-2-4/5.9.4iii)
3-2-4/5.11
3-2-4/5.11.1
3-2-4/5.11.2
3-2-4/5.11.3
3-2-4/5.11.4
3-2-4/5.11.5
3-2-4/5.13
3-2-4/7
3-2-4/7.1
39
40
Title
Deckhouses on an Upper Structure Not Subjected to Wave Loading
Deckhouses on an Upper Structure Subjected to Wave Loading
Deckhouses on a Buoyant Upper Structure
Storage Tanks on Upper Structure
Wave Clearance
Afloat Modes of Operation
On-bottom Modes of Operation
Structural Redundancy
Assumed Damage
Analysis
----Upper Structure
Structures Supporting the Drilling Derrick
Higher-strength Materials
General
Upper Structure
Values of Q
Hull Construction and Equipment
Hull Structures and Arrangements
Surface-Type Drilling Units
Surface-type Drilling Units
General
Hull Scantlings
General
Drilling Well
Hatches
Concentrated Loads
Effect of Mooring Forces on Local Structure
Structures Supporting the Drilling Derrick
Hull Construction and Equipment
Hull Structures and Arrangements
Welding, Forming & Weld Design Weld Design
Welding, Forming and Weld Design Weld Design
Fillet Welds
Plans and Specifications
Tee Connections
Size of Fillet Welds
Length and Arrangement of Fillet
Intermittent Welding at Intersection
Welding of Longitudinals to Plating
Stiffeners and Webs to Hatch Covers
Tee-type End Connections
Ends of Unbracketed Stiffeners
Reduced Weld Size
Controlled Gaps
Deep Penetration Welds
Lapped Joints
Overlapped End Connections
Overlapped Seams
Plug Welds or Slot Welds
Full or Partial Penetration Corner or Tee Joints
Alternatives
Welding for Machinery Components
Weld Factors
Hull Construction and Equipment
Hull Structures and Arrangements
Welding, Forming & Weld Design Production Welding
Welding, Forming and Weld Design Production Welding
General
Thickness in Excess of 50 mm (2 in.)
Extent of Inspection of Welds
General
MODU 2012
3-2-4/7.1.1
3-2-4/7.1.2
3-2-4/7.1.3
3-2-4/7.3
3-2-4/9
3-2-4/9.1
3-2-4/9.3
3-2-4/11
3-2-4/11.1
3-2-4/11.3
3-2-4/11.3i)
3-2-4/11.3ii)
3-2-4/11.5
3-2-4/13
3-2-4/15
3-2-4/15.1
3-2-4/15.3
3-2-4/Table 1
3-2-5
3-2-5/1
----3-2-5/9
3-2-5/11
3-2-5/5.9.2
3-2-5/13
---
3-2-6
3-2-6/1
3-2-6/1.1
3-2-6/1.3
3-2-6/1.3.1
3-2-6/1.3.2
3-2-6/1.3.3
3-2-6/1.3.4
3-2-6/1.3.5
3-2-6/1.5
3-2-6/1.7
3-2-6/1.9
3-2-6/1.9.1
3-2-6/1.9.2
3-2-6/1.11
3-2-6/1.11.1
3-2-6/1.11.2
3-2-6/1.13
3-2-6/3
3-2-6/5
4-1-1/7.11
3-2-6/Table 1
7-1-2/9
7-1-2/9
7-1-2/9.1
--7-1-2/9.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
MODU 2012
Extent and Method
7-1-2/11.7
Self-elevating Units
7-1-2/11.3
Column-stabilized Units
7-1-2/11.1
Nondestructive Inspection Plan
7-1-2/11
Acceptance Criteria
7-1-2/11.11
Fillet Welds
7-1-2/9.5
Workmanship
7-1-2/9.5
Special Precautions
7-1-2/9.5
Hull Construction and Equipment
Hull Structures and Arrangements
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
3-2-A1
Application
3-2-A1/1
Column Stabilized Unit
3-2-A1/1.1
Units of Other Type
3-2-A1/1.3
Surface Units
3-2-A1/1.3.1
Self-elevating Units
3-2-A1/1.3.2
Novel Features
3-2-A1/1.5
Ice Class Selection
3-2-A1/3
Ice Waterline
3-2-A1/5
Clearance
3-2-A1/7
Ice Belt
3-2-A1/9
Design Ice Loads
3-2-A1/11
Design Ice Pressure
3-2-A1/11.1
Global Design Ice Load
3-2-A1/11.3
Structural Evaluation
3-2-A1/13
Global Evaluation
3-2-A1/13.1
Local Scantlings
3-2-A1/13.3
Other Requirements
3-2-A1/15
Guidance for Ice Class Selection of Column Stabilized Drilling Units
3-2-A1/Table 1
Definition of Ice Conditions of Broken First-year Ice Versus Concentration and
3-2-A1/Table 2
Thickness
Ice Pressure Factors
3-2-A1/Table 3
Ice Belt Areas
3-2-A1/Figure 1
Hull Construction and Equipment
Hull Structures and Arrangements
Response Analysis Guide for Selecting Design Waves for Structural Analysis of ColumnStabilized Drilling Units (Twin-Hull Semi-Submersible)
Response Analysis Guide for Selecting Design Waves for Structural Analysis of
3-2-A2
Column-Stabilized Drilling Units (Twin-Hull Semi-Submersible)
General
3-2-A2/1
Introduction
3-2-A2/1.1
Global Hydrodynamic Load Characteristics
3-2-A2/3
General
3-2-A2/3.1
--3-2-A2/3.1i)
--3-2-A2/3.1ii)
--3-2-A2/3.1iii)
--3-2-A2/3.1iv)
--3-2-A2/3.1v)
Split Force Between Pontoons
3-2-A2/3.3
--3-2-A2/3.3i)
--3-2-A2/3.3ii)
--3-2-A2/3.3iii)
Twisting Pitch Moment About Transverse Horizontal Axis
3-2-A2/3.5
--3-2-A2/3.5i)
--3-2-A2/3.5ii)
Longitudinal Shear Force Between Pontoons
3-2-A2/3.7
Longitudinal and Transverse Accelerations of Deck Mass
3-2-A2/3.9
Vertical Wave Bending Moment on the Pontoon
3-2-A2/3.11
--3-2-A2/3.11i)
--3-2-A2/3.11ii)
Selecting Design Waves by the Stochastic Method
3-2-A2/5
General
3-2-A2/5.1
Analytical Approach
3-2-A2/5.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
41
Title
------------------Irregular Sea Steepness
Selecting Design Waves by the Deterministic Method
General
Analytical Approach
----------Regular Wave Steepness
Hull Construction and Equipment
Hull Structures and Arrangements
Guide for the Allowable Stresses for Localized Highly-Stressed Areas
Guide for the Allowable Stresses for Localized Highly-Stressed Areas
Plated Structures
Hull Construction and Equipment
Subdivision and Stability
Stability and Watertight/Weathertight Integrity
Stability and Watertight/Weathertight Integrity
Stability
General
Stability Afloat
Intact Stability
3-3-1/1.3.2
Damage Stability
3-3-1/1.3.2(a)
3-3-1/1.3.2(b)
3-3-1/1.3.2(b)i)
3-3-1/1.3.2(b)ii)
3-3-1/1.3.2(b)iii)
3-3-1/1.3.2(c)
3-3-1/1.3.3
3-3-1/1.3.3(a)
3-3-1/1.3.3(b)
3-3-1/1.5
3-3-1/3
3-3-1/3.1
3-3-1/3.3
3-3-1/3.3.1
3-3-1/3.3.2
3-3-1/3.3.3
3-3-1/3.3.3(a)
3-3-1/3.3.3(b)
3-3-1/3.3.4
3-3-1/3.5
3-3-1/3.7
3-3-1/3.9
3-3-1/3.9.1
3-3-1/3.9.2
3-3-1/3.9.2i)
3-3-1/3.9.2ii)
3-3-1/3.9.2iii)
3-3-1/3.9.2iv)
3-3-1/3.9.2v)
42
MODU 2012
3-2-A2/5.3.1
3-2-A2/5.3.2
3-2-A2/5.3.3
3-2-A2/5.3.4
3-2-A2/5.3.5
3-2-A2/5.3.6
3-2-A2/5.3.7
3-2-A2/5.3.8
3-2-A2/5.3.9
3-2-A2/5.5
3-2-A2/7
3-2-A2/7.1
3-2-A2/7.3
3-2-A2/7.3i)
3-2-A2/7.3ii)
3-2-A2/7.3iii)
3-2-A2/7.3iv)
3-2-A2/7.3v)
3-2-A2/7.5
3-2-A3
3-2-A3/1
3-3-1, 3-3-2
3-3-2/1
3-3-2/1.1
3-3-2/1.3
3-3-2/1.3.1
3-3-2/1.3.2
3-3-2/1.3.3
3-3-2/1.3.2(a)
3-3-2/1.3.2(b)
3-3-2/1.3.2(b)i)
3-3-2/1.3.2(b)ii)
3-3-2/1.3.2(b)iii)
3-3-2/1.3.2(c)
3-3-2/1.3.4
3-3-2/1.3.4(a)
3-3-2/1.3.4(b)
3-3-1/3
3-3-2/3
3-3-2/3.1
3-3-2/3.3
3-3-2/3.3.1
3-3-2/3.3.2
3-3-2/3.3.4
3-3-2/3.3.4(a)
3-3-2/3.3.4(b)
3-3-2/3.3.3
3-3-2/3.7
3-3-2/3.9
3-3-2/3.11
3-3-2/3.11.1
3-3-2/3.11.2
3-3-2/3.11.2i)
3-3-2/3.11.2ii)
3-3-2/3.11.2iii)
3-3-2/3.11.2iv)
3-3-2/3.11.2v)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
MODU 2012
--3-3-2/3.11.2vi)
Alternative Intact Stability Criteria
3-3-2/3.11.3
Load Line
3-3-1/1
Extent of Damage for Damage Stability Studies
3-3-2/3.5
Self-Elevated Drilling Units
3-3-2/3.5.1
--3-3-2/3.5.1i)
--3-3-2/3.5.1ii)
Column-stabilized Drilling Units
3-3-2/3.5.2
--3-3-2/3.5.2i)
--3-3-2/3.5.2ii)
--3-3-2/3.5.2iii)
--3-3-2/3.5.2iv)
--3-3-2/3.5.2v)
Surface-Type Drilling Units
3-3-2/3.5.3
--3-3-2/3.5.3i)
--3-3-2/3.5.3ii)
Watertight/Weathertight Integrity
3-3-2/5
Weathertight Integrity
3-3-2/5.1
Watertight Integrity
3-3-2/5.3
Internal Openings Used for Access While Afloat
3-3-2/5.3.1
--3-3-2/5.3.1(a)
--3-3-2/5.3.1(b)
--3-3-2/5.3.1(c)
Internal Openings Secured Closed While Afloat
3-3-2/5.3.2
--3-3-2/5.3.2(a)
--3-3-2/5.3.2(b)
--3-3-2/5.3.2(c)
--3-3-2/5.3.2(d)
External Openings Used While Afloat
3-3-2/5.3.3
--3-3-2/5.3.3(a)
--3-3-2/5.3.3(b)
--3-3-2/5.3.3(c)
External Openings Secured Closed While Afloat
3-3-2/5.3.4
Penetrations
3-3-2/5.5
Onboard Computers for Stability Calculations
3-3-2/7
Intact Stability Curve
3-3-2/Figure 1
Damage Stability Curve
3-3-2/Figure 2
Residual Damage Stability Requirements for Column-Stabilized Units Collision
3-3-2/Figure 4A
Damage
Residual Damage Stability Requirements for Column-Stabilized Units Remote
3-3-2/Figure 4B
Flooding
Residual Damage Stability Requirements for Self-Elevating Units
3-3-2/Figure 3
Minimum Weathertight Integrity Requirements for Column Stabilized Units
3-3-2/Figure 5
Hull Construction and Equipment
Subdivision and Stability
Guide for the Application of Dynamic Response Based Intact Stability Criteria for ColumnStabilized Mobile Offshore Drilling Units
Guide for the Application of Dynamic Response Based Intact Stability Criteria for
3-3-A1
Column-stabilized Mobile Offshore Drilling Units
Introduction
3-3-A1/1
Definitions and Symbols
3-3-A1/3
General
3-3-A1/5
Scope
3-3-A1/5.1
Conditions for Compliance
3-3-A1/5.3
Dynamic-response-based Criteria
3-3-A1/5.5
Dynamic-response-based Criteria
3-3-A1/7
Criteria
3-3-A1/7.1
Capsizing
3-3-A1/7.1.1
Downflooding
3-3-A1/7.1.2
Conditions of Assessment
3-3-A1/7.3
--3-3-A1/7.3.1
--3-3-A1/7.3.2
--3-3-A1/7.3.3
--3-3-A1/7.3.4
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
43
44
Title
Determination of Dynamic Response
Empirical Approximations
Maximum Dynamic Response Angle, max
Reduction in Downflooding Distance, RDFD
Application Limits of Empirical Approximations
Geometric Parameters
Operating Parameters
Direct Calculation
Capsize Criteria Format
Downflooding Criteria Concepts
Hull Construction and Equipment
Subdivision and Stability
Sample Calculations
Sample Calculations
Capsize Criteria Assessment (Metric Units)
Downflooding Criteria Assessment (Metric Units)
Hull Construction and Equipment
Subdivision and Stability
Direct Analysis of Dynamic Motion Responses
Direct Analysis of Dynamic Motion Responses
General
Analysis Methods and Theoretical Background
Analysis Conditions
Environmental Conditions
Heading
Hydrodynamic Coefficients
Radii of Gyration
Mooring Arrangement
Representation of Environment
Wind Loads
Wave Loads
Current Effects
Results of Analyses and Format
------Model Tests
--------Hull Construction and Equipment
Subdivision and Stability
Environmental Conditions and Representations
Environmental Conditions and Representations
General
ABS Average Measured Wind Spectrum
Wave Spectra
Fetch-limited Regions
Open Seas
Joint Probabilities of Occurrence of Wind Speed and Wave Height
Hull Construction and Equipment
Subdivision and Stability
Onboard Computers for Stability Calculations
Onboard Computers for Stability Calculations
General
Scope
Design
Calculation Systems
Types of Stability Software
Functional Requirements
Calculation Program
Direct Damage Stability Calculation
MODU 2012
3-3-A1/9
3-3-A1/9.1
3-3-A1/9.1.1
3-3-A1/9.1.2
