Вы находитесь на странице: 1из 86

Notices and General Information

RULES FOR BUILDING AND CLASSING

MOBILE OFFSHORE DRILLING UNITS


2012
NOTICES AND
GENERAL INFORMATION

American Bureau of Shipping


Incorporated by Act of Legislature of
the State of New York 1862

Copyright 2011
American Bureau of Shipping
ABS Plaza
16855 Northchase Drive
Houston, TX 77060 USA

part
T

a b

o f

o n

e n

Notices and General Information


CONTENTS
Introduction ..................................................................................................................... 1
TABLE 1
Applicable Editions of Booklets Comprising 2012 Rules ..........2
TABLE 2
Division and Numbering of Rules..............................................2
Rule Change Notice (2012)............................................................................................. 3
TABLE 3
Summary of Changes from the 2008 Rules..............................3
TABLE 4
Comparison of the Numbering System of the 2008 Rules
vs. 2012 Rules ........................................................................29

ii

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


Introduction
1.

The year 2012 edition of the Rules for Building and Classing Mobile Offshore Drilling Units
consists of the nine (9) booklets as shown in Table 1. The Rules have been reorganized, and a new
Part 6 for equipment and machinery certification has been added. The survey requirements in the
former Part 6 are now in Part 7, along with requirements for surveys during construction and for
testing and trials. The cross-reference table in Table 4 shows the relationship between the 2008
numbering and the 2012 numbering.
The purpose of the generic title ABS Rules for Conditions of Classification Offshore Units and
Structures (Part 1) is to reflect the expanded contents of PART 1, as a result of including
consolidated requirements for Classification applicable to all types of offshore units, pipelines,
risers, and other offshore structures, as specified in the Foreword to Part 1.
With regard to Part 2, the purpose of the generic title ABS Rules for Materials and Welding is to
emphasize the common applicability of the requirements to ABS-classed vessels, other marine
structures and their associated machinery, and thereby make PART 2 more readily a common
PART of various ABS Rules and Guides, as appropriate.

2.

The numbering system applied in the Rules is shown in Table 2.

3.

The primary changes from the 2008 edition of the Rules are identified and listed in Table 3. The
effective date of the indicated Rule Changes is 1 January 2012, unless specifically indicated otherwise.

4.

The effective date of each technical change since 1993 is shown in parenthesis at the end of the
subsection/paragraph titles within the text of each Part. Unless a particular date and month are
shown, the years in parentheses refer to the following effective dates:
(2000) and after
(1999)
(1998)
(1997)

1 January 2000 (and subsequent years)


12 May 1999
13 May 1998
19 May 1997

(1996)
(1995)
(1994)
(1993)

9 May 1996
15 May 1995
9 May 1994
11 May 1993

5.

Until the next edition of the Rules for Building and Classing Mobile Offshore Drilling Units is
published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS
website www. eagle.org only, and will be available free for downloading. It is not intended to
publish hard copies of future Rule Change Notices and/or Corrigenda to existing Rules or Guides.
The consolidated edition of the Rules for Building and Classing Mobile Offshore Drilling Units,
which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition
will be published on the ABS website only when RCN and/or Corrigenda are issued.

6.

The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS
website www.eagle.org for download.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

TABLE 1
Applicable Editions of Booklets Comprising 2012 Rules
Notices and General Information

2012

Part 1:

Rules for Conditions of Classification Offshore Units and


Structures (1)

2012 (2)

Part 1:

Conditions of Classification (Supplement to the ABS Rules for


Conditions of Classification Offshore Units and Structures) (1)

2012

Part 2:

Rules for Materials and Welding

2012 (2)

Part 3:

Hull Construction and Equipment

2012

Part 4:

Machinery and Systems

2012

Part 5:

Fire and Safety Measures and Features

2012

Part 6:

Rules for Equipment and Machinery Certification

2012

Part 7:

Surveys

2012

Notes:
1

The requirements for conditions of classification are contained in the separate, generic ABS Rules for Conditions
of Classification (Part 1). Additional specific requirements are contained in Part 1 of these Rules.

The latest edition of these Rules is to be referred to. After 2012, these Rules may be downloaded from the ABS
website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications
online catalog at www.eagle.org, Rules and Guides, Catalog.

TABLE 2
Division and Numbering of Rules
Division
Part
Chapter
Section
Subsection (see Note 1)
Paragraph (see Note 1)
Subparagraph
Item
Subitem
Appendix

Note:
1

Number
Part 1
Part 1, Chapter 1
Section 1-1-1
1-1-1/1
1-1-1/1.1
1-1-1/1.1.1
1-1-1/1.1.1(a)
1-1-1/1.1.1(a)i)
Appendix 1-1-A1
or
Appendix 1-A1-1

An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit future insertions of
even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text
and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets,
etc.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Rule Change Notice (2012)


TABLE 3
Summary of Changes from the 2008 Rules
EFFECTIVE DATE 1 January 2009 shown as (2009)
Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-3/1.5.1

Ship-Type Drilling Units

To modify the class notation for ship-type drilling units from Drilling
Unit to Drillship in order to clarify the type of drilling units
receiving this notation.. (Incorporates Notice No. 1 to Part 1)

EFFECTIVE DATE 31 July 2009 shown as (31 July 2009)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-5/1

Governmental and Other Regulations

To comply with Articles 8(1) and 9 of Regulation (EC) No. 391/2009


on Common rules and standards for ship inspection and survey
organizations. (Incorporates Notice No. 2 to Part 1)

1-1-5/5

Governmental Regulations

To comply with Articles 8(1) and 9 of Regulation (EC) No. 391/2009


on Common rules and standards for ship inspection and survey
organizations. (Incorporates Notice No. 2 to Part 1)

EFFECTIVE DATE 1 January 2010 shown as (2010)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-A2/5.9

Terms and Conditions of the Request


for Product Type Approval and
Agreement

To clarify the terms and conditions for Type Approval. (Incorporates


Notice No. 3 to Part 1)

EFFECTIVE DATE 1 April 2010 shown as (1 April 2010)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

Section 1-1-6

IACS Audit

To align the requirements with the IACS Quality System Certification


Scheme. (Incorporates Notice No. 4 to Part 1)

1-1-8/3

Notification and Availability for


Survey

To align the requirements with the IACS Quality System Certification


Scheme. (Incorporates Notice No. 4 to Part 1)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

EFFECTIVE DATE 1 January 2011 shown as (2011)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-3/1.9

Temporary Mooring Equipment


Symbol

To define temporary mooring and position mooring on board mobile


offshore drilling units for clarification in the application of symbols
, and . (Incorporates Notice No. 5 to Part 1)

1-1-3/1.11

Position Mooring Equipment and


Systems

To define temporary mooring and position mooring on board mobile


offshore drilling units for clarification in the application of symbols
, and . (Incorporates Notice No. 5 to Part 1)

1-1-3/5

Service Limitations

To clarify the use of the class notation Restricted Service in offshore


units, based on their operational characteristics, and to identify the
conditions for unrestricted service specified in the MODU Rules.
(Incorporates Notice No. 5 to Part 1)

1-1-3/25

Propulsion Machinery

To reference to the definitions of self-propelled and non-selfpropelled units. (Incorporates Notice No. 5 to Part 1)

1-1-7/7

Submissions

To align the plan submission requirements with current ABS practice.