3-3-A1/9.3
3-3-A1/9.3.1
3-3-A1/9.3.2
3-3-A1/9.5
3-3-A1/Figure 1
3-3-A1/Figure 2
3-3-A1a
3-3-A1a/1
3-3-A1a/3
3-3-A1b
3-3-A1b/1
3-3-A1b/3
3-3-A1b/5
3-3-A1b/5.1
3-3-A1b/5.3
3-3-A1b/5.5
3-3-A1b/5.7
3-3-A1b/5.9
3-3-A1b/7
3-3-A1b/7.1
3-3-A1b/7.3
3-3-A1b/7.5
3-3-A1b/9
3-3-A1b/9i)
3-3-A1b/9ii)
3-3-A1b/9iii)
3-3-A1b/11
3-3-A1b/11i)
3-3-A1b/11ii)
3-3-A1b/11iii)
3-3-A1b/11iv)
3-3-A1c
3-3-A1c/1
3-3-A1c/3
3-3-A1c/5
3-3-A1c/5.1
3-3-A1c/5.3
3-3-A1c/Figure 1
3-3-A2
3-3-A2/1
3-3-A2/1.1
3-3-A2/1.3
3-3-A2/3
3-3-A2/5
3-3-A2/7
3-3-A2/7.1
3-3-A2/7.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Warning
Data Printout
Date and Time
Information of Program
Units
Acceptable Tolerances
Calculation Program of the Approved Stability Information
Independent Program for Assessment of Stability
Approval Procedure
Conditions of Approval of the Onboard Computers for Stability Calculations
General Approval (optional)
Specific Approval
Operation Manual
Installation Testing
3-3-A2/17
Periodical Testing
3-3-A2/19
3-3-A2/Table 1
Part
3
Chapter
4
Section
1
3-4-1
3-4-1/1
3-4-1/3
3-4-1/5
3-4-1/7
Part
3
Chapter
4
Appendix 1
3-4-A1
3-4-A1/1
3-4-A1/1.1
3-4-A1/3
3-4-A1/3.1
3-4-A1/3.3
3-4-A1/3.3.1
3-4-A1/3.3.1i)
3-4-A1/3.3.1ii)
3-4-A1/3.3.1iii)
3-4-A1/3.3.2
3-4-A1/3.3.3
3-4-A1/3.3.4
3-4-A1/3.3.4(a)
3-4-A1/3.3.4(b)
3-4-A1/3.3.5
3-4-A1/3.3.5(a)
3-4-A1/3.3.5(b)
3-4-A1/3.3.5(c)
3-4-A1/3.3.5(d)
3-4-A1/3.3.5(e)
3-4-A1/3.3.5(f)
3-4-A1/3.3.6
3-4-A1/3.3.7
3-4-A1/3.3.8
3-4-A1/3.3.9
3-4-A1/5
3-4-A1/5.1
3-4-A1/5.1.1
3-4-A1/5.1.2
3-4-A1/5.1.3
3-4-A1/5.3
3-4-A1/5.3.1
3-4-A1/7
Other Requirements
Acceptable Tolerances
Hull Construction and Equipment
Equipment
Position Mooring Systems and Equipment
Position Mooring Systems and Equipment
General
Temporary Mooring Equipment
Position Mooring Equipment
Position Mooring System
Hull Construction and Equipment
Equipment
Guide for Position Mooring Systems
Guide for Position Mooring Systems
General
--Anchoring Systems
General
Design
--------------------Operating Intact
Operating Damaged
Operating Transient
Severe Storm Intact
Severe Storm Damaged
Severe Storm Transient
--------Equipment
Winches and Windlasses
------Fairleads and Sheaves
--Anchor Lines
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
3-3-A2/7.5
3-3-A2/7.7
3-3-A2/7.9
3-3-A2/7.11
3-3-A2/7.13
3-3-A2/9
3-3-A2/9.1
3-3-A2/9.3
3-3-A2/11
3-3-A2/11.1
3-3-A2/11.3
3-3-A2/11.5
3-3-A2/13
7-1-A2/7
7-2-4/1.1.15
7-2-5/1.9
7-1-A2/9
3-3-A2/Table 1
3-4-1
3-4-1/1
3-4-1/3
3-4-1/5
3-4-1/7
3-4-A1
3-4-A1/1
3-4-A1/1.1
3-4-A1/3
3-4-A1/3.1
3-4-A1/3.3
3-4-A1/3.3.1
3-4-A1/3.3.1i)
3-4-A1/3.3.1ii)
3-4-A1/3.3.1iii)
3-4-A1/3.3.2
3-4-A1/3.3.3
3-4-A1/3.3.4
3-4-A1/3.3.4(a)
3-4-A1/3.3.4(b)
3-4-A1/3.3.5
3-4-A1/3.3.5(a)
3-4-A1/3.3.5(b)
3-4-A1/3.3.5(c)
3-4-A1/3.3.5(d)
3-4-A1/3.3.5(e)
3-4-A1/3.3.5(f)
3-4-A1/3.3.6
3-4-A1/3.3.7
3-4-A1/3.3.8
3-4-A1/3.3.9
3-4-A1/5
3-4-A1/5.1
3-4-A1/5.1.1
3-4-A1/5.1.2
3-4-A1/5.1.3
3-4-A1/5.3
3-4-A1/5.3.1
3-4-A1/7
45
Title
------Anchors
----Quality Control
--Control Stations
------Machinery and Systems
Machinery, Equipment, and Their Installation
General
General
Machinery and Equipment
Drilling Equipment
Certification of Machinery
Basic Requirements
Type Approval Program
Non-mass Produced Machinery
Details of Certification of Some Representative Products
Inclinations
4-1-1/9
4-1-1/10
4-1-1/10.1
4-1-1/10.3
4-1-1/10.3i)
4-1-1/10.3ii)
4-1-1/11
4-1-1/13
4-1-1/15
Ambient Temperature
4-1-1/17
4-1-1/Table 1
4-1-1/Table 2
Part
Chapter
Section
4-1-2
4-1-2/1
4-1-2/3
4-1-2/3.1
4-1-2/3.1.1
4-1-2/3.1.2
4-1-2/3.3
4-1-2/3.3.1
4-1-2/3.3.2
4-1-2/3.3.3
4-1-2/3.5
4-1-2/3.7
4-1-2/3.9
Part
Chapter
Section
4-1-3
4-1-3/1
4-1-3/3
4-1-3/3.1
4-1-3/3.3
4-1-3/3.5
46
4
1
2
4
1
3
MODU 2012
3-4-A1/7.1
3-4-A1/7.3
3-4-A1/7.5
3-4-A1/9
3-4-A1/9.1
3-4-A1/9.3
3-4-A1/11
3-4-A1/11.1
3-4-A1/13
3-4-A1/13.1
3-4-A1/13.3
3-4-A1/13.5
4-1-1, 6-1-1
6-1-1/1.1
6-1-1/1.3
6-1-1/3
6-1-1/3.1
6-1-1/9.5
6-1-1/9.9
6-1-1/3.3
4-1-1/7.1
4-1-2/7
4-3-6/3
--4-1-1/3.11
4-1-1/3.9
4-1-1/3.9i)
4-1-1/3.9ii)
4-1-1/7.3
4-1-1/7.5
3-1-4/1.9
4-1-1/7.7
4-1-1/7.9
4-1-1/Table 1
4-1-1/Table 2
4-1-2
--4-1-2/3
4-1-2/3.1
4-1-2/3.1.1
4-1-2/3.1.2
4-1-2/3.3
4-1-2/3.3.1
4-1-2/3.3.2
4-1-2/3.3.3
4-1-2/3.5
4-1-2/3.7
4-1-2/3.9
6-1-9
6-1-9/1
6-1-9/3
6-1-9/3.1
6-1-9/3.3
6-1-9/3.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Yoke and Pin Jacking System
Fixation System
Specified Service Temperature
Jacking Unit Rated Capacity
Lifting Capacity per Leg
Plans and data to be Submitted
Failure Modes and Effects Analysis (FMEA)
Material
Toughness
Strength Analysis
Mechanical Components
Bearings
Brakes
Flexible Shock Pads
Electrical Power System
Hydraulic System
Control, Monitoring, and Alarm System
Inspection and Material Testing
Low Temperature Operation
Jacking Systems of Novel Design
Charpy V-Notch (CVN) Impact Requirements for Steel Materials
Machinery and Systems
Machinery, Equipment, and Their Installation
Thrusters and Dynamic Positioning Systems
Thrusters and Dynamic Positioning Systems
Machinery and Systems
Pumps and Piping Systems
General
General
General Requirements
Damage Stability
Segregation of Piping System
Piping Groups
Plans and Data to be Submitted
Plans
All Piping Systems
Booklet of Standard Details
Material Tests and Inspection
Specifications and Purchase Orders
Special Materials
General Installation Details
4-2-1/7.1
Protection
4-2-1/7.3
4-2-1/7.5
4-2-1/7.7
4-2-1/7.7.1
4-2-1/7.7.2
4-2-1/7.7.2(a)
4-2-1/7.7.2(b)
4-2-1/7.7.2(c)
4-2-1/7.7.2(d)
4-2-1/7.7.3
4-2-1/7.9
4-2-1/7.11
4-2-1/7.13
4-2-1/7.15
4-2-1/7.15.1
4-2-1/7.17
4-2-1/7.19
4-2-1/7.21
4-2-1/7.23
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
6-1-9/3.7
6-1-9/3.9
6-1-9/3.11
6-1-9/3.13
6-1-9/3.15
6-1-9/5
6-1-9/7
6-1-9/9
6-1-9/9.1
6-1-9/11
6-1-9/13
6-1-9/13.1
6-1-9/13.3
6-1-9/13.5
6-1-9/15
6-1-9/17
6-1-9/19
6-1-9/25.1
6-1-9/21
6-1-9/23
6-1-9/Table 1
4-1-2/5
4-2-1, 7-1-3
4-2-1/1
4-2-1/1.1
4-2-1/1.3
4-2-1/5
4-2-1/7
4-2-1/7.1
4-2-1/7.3
4-2-1/7.5
4-2-1/9
4-2-1/9.1
4-2-1/9.3
4-2-1/11
4-2-1/11.1
7-1-3/11.3
4-2-1/11.3
7-1-3/11.5
4-2-1/11.5
7-1-3/11.7
4-2-1/11.7
4-2-1/11.7.1
4-2-1/11.7.2
4-2-1/11.7.2(a)
4-2-1/11.7.2(b)
4-2-1/11.7.2(c)
4-2-1/11.7.2(d)
4-2-1/11.7.3
4-2-1/11.15
4-2-1/11.17
4-2-1/11.19
4-2-1/11.21
4-2-1/11.21.1
4-2-1/11.23
4-2-1/11.25
4-2-1/3.9
4-2-1/11.27
47
Temperature
Pressure
Hose
4-2-1/7.27
4-2-1/7.29
4-2-1/7.29.1
4-2-1/7.29.2
Part
Chapter
Section
4-2-2
4-2-2/1
4-2-2/1.1
4-2-2/1.3
4-2-2/3
4-2-2/3.1
4-2-2/5
4-2-2/5.1
4-2-2/5.3
4-2-2/5.3.1
4-2-2/5.3.2
4-2-2/5.3.3
4-2-2/5.5
4-2-2/5.7
4-2-2/5.9
4-2-2/5.9.1
Leakage Containment
Oil Leaks
Boiler Flats
Machinery and Systems
Pumps and Piping Systems
Pumps, Pipes, Valves, and Fittings
Pumps, Pipes, Valves and Fittings
General
Service Conditions
Standards for Valves, Fittings and Flanges
Pumps
General Requirements
Metallic Piping
Test and Inspection Group I Piping
Steel Pipe
Seamless Pipe
Welded Pipe
Fuel-oil Pipe
Copper Pipe
Brass Pipe
Design
Maximum Allowable Working Pressure and Minimum Thickness
4
2
2
Title
4-2-2/5.9.2
Pipe Bending
4-2-2/5.11
4-2-2/7
4-2-2/7.1
4-2-2/7.3
4-2-2/7.3.1
4-2-2/7.3.2
4-2-2/7.3.3
4-2-2/7.5
4-2-2/7.5.1
4-2-2/7.5.2
4-2-2/7.5.3
4-2-2/7.5.3(a)
4-2-2/7.5.3(b)
4-2-2/7.5.4
4-2-2/7.5.5
4-2-2/7.5.6
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6iv)
4-2-2/7.5.6v)
4-2-2/7.5.7
4-2-2/7.5.7(a)
4-2-2/7.5.7(b)
4-2-2/7.5.8
4-2-2/7.5.8(a)
4-2-2/7.5.8(b)
4-2-2/7.5.8(c)
---
4-2-2/7.5.8(d)
---
4-2-2/7.5.9
Marking
48
MODU 2012
4-2-1/11.27.1
4-2-1/11.27.2
4-2-1/11.29
4-2-1/11.31
7-1-3/11.29
4-2-1/11.33
4-2-1/11.33.1
4-2-1/11.33.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
4-2-2/7.7.2
External Loads
4-2-2/7.7.3
4-2-2/7.7.3(a)
4-2-2/7.7.3(b)
4-2-2/7.7.3(c)
4-2-2/7.7.3(d)
4-2-2/7.7.4
4-2-2/7.7.4(a)
4-2-2/7.7.4(b)
4-2-2/7.7.5
4-2-2/7.7.6
4-2-2/7.7.6(a)
4-2-2/7.7.6(b)
4-2-2/7.7.6(c)
4-2-2/7.7.7
4-2-2/7.9
4-2-2/7.11
4-2-2/7.11.1
4-2-2/7.11.1(a)
4-2-2/7.11.1(a)i)
4-2-2/7.11.1(a)ii)
4-2-2/7.11.1(a)iii)
4-2-2/7.11.1(a)iv)
4-2-2/7.11.1(a)v)
4-2-2/7.11.1(a)vi)
4-2-2/7.11.1(a)vii)
4-2-2/7.11.1(b)
4-2-2/7.11.2
4-2-2/7.11.2(a)
4-2-2/7.11.2(b)
4-2-2/7.11.2(b)i)
4-2-2/7.11.2(b)ii)
4-2-2/7.11.2(c)
4-2-2/7.13
4-2-2/7.13.1
4-2-2/7.13.1(a)
4-2-2/7.13.1(b)
4-2-2/7.13.1(b)i)
4-2-2/7.13.1(b)ii)
4-2-2/7.13.1(b)iii)
4-2-2/7.13.1(b)iv)
4-2-2/7.13.1(c)
4-2-2/7.13.2
4-2-2/7.13.2(a)
4-2-2/7.13.2(b)
4-2-2/7.13.2(c)
4-2-2/7.13.2(d)
4-2-2/7.13.2(e)
4-2-2/7.13.2(f)
4-2-2/7.13.3
4-2-2/7.13.4
4-2-2/7.13.4(a)
4-2-2/7.13.4(b)
4-2-2/7.13.4(c)
Title
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-2-2/7.7
4-2-2/7.7.1
4-2-2/7.7.1(a)
7-1-3/13.5.3i)
7-1-3/13.5.3i)
4-2-2/7.7.1(b)
4-2-2/7.7.1(c)
4-2-2/7.7.2
7-1-3/13.5.2
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iv)
7-1-3/13.5.3iv)
7-1-3/13.5.3iv)
4-2-2/7.7.3
4-2-2/7.7.4
4-2-2/7.7.4(a)
4-2-2/7.7.4(b)
4-2-2/7.7.4(c)
7-1-3/13.5.3vii)
4-2-2/7.9
4-2-2/7.11
4-2-2/7.11.1
4-2-2/7.11.1(a)
4-2-2/7.11.1(a)i)
4-2-2/7.11.1(a)ii)
4-2-2/7.11.1(a)iii)
4-2-2/7.11.1(a)iv)
4-2-2/7.11.1(a)v)
4-2-2/7.11.1(a)vi)
4-2-2/7.11.1(a)vii)
4-2-2/7.11.1(b)
4-2-2/7.11.2
4-2-2/7.11.2(a)
4-2-2/7.11.2(b)
4-2-2/7.11.2(b)i)
4-2-2/7.11.2(b)ii)
4-2-2/7.11.2(c)
4-2-2/7.13
4-2-2/7.13.1
4-2-2/7.13.1(a)
4-2-2/7.13.1(b)
4-2-2/7.13.1(b)i)
4-2-2/7.13.1(b)ii)
4-2-2/7.13.1(b)iii)
4-2-2/7.13.1(b)iv)
4-2-2/7.13.1(c)
4-2-2/7.13.2
4-2-2/7.13.2(a)
4-2-2/7.13.2(b)
4-2-2/7.13.2(c)
4-2-2/7.13.2(d)
4-2-2/7.13.2(e)
4-2-2/7.13.2(f)
4-2-2/7.13.3
4-2-2/7.13.4
4-2-2/7.13.4(a)
4-2-2/7.13.4(b)
4-2-2/7.13.4(c)
49
50
Title
Test by the Manufacturer - Fire Endurance Testing of Water-Filled Plastic Piping
(For Level 3)
Test Method
----------Test Specimen
--------------Test Conditions
------Acceptance Criteria
----Test by Manufacturer Flame Spread
Test Method
------------------Testing by Manufacturer General
Valves
General
Standard Valves
Non-Standard Valves
Construction
Hydrostatic Test and Identification
Pipe Fittings
General
Hydrostatic Test and Identification
Nonstandard Fittings
Mechanical Joints
Welded Nonstandard Valves and Fittings
Flanges
General
Group I Piping Flanges
Steel Pipe
Nonferrous Pipe
Group II Piping Flanges
Material of Valves and Fittings
General
Forged or Cast Steel
Cast Iron
Nonferrous
Ductile (Nodular) Iron
Fluid Power Cylinders
General
Non-compliance with a Recognized Standard
-----
MODU 2012
4-2-2/7.15
4-2-2/7.15.1
4-2-2/7.15.1(a)
4-2-2/7.15.1(b)
4-2-2/7.15.1(c)
4-2-2/7.15.1(d)
4-2-2/7.15.1(e)
4-2-2/7.15.2
4-2-2/7.15.2(a)
4-2-2/7.15.2(b)
4-2-2/7.15.2(c)
4-2-2/7.15.2(d)
4-2-2/7.15.2(e)
4-2-2/7.15.2(f)
4-2-2/7.15.2(g)
4-2-2/7.15.3
4-2-2/7.15.3(a)
4-2-2/7.15.3(b)
4-2-2/7.15.3(c)
4-2-2/7.15.4
4-2-2/7.15.4(a)
4-2-2/7.15.4(b)
4-2-2/7.17
4-2-2/7.17.1
4-2-2/7.17.1(a)
4-2-2/7.17.1(b)
4-2-2/7.17.1(c)
4-2-2/7.17.1(d)
4-2-2/7.17.1(e)
4-2-2/7.17.1(f)
4-2-2/7.17.1(g)
4-2-2/7.17.1(h)
4-2-2/7.17.1(i)
4-2-2/7.19
4-2-2/9
4-2-2/9.1
4-2-2/9.1.1
4-2-2/9.1.2
4-2-2/9.3
4-2-2/9.5
4-2-2/11
4-2-2/11.1
4-2-2/11.3
4-2-2/11.5
7-1-3/17.5
4-2-2/13
4-2-2/15
4-2-2/15.1
4-2-2/15.3
4-2-2/15.3.1
4-2-2/15.3.2
4-2-2/15.5
4-2-2/17
4-2-2/17.1
4-2-2/17.3
4-2-2/17.5
4-2-2/17.7
4-2-2/17.9
4-2-2/19
4-2-2/19.1
4-2-2/19.3
4-2-2/19.3i)
4-2-2/19.3ii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
--Materials
------Rudder Actuators
Cylinders below Pressures or Temperatures Indicated in 4-2-2/19.1
Independently Manufactured and Assembled Units
Sea Inlets and Overboard Discharges
Installation
Valve Connection to Shell
Materials
Shell Reinforcement
4-2-2/21.9
4-2-2/21.9i)
4-2-2/21.9ii)
4-2-2/21.9iii)
4-2-2/21.9.1
4-2-2/21.9.2
4-2-2/21.9.3
4-2-2/21.11
4-2-2/23
4-2-2/23.1
4-2-2/23.1.1
4-2-2/23.1.2
4-2-2/23.1.3
4-2-2/23.3
4-2-2/23.5
4-2-2/27
4-2-2/27.1
4-2-2/27.3
4-2-2/27.5
4-2-2/29
4-2-2/29.1
4-2-2/29.1i)
4-2-2/29.1ii)
4-2-2/29.3
4-2-2/29.3.1
4-2-2/29.3.2
4-2-2/Table 1
4-2-2/Table 2
4-2-2/Table 3
4-2-2/Table 4
4-2-2/Figure 1
4-2-2/Figure 2
Part
4
Chapter
2
Section
3
4-2-3
4-2-3/1
4-2-3/1.1
4-2-3/1.3
4-2-3/1.5
4-2-3/1.5.1
4-2-3/1.5.2
4-2-3/1.7
4-2-3/1.9
4-2-3/1.9.1
4-2-3/1.9.2
4-2-3/1.9.3
4-2-3/1.9.4
4-2-3/1.9.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-2-2/19.3iii)
4-2-2/19.5
4-2-2/19.5i)
4-2-2/19.5ii)
4-2-2/19.5iii)
4-2-2/19.7
4-2-2/19.9
4-2-2/19.11
4-2-2/21
4-2-2/21.1
4-2-2/21.3
4-2-2/21.5
4-2-2/21.7
4-2-2/21.9
7-1-3//23.3
7-1-3//23.3i)
7-1-3//23.3ii)
7-1-3//23.3iii)
4-2-2/21.9.1
4-2-2/21.9.2
4-2-2/21.9.3
4-2-2/21.11
4-2-2/23
4-2-2/23.1
4-2-2/23.1.1
4-2-2/23.1.2
4-2-2/23.1.3
4-2-2/23.3
4-2-2/23.5
4-2-2/27
4-2-2/27.1
4-2-2/27.3
4-2-2/27.5
4-2-2/29
4-2-2/29.1
4-2-2/29.1i)
4-2-2/29.1ii)
4-2-2/29.3
4-2-2/29.3.1
4-2-2/29.3.2
4-2-2/Table 1
4-2-2/Table 2
4-2-2/Table 3
4-2-2/Table 4
4-2-2/Figure 1
4-2-2/Figure 2
4-2-3
4-2-3/1
4-2-3/1.1
4-2-3/1.3
4-2-3/1.5
4-2-3/1.5.1
4-2-3/1.5.2
4-2-3/1.7
4-2-3/1.9
4-2-3/1.9.1
4-2-3/1.9.2
4-2-3/1.9.3
4-2-3/1.9.4
4-2-3/1.9.5
51
52
Title
General
Design
------------------Materials
--------Type Testing
------Overflow Pipes
Sounding Arrangements
General
Sounding Pipes
Oil Tanks
Other Tanks
Ignition of Spillage
Fuel Oil Tanks
------Lubricating Oil Tanks
----Gauge Glasses
Level Indicating Device
Machinery and Systems
Pumps and Piping Systems
Bilge and Ballast Systems and Tanks
Bilge and Ballast Systems and Tanks
General Arrangement of Bilge and Ballast Systems for Surface Type Units
General
Number of Bilge Pumps
Direct Bilge Suctions
Emergency Bilge Suctions
General Arrangement for Bilge Systems for Column-Stabilized Units and Self
Elevating Units
Permanent Systems
Void Compartments
Chain Lockers
Bilge Alarm
Bilge Piping (All Units)
General
Installation
Manifolds, Cocks, and Valves
Common-main-type Bilge System
Strainers
Gravity Drains
Bilge Suctions from Hazardous Areas
Exceptions
Bilge Pumps (All Units)
General
Arrangement and Capacity
Size of Bilge Suctions
MODU 2012
4-2-3/1.9.5(a)
4-2-3/1.9.5(b)
4-2-3/1.9.5(b)i)
4-2-3/1.9.5(b)ii)
4-2-3/1.9.5(b)iii)
4-2-3/1.9.5(b)iv)
4-2-3/1.9.5(b)v)
4-2-3/1.9.5(b)vi)
4-2-3/1.9.5(b)vii)
4-2-3/1.9.5(b)viii)
4-2-3/1.9.5(b)ix)
4-2-3/1.9.5(c)
4-2-3/1.9.5(c)i)
4-2-3/1.9.5(c)ii)
4-2-3/1.9.5(c)iii)
4-2-3/1.9.5(c)iv)
4-2-3/1.9.5(d)
4-2-3/1.9.5(d)i)
4-2-3/1.9.5(d)ii)
4-2-3/1.9.5(d)iii)
4-2-3/1.11
4-2-3/3
4-2-3/3.1
4-2-3/3.3
4-2-3/3.3.1
4-2-3/3.3.2
4-2-3/3.3.3
4-2-3/3.3.3(a)
4-2-3/3.3.3(a)i)
4-2-3/3.3.3(a)ii)
4-2-3/3.3.3(a)iii)
4-2-3/3.3.3(b)
4-2-3/3.3.3(b)i)
4-2-3/3.3.3(b)ii)
4-2-3/3.5
4-2-3/3.7
4-2-4
4-2-4/1
4-2-4/1.1
4-2-4/1.3
4-2-4/1.5
4-2-4/1.7
4-2-4/3
4-2-4/3.1
4-2-4/3.3
4-2-4/3.5
4-2-4/3.7
4-2-4/5
4-2-4/5.1
4-2-4/5.3
4-2-4/5.5
4-2-4/5.7
4-2-4/5.9
4-2-4/5.11
4-2-4/5.13
4-2-4/5.15
4-2-4/7
4-2-4/7.1
4-2-4/7.3
4-2-4/9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Surface Type Units
Main Line
Branch Line
Main Line Reduction
Size Limits
Column-Stabilized Units and Self-Elevating Units
Main Line
Branch Line
Size Limits
Ballast Piping (All Units)
General
Installation
Controls for Ballast Tank Valves
Exceptions
Ballasting Systems for Column-Stabilized Units
General
----Manifolds
Pumps
Number
Pump Performance
Ballast Control Features
Centralized Control Station
Location
Controls and Indications
----------------------Communication
Back-up Station
Independent Local Control
Safety Futures
Independence
All Systems
Pump/Valve Control System
Dual Power Source
Disconnects
Electronic Systems
Valve Controls
Valve Positioning Indicating System
Draft Indicating System
Tank Level indicating System
Machinery and Systems
Pumps and Piping Systems
Fuel Oil Systems and Tanks
Fuel Oil Systems and Tanks
Fuel Oil Piping System General
Arrangement
Tanks
Structural Tanks
Free Standing Tanks
Spillage
Sounding Arrangements
4-2-5/1.1.4
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-2-4/9.1
4-2-4/9.1.1
4-2-4/9.1.2
4-2-4/9.1.3
4-2-4/9.1.4
4-2-4/9.3
4-2-4/9.3.1
4-2-4/9.3.2
4-2-4/9.3.3
4-2-4/11
4-2-4/11.1
4-2-4/11.3
4-2-4/11.5
4-2-4/11.7
4-2-4/13
4-2-4/13.1
4-2-4/13.1i)
4-2-4/13.1ii)
4-2-4/13.3
4-2-4/13.5
4-2-4/13.5.1
4-2-4/13.5.2
4-2-4/13.7
4-2-4/13.7.1
4-2-4/13.7.1(a)
4-2-4/13.7.1(b)
4-2-4/13.7.1(b)i)
4-2-4/13.7.1(b)ii)
4-2-4/13.7.1(b)iii)
4-2-4/13.7.1(b)iv)
4-2-4/13.7.1(b)v)
4-2-4/13.7.1(b)vi)
4-2-4/13.7.1(b)vii)
4-2-4/13.7.1(b)viii)
4-2-4/13.7.1(b)ix)
4-2-4/13.7.1(b)x)
4-2-4/13.7.1(b)xi)
4-2-4/13.7.1(c)
4-2-4/13.7.1(d)
4-2-4/13.7.2
4-2-4/13.7.3
4-2-4/13.7.3(a)
4-2-4/13.7.3(a)i)
4-2-4/13.7.3(a)ii)
4-2-4/13.7.3(b)
4-2-4/13.7.3(c)
4-2-4/13.7.3(d)
4-2-4/13.7.3(e)
4-2-4/13.7.4
4-2-4/13.7.5
4-2-4/13.7.6
4-2-5, 6-1-3
4-2-5/1
4-2-5/1.1
4-2-5/1.1.1
4-2-5/1.1.1(a)
4-2-5/1.1.1(b)
4-2-5/1.1.2
4-2-5/1.1.3
4-2-5/1.1.4
4-2-3/1.9.3
53
Title
Piping, Valves and Fittings
Oil Heating Arrangements
Oil Heaters
Tanks
Fuel Oil Purifiers
Fuel Oil Transfer and Filling
General
Heating Coils
Pipes in Oil Tanks
Control Valves or Cocks
Valves on Oil Tanks
------Fuel-oil Service System for Boilers
Fuel-oil Service System for Internal Combustion Engines
Fuel-oil Pumps and Oil Heaters
Transfer Pumps
Booster Pumps
Heaters
Oil Tanks and Drains for Fuel Oil Systems
Fuel-oil Pressure Piping
Fuel-oil Injection System
General
4-2-5/7.7.2
4-2-5/7.7.2(a)
4-2-5/7.7.2(b)
4-2-5/7.9
4-2-5/9
4-2-5/9.1
4-2-5/9.1.1
4-2-5/9.1.2
4-2-5/9.1.3
4-2-5/9.3
4-2-5/9.5
4-2-5/11
4-2-5/11.1
4-2-5/11.1.1
4-2-5/11.1.2
4-2-5/11.3
4-2-5/11.3.1
4-2-5/11.3.2
4-2-5/11.3.2(a)
4-2-5/11.3.2(a)i)
4-2-5/11.3.2(a)ii)
4-2-5/11.3.2(a)iii)
4-2-5/11.3.2(a)iv)
4-2-5/11.3.2(b)
4-2-5/13
4-2-5/13i)
4-2-5/13ii)
4-2-5/Figure 1
Part
4
Chapter
2
Section
6
4-2-6
4-2-6/1
4-2-6/1.1
4-2-6/1.3
4-2-6/1.5
4-2-6/1.7
4-2-6/1.7.1
4-2-6/1.7.2
Injection Piping
Fuel Oil Return Piping
Piping Between Booster Pump and Injection Pumps
Low Flash Point Fuels
General
------Fuel Heating
Fuel-tank Vents
Additional Measures for Oil Pollution Prevention
General
Application
Submission of Plans
Tank Protection Requirements
General
Protective Location of Tanks
Deterministic Approach
--------Probabilistic Approach
Class Notation POT
----Acceptable Fuel Oil Tanks Arrangements Inside Category A Machinery Spaces
Machinery and Systems
Pumps and Piping Systems
Other Piping Systems and Tanks
Other Piping Systems and Tanks
Lubricating Oil Systems
General
Sight Flow Glasses
Turbines and Reduction Gears
Internal Combustion Engines and Reduction Gear
Lubricating Oil Pumps
Filters
54
MODU 2012
4-2-5/1.3
4-2-5/1.5
4-2-5/1.5.1
4-2-5/1.5.2
4-2-5/1.7
4-2-5/3
4-2-5/3.1
4-2-5/3.3
4-2-5/3.5
4-2-5/3.7
4-2-5/3.9
4-2-5/3.9i)
4-2-5/3.9ii)
4-2-5/3.9iii)
4-2-5/5
4-2-5/7
4-2-5/7.1
4-2-5/7.1.1
4-2-5/7.1.2
4-2-5/7.1.3
4-2-5/7.3
4-2-5/7.5
4-2-5/7.7
4-2-5/7.7.1
4-2-5/7.7.2
6-1-3/3.1
6-1-3/3.1.1
6-1-3/3.1.2
4-2-5/7.9
4-2-5/9
4-2-5/9.1
4-2-5/9.1.1
4-2-5/9.1.2
4-2-5/9.1.3
4-2-5/9.3
4-2-5/9.5
4-2-5/11
4-2-5/11.1
4-2-5/11.1.1
4-2-5/11.1.2
4-2-5/11.3
4-2-5/11.3.1
4-2-5/11.3.2
4-2-5/11.3.2(a)
4-2-5/11.3.2(a)i)
4-2-5/11.3.2(a)ii)
4-2-5/11.3.2(a)iii)
4-2-5/11.3.2(a)iv)
4-2-5/11.3.2(b)
4-2-5/13
4-2-5/13i)
4-2-5/13ii)
4-2-5/Figure 1
4-2-6
4-2-6/1
4-2-6/1.1
4-2-6/1.3
4-2-6/1.5
4-2-6/1.7
4-2-6/1.7.1
4-2-6/1.7.2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Low Oil Pressure Alarm
Drain Pipes
Electrical Machinery
Hydraulic Systems
General
Valves
General
Relief Valves
Piping
Pipe Fittings
Non-standard Fittings
Split Flanges
Straight Thread O Rings Connections
Tapered Threaded Connections
Hose
Accumulators
Fluid Power Cylinders
Design Pressure
Segregation of High Pressure Hydraulic Units
Fixed Oxygen Acetylene Installations
Application
Gas Storage
Storage of Gas Cylinders
Storage Room
Open Area
Piping Passing Through Storage Room or Area
Ventilation of Storage Room
Electrical Installation in Storage Room
Piping System Components
Pipe and Fittings
General
Piping Materials
Design Pressure
Pipe Joints
Flexible Hoses
Pressure Relief Devices
System Arrangements
Gas Cylinders
Fuel Storage for Helicopter Facilities
General
Isolation
Hazardous Areas
Ventilation Capacity
Exhaust Ventilation Duct and Fan
Dewatering System
Fuel Storage Tank Construction
Fuel Storage Tank Vents
Fuel Storage Tank Valves
Spill Containment
------Starting-air Systems
Design and Construction
Starting-air Capacity
Diesel Propulsion
Diesel-Electric Propulsion
Non Self-Propelled Units
Protective Devices for Starting Air Mains
Cooling Water Systems for Internal Combustion Engines
General
Sea Suctions
Strainers
Circulating Water Pumps
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-2-6/1.7.3
4-2-6/1.7.4
4-2-6/1.9
4-2-6/3
4-2-6/3.1
4-2-6/3.3
4-2-6/3.3.1
4-2-6/3.3.2
4-2-6/3.5
4-2-6/3.7
4-2-6/3.7.1
4-2-6/3.7.2
4-2-6/3.7.3
4-2-6/3.7.4
4-2-6/3.9
4-2-6/3.11
4-2-6/3.13
4-2-6/3.15
4-2-6/3.17
4-2-6/5
4-2-6/5.1
4-2-6/5.3