(Incorporates Notice No. 5 to Part 1)

EFFECTIVE DATE 1 January 2011 shown as (1 January 2011)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-3/25

Propulsion Machinery

To provide a notation of AMS for non-self propelled MODUs.


(Incorporates Notice No. 6 to Part 1)

EFFECTIVE DATE 1 August 2011 shown as (1 August 2011)


Part/Para. No.

Title/Subject

Status/Remarks

1-1-1/5

Representations as to Classification

To remove language that might be construed as providing a warranty.


(Incorporates Notice No. 7 to Part 1)

1-1-3/1

Drilling Units Built Under Survey

To remove language that might be construed as providing a warranty.


(Incorporates Notice No. 7 to Part 1)

1-1-4/9.7.5iii)
(New)

Applicable Uses of Type Approved


Products

To cover the situation where a component or product has been


manufactured under an ABS Type Approved manufacturing process
but unit certification has been obtained at the place of manufacture.
(Incorporates Notice No. 7 to Part 1)

1-1-4/9.7.7

The Terms and Conditions for use of


ABS Type Approved Product Logo

To provide a logo for products which have received a Product Design


Assessment (PDA) but the manufacturer does not have a Manufacturing
Assessment (MA) (Incorporates Notice No. 7 to Part 1)

EFFECTIVE DATE 1 September 2011 shown as (1 September 2011)


Part/Para. No.

Title/Subject

Status/Remarks

1-1-8/1.3

Repairs

To harmonize the Rules for Conditions of Classification Offshore


Units and Structures with the Rules for Conditions of Classification
for ships. (Incorporates Notice No. 8 to Part 1)

1-1-8/1.5
(New)

Suspension of Classification

To harmonize the Rules for Conditions of Classification Offshore


Units and Structures with the Rules for Conditions of Classification
for ships. (Incorporates Notice No. 8 to Part 1)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

EFFECTIVE DATE 1 January 2012 shown as (1 January 2012)


Part/Para. No.
PART 1

Title/Subject
Status/Remarks
Rules for Conditions of Classification Offshore Units and Structures

1-1-3/1.9

Anchoring (Temporary Mooring)


Equipment

To clarify the requirements for anchoring (temporary mooring)


equipment and the symbol .

1-1-3/1.11

Position Mooring Equipment and


Systems

To clarify the requirements for position mooring equipment and


systems and the symbols and .

1-1-3/9

Offshore Installations

To specify that offshore installations are to be satisfactorily design


reviewed and surveyed, and installed at an Owners specified
operation site.

1-1-3/11

Floating Production Installations

To specify that floating installations are to be satisfactorily design


reviewed and surveyed, and installed at an Owners specified
operation site and to provide a notation for floating installations on
which ABS is not requested to class the topside production facilities.

1-1-3/19.1

Floating Installations

To specify that the notations apply to topside facilities.

1-1-3/31

Drilling Systems

To include the notation CDS (N).

EFFECTIVE DATE 1 January 2009 shown as (2009)


(based on the contract date for new construction between builder and Owner)
Part/Para. No.

Title/Subject

Status/Remarks

PART 3

Hull Construction and Equipment

3-1-3/5.7

Selection Criteria for ABS Grades of


Steel

To reflect expansion of the thickness ranges and corresponding CVN


impact requirements for the ordinary and higher strength hull steels in
2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and
Welding. (Incorporates Notice No. 1)

3-1-3/5.9.2

CVN Requirements

To reflect expansion of the thickness ranges and corresponding CVN


impact requirements for the ordinary and higher strength hull steels in
2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and
Welding. (Incorporates Notice No. 1)

3-1-3/Table 1

Material Selection Requirements for


ABS Ordinary and Higher Strength
Steels

To reflect expansion of the thickness ranges and corresponding CVN


impact requirements for the ordinary and higher strength hull steels in
2-1-2/Table 4 and 2-1-3/Table 4 of the ABS Rules for Materials and
Welding. To delete obsolete material grades CS and DS.
(Incorporates Notice No. 1)

PART 4

Machinery and Systems

4-1-1/Table 2

Ambient Temperatures for


Unrestricted Service

To base acceptance of materials for machinery on specified minimum


identified air and sea temperatures. (Incorporates Notice No. 1)

4-2-6/5.5.1(e)
(New)

Flexible Hoses

To provide requirements governing the use of flexible hoses in fixed


oxygen-acetylene systems. (Incorporates Notice No. 1)

4-2-6/9.3.3
(New)

Non Self-Propelled Units

To clarify the starting air requirements for non self propelled units.
(Incorporates Notice No. 1)

4-3-2/3.1.2

Capacity of Generators

To clarify that after the emergency generator has been started (after a
blackout), other machinery must be used in conjunction with the
remaining main generators in order to start the propulsion machinery.
(Incorporates Notice No. 1)

4-3-2/3.1.4

Starting from Dead Ship Condition

To clarify that some sources of power are assumed not to be available


and that the requirement would also be applicable to vessels with
emergency batteries (with no emergency generator). (Incorporates
Notice No. 1)

4-3-2/5.3

Emergency Power Supply

To clarify the requirements. (Incorporates Notice No. 1)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-3-2/5.7

Transitional Source of Power

To align the requirements for the minimum emergency services required


to be supplied by the transitional source of power with 5.3.10 of the
IMO MODU Code. (Incorporates Notice No. 1)

4-3-2/Table 1

Alarms and Safeguards for


Emergency Diesel Engines

To provide clarification between the requirements in 4-3-2/Table 1 and


those in 4-2-1/7.2 of the Steel Vessel Rules. (Incorporates Notice No. 1)

4-3-2/7.9

Harmonics

To align the requirements with 4.9.2.2. of IEC 61892-1. (Incorporates


Notice No. 1)

4-3-2/17.1.2

System Requirements

To clarify the requirement for two separate feeders, to require an alarm


when there is a loss of power in any one of the feeders, and to clarify
an acceptable alternative arrangement when one feeder with a battery
is provided. (Incorporates Notice No. 1)

4-3-2/19.1.2

Other Auxiliaries

To align the requirements with Chapter 9.10.2 of the IMO MODU


Code. (Incorporates Notice No. 1)

4-3-4/7.9.7

Terminals

To align the requirements with current practice. (Incorporates Notice


No. 1)

PART 5

Fire and Safety Measures and Features

5-2-2/1.3.6
(New)

Connections

To align the requirements with 9.4.15 of the IMO MODU Code and
ABS practice. (Incorporates Notice No. 1)

5-2-3/1

Fixed Fire Fighting Systems

To clarify the applicable standard for fixed fire fighting systems that are
installed in excess of the Rule requirements. (Incorporates Notice No. 1)

5-3-1//9.3

Other Auxiliaries

To align the requirements with 9.10.2 of the IMO MODU Code.


(Incorporates Notice No. 1)

EFFECTIVE DATE 1 July 2009 shown as (1 July 2009)


(based on the contract date for new construction between builder and Owner)
Part/Para. No.

Title/Subject

Status/Remarks

PART 4

Machinery and Systems

4-2-2/7.9

Manufacturing of Plastic Pipes

To allow for consideration of the requirements in recognized standards


for plastic pipe manufacturing. (Incorporates Notice No. 2)

4-2-2/19

Fluid Power Cylinders

To clarify the requirements and align them with the Steel Vessel
Rules. (Incorporates Notice No. 2)

4-3-3/5.17.3
(New)

Electrical Cables for the Emergency


Fire Pump

To align the requirements with IMO MSC Circular 1120.


(Incorporates Notice No. 2)

5-2-3/5.11

Fixed High Expansion Foam Systems

To reflect the use of MSC.1/Circ.1271 for High-Expansion Foam


Systems that utilize inside air. (Incorporates Notice No. 2)

5-2-4/Table 1

Classification of Portable and Semiportable Extinguishers

To align the requirements with Chapter 4, Paragraph 3.1.1.1 of the


IMO FSS Code and to remove application of Halon fire extinguishers.
(Incorporates Notice No. 2)

5-2-4/Table 2

Hand Portable Fire Extinguishers and


Semi-portable Fire-Extinguishing
Systems

To align the requirements with Chapter 4, Paragraph 3.1.1.1 of the


IMO FSS Code. (Incorporates Notice No. 2)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

EFFECTIVE DATE 1 January 2010 shown as (2010)


(based on the contract date for new construction between builder and Owner)
Part/Para. No.

Title/Subject

Status/Remarks

PART 3

Hull Construction and Equipment

3-1-1/3.1

Self-Elevating Drilling Unit

To clarify the definition of self-elevating drilling unit in line with the


IMO MODU Code, Regulation 1.3.3 and IACS UR D2. (Incorporates
Notice No. 3)

3-1-1/3.3

Column-Stabilized Drilling Unit

To clarify the definition of self-elevating drilling unit in line with the


IMO MODU Code, Regulation 1.3.4 and IACS UR D2. (Incorporates
Notice No. 3)

3-1-2/1.5.4

Wave-induced Dynamic Responses

To clarify that the requirements only apply to self-elevating drilling


units in elevated condition. (Incorporates Notice No. 3)

3-1-A2
First Paragraph

<No Title>

To clarify that the application of Appendix 3-1-A2 for deep water


wave theory is not limited to water depths exceeding 300 ft, but the
minimum water depth where the linear wave theory can be used is also
dependent on the wave height and period. (Incorporates Notice No. 3)

3-2-4/5.11.5

Watertight Bracing Members

To align the requirements with 2.6.14 of the IMO MODU Code.


(Incorporates Notice No. 3)

3-3-1/7.3

Column-Stabilized Drilling Units

To clarify that footings at the bottom of single columns are subject to


the same extent of damage as the columns and to align the
requirements with 3.5.2 of the IMO MODU Code. (Incorporates
Notice No. 3)

PART 4

Machinery and Systems

4-2-3/1.1

Tank Vents and Overflows General

To align the requirements with Regulation 20 of the International


Convention on Load Lines (Incorporates Notice No. 3)

4-2-3/1.5

Height and Wall Thickness of Vent


Pipes

To align the requirements with Regulation 20 of the International


Convention on Load Lines and IACS UI LL36. (Incorporates Notice
No. 3)

4-2-3/1.9.5

Vent Outlet Closing Devices

To incorporate requirements for the vent closing devices in line with


IACS UR P3. (Incorporates Notice No. 3)

4-2-5/11
(New)

Additional Measures for Oil Pollution


Prevention

To incorporate requirements protection of fuel oil tanks in line with


Regulation 12A, Annex I, MARPOL 73/78, as amended.
(Incorporates Notice No. 3)

4-2-5/13
(New)

Class Notation POT

To recognize enhanced pollution prevention compliance of mobile


offshore drilling units. (Incorporates Notice No. 3)

4-2-6/5.5.1(b)

Piping Materials

To align the requirements with NFPA 51, USCG Title 46 CFR 56.50-103,
and BS 29593/ISO 9539. (Incorporates Notice No. 3)

4-3-1/Table 4

Primary Essential Services

To incorporate additional services required to be ABS certified.


(Incorporates Notice No. 3)

4-3-1/Table 5

Secondary Essential Services

To incorporate additional services required to be ABS certified.


(Incorporates Notice No. 3)

4-3-3/3.1.1(b)

Equipment in Areas Protected by


Local Fixed Pressure Water-spraying
or Local Water-mist Fire
Extinguishing System in Machinery
Spaces

To clarify that the requirement for a degree of protection not less than
IP 44 will apply only to electrical and electronic equipment intended
for essential services when affected by the discharge of local
application water-spray or water mist fire extinguishing systems.
(Incorporates Notice No. 3)

4-3-4/1

Plans and Data to Be Submitted

To clarify the requirements for essential machines of 100 kW and over.


(Incorporates Notice No. 3)

4-3-4/3.1.1

Applications

To document that rotating machines for services indicated in 4-3-4/Table


11 require ABS certification. (Incorporates Notice No. 3)

4-3-4/7.1.1

Applications

To document that motor controllers, and motor control centers for


services indicated in 4-3-4/Table 11 require ABS certification.
(Incorporates Notice No. 3)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-3-4/13.1.1

General

To clarify the requirements regarding cable glands designed for use in


hazardous areas. (Incorporates Notice No. 3)

4-3-4/Table 11
(New)

Additional Services Requiring


Electrical Equipment to be Designed,
Constructed and Tested to the
Requirements in Section 4-3-4

To incorporate additional services required to be ABS certified.