4-2-6/5.3.1
4-2-6/5.3.1(a)
4-2-6/5.3.1(b)
4-2-6/5.3.1(c)
4-2-6/5.3.2
4-2-6/5.3.3
4-2-6/5.5
4-2-6/5.5.1
4-2-6/5.5.1(a)
4-2-6/5.5.1(b)
4-2-6/5.5.1(c)
4-2-6/5.5.1(d)
4-2-6/5.5.1(e)
4-2-6/5.5.2
4-2-6/5.5.3
4-2-6/5.5.4
4-2-6/7
4-2-6/7.1
4-2-6/7.1.1
4-2-6/7.1.2
4-2-6/7.1.2(a)
4-2-6/7.1.2(b)
4-2-6/7.1.2(c)
4-2-6/7.1.3
4-2-6/7.1.4
4-2-6/7.1.5
4-2-6/7.3
4-2-6/7.3.1
4-2-6/7.3.2
4-2-6/7.3.3
4-2-6/9
4-2-6/9.1
4-2-6/9.3
4-2-6/9.3.1
4-2-6/9.3.2
4-2-6/9.3.3
4-2-6/9.5
4-2-6/11
4-2-6/11.1
4-2-6/11.3
4-2-6/11.5
4-2-6/11.7
55
Title
Exhaust System
Exhaust Lines
Exhaust Gas Temperature
Valves in Atomizing Lines
Helicopter Deck Drainage Arrangements
Boilers and Associated Piping
Steering Gear Piping
Gas Turbine Piping
Machinery and Systems
Electrical Installations
General
General
Applications
Definitions
Earthed Distribution System
4-3-1/3.3
Essential Services
4-3-1/3.5
4-3-1/3.5i)
4-3-1/3.5ii)
4-3-1/3.7
4-3-1/3.9
4-3-1/3.11
4-3-1/3.11.1
4-3-1/3.13
4-3-1/3.15
4-3-1/3.17
4-3-1/3.19
4-3-1/3.21
4-3-1/3.23
4-3-1/3.25
4-3-1/3.27
4-3-1/3.29
4-3-1/3.31
4-3-1/5
4-3-1/7
4-3-1/9
4-3-1/11
4-3-1/12
4-3-1/13
4-3-1/13.1
4-3-1/13.3
4-3-1/13.5
4-3-1/13.7
4-3-1/13.9
4-3-1/13.11
4-3-1/15
4-3-1/17
4-3-1/17.1
4-3-1/17.3
4-3-1/17.3.1
4-3-1/17.3.1i)
4-3-1/17.3.1ii)
4-3-1/17.3.1iii)
4-3-1/17.3.1iv)
4-3-1/17.3.2
4-3-1/17.3.3
4-3-1/19
4-3-1/Table 1
4-3-1/Table 2
4-3-1/Table 3
4-3-1/Table 4
4-3-1/Table 5
56
MODU 2012
4-2-6/13
4-2-6/13.1
4-2-6/13.3
4-2-6/15
4-2-6/17
4-2-6/19
4-2-6/21
4-2-6/23
4-3-1, 6-1-7
4-3-1/1
4-3-1/3
4-3-1/3.1
4-3-1/3.3
4-1-1/3.5
4-3-1/3.5
4-3-1/3.5i)
4-3-1/3.5ii)
4-3-1/3.7
4-3-1/3.9
4-3-1/3.11
4-3-1/3.11.1
4-3-1/3.13
4-3-1/3.15
4-3-1/3.17
4-3-1/3.19
4-3-1/3.21
4-3-1/3.23
4-3-1/3.25
4-3-1/3.27
4-3-1/3.29
4-3-1/3.31
4-3-1/5
4-3-1/7
4-3-1/9
4-3-1/11
4-3-1/13
6-1-7/1.1
6-1-7/1.1.1
6-1-7/1.1.2
6-1-7/1.1.3
6-1-7/1.1.4
6-1-7/1.1.5
6-1-7/1.1.6
4-3-1/15
4-3-1/17
4-3-1/17.1
4-3-1/17.3
4-3-1/17.3.1
4-3-1/17.3.1i)
4-3-1/17.3.1ii)
4-3-1/17.3.1iii)
4-3-1/17.3.1iv)
4-3-1/17.3.2
4-3-1/17.3.3
4-3-1/19
4-3-1/Table 1
4-3-1/Table 2
4-3-1/Table 3
4-1-1/Table 3
4-1-1/Table 4
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Machinery and Systems
Electrical Installations
Drilling Unit Systems
Drilling Unit Systems
Plans and Data to be Submitted
Wiring
Systems
Data for Wiring Systems
Short-circuit Data
Protective Device Coordination
Load Analysis
Drilling Unit Main Service Source of Power
Power Supply by Generators
Number of Generators
Capacity of Generators
Multiple Generators
Starting from "Dead Ship" Condition
Fuel Capacity for Generator Prime Mover
System Arrangement
General
Single Generator Operation
Multiple Generator Operation
Generator Driven by Propulsion Unit
Constant Speed Drive
------Variable Speed Drive
----------Sizing of AC Generator
Emergency Source of Power
General
Basic Requirement
Boundary
Alternative Arrangements
----------Emergency Power Supply
Emergency Lighting
----------------Navigation Lights and Signals
Marking of Offshore Structures
Internal Communications
Fire and Gas Detection and Alarm Systems
Emergency Signals
Blow-Out Preventer (BOP) and Well Disconnection
Fire Pump and Fire Extinguishing Systems
Diving Equipment
Column-Stabilized Units
---
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-2, 7-1-6
4-3-2/1
4-3-2/1.1
4-3-2/1.1.1
4-3-2/1.1.2
4-3-2/1.3
4-3-2/1.5
4-3-2/1.7
4-3-2/3
4-3-2/3.1
4-3-2/3.1.1
4-3-2/3.1.2
4-3-2/3.1.3
4-3-2/3.1.4
4-3-2/3.1.5
4-3-2/3.1.6
4-3-2/3.1.6(a)
4-3-2/3.1.6(b)
4-3-2/3.1.6(c)
4-3-2/3.3
4-3-2/3.3.1
4-3-2/3.3.1i)
4-3-2/3.3.1ii)
4-3-2/3.3.1iii)
4-3-2/3.3.2
4-3-2/3.3.2i)
4-3-2/3.3.2ii)
4-3-2/3.3.2iii)
4-3-2/3.3.2iv)
4-3-2/3.3.2v)
4-3-2/3.5
4-3-2/5
4-3-2/5.1
4-3-2/5.1.1
4-3-2/5.1.2
4-3-2/5.1.3
4-3-2/5.1.3i)
4-3-2/5.1.3ii)
4-3-2/5.1.3iii)
4-3-2/5.1.3iv)
4-3-2/5.1.3v)
4-3-2/5.3
4-3-2/5.3.1
4-3-2/5.3.1(a)
4-3-2/5.3.1(b)
4-3-2/5.3.1(c)
4-3-2/5.3.1(d)
4-3-2/5.3.1(e)
4-3-2/5.3.1(f)
4-3-2/5.3.1(g)
4-3-2/5.3.1(h)
4-3-2/5.3.2
4-3-2/5.3.3
4-3-2/5.3.4
4-3-2/5.3.5
4-3-2/5.3.6
4-3-2/5.3.7
4-3-2/5.3.8
4-3-2/5.3.9
4-3-2/5.3.10
4-3-2/5.3.10(a)
57
58
Title
--Self-propelled Drilling Units
--------Other Emergency Services
------Emergency Sources
General
Generator
------Accumulator Battery
------Emergency Generator for Non-emergency Services
Transitional Source of Power
----Emergency Switchboard
General
Emergency Switchboard for Generator
Accumulator Battery
Interconnect Feeder Between Emergency and Main Switchboard
Disconnection of Non-emergency Circuits
Ballast Pumps
Arrangement for Periodic Testing
Starting Arrangement for Emergency Generator Sets
Cold Conditions
Number of Starts
Charging of Stored Energy
------Manual Starting
Alarms and Safeguards for Emergency Diesel Engines
Information to be Submitted
Alarms and Safeguards
------------Requirements by the Governmental Authority
Distribution System
Drilling Unit Main Service Distribution System
General
Method of Distribution
Through-feed Arrangement
Motor Control Center
Motor Branch Circuit
Power Supply Through Transformer and Converters
Continuity of Supply
Arrangements
Transformers and Converters for Battery Charger
-------
MODU 2012
4-3-2/5.3.10(b)
4-3-2/5.3.11
4-3-2/5.3.11(a)
4-3-2/5.3.11(b)
4-3-2/5.3.11(c)
4-3-2/5.3.11(d)
4-3-2/5.3.12
4-3-2/5.3.12(a)
4-3-2/5.3.12(b)
4-3-2/5.3.12(c)
4-3-2/5.5
4-3-2/5.5.1
4-3-2/5.5.2
4-3-2/5.5.2i)
4-3-2/5.5.2ii)
4-3-2/5.5.2iii)
4-3-2/5.5.3
4-3-2/5.5.3i)
4-3-2/5.5.3ii)
4-3-2/5.5.3iii)
4-3-2/5.5.4
4-3-2/5.7
4-3-2/5.7i)
4-3-2/5.7ii)
4-3-2/5.9
4-3-2/5.9.1
4-3-2/5.9.2
4-3-2/5.9.3
4-3-2/5.9.4
4-3-2/5.9.5
4-3-2/5.11
4-3-2/5.13
4-3-2/5.15
4-3-2/5.15.1
4-3-2/5.15.2
4-3-2/5.15.3
4-3-2/5.15.3(a)
4-3-2/5.15.3(b)
4-3-2/5.15.3(c)
4-3-2/5.15.4
4-3-2/5.17
4-3-2/5.17.1
4-3-2/5.17.2
4-3-2/5.17.2(a)
4-3-2/5.17.2(b)
4-3-2/5.17.2(c)
4-3-2/5.17.2(d)
4-3-2/5.17.2(e)
4-3-2/5.17.2(f)
4-3-2/5.19
4-3-2/7
4-3-2/7.1
4-3-2/7.1.1
4-3-2/7.1.2
4-3-2/7.1.3
4-3-2/7.1.4
4-3-2/7.1.5
4-3-2/7.1.6
4-3-2/7.1.6(a)
4-3-2/7.1.6(b)
4-3-2/7.1.6(c)
4-3-2/7.1.6(c)i)
4-3-2/7.1.6(c)ii)
4-3-2/7.1.6(c)iii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Heating Appliances
Hull Return System
General
------Final Subcircuits and Earth Wires
Earthed Distribution Systems
External or Shore Power Supply Connection
General
Earthing Terminal
Indicators
Polarity or Phase Sequence
4-3-2/7.7.5
Information Plate
4-3-2/7.7.6
4-3-2/7.7
4-3-2/9
4-3-2/9.1
4-3-2/9.1.1
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.1iii)
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.2
4-3-2/9.1.2(a)
4-3-2/9.1.2(b)
4-3-2/9.1.2(c)
4-3-2/9.1.3
4-3-2/9.1.3(a)
4-3-2/9.1.3(b)
4-3-2/9.1.3(c)
4-3-2/9.1.3(d)
4-3-2/9.1.4
4-3-2/9.1.4(a)
4-3-2/9.1.4(b)
4-3-2/9.1.5
4-3-2/9.1.5(a)
4-3-2/9.1.5(b)
4-3-2/9.1.5(c)
4-3-2/9.3
4-3-2/9.3.1
4-3-2/9.3.2
4-3-2/9.3.3
4-3-2/9.3.3(a)
4-3-2/9.3.3(a)i)
4-3-2/9.3.3(a)ii)
4-3-2/9.3.3(b)
4-3-2/9.3.3(b)i)
4-3-2/9.3.3(b)ii)
4-3-2/9.3.3(b)iii)
4-3-2/9.3.4
4-3-2/9.5
4-3-2/9.5.1
4-3-2/9.5.2
4-3-2/9.5.2(a)
4-3-2/9.5.2(b)
4-3-2/9.5.2(c)
4-3-2/9.7
4-3-2/9.7.1
4-3-2/9.7.2
4-3-2/9.7.2(a)
4-3-2/9.7.2(b)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-2/7.1.7
4-3-2/7.3
4-3-2/7.3.1
4-3-2/7.3.1i)
4-3-2/7.3.1ii)
4-3-2/7.3.1iii)
4-3-2/7.3.2
4-3-2/7.5
4-3-2/7.7
4-3-2/7.7.1
4-3-2/7.7.2
4-3-2/7.7.3
4-3-2/7.7.4
4-3-2/7.7.5
7-1-6/7.7.1
7-1-6/7.7.2
4-3-2/7.7
4-3-2/9
4-3-2/9.1
4-3-2/9.1.1
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.1iii)
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.2
4-3-2/9.1.2(a)
4-3-2/9.1.2(b)
4-3-2/9.1.2(c)
4-3-2/9.1.3
4-3-2/9.1.3(a)
4-3-2/9.1.3(b)
4-3-2/9.1.3(c)
4-3-2/9.1.3(d)
4-3-2/9.1.4
4-3-2/9.1.4(a)
4-3-2/9.1.4(b)
4-3-2/9.1.5
4-3-2/9.1.5(a)
4-3-2/9.1.5(b)
4-3-2/9.1.5(c)
4-3-2/9.3
4-3-2/9.3.1
4-3-2/9.3.2
4-3-2/9.3.3
4-3-2/9.3.3(a)
4-3-2/9.3.3(a)i)
4-3-2/9.3.3(a)ii)
4-3-2/9.3.3(b)
4-3-2/9.3.3(b)i)
4-3-2/9.3.3(b)ii)
4-3-2/9.3.3(b)iii)
4-3-2/9.3.4
4-3-2/9.5
4-3-2/9.5.1
4-3-2/9.5.2
4-3-2/9.5.2(a)
4-3-2/9.5.2(b)
4-3-2/9.5.2(c)
4-3-2/9.7
4-3-2/9.7.1
4-3-2/9.7.2
4-3-2/9.7.2(a)
4-3-2/9.7.2(b)
59
60
Title
Undervoltage Protection
Protection for Accumulator Batteries
Protection for External or Shore Power Supply
General
Interlocking Arrangement
Protection for Motor Branch Circuits
General
Direct-current Motor Branch Circuits
Alternating-current Motor Branch Circuits
Motor Running Protection
Undervoltage Protection and Undervoltage Release
----Jacking Gear Motors
Protection for Transformer Circuits
Setting for Overcurrent Device
Parallel Operation
Protection for Meters, Pilot Lamps, and Control Circuits
Systems for Steering Gear Installed in Self-propelled Units
Power Supply Feeder
Protection for Steering Gear Motor Circuit
Short Circuit Protection
Direct Current (DC) Motors
Alternating Current (AC) Motors
Fuses as Motor-feeder Protection
Undervoltage Release
Emergency Power Supply
Controls, Instrumentation, and Alarms
Lighting and Navigation Light Systems
Lighting System
Main Lighting System
System Arrangement
Main Lighting System
Emergency Lighting System
Lighting Circuits in Machinery Space and Accommodation Spaces
Protection for Lighting Circuits
Navigation Light System
Feeders
Navigation Light Indicator
Protection
Interior Communication Systems
Navigation Bridge
General
Engine Order Telegraph
Main Propulsion Control Stations
Voice Communications
Propulsion and Steering Control Stations
Communication in Case of an Emergency
Elevator
Jacking System
Independence of Power Supply Circuit
Emergency and Interior-communication Switchboard
Public Address System
System Requirements
Minimum Sound Levels
----Emergency Source of Power
Public Address System Combined with General Alarm System
Manually Operated Alarms
General Emergency Alarm Systems
General
System Requirements
---
MODU 2012
4-3-2/9.7.2(c)
4-3-2/9.9
4-3-2/9.11
4-3-2/9.11.1
4-3-2/9.11.2
4-3-2/9.13
4-3-2/9.13.1
4-3-2/9.13.2
4-3-2/9.13.3
4-3-2/9.13.4
4-3-2/9.13.5
4-3-2/9.13.5i)
4-3-2/9.13.5ii)
4-3-2/9.13.6
4-3-2/9.15
4-3-2/9.15.1
4-3-2/9.15.2
4-3-2/9.17
4-3-2/11
4-3-2/11.1
4-3-2/11.3
4-3-2/11.3.1
4-3-2/11.3.1(a)
4-3-2/11.3.1(b)
4-3-2/11.3.1(c)
4-3-2/11.3.2
4-3-2/11.5
4-3-2/11.7
4-3-2/13
4-3-2/13.1
4-3-2/13.1.1
4-3-2/13.1.2
4-3-2/13.1.2(a)
4-3-2/13.1.2(b)
4-3-2/13.1.3
4-3-2/13.1.4
4-3-2/13.3
4-3-2/13.3.1
4-3-2/13.3.2
4-3-2/13.3.3
4-3-2/15
4-3-2/15.1
4-3-2/15.1.1
4-3-2/15.1.2
4-3-2/15.3
4-3-2/15.5
4-3-2/15.5.1
4-3-2/15.5.2
4-3-2/15.5.3
4-3-2/15.5.4
4-3-2/15.5.5
4-3-2/15.7
4-3-2/15.9
4-3-2/15.9.1
4-3-2/15.9.2
4-3-2/15.9.2i)
4-3-2/15.9.2ii)
4-3-2/15.9.3
4-3-2/15.9.4
4-3-2/17
4-3-2/17.1
4-3-2/17.1.1
4-3-2/17.1.2
4-3-2/17.1.2(a)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
-------------
4-3-2/17.3
Engineers Alarm
4-3-2/17.5
4-3-2/17.7
4-3-2/19
4-3-2/19.1
4-3-2/19.1.1
4-3-2/19.1.1(a)
4-3-2/19.1.1(b)
4-3-2/19.1.1(c)
4-3-2/19.1.2
4-3-2/19.3
4-3-2/Table 1
Part
4
Chapter
3
Section
3
4-3-3
4-3-3/1
4-3-3/1.1
4-3-3/1.3
4-3-3/1.5
4-3-3/1.7
4-3-3/1.9
4-3-3/3
4-3-3/3.1
4-3-3/3.1.1
4-3-3/3.1.1(a)
4-3-3/3.1.2
4-3-3/3.1.3
Accessibility
4-3-3/3.3
4-3-3/3.5
4-3-3/3.5.1
4-3-3/3.5.2
4-3-3/3.5.3
4-3-3/3.5.4
4-3-3/3.7
4-3-3/3.7.1
4-3-3/3.7.2
4-3-3/3.7.2(a)
4-3-3/3.7.2(b)
4-3-3/3.7.2(c)
4-3-3/3.7.2(d)
4-3-3/3.7.2(d)i)
4-3-3/3.7.2(d)ii)
4-3-3/3.7.2(e)
4-3-3/3.7.2(f)
4-3-3/3.7.3
4-3-3/3.7.3(a)
4-3-3/3.7.3(b)
4-3-3/3.7.3(c)
4-3-3/3.7.3(d)
4-3-3/3.7.4
4-3-3/3.7.5
4-3-3/3.7.5(a)
4-3-3/3.7.5(b)
Generators
Drilling Unit Main Service Motors
General
Pump Motors
Motors on Weather Decks
Motors Below Decks
Accumulator Batteries
General
Battery Installation and Arrangement
Large Batteries
Moderate-size Batteries
Small Batteries
Low-hydrogen-emission Battery Installations
----Battery Trays
Identification of Battery Types
Ventilation
Battery Rooms
Battery Lockers
Deck Boxes
Small Battery Boxes
Protection from Corrosion
Maintenance of Batteries
Maintenance Schedule of Batteries
Procedure of Maintenance
4-3-3/3.1.1(b)
Title
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-2/17.1.2(b)
4-3-2/17.1.2(c)
4-3-2/17.1.2(d)
4-3-2/17.1.2(e)
7-1-6/17.1i)
7-1-6/17.1ii)
4-3-2/17.3
7-1-6/17.3
4-3-2/17.5
4-3-2/17.7
4-3-2/19
4-3-2/19.1
4-3-2/19.1.1
4-3-2/19.1.1(a)
4-3-2/19.1.1(b)
4-3-2/19.1.1(c)
4-3-2/19.1.2
4-3-2/19.3
4-3-2/Table 1
61
Title
Replacement of Batteries
Switchboard
Distribution Boards
Location and Protection
Switchboard-type Distribution Boards
Safety-type Panels
Motor Controllers and Control Centers
Location and Installation
Disconnecting Arrangement
Device
Location
Locking Means
Identification Plate
Open and Close Indications
Indicating-light Circuits
Resistors for Control Apparatus
Lighting Fixtures
Heating Equipment
Magnetic Compasses
Portable Equipment and Outlets
Receptacles and Plugs of Different Ratings
Installation Requirements for Recovery from Dead Ship Condition
Services Required to be Operable Under a Fire Condition
------------------High Fire Risk Areas
--------Cable Installation
General Consideration
Continuity of Cabling
Choice of Cables
Cable Voltage Drop for New Installation
Restricting Locating of Cabling
Means of Drainage from Cable Enclosures
High Voltage Cables
Paint on Cables
Cable Installation above High Voltage Switchgear and Control-Gear
4-3-3/5.3
4-3-3/5.5
4-3-3/5.5.1
4-3-3/5.5.2
4-3-3/5.5.2(a)
4-3-3/5.5.2(b)
4-3-3/5.5.2(c)
4-3-3/5.5.3
4-3-3/5.7
4-3-3/5.9
4-3-3/5.9.1
4-3-3/5.9.1(a)
4-3-3/5.9.1(b)
4-3-3/5.9.1(c)
4-3-3/5.9.1(d)
---------
62
MODU 2012
4-3-3/3.7.6
4-3-3/3.9
4-3-3/3.11
4-3-3/3.11.1
4-3-3/3.11.2
4-3-3/3.11.3
4-3-3/3.13
4-3-3/3.13.1
4-3-3/3.13.2
4-3-3/3.13.2(a)
4-3-3/3.13.2(b)
4-3-3/3.13.2(c)
4-3-3/3.13.2(d)
4-3-3/3.13.2(e)
4-3-3/3.13.3
4-3-3/3.15
4-3-3/3.17
4-3-3/3.19
4-3-3/3.21
4-3-3/3.23
4-3-3/3.25
4-3-3/3.27
4-3-3/3.29
4-3-3/3.29i)
4-3-3/3.29ii)
4-3-3/3.29iii)
4-3-3/3.29iv)
4-3-3/3.29v)
4-3-3/3.29vi)
4-3-3/3.29vii)
4-3-3/3.29viii)
4-3-3/3.29ix)
4-3-3/3.31
4-3-3/3.31i)
4-3-3/3.31ii)
4-3-3/3.31iii)
4-3-3/3.31iv)
4-3-3/5
4-3-3/5.1
4-3-3/5.1.1
4-3-3/5.1.2
4-3-3/5.1.3
4-3-3/5.1.4
4-3-3/5.1.5
4-3-3/5.1.6
7-1-5/5.1
4-3-3/5.1.7
4-3-3/5.3
7-1-5/5.3
4-3-3/5.5
4-3-3/5.5.1
4-3-3/5.5.2
4-3-3/5.5.2(a)
4-3-3/5.5.2(b)
4-3-3/5.5.2(c)
4-3-3/5.5.3
4-3-3/5.7
4-3-3/5.9
4-3-3/5.9.1
7-1-5/5.9.1
7-1-5/5.9.1(a)
7-1-5/5.9.1(b)
7-1-5/5.9.1(c)
7-1-5/5.9.1(d)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
---
Title
4-3-3/5.9.2
Bending Radius
4-3-3/5.9.3
4-3-3/5.9.3(a)
4-3-3/5.9.3(b)
4-3-3/5.9.3(c)
4-3-3/5.9.3(d)
4-3-3/5.9.3(e)
4-3-3/5.11
4-3-3/5.11.1
4-3-3/5.11.2
4-3-3/5.11.3
Installations
Safe Working Load
Cable Occupation Ratio in Protective Casing
Hazardous Areas
Type Testing
Cable Run and Bunches
Reduction of Current Rating
Clearance and Segregation
Cable of Lower Conductor Temperature
4-3-3/5.13
4-3-3/5.15
Mechanical Penetrations
4-3-3/5.15.1
Metallic Armor
4-3-3/5.15.2
4-3-3/5.17
4-3-3/5.17.1
4-3-3/5.17.2
4-3-3/5.17.2(a)
4-3-3/5.17.2(b)
4-3-3/5.17.2(c)
4-3-3/5.17.3
4-3-3/5.17.4
4-3-3/5.19
4-3-3/5.21
4-3-3/5.23
4-3-3/5.25
4-3-3/5.27
4-3-3/5.29
4-3-3/5.29.1
4-3-3/5.29.2
4-3-3/5.29.3
4-3-3/5.31
4-3-3/5.33
4-3-3/5.33.1
4-3-3/5.33.2
4-3-3/5.33.3
4-3-3/5.33.3(a)
4-3-3/5.33.3(b)
4-3-3/5.33.3(c)
4-3-3/5.33.4
4-3-3/5.33.5
4-3-3/7
4-3-3/7.1
4-3-3/7.1i)
4-3-3/7.1ii)
4-3-3/7.1iii)
4-3-3/7.3
4-3-3/7.5
4-3-3/7.5.1
4-3-3/7.5.2
4-3-3/7.5.3
4-3-3/7.7
4-3-3/7.9
4-3-3/9
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
7-1-5/5.9.1(e)
4-3-3/5.9.2
7-1-5/5.9.2
4-3-3/5.9.3
7-1-5/5.9.3
4-3-3/5.9.3(a)
4-3-3/5.9.3(b)
7-1-5/5.9.3
4-3-3/5.9.3(c)
4-3-3/5.9.3(d)
4-3-3/5.11
4-3-3/5.11.1
4-3-3/5.11.2
4-3-3/5.11.3
4-3-3/5.13
7-1-5/5.13
4-3-3/5.15
7-1-5/5.15
4-3-3/5.15.1
7-1-5/5.15.1
4-3-3/5.15.2
7-1-5/5.15.2
4-3-3/5.17
4-3-3/5.17.1
4-3-3/5.17.2
7-1-5/5.17.1
4-3-3/5.17.2(a)
4-3-3/5.17.2(b)
4-3-3/5.17.2(c)
4-3-3/5.17.3
4-3-3/5.17.4
7-1-5/5.17.2
7-1-5/5.19
7-1-5/5.21
4-3-3/5.19
7-1-5/5.25
7-1-5/5.27
4-3-3/5.21
4-3-3/5.21.1
7-1-5/5.29.1
7-1-5/5.29.2
4-3-3/5.23
4-3-3/5.25
4-3-3/5.25.1
4-3-3/5.25.2
4-3-3/5.25.3
4-3-3/5.25.3(a)
4-3-3/5.25.3(b)
4-3-3/5.25.3(c)
4-3-3/5.25.4
7-1-5/5.33
4-3-3/7
4-3-3/7.1
4-3-3/7.1i)
4-3-3/7.1ii)
4-3-3/7.1iii)
4-3-3/7.3
4-3-3/7.5
4-3-3/7.5.1
4-3-3/7.5.2
4-3-3/7.5.3
4-3-3/7.7
4-3-3/7.9
4-3-3/9
63
General Consideration
General
Electrical Equipment
Zone 0 Areas
Zone 1 Areas
------------Zone 2 Areas
------Cables Installation
4-3-3/9.1.4
Lighting Circuits
4-3-3/9.1.5
4-3-3/9.3
4-3-3/9.3.1
4-3-3/9.3.2
4-3-3/9.3.2(a)
4-3-3/9.3.2(b)
4-3-3/9.3.2(c)
4-3-3/9.3.2(d)
4-3-3/9.3.3
4-3-3/9.5
4-3-3/9.5.1
4-3-3/9.5.1i)
4-3-3/9.5.1ii)
4-3-3/9.5.1iii)
4-3-3/9.5.1iv)
4-3-3/9.5.1v)
4-3-3/9.5.2
4-3-3/9.5.3
4-3-3/9.5.3i)
4-3-3/9.5.3ii)
4-3-3/9.5.3iii)
4-3-3/9.7
4-3-3/9.7.1
4-3-3/9.7.1(a)
4-3-3/9.7.1(b)
4-3-3/9.7.2
4-3-3/9.7.2(a)
4-3-3/9.7.2(b)
4-3-3/9.7.2(c)
4-3-3/9.7.2(c)i)
4-3-3/9.7.2(c)ii)
4-3-3/9.7.2(c)iii)
4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d)
4-3-3/9.7.2(d)i)
4-3-3/9.7.2(d)ii)
4-3-3/9.7.2(d)iii)
4-3-3/9.7.3
4-3-3/Table 1
4-3-3/Table 2
4-3-3/Table 3
4-3-3/Figure 1
4-3-3/Figure 2
64
Title
MODU 2012
4-3-3/9.1
4-3-3/9.1.1
4-3-3/9.1.2
4-3-3/9.1.2(a)
4-3-3/9.1.2(b)
4-3-3/9.1.2(b)i)
4-3-3/9.1.2(b)ii)
4-3-3/9.1.2(b)iii)
4-3-3/9.1.2(b)iv)
4-3-3/9.1.2(b)v)
4-3-3/9.1.2(b)vi)
4-3-3/9.1.2(c)
4-3-3/9.1.2(c)i)
4-3-3/9.1.2(c)ii)
4-3-3/9.1.2(c)iii)
4-3-3/9.1.4
4-3-3/9.1.5
7-1-7/9.1.2
7-1-7/9.1.3
4-3-3/9.3
4-3-3/9.3.1
4-3-3/9.3.2
4-3-3/9.3.2(a)
4-3-3/9.3.2(b)
7-1-7/9.3.1
4-3-3/9.3.2(c)
4-3-3/9.3.3
4-3-3/9.5
4-3-3/9.5.1
4-3-3/9.5.1i)
4-3-3/9.5.1ii)
4-3-3/9.5.1iii)
4-3-3/9.5.1iv)
4-3-3/9.5.1v)
4-3-3/9.5.2
4-3-3/9.5.3
4-3-3/9.5.3i)
4-3-3/9.5.3ii)
4-3-3/9.5.3iii)
4-3-3/9.7
4-3-3/9.7.1
4-3-3/9.7.1(a)
4-3-3/9.7.1(b)
4-3-3/9.7.2
4-3-3/9.7.2(a)
4-3-3/9.7.2(b)
4-3-3/9.7.2(c)
4-3-3/9.7.2(c)i)
4-3-3/9.7.2(c)ii)
4-3-3/9.7.2(c)iii)
4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d)
4-3-3/9.7.2(d)i)
4-3-3/9.7.2(d)ii)
4-3-3/9.7.2(d)iii)
4-3-3/9.7.3
4-3-3/Table 1
7-1-5/Table 1
4-3-3/Table 2
4-3-3/Figure 1
4-3-3/Figure 2
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Machinery and Systems
Electrical Installations
Machinery and Equipment
Machinery and Equipment
Plans and Data to Be Submitted
Rotating Machines of 100 kW and Over
Switchboards, Distribution Boards, Controllers, etc.
Rotating Machines
General
Applications
Certification on Basis of an Approved Quality Assurance Program
References
Inclination
Insulation Material
Capacity of Generators
Power Supply by Generator
Protection for Generator Circuits
Protection for Motor Circuits
Installation
Protection Enclosures and its Selection
Insulation Resistance Measurement
Overload and Overcurrent Capacity
AC Generators
AC Motors
Overcurrent Capacity
Overload Capacity
Overload Capacity for Synchronous Motors
Dielectric Strength of Insulation
Application
Standard Voltage Test
Direct Current Test
Temperature Rating
Temperature Rises
Continuous Rating Machines
Short-time Rating Machines
Periodic Duty Rating Machines
Non-Periodic Duty Rating Machines
Insulation Material Above 180C (356F)
Ambient Temperature
Construction and Assembly
Enclosure, Frame and Pedestals
Shafts and Couplings
Circulating Current
Rotating Exciters
Insulation of Winding
Protection Against Cooling Water
Moisture-condensation Prevention
Terminal Arrangements
Nameplates
Lubrication
Turbines for Generators
Operating Governor
Transient Frequency Variations
----Speed Variation in Steady State
Emergency Generator Prime Mover
Overspeed Governor
Power Output of Gas Turbines
Diesel Engines for Generators
Operating Governor
Transient Frequency Variations
-----
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
65
66
Title
--Frequency Variations in Steady State
Emergency Generator Prime Movers
Overspeed Governor
Alternating-current (AC) Generators
Control and Excitation of Generators
Voltage Regulation
Voltage Regulators
Variation from Rated Voltage Steady Conditions
Variation from Rated Voltage Transient Conditions
Short Circuit Conditions
Parallel Operation
Reactive Load Sharing
Load Sharing
Facilities for Load Adjustment
Direct-current (DC Generators
Control and Excitation of Generators
Field Regulations
Polarity of Series Windings
Equalizer Connections
Voltage Regulation
Shunt or Stabilized Shunt-wound Generator
Compound-wound Generator
Automatic Voltage Regulators
Parallel Operation
Stability
Load Sharing
Tripping of Circuit Breaker
Accumulator Batteries
General
Application
Sealed Type Batteries
References
Emergency Service
Protection of Batteries
Battery Installation
Cable Installation
Construction and Assembly
Cells and Fillings Plugs
Crates and Trays
Nameplate
Engine-starting Battery
Switchboards, Distribution Boards, Controllers, etc.