(Incorporates Notice No. 3)

PART 5

Fire and Safety Measures and Features

5-1-1/5.9

<No Title>

To align the requirements with 9.2.5 of the IMO MODU Code.


(Incorporates Notice No. 3)

5-2-1/3.1

Plans and Specifications General

To ensure that the emergency fire pumps have sufficient lift capacity
(NPSHR vs. NPSHA) and performance at limited suction conditions
and to verify compliance with such requirements early in the design
phase of the vessel. (Incorporates Notice No. 3)

EFFECTIVE DATE 1 January 2011 shown as (2011)


(based on the contract date for new construction between builder and Owner)
Part/Para. No.

Title/Subject

Status/Remarks

PART 1

Conditions of Classification (Supplement to Rules for Conditions of Classification Offshore


Units and Structures)

1-1-4/1

Hull and Design Data

To align the plan submission requirements with current ABS practice.


(Incorporates Notice No. 4)

1-1-4/9

Submissions

To align the plan submission requirements with current ABS practice.


(Incorporates Notice No. 4)

1-1-5/1
First Paragraph

<No Title>

To clarify the conditions for unrestricted service specified in the MODU


Rules and the request for the details of the service restrictions, when
applicable, to be placed in the Operating Manual. To remove references
to a Limited Service notation (Incorporates Notice No. 4)

1-1-5/1.3vi)

<No Title>

To remove references to a Limited Service notation (Incorporates


Notice No. 4)

PART 3

Hull Construction and Equipment

3-1-1/1.5

Self-Propelled Unit

To clarify the definition of self-propelled units and to clarify the


process to confirm a unit as self-propelled or non-self-propelled.
(Incorporates Notice No. 4)

3-1-1/1.7

Non-Self-Propelled Unit

To clarify the definition of non-self-propelled units and to clarify the


process to confirm a unit as self-propelled or non-self-propelled.
(Incorporates Notice No. 4)

3-2-1/1.17

Fatigue Analysis

To add surface-type unit for fatigue analysis. (Incorporates Notice No. 4)

3-2-2/13
(New)

Higher-strength Materials

To introduce the material conversion coefficient to account for the use


of higher-stress structural steels for stiffeners, beams, girders and
webs in watertight bulkheads and flats and tank bulkheads and flats.
(Incorporates Notice No. 4)

3-2-3/9

Hull Interface Structure with Legs

To introduce a paragraph on the effects of friction on leg guides and to


align the text with Section 4-1-3. (Incorporates Notice No. 4)

3-2-4/15
(New)

Higher-strength Materials

To introduce the material conversion coefficient to account for the use


of higher-stress structural steels for beams and girders on the upper
structure of column-stabilized drilling units. (Incorporates Notice No. 4)

3-2-A3
(New)

Guide for the Allowable Stresses for


Localized Highly-stressed Areas

To clarify the allowable stresses for fine mesh sizes of Finite Element
Analyses intended for localized high stress areas in way of structural
discontinuities. (Incorporates Notice No. 4)

3-4-1/3.3.5

Hull Interface Structure with Legs

To provide the factor of safety for dynamic analysis methods based on


the ratios of factor of safety between quasi-static method and dynamic
method specified in API RP 2SK. (Incorporates Notice No. 4)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

PART 4

Machinery and Systems

4-1-1/9

Plans and Data to be Submitted

To align the plan submission requirements with current ABS practice.


(Incorporates Notice No. 4)

4-1-1/15

Ambient Temperature

To clarify that, for unrestricted service, the offshore unit is to be


designed for an ambient temperature of 0C (32F) or lower.
(Incorporates Notice No. 4)

4-1-1/17

Materials Containing Asbestos

To align the requirements with IMO Res. MSC.282(86), adopting


SOLAS Reg II-1/3-5.2, which prohibits installation of materials
containing asbestos on all ships or units (both new construction and
existing vessels) after 1 January 2011. (Incorporates Notice No. 4)

Section 4-1-3

Jacking and Associated Systems

To update the requirements for jacking systems per the Jacking System
Ad-hoc Group, formed by ABS and industry representatives.
(Incorporates Notice No. 4)

4-2-2/3.1

General Requirements

To require that pumps used in fixed water-based, or equivalent, local


application fire-fighting systems and the sprinkler system pump are to
be also certified by the Surveyor at the manufacturers plant.
(Incorporates Notice No. 4)

4-2-2/21.3

Valve Connections to Shell

To align the requirements with other ABS Rules. (Incorporates


Notice No. 4)

4-2-3/1.1

General

To clarify the requirements regarding shutoff valves or closing devices


in vent piping. (Incorporates Notice No. 4)

4-2-4/1.1

General

To align the alternative bilge requirements for small compartments in


surface-type units with the Steel Vessel Rules. (Incorporates Notice
No. 4)

4-2-4/1.5

Direct Bilge Suctions

To require a direct bilge suction to be fitted with a stop-check valve.


(Incorporates Notice No. 4)

4-2-4/1.7

Emergency Bilge Suctions

To clarify the requirements for emergency bilge suctions.


(Incorporates Notice No. 4)

4-2-4/13.7.1(b)

Controls and Indications

To make a comprehensive list of control and indications required at


the centralized ballast control station. (Incorporates Notice No. 4)

4-2-5/1.1.1

Tanks

To incorporate requirements of IMO MSC.1/Circ.1322, which requires


that boundary area of a fuel oil tank that is common with machinery
spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/Figure 1

Acceptable Fuel Oil Tanks


Arrangements Inside Category A
Machinery Spaces

To incorporate requirements of IMO MSC.1/Circ.1322, which requires


that boundary area of a fuel oil tank that is common with machinery
spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/1.1.2

Spillage

To incorporate requirements of IMO MSC.1/Circ.1322, which requires


that boundary area of a fuel oil tank that is common with machinery
spaces of category A be kept to a minimum. (Incorporates Notice No. 4)

4-2-5/3.9

Valves on Oil Tanks

To clarify that the use of an electric, hydraulic or pneumatic system to


keep the valve directly in the open position is not acceptable for tanks
supplying fuel to diesel engines for essential or emergency services.
(Incorporates Notice No. 4)

4-2-6/1.1

General

To remove the necessity of remote closure on valves which are normally


closed. (Incorporates Notice No. 4)

4-2-6/5.5.1(a)

General

To clarify that only high pressure oxygen and acetylene piping is to be


certified as Group I piping. (Incorporates Notice No. 4)

4-2-6/9.5

Protective Devices for Starting-air


Mains

To clarify that the protective devices for starting-air mains requirement


applies to the case where starting air is directly injected into cylinders.
(Incorporates Notice No. 4)

4-3-2/9.1.4

Back-up Protection

To clarify the specific requirements for back-up fuse arrangements


and cascade protection and to align the MODU Rules with the Steel
Vessel Rules. (Incorporates Notice No. 4)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-3-2/9.13.5

Undervoltage Protection and


Undervoltage Release

To clarify that motors provided with undervoltage protection (UVP)


will not automatically restart upon restoration of normal voltage, after
a stoppage due to a low voltage condition or voltage failure condition.
To clarify which motors are required to be provided with undervoltage
release. (Incorporates Notice No. 4)

4-3-2/15.5.4
(New)

Jacking System

To require a voice communication system between the central jacking


control station and a location at each leg in self-elevating units.
(Incorporates Notice No. 4)

PART 5

Fire and Safety Measures and Features

5-1-1/1.5

Materials Containing Asbestos

To align the requirements with IMO Res. MSC.282(86), adopting


SOLAS Reg II-1/3-5.2, which prohibits installation of materials
containing asbestos on all ships or units (both new construction and
existing vessels) after 1 January 2011. (Incorporates Notice No. 4)

5-1-1/3.15

<No Title>

To clarify the requirements for structural fire protection of watertight


doors and to incorporate IACS Unified Interpretation (UI) SC156,
Section 4. (Incorporates Notice No. 4)

5-1-1/3.19

<No Title>

To incorporate the requirements of SOLAS Chapter II-2/Reg 9.3.1


and 9.3.3 concerning pipe penetrations through A Class divisions.
(Incorporates Notice No. 4)

5-1-1/Figure 1

Pipes Penetrating A Class


Divisions

To incorporate the requirements of SOLAS Chapter II-2/Reg 9.3.1


and 9.3.3 concerning pipe penetrations through A Class divisions.
(Incorporates Notice No. 4)

5-1-1/3.21

<No Title>

To incorporate the requirements of SOLAS II-2, Regulation 9.3.2 for


pipe penetrations through B Class divisions. (Incorporates Notice No. 4)

5-1-1/Figure 2
(New)

Pipes Penetrating B Class Divisions

To incorporate the requirements of SOLAS II-2, Regulation 9.3.2 for


pipe penetrations through B Class divisions. (Incorporates Notice No. 4)

5-1-1/5.23

<No Title>

To incorporate the requirement of SOLAS II-2/Regulation 9.7.3.


(Incorporates Notice No. 4)

5-1-1/Figure 3
(New)

Ventilation Ducts Penetrating A


Class Divisions

To incorporate the requirement of SOLAS II-2/Regulation 9.7.3.


(Incorporates Notice No. 4)

5-1-1/5.25

<No Title>

To align the requirements with SOLAS II-2/9.7.2.1 (and the draft of


2009 IMO MODU Code 9.3.15). To add conditions under which the
ventilation system for the galley may also serve the pantry
(Incorporates Notice No. 4)

5-1-1/5.29

<No Title>

To incorporate the requirements of SOLAS II-2/Reg 9.7.3.2.


(Incorporates Notice No. 4)

5-1-1/Figure 4
(New)

Ventilation Ducts Penetrating B


Class Divisions

To incorporate the requirements of SOLAS II-2/Reg 9.7.3.2.


(Incorporates Notice No. 4)

5-1-1/5.41
(New)

<No Title>

To clarify the use of air balance duct installation in line with IACS
Unified Interpretation SC119. (Incorporates Notice No. 4)

5-2-3/9

Protection of Helicopter Decks and


Refueling Facilities

To align the requirements with 9.11 of the IMO MODU Code 98,
2001 Consolidated Edition. (Incorporates Notice No. 4)

5-3-1/9.1

Ventilating Fans and Openings

To require arrangements to permit the release of smoke, in the event of


fire, from a machinery space of Category A. To incorporate SOLAS
Reg. II-2/8.3. (Incorporates Notice No. 4)

10

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

EFFECTIVE DATE 1 January 2012 shown as (2012)


(based on the contract date for new construction between builder and Owner)
Part/Para. No.

Title/Subject

Status/Remarks

PART 1

Conditions of Classification (Supplement to Rules for Conditions of Classification Offshore


Units and Structures)

Section 1-1-4

Plans and Design Data to be


Submitted

To move lists of plans and data to Parts 3 and 4. To clarify the application
of requirements in other Rules and Guides for additional class notations.

1-1-5/1

<No Title>

To clarify that the Operating Manual needs to be available in English.

1-1-5/1.3i)

<No Title>

To clarify the terminology on temperatures.

PART 3

Hull Construction and Equipment

3-1-1/3.1

Self-Elevating Drilling Unit

To align the text with 1.3.47 of the 2009 IMO MODU Code.

3-1-1/25
(New)

Service Temperature

To clarify the term Service Temperature, including an explanatory


figure.

3-1-1/27
(New)

Wind Velocity or Speed

To clarify the term Wind Velocity.

3-1-1/29
(New)

Critical Structural Areas

To clarify the term Critical Structural Areas.

Section 3-1-2
(New)

Plans and Design Data to be


Submitted

To move the requirements for submission of hull plans and design


data into Part 3.

3-1-2/1
Last 2 Bullets

<No Title>

To require this essential information on critical structural areas for


maintenance/survey work and to clarify the terminology for temperatures.

3-1-3/1.1

General

To clarify that the specified environmental conditions used in the


design are to be recorded in the Operating Manual.

3-1-4/1.1

General

To clarify the requirements and to remove reference to machinery


materials in this structural section.

3-1-4/1.9
(New)

Service Temperature

To clarify the maximum service temperature of units intended for


unrestricted service.

3-1-4/5.1

General

To include selection of material grades for surface-type drilling units


and to clarify terminology on service temperature.

3-1-4/5.3
(New)

Material Application Categories

To define the three material application categories used in the MODU


Rules.

3-1-4/5.5

Selection Criteria for ABS Grades of


Steel

To clarify the terminology on temperatures.

3-1-4/5.7.1

General

To clarify the terminology on temperatures.

3-2-1/3.1

General

To refer to the Drillship Guide for surface-type drilling units.

3-2-2/1.3

Scantlings

To add reference to the Drillship Guide.

3-2-2/1.5

Protection of Steel Work

To clarify that only hard coatings are permitted for protection of salt
water ballast tanks and to advise about compliance with PSPC with
the optional notation CPS.

3-2-2/7.1

General

To add reference to the Drillship Guide.

3-2-2/7.7.2

Stiffeners

To clarify the use of the equation for SM.

3-2-2/7.11
(New)

Openings

To address the strength of watertight bulkheads in the way of openings


for watertight doors, in accordance with 3-2-9/9.9 of the Steel Vessel
Rules.