General
Applications
Switchboards
Motor Controllers
Motor Control Centers
Battery Charger Units and Uninterruptible Power System (UPS) Units
Distribution Boards
References
Inclination
Emergency Switchboard
Circuit Breakers
Feeder Protection
Hull Return and Earthed Distribution System
Earthing
Installation
Protection Enclosures and its Selection
Insulation Resistance Measurement
Dielectric Strength of Insulation
----Production-line Apparatus
MODU 2012
6-1-3/3.5.1(a)iii)
6-1-3/3.5.1(b)
6-1-3/3.5.1(c)
6-1-3/3.5.2
6-1-7/5.17
6-1-7/5.17.1
6-1-7/5.17.2
6-1-7/5.17.2(a)
6-1-7/5.17.2(b)
6-1-7/5.17.2(c)
6-1-7/5.17.2(d)
6-1-7/5.17.3
6-1-7/5.17.3(a)
6-1-7/5.17.3(b)
6-1-7/5.17.3(c)
6-1-7/5.19
6-1-7/5.19.1
6-1-7/5.19.1(a)
6-1-7/5.19.1(b)
6-1-7/5.19.1(c)
6-1-7/5.19.2
6-1-7/5.19.2(a)
6-1-7/5.19.2(b)
6-1-7/5.19.2(c)
6-1-7/5.19.3
6-1-7/5.19.3(a)
6-1-7/5.19.3(b)
6-1-7/5.19.3(c)
6-1-7/7
6-1-7/7.1
6-1-7/7.1.1
6-1-7/7.1.2
4-3-4/3.1
4-3-4/3.1.1
4-3-4/3.1.2
4-3-4/3.1.3
4-3-4/3.1.4
6-1-7/7.3
6-1-7/7.3.1
6-1-7/7.3.2
6-1-7/7.3.3
4-3-4/3.3
6-1-7/9
6-1-7/9.1
6-1-7/9.1.1
6-1-7/9.1.1(a)
6-1-7/9.1.1(b)
6-1-7/9.1.1(c)
6-1-7/9.1.1(d)
6-1-7/9.1.1(e)
6-1-7/9.1.2
6-1-7/9.1.2(a)
6-1-7/9.1.2(b)
6-1-7/9.1.2(c)
6-1-7/9.1.2(d)
6-1-7/9.1.2(e)
6-1-7/9.1.2(f)
6-1-7/9.1.2(g)
6-1-7/9.1.2(h)
6-1-7/9.3
6-1-7/9.5
6-1-7/9.5i)
6-1-7/9.5ii)
6-1-7/9.5.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Devices with Low Insulation Strength
Construction and Assembly
Enclosure and Assemblies
Dead Front
Mechanical Strength
Mechanical Protection
Bus Bars, Wiring and Contacts
Design
Operating Temperature of Bus Bars
Short Circuit Rating
Internal Wiring
Arrangement
Accessibility
Locking of Connections
Soldered Connections
Clearances and Creepage Distances
Terminals
Control and Protection Devices
Circuit-disconnecting Devices
Systems Exceeding 55 Volts
Systems of 55 Volts and Less
Disconnected Devices
Arrangement of Equipment
Air Circuit Breakers
Voltage Regulators
Equipment Operated in High Temperature
Accessibility to Fuses
Protective Devices for Instruments
Wearing Parts
Markings
Switchboards
Handrails
Main Bus Bar Sub-division
Equalizer Circuit for Direct-current (D.C.) Generators
Equalizer Main Circuit
Equalizer Bus Bar
Equipment and Instrumentation
Motor Controllers and Control Centers
Enclosures and Assemblies
Disconnect Switches and Circuits Breakers
Auto-starters
Battery Systems and Uninterruptible Power Systems (UPS)
Definitions
Battery Charging Rate
Discharge Protection
Design and Construction
Construction
Operation
Type
Continuity of Supply
Monitoring and Alarming
Location
Location
Ventilation
Battery Installation
Performance
Duration
Battery Capacity
Recharging
Testing and Survey
Surveys
Testing
Test upon Power Input Failure
Transformers
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
6-1-7/9.5.2
6-1-7/9.7
6-1-7/9.7.1
6-1-7/9.7.2
6-1-7/9.7.3
6-1-7/9.7.4
6-1-7/9.9
6-1-7/9.9.1
6-1-7/9.9.2
6-1-7/9.9.3
6-1-7/9.9.4
6-1-7/9.9.5
6-1-7/9.9.5(a)
6-1-7/9.9.5(b)
6-1-7/9.9.5(c)
6-1-7/9.9.6
6-1-7/9.9.7
6-1-7/9.11
6-1-7/9.11.1
6-1-7/9.11.1(a)
6-1-7/9.11.1(b)
6-1-7/9.11.1(c)
6-1-7/9.11.2
6-1-7/9.11.2(a)
6-1-7/9.11.2(b)
6-1-7/9.11.2(c)
6-1-7/9.11.2(d)
6-1-7/9.11.2(e)
6-1-7/9.11.2(f)
6-1-7/9.11.3
6-1-7/9.13
6-1-7/9.13.1
6-1-7/9.13.2
6-1-7/9.13.3
6-1-7/9.13.3(a)
6-1-7/9.13.3(b)
6-1-7/9.13.4
6-1-7/9.15
6-1-7/9.15.1
6-1-7/9.15.2
6-1-7/9.15.3
6-1-7/9.17
6-1-7/9.17.1
6-1-7/9.17.2
6-1-7/9.17.3
6-1-7/9.17.4
6-1-7/9.17.4(a)
6-1-7/9.17.4(b)
6-1-7/9.17.4(c)
6-1-7/9.17.4(d)
6-1-7/9.17.4(e)
4-3-4/3.5
4-3-4/3.5.1
4-3-4/3.5.2
4-3-4/3.5.3
4-3-4/3.7
4-3-4/3.7.1
4-3-4/3.7.2
4-3-4/3.7.3
6-1-7/19.9
--6-1-7/19.9
6-1-7/19.9
6-1-7/11
67
68
4
3
5
Title
General
Applications
References
Power Supply Arrangements
Protections
Protection Enclosures and its Selection
Forced Cooling Arrangement (Air or Liquid)
Temperature Rise
Construction and Assembly
Windings
Terminals
Nameplate
Prevention of the Accumulation of Moisture
Other Electric and Electronics Devices
Circuit Breakers
General
Mechanical property
Isolation
Fuses
Semiconductor Converters
General
Cooling Arrangement
Accessibility
Nameplate
Cable Junction Boxes
General
Design and Construction
Cables and Wires
Cable Construction
General
Flame Retarded Property
Standards
------Alternative Arrangement
Fire Resistant Property
Insulating Material
Armor for Single-conductor Cables
Fabric Optic Cables
Portable and Flexing Electric Cables
Mineral-isolated Metal-sheathed Cable
Factory Testing Schedule for Generators and Motors 100 kW (135 hp)
Dielectric Strength Test for Rotating Machines
Limits of Temperature Rise for Air-Cooled Rotating Machines
Nameplates
Factory Testing Schedule for Switchboards, Chargers, Motor Control Centers, and
Controllers
Clearance and Creepage Distance for Switchboards, Distribution Boards, Chargers,
Motor Control Centers, and Controllers
Equipment and Instrumentation for Switchboard
Temperature Rise for Transformers
Types of Cable Insulation
Maximum Current Carrying Capacity for Insulated Copper Wires and Cables
Additional Services Requiring Electrical Equipment to be Designed, Constructed and
Tested to the Requirements in Section 4-3-4
Limiting Curves for Loading 4-stroke Diesel Engine Step-by-step from No-load to
Rated Power as Function of the Brake Mean Effective Pressure
Machinery and Systems
Electrical Installations
Specialized Installations
Specialized Installations
High Voltage System
MODU 2012
6-1-7/11.1
6-1-7/11.1.1
6-1-7/11.1.2
6-1-7/11.1.2(a)
6-1-7/11.1.2(b)
6-1-7/11.1.2(c)
6-1-7/11.1.3
6-1-7/11.3
6-1-7/11.5
6-1-7/11.5.1
6-1-7/11.5.2
6-1-7/11.5.3
6-1-7/11.5.4
6-1-7/13
6-1-7/13.1
6-1-7/13.1.1
6-1-7/13.1.2
6-1-7/13.1.3
6-1-7/13.3
6-1-7/13.5
6-1-7/13.5.1
6-1-7/13.5.2
6-1-7/13.5.3
6-1-7/13.5.4
6-1-7/13.7
6-1-7/13.7.1
6-1-7/13.7.2
4-3-4/7
4-3-4/7.1
4-3-4/7.1.1
4-3-4/7.1.2
4-3-4/7.1.2(a)
4-3-4/7.1.2(a)i)
4-3-4/7.1.2(a)ii)
4-3-4/7.1.2(a)iii)
4-3-4/7.1.2(b)
4-3-4/7.1.3
4-3-4/7.1.4
4-3-4/7.1.5
4-3-4/7.1.6
4-3-4/7.3
4-3-4/7.5
6-1-7/Table 2
6-1-7/Table 3
6-1-7/Table 4
6-1-7/Table 5
6-1-7/Table 6
6-1-7/Table 7
6-1-7/Table 8
6-1-7/Table 9
4-3-4/Table 1
4-3-4/Table 2
6-1-7/3.3
6-1-7/5.1.1
6-1-3/Figure 1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
4-3-5/1.1
General
4-3-5/1.1.1
Application
4-3-5/1.1.2
4-3-5/1.1.3
4-3-5/1.1.3(a)
4-3-5/1.1.3(b)
4-3-5/1.3
4-3-5/1.3.1
4-3-5/1.3.2
4-3-5/1.3.2(a)
4-3-5/1.3.2(b)
4-3-5/1.3.3
4-3-5/1.3.4
4-3-5/1.3.5
4-3-5/1.3.6
Standard Voltages
Air Clearance and Creepage Distance
Air Clearance
Creepage Distance
System Design
Selective Coordination
Earthed Neutral Systems
Neutral Earthing
Equipment
Neutral Disconnection
Hull Connection of Earthing Impedance
Earth Fault Detection
Number and Capacity of Transformers
Circuit Breakers and Switches Auxiliary Circuit Power Supply Systems for
Operating Energy
Source and Capacity of Power Supply
Number of External Sources of Stored Energy
Circuit Protection
Protection of Generator
Protection of Power Transformers
Coordinated Trips of Protective Devices
----Load Shedding Arrangements
Protection from Electrical Disturbance
Detection of Phase-to-Phase Internal Faults
Protection from Earth-Faults
Transformers Arranged in Parallel
Voltage Transformers for Control and Instrumentation
Fuses
Over Voltage Protection
------Equipment Installation and Arrangement
Degree of Protection
Protective Arrangements
Interlocking Arrangements
Warning Plates
Cables
Runs of Cables
Segregation
Installation Arrangement
Termination and Splices
Marking
Test after Installation
Machinery and Equipment
Rotating Machines
Protection
Windings
Temperature Detectors
(No Text)
Space Heater
Tests
Switchgear and Control-gear Assemblies
Protection
Mechanical Construction
Configuration
Clearance and Creepage Distances
Locking Facilities
4-3-5/1.5
4-3-5/1.5.1
4-3-5/1.5.2
4-3-5/1.7
4-3-5/1.7.1
4-3-5/1.7.2
4-3-5/1.7.2(a)
4-3-5/1.7.2(a)i)
4-3-5/1.7.2(a)ii)
4-3-5/1.7.2(b)
4-3-5/1.7.2(c)
4-3-5/1.7.2(d)
4-3-5/1.7.2(e)
4-3-5/1.7.2(f)
4-3-5/1.7.3
4-3-5/1.7.4
4-3-5/1.7.5
4-3-5/1.7.5i)
4-3-5/1.7.5ii)
4-3-5/1.7.5iii)
4-3-5/1.9
4-3-5/1.9.1
4-3-5/1.9.2
4-3-5/1.9.2(a)
4-3-5/1.9.2(b)
4-3-5/1.9.3
4-3-5/1.9.3(a)
4-3-5/1.9.3(b)
4-3-5/1.9.3(c)
4-3-5/1.9.3(d)
4-3-5/1.9.3(e)
4-3-5/1.9.3(f)
4-3-5/1.11
4-3-5/1.11.1
4-3-5/1.11.1(a)
4-3-5/1.11.1(b)
4-3-5/1.11.1(c)
4-3-5/1.11.1(d)
4-3-5/1.11.1(e)
4-3-5/1.11.1(f)
4-3-5/1.11.2
4-3-5/1.11.2(a)
4-3-5/1.11.2(b)
4-3-5/1.11.2(c)
4-3-5/1.11.2(d)
4-3-5/1.11.2(e)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-5/1.1
6-1-7/15.1
4-3-5/1.1.1
6-1-7/15.1.1
4-3-5/1.1.2
4-3-5/1.1.3
4-3-5/1.1.3(a)
4-3-5/1.1.3(b)
4-3-5/1.3
4-3-5/1.3.1
4-3-5/1.3.2
4-3-5/1.3.2(a)
4-3-5/1.3.2(b)
4-3-5/1.3.3
4-3-5/1.3.4
4-3-5/1.3.5
4-3-5/1.3.6
4-3-5/1.5
4-3-5/1.5.1
4-3-5/1.5.2
4-3-5/1.7
4-3-5/1.7.1
4-3-5/1.7.2
4-3-5/1.7.2(a)
4-3-5/1.7.2(a)i)
4-3-5/1.7.2(a)ii)
4-3-5/1.7.2(b)
4-3-5/1.7.2(c)
4-3-5/1.7.2(d)
4-3-5/1.7.2(e)
4-3-5/1.7.2(f)
4-3-5/1.7.3
4-3-5/1.7.4
4-3-5/1.7.5
4-3-5/1.7.5i)
4-3-5/1.7.5ii)
4-3-5/1.7.5iii)
4-3-5/1.9
4-3-5/1.9.1
4-3-5/1.9.2
4-3-5/1.9.2(a)
4-3-5/1.9.2(b)
4-3-5/1.9.3
4-3-5/1.9.3(a)
4-3-5/1.9.3(b)
4-3-5/1.9.3(c)
4-3-5/1.9.3(d)
4-3-5/1.9.3(e)
4-3-5/1.9.3(f)
6-1-7/15.3
6-1-7/15.3.1
6-1-7/15.3.1(a)
6-1-7/15.3.1(b)
6-1-7/15.3.1(c)
--6-1-7/15.3.1(d)
6-1-7/19.19
6-1-7/15.3.2
6-1-7/15.3.2(a)
6-1-7/15.3.2(b)
6-1-7/15.3.2(c)
6-1-7/15.3.2(d)
6-1-7/15.3.2(r)
69
70
Title
Shutters
Earthing and Short-circuiting
Tests
Transformers
Application
Plans
Enclosure
Space Heater
Testing
----Nameplate
Cables
Standards
Electric Propulsion System
General
Application
Plans and Data to be Submitted
System Design
General
Generating Capacity
Power Management System
Regenerative Power
Harmonics
Propulsion Power Supply Systems
Propulsion Generators
Power Supply
Single System
Multiple System
Excitation System
Features for Other Services
Propulsion Excitation
Excitation Circuits
Field Circuits
Drilling Unit's Service Generator Connections
Semiconductor Converters
------Circuit Protection
Settings
Direct-current (DC) Propulsion Circuits
Circuit Protection
Protection for Reversal of the Rotation
Excitation Circuits
Reduction of Magnetic Fluxes
Semiconductor Converters
Overvoltage Protection
Overcurrent Protection
Short-circuit Protection
Filter Circuits
Direct-current (DC) Propulsion Motors Supplied by Semiconductor Converters
Protection for Earth Leakage
Main Propulsion Circuits
Excitation Circuits
Alternating-current (AC) Systems
Direct-current (DC) Systems
Electric Propulsion Control
General
Automatic and Remote Control System
Testing and Inspection
Initiation of Control
Emergency Stop
Prime Mover Control
MODU 2012
6-1-7/15.3.2(f)
6-1-7/15.3.2(g)
6-1-7/19.21
6-1-7/15.3.3
6-1-7/15.3.3(a)
6-1-7/15.3.3(b)
6-1-7/15.3.3(c)
6-1-7/15.3.3(d)
6-1-7/19.23
6-1-7/19.23i)
6-1-7/19.23ii)
6-1-7/19.23
4-3-5/1.11
4-3-5/1.11
4-3-5/3
4-3-5/3.1
4-3-5/3.1.1
4-3-5/3.1.2
4-3-5/3.3
4-3-5/3.3.1
4-3-5/3.3.2
4-3-5/3.3.3
4-3-5/3.3.4
4-3-5/3.3.5
4-3-5/3.5
4-3-5/3.5.1
4-3-5/3.5.1(a)
4-3-5/3.5.1(b)
4-3-5/3.5.1(c)
4-3-5/3.5.1(d)
4-3-5/3.5.1(e)
4-3-5/3.5.2
4-3-5/3.5.2(a)
4-3-5/3.5.2(b)
4-3-5/3.5.2(c)
4-3-5/3.5.3
4-3-5/3.5.3(a)
4-3-5/3.5.3(b)
4-3-5/3.5.3(c)
4-3-5/3.7
4-3-5/3.7.1
4-3-5/3.7.2
4-3-5/3.7.2(a)
4-3-5/3.7.2(b)
4-3-5/3.7.3
4-3-5/3.7.4
4-3-5/3.7.5
4-3-5/3.7.5(a)
4-3-5/3.7.5(b)
4-3-5/3.7.5(c)
4-3-5/3.7.5(d)
4-3-5/3.7.6
4-3-5/3.9
4-3-5/3.9.1
4-3-5/3.9.2
4-3-5/3.9.3
4-3-5/3.9.4
4-3-5/3.11
4-3-5/3.11.1
4-3-5/3.11.2
6-1-7/19.17
4-3-5/3.11.3
4-3-5/3.11.4
4-3-5/3.11.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Control Power Failure
Protection
Interlocks
Instrumentation at the Control Station
Indication, Display and Alarms
For AC Systems
For DC Systems
For Electric Slip Couplings
Indication of Propulsion System Status
Ready for Operation
Faulty
Power Limitation
Equipment Installation and Arrangement
General
Accessibility and Facilities for Repairs
Accessibility
Facility for Supporting
Slip couplings
Semiconductor Converters
Propulsion Cables
Machinery and equipment
Material Tests
Temperature Rating
Protection Against Moisture Condensation
Prime Movers
Capability
Speed Control
Manual Controls
Parallel Operation
Protection for Regenerated Power
Rotating Machines for Propulsion
Ventilation and Protection
Fire-extinguishing Systems
Air Coolers
Temperature Sensors
Propulsion Generators
Direct-current (DC) Propulsion Motors
Rotors
Overspeed Protection
Electric Couplings
General
Accessibility for Repairs
Temperature Rating
Excitation
Control Equipment
Nameplates
Semiconductor Converters for Propulsion
General
Testing and Inspection
Forced Cooling
Additional Requirements for Water Cooled Converters
Reactors and Transformers for Semiconductor Converters
General
Voltage Regulation
High Temperature Alarm
Switches
General Design
Generator and Motor Switches
Field Switches
Propulsion Cables
Conductors
Insulation Materials
Braided Metallic Armor and Impervious Metallic Sheaths
Inner Wiring
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-5/3.11.6
4-3-5/3.11.7
4-3-5/3.11.8
4-3-5/3.13
4-3-5/3.13.1
4-3-5/3.13.1(a)
4-3-5/3.13.1(b)
4-3-5/3.13.1(c)
4-3-5/3.13.2
4-3-5/3.13.2(a)
4-3-5/3.13.2(b)
4-3-5/3.13.2(c)
4-3-5/3.15
4-3-5/3.15.1
4-3-5/3.15.2
6-1-7/17.1.3
4-3-5/3.15.2(a)
4-3-5/3.15.2(b)
4-3-5/3.15.3
4-3-5/3.15.4
6-1-7/17
6-1-4/3
6-1-7/17.1.1
6-1-7/17.1.1
6-1-3/3.7
6-1-3/3.7.1
6-1-3/3.7.2
6-1-3/3.7.3
6-1-3/3.7.4
6-1-3/3.7.5
6-1-7/17.3.1
6-1-7/17.3.1(a)
6-1-7/17.3.1(b)
6-1-7/17.3.1(c)
6-1-7/17.3.1(d)
6-1-7/17.3.2
6-1-7/17.3.3
6-1-7/17.3.3(a)
6-1-7/17.3.3(b)
6-1-7/17.3.4
6-1-7/17.3.4(a)
6-1-7/17.3.4(b)
6-1-7/17.3.4(c)
6-1-7/17.3.4(d)
6-1-7/17.3.4(e)
6-1-7/17.3.4(f)
6-1-7/17.3.5
6-1-7/17.3.5(a)
6-1-7/19.13
6-1-7/17.3.5(b)
6-1-7/17.3.5(c)
6-1-7/17.3.6
6-1-7/17.3.6(a)
6-1-7/17.3.6(b)
6-1-7/17.3.6(c)
4-3-5/3.17.2
4-3-5/3.17.2(a)
4-3-5/3.17.2(b)
4-3-5/3.17.2(c)
6-1-7/17.3.7
6-1-7/17.3.7(a)
6-1-7/17.3.7(b)
6-1-7/17.3.7(c)
6-1-7/17.3.7(d)
71
72
Title
Testing
Three-wire Dual-voltage DC System
Three-wire DC Drilling Unit's Generator
Neutral Earthing
Main Switchboard
Emergency Switchboard
Size of Neutral Conductor
Systems Associated with Drilling Operations
Emergency Shutdown Facilities
Shutdown Arrangements
Operation After Shutdown
----------Machinery and Systems
Machinery, Equipment, and Their Installation
Hazardous Areas
Hazardous Areas
Definitions
Hazardous Areas
Enclosed Space
Semi-Enclosed Location
Classification of Areas
Hazardous Areas Zone 0 include
------Hazardous Areas Zone 1 include
----------Hazardous Areas Zone 2 include
------------------Openings, Access, and Ventilation Conditioning Affecting the Extent of Hazardous
Zones
Enclosed Space with Direct Access to any Zone 1 Location
------Enclosed Space with Direct Access to any Zone 2 Location
------Enclosed Space with Access to any Zone 1 Location
------Ventilation
General
Ventilation of Hazardous Areas
Ventilation of Non-Hazardous Areas
Machinery Installations
MODU 2012
6-1-7/19.15
4-3-5/5
4-3-5/5.1
4-3-5/5.3
4-3-5/5.3.1
4-3-5/5.3.2
4-3-5/5.5
4-3-5/7
4-3-5/7.1
4-3-5/7.1
4-3-5/7.1.2
4-3-5/7.1.2i)
4-3-5/7.1.2ii)
4-3-5/7.1.2iii)
4-3-5/7.1.2iv)
4-3-5/7.1.2v)
4-3-6
4-3-6/1
4-3-6/1.1
4-3-6/1.3
4-3-6/1.5
4-3-6/5
4-3-6/5.1
4-3-6/5.1i)
4-3-6/5.1ii)
4-3-6/5.1iii)
4-3-6/5.3
4-3-6/5.3i)
4-3-6/5.3ii)
4-3-6/5.3iii)
4-3-6/5.3iv)
4-3-6/5.3v)
4-3-6/5.5
4-3-6/5.5i)
4-3-6/5.5ii)
4-3-6/5.5iii)
4-3-6/5.5iv)
4-3-6/5.5v)
4-3-6/5.5vi)
4-3-6/5.5vii)
4-3-6/5.5viii)
4-3-6/5.5ix)
4-3-6/7
4-3-6/7.1
4-3-6/7.1i)
4-3-6/7.1ii)
4-3-6/7.1iii)
4-3-6/7.3
4-3-6/7.3i)
4-3-6/7.3ii)
4-3-6/7.3iii)
4-3-6/7.5
4-3-6/7.5i)
4-3-6/7.5ii)
4-3-6/7.5iii)
4-3-6/9
4-3-6/9.1
4-3-6/9.3
4-3-6/9.5
4-3-6/11
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
General
Hazardous Areas
Hazardous Zones
Hazardous Zones
Hazardous Zones
Fire and Safety Measures and Features
Passive Fire Protection
General
General
General
Administrative Review
ABS Review
Materials Containing Asbestos
Structural Fire Protection
Construction Materials
Alternate Materials
Fire Integrity of Bulkheads and Decks
Application of Tables
--------------------------------------------------------------Protection of Accommodation Spaces, Service Spaces and Control Stations
---
5-1-1/5.3
---
5-1-1/5.5
5-1-1/5.7
5-1-1/5.9
5-1-1/5.11
5-1-1/5.13
5-1-1/5.13i)
5-1-1/5.13ii)
5-1-1/5.13iii)
5-1-1/5.15
5-1-1/5.17
5-1-1/5.19
-----------------------
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
4-3-6/11
4-3-6/11
4-3-6/Figure 1
4-3-6/Figure 2
4-3-6/Figure 3
5-1-1
5-1-1/1
5-1-1/1.1
5-1-1/1.3
5-1-1/1.5
5-1-1/3
5-1-1/3.1
5-1-1/3.3
5-1-1/3.7
5-1-1/3.9
5-1-1/3.9.1
5-1-1/3.9.2
5-1-1/3.9.2(1)
5-1-1/3.9.2(2)
5-1-1/3.9.2(3)
5-1-1/3.9.2(4)
5-1-1/3.9.2(5)
5-1-1/3.9.2(6)
5-1-1/3.9.2(7)
5-1-1/3.9.2(8)
5-1-1/3.9.2(9)
5-1-1/3.9.2(10)
5-1-1/3.9.2(11)
5-1-1/3.11
5-1-1/3.13
5-1-1/3.15
5-1-1/3.17
5-1-1/3.17i)
5-1-1/3.17ii)
5-1-1/3.17iii)
5-1-1/3.17iv)
5-1-1/3.17v)
5-1-1/3.19
5-1-1/3.19i)
5-1-1/3.19ii)
5-1-1/3.19iii)
5-1-1/3.21
5-1-1/3.23
5-1-1/3.23i)
5-1-1/3.23ii)
5-1-1/3.23iii)
5-1-1/5
5-1-1/5.7
5-1-1/5.9
5-1-1/3.17vi)
5-1-1/5.9
5-1-1/5.11
5-1-1/5.13
5-1-1/5.15
5-1-1/5.17
5-1-1/5.17i)
5-1-1/5.17ii)
5-1-1/5.17iii)
5-1-1/5.19
5-1-1/5.21
5-1-1/5.23
73
---------------------------------------------------------
5-1-1/5.31
---
5-1-1/5.31i)
5-1-1/5.31ii)
5-1-1/5.31iii)
5-1-1/5.31iv)
5-1-1/5.33
5-1-1/5.35
5-1-1/5.37
5-1-1/5.37i)
5-1-1/5.37ii)
5-1-1/5.37iii)
5-1-1/5.39
5-1-1/5.41
5-1-1/5.41i)
5-1-1/5.41ii)
5-1-1/5.41iii)
5-1-1/5.41iv)
5-1-1/Table 1
5-1-1/Table 2
5-1-1/Figure 1
5-1-1/Figure 2
5-1-1/Figure 3
5-1-1/Figure 4
Part
5
Chapter
2
Section
1
5-2-1/1
5-2-1/3
5-2-1/3.1
5-2-1/3.3
74
Title
MODU 2012
5-1-1/5.25
5-1-1/5.25i)
5-1-1/5.25ii)
5-1-1/5.25iii)
5-1-1/5.27
5-1-1/5.27i)
5-1-1/5.27ii)
5-1-1/5.27iii)
5-1-1/5.29
5-1-1/5.29i)
5-1-1/5.29ii)
5-1-1/5.29iii)
5-1-1/5.29v)
5-1-1/5.29vi)
5-1-1/5.29.1
5-1-1/5.29.1i)
5-1-1/5.29.1ii)
5-1-1/5.29.1iii)
5-1-1/5.29.1iv)
5-1-1/5.29.1v)
5-1-1/5.29.1vi)
5-1-1/5.31
5-1-1/5.31i)
5-1-1/5.31ii)
5-1-1/5.31iii)
5-1-1/5.31iv)
5-1-1/5.31v)
5-1-1/5.33
5-1-1/5.35
5-1-1/5.37
5-1-1/5.37i)
5-1-1/5.37ii)
5-1-1/5.37iii)
5-1-1/5.37iv)
5-1-1/5.39
5-1-1/5.41
5-1-1/5.43
5-1-1/5.43i)
5-1-1/5.43ii)
5-1-1/5.43iii)
5-1-1/5.45
5-1-1/5.47
5-1-1/5.47i)
5-1-1/5.47ii)
5-1-1/5.47iii)
5-1-1/5.47iv)
5-1-1/Table 1
5-1-1/Table 2
5-1-1/Figure 1
5-1-1/Figure 2
5-1-1/Figure 3
5-1-1/Figure 4
5-2-1/1
5-2-1/3
5-2-1/3.1
5-2-1/3.3
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Fixed Fire Fighting Systems
Fixed Fire Fighting Systems
Fire Main Systems
Fire Pumps
Number of Pumps
Location of Pumps
Location
------Remote Operation
Type of Pumps
Pressure
Pump Capacity
General
Ship-type Drilling Units
Total Pump Capacity
Individual Pump Capacity
Relief Valves
Intermediate Tank Water Supply
Tank Capacity
Features
------Pressurized Main Water supply
Fire Main
Size
Cocks or Valves
Isolation
Cold Weather Protection
Materials
Connections
Hydrants, Hoses, and Nozzles
Hydrants
Hoses
Nozzles
International Shore Connection
International Shore Connection
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Additional Fixed Fire Fighting Systems
Additional Fixed Firefighting Systems
Fixed Firefighting Systems
----------Gas Smothering
General
Storage
Design
Alarm
Electric
Pneumatic
Controls
Carbon Dioxide Systems
Foam
Fixed High Pressure Expansion Foam System
Low Expansion Foam System
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
5-2-2
5-2-2/1
5-2-2/1.1
5-2-2/1.1.1
5-2-2/1.1.2
5-2-2/1.1.2(a)
5-2-2/1.1.2(a)i)
5-2-2/1.1.2(a)ii)
5-2-2/1.1.2(a)iii)
5-2-2/1.1.2(b)
5-2-2/1.1.3
5-2-2/1.1.4
5-2-2/1.1.5
5-2-2/1.1.5(a)
5-2-2/1.1.5(b)
5-2-2/1.1.5(b)i)
5-2-2/1.1.5(b)ii)
5-2-2/1.1.6
5-2-2/1.1.7
5-2-2/1.1.7(a)
5-2-2/1.1.7(b)
5-2-2/1.1.7(b)i)
5-2-2/1.1.7(b)ii)
5-2-2/1.1.7(b)iii)
5-2-2/1.1.8
5-2-2/1.3
5-2-2/1.3.1
5-2-2/1.3.2
5-2-2/1.3.3
5-2-2/1.3.4
5-2-2/1.3.5
5-2-2/1.3.6
5-2-2/1.5
5-2-2/1.5.1
5-2-2/1.5.2
5-2-2/1.5.3
5-2-2/1.5.4
5-2-2/Figure 1
5-2-3
5-2-3/1
5-2-3/1i)
5-2-3/1ii)
5-2-3/1iii)
5-2-3/1iv)
5-2-3/1v)
5-2-3/3
5-2-3/3.1
5-2-3/3.1.1
5-2-3/3.1.2
5-2-3/3.1.3
5-2-3/3.1.3(a)
5-2-3/3.1.3(b)
5-2-3/3.1.4
5-2-3/3.3
5-2-3/5
5-2-3/5.1
5-2-3/5.3
75
76
5
2
4
5
2
5
5
3
1
Title
Application
Design
Fixed Pressure Water Spraying System
Protection of Helicopter Decks and Refueling Facilities
General
Firefighting Systems
Hoses and Nozzles
Portable Extinguisher
Back-up System
Fixed-Foam System
Paint and Flammable Liquid Lockers
Lockers of 4 m2 (43 ft2) or More Floor Area and Lockers with Access to
Accommodation Spaces
--------Lockers of Less Than 4 m2 (43 ft2) Floor Area Having no Access to Accommodation
Spaces
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Portable Fire Fighting Systems
Portable Fire Fighting Systems
Portable Fire Extinguishers and Sand
Extinguishers
Sand
Fireman's Outfit
Number
Breathing Apparatus
----Lifeline
Safety lamp and Axe
Boots and Gloves
Helmet
Protective Clothing
Classification of Portable and Semi-portable Extinguishers
Hand Portable Fire Extinguishers and Semi-portable Fire-Extinguishing Systems
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Fire and Gas Detection
Fire and Gas Detection
Other Fire Protection Requirements
Fire Detection and Alarm Systems
General Alarm
Mud tanks Level Alarm
Ventilation System Alarms
Gas Detection and Alarm Systems
----------Fire and Safety Measures and Features
Outfitting
General
Means of Escape
-------------
MODU 2012
5-2-3/5.3.1
5-2-3/5.3.2
5-2-3/7
5-2-3/9
5-2-3/9.1
5-2-3/9.3
5-2-3/9.3.1
5-2-3/9.3.2
5-2-3/9.3.3
5-2-3/9.3.4
5-2-3/11
5-2-3/11.1
5-2-3/11.1i)
5-2-3/11.1ii)
5-2-3/11.1iii)
5-2-3/11.1iv)
5-2-3/11.3
5-2-4
5-2-4/1
5-2-4/1.1
5-2-4/1.3
5-2-4/3
5-2-4/3.1
5-2-4/3.3
5-2-4/3.3i)
5-2-4/3.3ii)
5-2-4/3.7
5-2-4/3.9
5-2-4/3.11
5-2-4/3.13
5-2-4/3.15
5-2-4/Table 1
5-2-4/Table 2
5-2-5
5-2-5/1
5-2-5/1.1
5-2-5/1.3
5-2-5/1.5
5-2-5/1.7
5-2-5/3
5-2-5/3i)
5-2-5/3ii)
5-2-5/3iii)
5-2-5/3iv)
5-2-5/3v)
5-3-1/1
5-3-1/1.1
5-3-1/1.1.1
5-3-1/1.1.2
5-3-1/1.1.3
5-3-1/1.3
5-3-1/1.3.1
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
--------Means of Access and Egress
Guards and Rails
Floor Deck Areas and Openings
Helicopter Landing Deck
Emergency Control Station
Arrangements in Machinery Space
Ventilation Fans and Openings
General
Release of Smoke from Machinery Space
Other Auxiliaries
Oil Tank Suction Pipes
Oil Fuel Units
Segregation of Fuel Oil Purifiers
--------Rotary Table Area
Fire Precautions for Machinery Spaces
--------Surveys
Surveys During Construction
General
General
General
Construction Surveys
6-1-1/3.1
Structure Fabrication/Erection
6-1-1/3.1.1
6-1-1/3.1.1(a)
6-1-1/3.1.1(b)
6-1-1/3.1.1(c)
6-1-1/3.1.1(d)
6-1-1/3.1.1(e)
6-1-1/3.1.1(f)
6-1-1/3.1.1(g)
6-1-1/3.1.1(h)
6-1-1/3.1.1(i)
6-1-1/3.1.1(j)
6-1-1/5
6-1-1/5.1
General
6-1-1/5.3
Part
Chapter
Section
6
1
2
6-1-2
6-1-2/1
6-1-2/1.1
6-1-2/1.3
6-1-2/1.5
6-1-2/3
6-1-2/3.1
6-1-2/3.3
6-1-2/3.5
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
5-3-1/1.3.2
5-3-1/1.5
5-3-1/1.7
5-3-1/1.9
5-3-1/3
5-3-1/5
5-3-1/5.1
5-3-1/5.3
5-3-1/7
5-3-1/9
5-3-1/9.1
5-3-1/9.1.1
5-3-1/9.1.2
5-3-1/9.3
5-3-1/9.5
5-3-1/9.7
5-3-1/11
5-3-1/11i)
5-3-1/11ii)
5-3-1/11iii)
5-3-1/11iv)
5-3-1/13
5-3-1/15
5-3-1/15i)
5-3-1/15ii)
5-3-1/15iii)
5-3-1/15iv)
77
Title
Structural Testing
Jacking Gear
Prototype Test
Prior to the Test
Test
Subsequent to the Test
Initial Jacking Test
Rotating Machines Testing and Inspection
Applications
Machines of 100 kW and Over
Machines Below 100 kW
Other Machines
Special Testing Arrangements
Moveable Cantilever and Skid Beam Testing
Metallic Piping Systems Pressure Tests
Fuel-oil Service System
Fuel-oil Suction and Transfer Lines
Starting-air Piping
Hydraulic Power Piping
All Piping
Specific Systems
Hydrostatic Tests of Shell Valves
Pneumatic Tests in Lieu of Hydrostatic Tests
Pump Hydrostatic Test
Pump Capacity Test
Relief Valve Capacity Test
Plastic Piping Testing On Board After Installation
Fixed Oxygen-Acetylene Installations Testing
Switchboards, Distribution Boards, Controllers, etc. Testing and Inspection