3-2-2/11.3

Lifeboat Platform

To clarify that the strength requirements are intended for the supporting
structure in the direct load path from the life saving appliances.

3-2-3/3

General Requirements for Materials


and Scantlings

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

3-2-3/Figure 1
(New)

Typical Grades for Self-Elevating


Drilling Units

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

11

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

3-2-4/1.7

Material Selection

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

3-2-4/Figure 1
(New)

Typical Grades for Column-Stabilized


Drilling Units

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

3-2-5/3

Material Selection

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

3-2-5/Figure 1
(New)

Typical Grades for Surface-Type


Drilling Units

To clarify the structural elements considered Special, Primary, and


Secondary Applications.

3-2-5/5.1
(New)

Hull Scantlings and Local Supporting


Structure

To clarify the basis for design of hull structure.

3-2-5/5.3
(New)

Hull Girder Strength

To clarify the requirements for longitudinal strength.

3-2-5/5.5
(New)

Structural Design and Analysis of the


Hull

To define the methodology for structural design and analysis of the


hull.

3-2-5/5.7
(New)

Fatigue Analysis

To clarify the fatigue analysis requirements for surface-type drilling


units.

3-2-5/5.9
(New)

Design Loads for Local Structures

To define the impact loads for the forebody and deck loads to be used
in the analyses.

3-2-5/5.11
(New)

Superstructures, Deckhouses and


Helicopter Decks

To clarify the requirements for the design of superstructures,


deckhouses, helicopter decks and other hull structures.

3-2-5/7
(New)

Dynamic Loading Approach

To clarify the application of the DLA methodology to surface-type


drilling units.

3-2-5/9

Drilling Well

To clarify current practices regarding the scantlings of drilling well


plating and the conditions to exempt cofferdams surrounding the
drilling well.

3-2-5/11

Hatches

To clarify application of requirements for small hatches on exposed


fore deck.

3-2-A1/1.1

Column Stabilized Unit

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A1/Table 1

Guidance for Ice Class Selection of


Column-Stabilized Drilling Units

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A1/7

Clearance

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A1/Table 3

Ice Pressure Factors

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A1/11.3

Global Design Ice Load

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A1/13.3

Local Scantlings

To align the Ice Class requirements with the revised Part 6, Chapter 1
of the Steel Vessel Rules.

3-2-A3/1

Plated Structures

To clarify the allowable stresses for higher tensile strength steel


considering their grade.

3-3-1/3

Inclining Experiment

To clarify how the results of the inclining experiment and lightweight


survey are to be presented.

3-3-2/1.1

General

To clarify metacentric height procedure requirements.

3-3-2/1.3.4

Alternatives for Treatment of Void


Spaces

To define the systems referenced and to add the need to address the
flooding of undrainable voids in the Operating Manual.

3-3-2/3.1

General

To clarify the examples given.

3-3-2/3.3.1

Intact Stability Criteria

To clarify the requirements and application.

3-3-2/3.5.1

Self-Elevating Units

To define the minimum distance between effective watertight bulkheads


assumed to be damaged in accordance with 3.5.6 of the 2009 IMO
MODU Code.

12

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

3-3-2/3.5.2

Column-Stabilized Units

To define an alternative for extent of horizontal damage in columns


based on the minimum distance between effective watertight bulkheads
assumed to be damaged.

3-3-2/3.5.3

Surface Type Units

To define the minimum distance between effective watertight bulkheads


assumed to be damaged in accordance with 3.5.2 of the 2009 IMO
MODU Code.

3-3-2/3.7

Overturning Moment

To update terminology and separate requirements for specific types of


units.

3-3-2/3.9

Wind Tunnel Tests

To clarify the extent of testing and the requirement to submit the testing
program for review.

3-3-2/5.3.1

Internal Openings Used for Access


While Afloat

To align the requirements with 3.6.5.2 of the 2009 IMO MODU Code.

3-3-A2/1.3

Design

To use standard terminology from ABS Rules.

3-3-A2/7.1

Calculation Program

To use standard terminology from ABS Rules and to clarify some items.

3-3-A2/9

Acceptable Tolerances

To use standard terminology from ABS Rules and to clarify some items.

3-3-A2/Table 1

Acceptable Tolerances

To update items for use in MODU stability.

3-4-1/1

General

To require symbol as a condition of classification for self-propelled


MODUs.

3-4-1/3

Temporary Mooring Equipment

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules for symbol .

3-4-1/5

Position Mooring Equipment

To reference new Survey requirement for symbol .

3-4-1/9
(New)

Anchoring and Mooring Equipment

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules. Revised to include paragraph on single anchor
arrangement for units with DPS-2 or DPS-3 notation intended for
deepwater operations.

3-4-1/11
(New)

Equipment Mass and Size

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/Table 1
(New)

Values of Cs

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/13
(New)

Tests

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/15
(New)

Anchor Types

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/17
(New)

Windlass Support Structure and


Cable Stopper

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/Figure 1
(New)

Direction of Forces and Weight

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/Figure 2
(New)

Sign Convention

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/19
(New)

Hawse Pipes

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

3-4-1/Table 2
(New)

Equipment for Self-propelled Oceangoing Units

To incorporate and adapt the requirements from Section 3-5-1 of the


Steel Vessel Rules.

PART 4

Machinery and Systems

4-1-1/1
(New)

Requirements for Classification

To define the scope of the several Parts of the MODU Rules referring
to equipment, machinery and systems.

4-1-1/1.1.1
(New)

General

To specify that the design and construction of general drilling equipment


are not subject to class requirements if they comply with a recognized
standard.

4-1-1/1.1.2
(New)

Essential Systems to Unit Safety

To identify safety systems and equipment needed to be reviewed and


surveyed even if they are located in drilling areas or related to drilling
systems and equipment.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

13

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-1-1/1.1.3
(New)

References

To provide references to other requirements applicable or related to


drilling systems and equipment.

4-1-1/3
(New)

Definitions

To include definitions for terms used in Part 4.

4-1-1/5
(New)

Machinery Plans

To add general information on submission of machinery plans in line


with Steel Vessel Rules and other ABS Rules and Guides.

4-1-1/7.1

Inclinations

To clarify the application of the requirements for angles of inclination.

4-1-1/Table 2

Ambient Temperatures for Machinery,


Equipment and Appliances in Units
of Unrestricted Service

To clarify the terminology on temperatures.

4-1-1/7.13
(New)

Well Test Systems

To clarify the application of the requirements for temporary and


permanent well test systems installed on board MODUs.

4-1-1/Table 3

Primary Essential Services

To clarify the terminology on temperatures.