Applications
Switchboards
Motor Controllers
Motor Control Centers
Battery Charger Units, Uninterruptible Power System (UPS) Units, and Distribution
Boards
Test Items
Special Testing Arrangements
Transformers Testing
------Electrical Service Trials
6-1-2/27.1
6-1-2/27.3
6-1-2/29
6-1-2/29.1
6-1-2/29.3
6-1-2/29.5
6-1-2/31
6-1-2/33
Part
Chapter
Section
6-2-1
6-2-1/1
6-2-1/1.1
6-2-1/3
6-2-1/3.1
6-2-1/3.3
6-2-1/3.5
6-2-1/3.7
6-2-1/3.9
6-2-1/3.11
Communication Facilities
Trials for Self-Propelled Drilling Units
Full Power
Reduced Power
Machinery Operation
Trials for Non Self-Propelled Drilling Units
Dock and Sea Trials
Surveys
Surveys After Construction
Conditions for Surveys After Construction
Conditions for Surveys After Construction
Application
Chapter 2 Sections 1 through 10
Definitions
Ballast Tank
Corrosion
Corrosion Control System
Critical Structural Areas
Girth Belt (Transverse Section)
Panel
6-1-2/23.1.4
78
6
2
1
MODU 2012
7-1-2/23.7
6-1-3/25.3
6-1-3/25.3
6-1-3/25.3i)
6-1-3/25.3ii)
6-1-3/25.3iii)
7-1-9/9.1
----6-1-7/19.1
6-1-7/5.1.1
----7-1-9/9.3
7-1-4/41.1
7-1-4/41.1.1
7-1-4/41.1.2
7-1-4/41.1.3
7-1-4/41.1.4
7-1-4/41.1.7
7-1-4/41.1.5
7-1-4/41.5
7-1-4/41.3
6-1-6/7.3.2(a)
6-1-6/7.3.2(b)
6-1-6/7.3.2(c)
7-1-4/41.7
7-1-4/41.9
----6-1-7/19.5
6-1-7/19.7
6-1-7/19.7
6-1-7/19.9
----6-1-7/19.11
6-1-7/19.11i)
6-1-7/19.11ii)
6-1-7/19.11iii)
--7-1-6/21
7-1-9/11.7
7-1-9/11.9
7-1-9/13
7-1-9/13.1
7-1-9/13.3
7-1-9/13.5
7-1-9/11
7-1-9/1
7-2-1
7-2-1/1
7-2-1/1.1
7-2-1/3
7-2-1/3.1
7-2-1/3.3
7-2-1/3.5
7-2-1/3.7
7-2-1/3.9
7-2-1/3.11
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
6
2
4
Title
Survey
Representative Spaces/Tanks
Spaces
Suspect Areas
Wind and Water Strakes
Notification and Availability for Survey
Damage, Failure and Repair
Examination and Repair
Repairs
Representation
Alterations
Welding and Replacement of Materials
Ordinary and Higher Strength Structural Steels
Special Materials
Incomplete Surveys
Lay-up and Reactivation
Units for Unrestricted Service
Units in Great Lakes Service
Surveys
Surveys After Construction
Survey Intervals
Survey Intervals
Units Unrestricted Service
Annual Surveys
Special Periodical Surveys
Continuous Surveys
In-line Surveys
Drydocking Survey or Equivalent
Underwater Inspection in Lieu of Drydocking Survey
Tail Shaft Surveys
Water-Lubricated Bearings in Fresh Water Exclusively
Water-Lubricated Bearings in Fresh Water and Sea Water
Single Screw
Multiple Screw
Continuous Liner or Equivalent
----Oil-Lubricated Bearings
Extensions Water-Lubricated Bearings
Extension up to Three (3) Months
Extension up to One (1) Year
Extensions Oil-Lubricated Bearings
Extension up to Three (3) Months
Extension up to One (1) Year
Extensions not Exceeding Five (5) Years
Auxiliary Boiler Surveys
Units Great Lakes Service
Surveys
Surveys After Construction
Survey Pre-planning
Survey Pre-planning
Special Surveys, Drydocking Surveys, and Underwater Inspections in Lieu of
Drydocking
Surveys
Surveys After Construction
Annual Surveys
Annual Surveys
Annual Survey Hull
All Types of Mobile Offshore Drilling Units
---------
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
7-2-1/3.13
7-2-1/3.15
7-2-1/3.17
7-2-1/3.19
7-2-1/3.21
7-2-1/5
7-2-1/7
7-2-1/7.1
7-2-1/7.3
7-2-1/7.5
7-2-1/9
7-2-1/11
7-2-1/11.1
7-2-1/11.3
7-2-1/13
7-2-1/15
7-2-1/15.1
7-2-1/15.3
7-2-2
7-2-2/1
7-2-2/1.1
7-2-2/1.3
7-2-2/1.5
7-2-2/1.7
7-2-2/1.9
7-2-6/3
7-2-2/1.11
7-2-2/1.11.1
7-2-2/1.11.2
7-2-2/1.11.2(a)
7-2-2/1.11.2(b)
7-2-2/1.11.2(c)
7-2-2/1.11.2i)
7-2-2/1.11.2ii)
7-2-2/1.11.3
7-2-2/1.11.4
7-2-2/1.11.4(a)
7-2-2/1.11.4(b)
7-2-2/1.11.5
7-2-2/1.11.5(a)
7-2-2/1.11.5(b)
7-2-2/1.11.5(c)
7-2-2/1.13
7-2-2/3
7-2-3
7-2-3/1
7-2-4
7-2-4/1
7-2-4/1.1
7-2-4/1.1.1
7-2-4/1.1.1
7-2-4/1.1.2
7-2-4/1.1.3
79
Title
----------Corrosion Control Systems
Alterations and Position of Load Lines
Surface-type Units
Self-elevating Units
Column-stabilized Units
Annual Survey Machinery and Electrical Systems
Non-self-propelled Units
Self-propelled Units
Preventative Maintenance Techniques
Examination during Overhaul
Examination at Shorter Intervals
Thrusters and Dynamic Positioning Systems
Construction
Surveys After Construction
Special Periodical Surveys
Special Periodical Surveys
Special Periodical Survey Hull No. 1
General All Types of Mobile Offshore Drilling Units
---
6-2-5/1.1.2
---
6-2-5/1.1.3
6-2-5/1.1.4
6-2-5/1.1.5
6-2-5/1.1.6
6-2-5/1.1.7
6-2-5/1.1.8
-------------
6-2-5/1.1.9
---
6-2-5/1.3
6-2-5/1.3.1
6-2-5/1.5
6-2-5/1.5.1
6-2-5/1.5.2
6-2-5/1.5.3
6-2-5/1.5.4
6-2-5/1.5.5
6-2-5/1.5.6
6-2-5/1.7
6-2-5/3
6-2-5/3.1
6-2-5/3.3
6-2-5/3.5
6-2-5/3.5.1
6-2-5/3.5.1i)
6-2-5/3.5.1ii)
6-2-5/3.5.1iii)
6-2-5/3.5.1iv)
6-2-5/3.5.1v)
6-2-5/3.5.1vi)
6-2-5/3.5.1vii)
6-2-5/3.5.2
6-2-5/3.5.2i)
6-2-5/3.5.2ii)
6-2-5/3.5.2iii)
6-2-5/3.5.2iv)
6-2-5/3.5.3
Surface-type Units
--Self-elevating Units
------------Column-stabilized Units
Special Survey No. 2 and Subsequent
General
Thickness Gauging Requirements
Nondestructive Testing
Column-Stabilized Units
--------------Self-Elevating Units
--------Record Keeping
80
MODU 2012
7-2-4/1.1.4
7-2-4/1.1.5
7-2-4/1.1.6
7-2-4/1.1.7
7-2-4/1.1.8
7-2-4/1.1.10
7-2-4/1.1.11
7-2-4/1.3
7-2-4/1.5
7-2-4/1.7
7-2-4/3
7-2-4/3.1
7-2-4/3.3
7-2-4/3.5
7-2-4/3.7
7-2-4/3.9
7-2-4/5
7-2-5
7-2-5/1
7-2-5/1.1
7-2-5/1.1.1
7-2-5/1.1.2
7-2-5/1.1.3
7-2-5/1.1.4
7-2-5/1.1.5
7-2-5/1.1.6
7-2-5/1.1.7
7-2-5/1.1.8
7-2-5/1.1.9
7-2-5/1.1.10
7-2-5/1.1.11
7-2-5/1.1.12
7-2-5/1.1.13
7-2-5/1.3
7-2-5/1.3.1
7-2-5/1.5
7-2-5/1.5.1
7-2-5/1.5.2
7-2-5/1.5.3
7-2-5/1.5.4
7-2-5/1.5.5
7-2-5/1.5.6
7-2-5/1.7
7-2-5/3
7-2-5/3.1
7-2-5/3.9
--7-2-5/3.5
7-2-5/3.5i)
7-2-5/3.5ii)
7-2-5/3.5iii)
7-2-5/3.5iv)
7-2-5/3.5v)
7-2-5/3.5vi)
7-2-5/3.5vii)
7-2-5/3.3
7-2-5/3.3i)
7-2-5/3.3ii)
7-2-5/3.3iii)
7-2-5/3.3iv)
7-2-5/3.7
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
----Special Periodical Survey Machinery
Correlation with Special Periodical Survey Hull
6-2-5/5.3
Parts to be Examined
6-2-5/5.3.1
---
6-2-5/5.3.2
---
6-2-5/5.3.3
6-2-5/5.3.4
6-2-5/7
6-2-5/7.1
6-2-5/7.3
6-2-5/7.3.1
6-2-5/7.3.2
6-2-5/7.3.3
6-2-5/7.3.4
6-2-5/7.3.5
6-2-5/7.3.6
6-2-5/7.5
6-2-5/7.7
6-2-5/9
6-2-5/9.1
6-2-5/9.3
6-2-5/9.5
6-2-5/9.7
6-2-5/9.9
6-2-5/9.11
6-2-5/9.13
6-2-5/9.15
6-2-5/11
6-2-5/13
6-2-5/Table 1
6-2-5/Table 2
6-2-5/Table 3
Part
6
Chapter
2
Section
6
6-2-6
6-2-6/1
6-2-6/1.1
6-2-6/1.3
6-2-6/1.3i)
6-2-6/1.3ii)
6-2-6/1.3iii)
6-2-6/1.3iv)
6-2-6/1.3v)
6-2-6/1.5
6-2-6/1.7
6-2-6/1.7.1
6-2-6/1.7.2
6-2-6/1.7.3
6-2-6/1.9
6-2-6/1.9.1
6-2-6/1.9.2
6-2-6/1.9.3
6-2-6/3
6-2-6/3.1
6-2-6/3.1.1
6-2-6/3.1.2
6-2-6/3.1.3
6-2-6/3.1.4
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
7-2-5/3.7i)
7-2-5/3.7ii)
7-2-5/5
7-2-5/5.1
7-2-5/5.3
7-2-5/5.5
7-2-5/5.3.1
7-2-5/5.3.2
7-2-5/5.3.3
7-2-5/5.3.4
7-2-5/5.3.5
7-2-5/5.3.6
7-2-5/7
7-2-5/7.1
7-2-5/7.3
7-2-5/7.3.1
7-2-5/7.3.2
7-2-5/7.3.3
7-2-5/7.3.4
7-2-5/7.3.5
7-2-5/7.3.7
7-2-5/7.5
7-2-5/7.7
7-2-5/9
7-2-5/9.1
7-2-5/9.3
7-2-5/9.5
7-2-5/9.7
7-2-5/9.9
7-2-5/9.11
7-2-5/9.13
7-2-5/9.15
7-2-5/11
7-2-5/13
7-2-5/Table 1
7-2-5/Table 2
7-2-5/Table 3
7-2-6
7-2-6/1
7-2-6/1.1
7-2-6/1.3
7-2-6/1.3i)
7-2-6/1.3ii)
7-2-6/1.3iii)
7-2-6/1.3iv)
7-2-6/1.3v)
7-2-6/1.5
7-2-6/1.7
7-2-6/1.7.1
7-2-6/1.7.2
7-2-6/1.7.3
7-2-6/1.9
7-2-6/1.9.1
7-2-6/1.9.2
7-2-6/1.9.3
7-2-6/3
7-2-6/3.1
7-2-6/3.1.1
7-2-6/3.1.2
7-2-6/3.1.3
7-2-6/3.1.4
81
82
Title
MODU 2012
Physical Features
7-2-6/3.3
Stern Bearing
7-2-6/3.3.1
Rudder Bearings
7-2-6/3.3.2
Sea Suctions
7-2-6/3.3.3
Sea Valves
7-2-6/3.3.4
Procedures
7-2-6/3.5
Exposed Areas
7-2-6/3.5.1
Underwater Areas
7-2-6/3.5.2
Damage Areas
7-2-6/3.5.3
Alternatives
7-2-6/3.11
Surveys
Surveys After Construction
Specific Survey on Self-Elevating Units After Ocean Transit Tow
Specific Survey on Self-elevating Units After Ocean Transit Tow
7-2-7
Surveys
Surveys After Construction
Tail Shaft Surveys
Tail Shaft Surveys
7-2-8
--7-2-8i)
--7-2-8ii)
--7-2-8iii)
--7-2-8iv)
Surveys
Surveys After Construction
Boiler Surveys
Boiler Surveys
7-2-9
Parts to be Examined
7-2-9/1
--7-2-9/1.1
--7-2-9/1.3
--7-2-9/1.5
--7-2-9/1.7
Surveys After Construction
Surveys After Construction
Automatic and Remote-control Systems
Automatic and Remote-control Systems
7-2-10
Annual Survey
7-2-10/1
Special Periodical Surveys
7-2-10/3
Control Actuators
7-2-10/3.1
Electrical
7-2-10/3.3
Unattended Plants
7-2-10/3.5
Repairs or Alternatives
7-2-10/5
Surveys
Surveys After Construction
Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units
Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units
7-2-A1
Guide for Lay-up of Mobile Offshore Drilling Units
7-2-A1/1
Lay-up Requirements
7-2-A1/1.1
--7-2-A1/1.1i)
--7-2-A1/1.1ii)
--7-2-A1/1.1iii)
Safety and Protection
7-2-A1/1.3
--7-2-A1/1.3i)
--7-2-A1/1.3ii)
--7-2-A1/1.3iii)
--7-2-A1/1.3iv)
--7-2-A1/1.3v)
--7-2-A1/1.3vi)
--7-2-A1/1.3vii)
--7-2-A1/1.3viii)
--7-2-A1/1.3ix)
--7-2-A1/1.3x)
--7-2-A1/1.3xi)
--7-2-A1/1.3xii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
Title
--------Preservation and Maintenance
Hull and Deck Equipment
------------------------------------Machinery Spaces, Machinery, and Drilling Equipment
------------------Boilers
----Boiler Stack Openings
Electrical Installation
------------------Tensioning System and Heave Compensators
Lay-up Site and Mooring Arrangements
Lay-up Site Considerations
----------------------Mooring Arrangements Considerations
---
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012
MODU 2012
7-2-A1/1.3xiii)
7-2-A1/1.3xiv)
7-2-A1/1.3xv)
7-2-A1/1.3xvi)
7-2-A1/1.5
7-2-A1/1.5.1
7-2-A1/1.5.1(a)
7-2-A1/1.5.1(b)
7-2-A1/1.5.1(c)
7-2-A1/1.5.1(d)
7-2-A1/1.5.1(e)
7-2-A1/1.5.1(f)
7-2-A1/1.5.1(g)
7-2-A1/1.5.1(h)
7-2-A1/1.5.1(i)
7-2-A1/1.5.1(j)
7-2-A1/1.5.1(k)
7-2-A1/1.5.1(l)
7-2-A1/1.5.1(m)
7-2-A1/1.5.1(n)
7-2-A1/1.5.1(o)
7-2-A1/1.5.1(p)
7-2-A1/1.5.1(q)
7-2-A1/1.5.1(r)
7-2-A1/1.5.2
7-2-A1/1.5.2(a)
7-2-A1/1.5.2(b)
7-2-A1/1.5.2(c)
7-2-A1/1.5.2(d)
7-2-A1/1.5.2(e)
7-2-A1/1.5.2(f)
7-2-A1/1.5.2(g)
7-2-A1/1.5.2(h)
7-2-A1/1.5.2(i)
7-2-A1/1.5.3
7-2-A1/1.5.3(a)
7-2-A1/1.5.3(b)
7-2-A1/1.5.4
7-2-A1/1.5.5
7-2-A1/1.5.5(a)
7-2-A1/1.5.5(b)
7-2-A1/1.5.5(c)
7-2-A1/1.5.5(d)
7-2-A1/1.5.5(e)
7-2-A1/1.5.5(f)
7-2-A1/1.5.5(g)
7-2-A1/1.5.5(h)
7-2-A1/1.5.5(i)
7-2-A1/1.5.6
7-2-A1/1.5.7
7-2-A1/1.5.7(a)
7-2-A1/1.5.7(a)i)
7-2-A1/1.5.7(a)ii)
7-2-A1/1.5.7(a)iii)
7-2-A1/1.5.7(a)iv)
7-2-A1/1.5.7(a)v)
7-2-A1/1.5.7(a)vi)
7-2-A1/1.5.7(a)vii)
7-2-A1/1.5.7(a)viii)
7-2-A1/1.5.7(a)ix)
7-2-A1/1.5.7(a)x)
7-2-A1/1.5.7(a)xi)
7-2-A1/1.5.7(b)
7-2-A1/1.5.7(b)i)
83
84
Title
--------------------------------Guide for Reactivation of Laid-up Mobile Offshore Drilling Units
Reactivation Survey Status
------Hull and Outfit
Drydocking Survey
Witnessing of Functional Testing or Verification of Fitness for Service
------------------------Machinery and Drilling Equipment
--------------------------Electrical
------Tensioner System and Motion Compensator
Control and Instrumentation
Trial
Documentation and Certification
-------
MODU 2012
7-2-A1/1.5.7(b)ii)
7-2-A1/1.5.7(b)iii)
7-2-A1/1.5.7(b)iv)
7-2-A1/1.5.7(b)iv)a)
7-2-A1/1.5.7(b)iv)b)
7-2-A1/1.5.7(b)iv)c)
7-2-A1/1.5.7(b)iv)d)
7-2-A1/1.5.7(b)v)
7-2-A1/1.5.7(b)vi)
7-2-A1/1.5.7(b)vii)
7-2-A1/1.5.7(b)viii)
7-2-A1/1.5.7(b)ix)
7-2-A1/1.5.7(b)x)
7-2-A1/1.5.7(b)xi)
7-2-A1/1.5.7(b)xii)
7-2-A1/1.5.7(b)xiii)
7-2-A1/3
7-2-A1/3.1
7-2-A1/3.1i)
7-2-A1/3.1ii)
7-2-A1/3.1iii)
7-2-A1/3.3
7-2-A1/3.3.1
7-2-A1/3.3.2
7-2-A1/3.3.2i)
7-2-A1/3.3.2ii)
7-2-A1/3.3.2iii)
7-2-A1/3.3.2iv)
7-2-A1/3.3.2v)
7-2-A1/3.3.2vi)
7-2-A1/3.3.2vii)
7-2-A1/3.3.2viii)
7-2-A1/3.3.2ix)
7-2-A1/3.3.2x)
7-2-A1/3.3.2xi)
7-2-A1/3.3.2xii)
7-2-A1/3.5
7-2-A1/3.5i)
7-2-A1/3.5ii)
7-2-A1/3.5iii)
7-2-A1/3.5iv)
7-2-A1/3.5v)
7-2-A1/3.5vi)
7-2-A1/3.5vii)
7-2-A1/3.5viii)
7-2-A1/3.5ix)
7-2-A1/3.5x)
7-2-A1/3.5xi)
7-2-A1/3.5xii)
7-2-A1/3.5xiii)
7-2-A1/3.7
7-2-A1/3.7i)
7-2-A1/3.7ii)
7-2-A1/3.7iii)
7-2-A1/3.9
7-2-A1/3.11
7-2-A1/3.13
7-2-A1/3.15
7-2-A1/3.15i)
7-2-A1/3.15ii)
7-2-A1/3.15iii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012