4-1-1/Table 4

Secondary Essential Services

To align Primary Essential and Secondary Essential services with the


new definition introduced in 4-1-1/3.5.

4-1-2/1
(New)

Prime Movers

To clarify requirements for certification of prime movers in line with


4-3-4/3 and the Steel Vessel Rules.

4-1-2/3
First Paragraph

<No Title>

To specify that for drilling units without CDS notation, internal


combustion engines used solely for drilling operations need not be of
approved type and need not be inspected at the plant of manufacture.

4-1-2/3.9

Governor Control

To reference requirements for operating governors of generator prime


movers in Section 6-1-3.

4-1-2/9
(New)

Electrical Machinery and Equipment

To clarify location of requirements for electrical machinery and


equipment.

4-1-2/11
(New)

Certification of Machinery and


Equipment

To clarify location of requirements for certification of machinery and


equipment.

4-2-1/3
(New)

Definitions

To add the definitions applicable to piping systems and to harmonize


definitions of pressures and temperatures and updated throughout the
text.

4-2-1/5

Classes of Piping Systems

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.

4-2-1/7.1

Plans

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.

4-2-1/11.7.1

Circulating Water Systems

To clarify that molded expansion joints are permitted only in Class III
sea water piping systems, in line with the Steel Vessel Rules.

4-2-1/11.7.2(b)

<No Title>

To clarify that the maximum working pressure of the system and not
the MAWP is to be lower than the design pressure of the expansion
joint determined by the burst test.

4-2-1/11.7.3

Fire Resistant Test

To clarify that maximum service pressure means maximum working


pressure of the system and that ISO 15540 and ISO 15541 can be used
for this test, as the criteria are identical.

4-2-1/11.9
(New)

Metallic Bellow Type Expansion


Joints

To add requirements for metallic bellow type expansion joints in line


with the Steel Vessel Rules.

4-2-1/11.11
(New)

Pipe Joints

To add requirements for pipe joints in line with the Steel Vessel Rules.

4-2-1/11.13
(New)

Mechanical Joints

To add requirements for mechanical joints in line with the Steel Vessel
Rules.

4-2-1/11.29

Flexible Hoses

To align the requirements with the Steel Vessel Rules and to clarify
that ISO 15540 and ISO 15541 can be used for this test, as the criteria
are identical.

4-2-1/11.33.2

Boiler Flats

To align the requirements with industry practice as the original IACS


requirement in this regard (UR F35.2.1.4.2) is no longer applied by
IACS.

14

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-2-2/3
(New)

Certification of Piping Components

To clarify location of requirements for certification of piping components.

4-2-2/5.1

Steel Pipe

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.

4-2-2/5.7.1

Design Pressure and Minimum


Thickness

To clarify that the equations determine the design pressure as defined


in 4-2-1/3.17 and that in the note, the actual working pressure is the
actual maximum working pressure as defined in 4-2-1/3.19.

4-2-2/5.9

Design Pressure and Thickness


Alternative Consideration

To clarify that the equations determine the design pressure as defined


in 4-2-1/3.17.

4-2-2/Table 1

Allowable Stress Values S for Piping

To clarify terminology on temperature.

4-2-2/7.5.1

Internal Pressure

To use the terminology defined in 4-2-1/3.19.

4-2-2/7.5.4

Temperature

To clarify terminology on temperature.

4-2-2/7.7.1

Supports

To clarify terminology on temperature.

4-2-2/7.9

Manufacturing of Plastic Pipes

To use the terminology defined in 4-2-1/3.17.

4-2-2/7.13.4(b)

<No Title>

To use the terminology defined in 4-2-1/3.17.

4-2-2/7.15.4(b)

<No Title>

To use the terminology defined in 4-2-1/3.17.

4-2-2/9.3

Construction

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify the meaning of maximum
pressure as maximum working pressure.

4-2-2/11.1

General

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify terminology on pressure and
temperature.

4-2-2/15

Flanges

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.

4-2-2/19.1

General

To use the terminology defined in 4-2-1/3.17.

4-2-2/19.3

Non-compliance with a Recognized


Standard

To use the terminology defined in 4-2-1/3.17.

4-2-2/19.11

Exemptions

To clarify the exemption of compliance with the Rule requirements


when the fluid power cylinders are not within the scope of classification.

4-2-2/21.3

Valve Connections to Shell

To clarify the requirements.

4-2-3/1.9.3

Protection for Fuel Oil and


Lubricating Oil Tanks

To align the requirements with 4.8.5 of the 2009 IMO MODU Code.

4-2-4/1.1

General

To clarify the definition of comparatively small compartments.

4-2-4/5.5

Manifolds, Cocks and Valve

To align the requirements with the 2009 IMO MODU Code.

4-2-4/9.1.2

Branch Lines

To adjust the intent of the requirement for small compartments.

4-2-3/13.5.2

Pump Performance

To align the requirements with 4.10.4 of the 2009 IMO MODU Code.

4-2-3/13.7.1(b)

Controls and Indications

To align the requirements with 4.10.10 of the 2009 IMO MODU Code.

4-2-3/13.7.3(c)

Disconnects

To align the requirement with the 2009 IMO MODU Code, and to avoid
the ambiguity whether the pumps or the pumps control system are to
be disconnected from the power system.

4-2-3/13.7.4

Valve Position Indicating Systems

To align the requirements with 4.10.17 of the 2009 IMO MODU Code.

4-2-5/1.1.4

Service and Settling Tanks

To align the requirements with 4.8.6 of the 2009 IMO MODU Code.

4-2-5/9.1.3

<No Title>

To define conditions for use of low flash point fuel in emergency


service prime movers.

4-2-6/3.1

General

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules and to clarify the exemption of compliance
with the Rules for hydraulic systems which are not within the scope of
classification.

4-2-6/3.17

Segregation of High Pressure Hydraulic


Units

To use the terminology defined in 4-2-1/3.17.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

15

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

4-2-6/5.5.1

General

To update the piping Groups I and II to the piping Classes I, II and III
used in other ABS Rules.

4-2-6/5.5.2

Pressure Relief Devices

To use the terminology defined in 4-2-1/3.17.

4-2-6/25
(New)

Raw Water System for Self-Elevating


Units in Elevated Condition

To add requirements for raw water systems on self-elevating units in


elevated condition based on current ABS practice.

4-3-1/5

Plans and Data to Be Submitted

To add a reference to the new paragraph for hazardous areas.

4-3-2/5.1.1

Basic Requirement

To clarify the arrangement of the emergency generator auxiliary systems.

4-3-2/5.1.2

Boundary

To align the requirements with 5.4.3 of the 2009 IMO MODU Code.

4-3-2/5.3
First Paragraph

Emergency Power Supply

To align the requirements with 4-8-2/5.5 of the Steel Vessel Rules.

4-3-2/5.3.1(f)

<No Title>

To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.

4-3-2/5.3.1(h)

<No Title>

To align the requirements with 5.4.6.1.8 of the 2009 IMO MODU Code.

4-3-2/5.3.3

Marking of Offshore Structures

To align the requirements with 5.4.6.3 of the 2009 IMO MODU Code.

4-3-2/5.5.1

General

To clarify that the angles of inclination referred to in this paragraph are


in static condition and that the minimum angles of inclination defined
in 4-1-1/7.1 are also applicable in this case.

4-3-2/5.5.2

Generator

To clarify the arrangement of the emergency generator auxiliary systems


and the use of low flashpoint fuels.

4-3-3/1.5

Electrical Equipment in Hazardous


Areas

To add reference to hazardous areas definition.

4-3-3/3.5.4

Motors Below Decks

To clarify that the suitability of the location where motors are installed
below deck will be verified by the attending Surveyor.

4-3-3/9.1.1

General

To align the requirements with 6.6.1 and 6.6.2 of the 2009 IMO MODU
Code.

4-3-3/9.1.2

Electrical Equipment

To align the requirements with 6.6.3 and 6.6.4 of the 2009 IMO MODU
Code, except that certified electrical equipment other than the types
listed under 4-3-3/9.1.2(b) will need special consideration.

4-3-3/9.1.3
(New)

Grouping and Temperature Class

To align the requirements with 6.6.5, 6.6.6 and 6.6.7 of the 2009 IMO
MODU Code.

4-3-3/Table 1

Minimum Degree of Protection

To clarify the degree of protection required for the remote closure and
monitoring of watertight doors, when the electrical equipment is below
the worst damage waterline.

4-3-4/5
(New)

Computer Based Systems

To align the requirements with 4-8-3/15 of the Steel Vessel Rules.

4-3-5/3.17.3
(New)

Cooling Systems for Machinery and


Equipment

To make reference to cooling system requirements in Section 6-1-7.

4-3-5/7.1.1
(New)

Machinery Associated with Dynamic


Positioning System

To align the requirements with 6.5.2 of the 2009 IMO MODU Code.

4-3-6/1.1

Hazardous Areas

To align the requirements with 6.1 of the 2009 IMO MODU Code.

4-3-6/5.1

Hazardous Areas Zone 0 Include

To align the requirements with 6.2.2 of the 2009 IMO MODU Code.

4-3-6/5.3vi)
(New)

<No Title>

To align the requirements with 6.2.3 of the 2009 IMO MODU Code.

4-3-6/5.5vi)

<No Title>

To align the requirements with 6.2.4 of the 2009 IMO MODU Code.

4-3-6/7.1i)

<No Title>

To align the requirements with 6.3.1.1 of the 2009 IMO MODU Code.

4-3-6/7.5i)

<No Title>

To align the requirements with 6.3.1.3 of the 2009 IMO MODU Code.

4-3-6/7.7
(New)

Ventilation Alarms

To clarify the requirements for ventilation alarms related to hazardous


areas based on IEC 60092-502.

4-3-6/7.9
(New)

Hold-back Devices

To align the requirements with 6.3.3 of the 2009 IMO MODU Code.

4-3-6/9.3

Ventilation of Hazardous Areas

To align the requirements with 6.4.1 of the 2009 IMO MODU Code.

16

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.
4-3-6/11

Title/Subject

Status/Remarks

Machinery Installations in Hazardous


Areas

To clarify the requirements. To add reference for requirements of


electrical equipment and wiring in hazardous areas. To add paragraph
to require safety devices in order to prevent overspeeding of internal
combustion engines due to ingestion of flammable gas through the air
intake. The distance of 15 m (50 ft) is based on API RP 505 for potential
release of large amounts of gas, equivalent to the case of loading
terminals.

PART 5

Fire and Safety Measures and Features

5-1-1/1.7
(New)

Alternative Design and Arrangements

To offer alternative methodology for the acceptance of novel designs,


in line with 9.1 of the 2009 IMO MODU Code.

5-1-1/3.5
(New)

Details, Materials and Methods of


Construction

To refer to the FTP Code and SOLAS, in line with 9.2.3 of the 2009
IMO MODU Code.

5-1-1/Table 1

Fire Integrity of Bulkheads


Separating Adjacent Spaces

To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO
MODU Code. Note 3 in 5-1-1/Table 1 is expanded to address the case
of bulkheads between adjacent spaces of the same category and purpose.

5-1-1/Table 2

Fire Integrity of Decks Separating


Adjacent Spaces

To align the requirements with Tables 9-1 and 9-2 of the 2009 IMO
MODU Code.

5-1-1/3.13

<No Title>

To align the requirements with 9.2.7 of the 2009 IMO MODU Code.

5-1-1/3.17vi)
(New)

<No Title>

To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU
Code.

5-1-1/5.1
(New)

<No Title>

To align the requirements with 9.3.1 of the 2009 IMO MODU Code.

5-1-1/5.3
(New)

<No Title>

To align the requirements with 9.3.2 of the 2009 IMO MODU Code.

5-1-1/5.5

<No Title>

To align the requirements with 9.3.3 of the 2009 IMO MODU Code.

5-1-1/5.7

<No Title>

To clarify the material requirements for stairs.

5-1-1/5.9

<No Title>

To align the requirements with 9.2.10 and 9.3.5 of the 2009 IMO MODU
Code.

5-1-1/5.11

<No Title>

To clarify that enclosed air spaces cannot communicate freely one deck
with the next.

5-1-1/5.19

<No Title>

To align the requirements with 9.3.10 of the 2009 IMO MODU Code.

5-1-1/5.21

<No Title>

To align the requirements with 9.3.11 of the 2009 IMO MODU Code.

5-1-1/5.23

<No Title>

To align the requirements with 9.3.12 of the 2009 IMO MODU Code.

5-1-1/5.27ii)

<No Title>

To align the requirements with 9.3.14.2 of the 2009 IMO MODU Code.

5-1-1/5.27
Last Paragraph

<No Title>

To clarify minimum thickness for steel sheet sleeves and the arrangement
in case of decks.

5-1-1/Figure 3

Ventilation Ducts Penetrating A


Class Divisions

To clarify that a manual damper may be an option in lieu of the required


automatic damper.

5-1-1/5.29

<No Title>

To align the requirements with 9.3.15 of the 2009 IMO MODU Code.

5-1-1/5.29.1

<No Title>

To clarify that other spaces associated to the galley in addition to the


pantry are also subject to the same requirements.

5-1-1/5.37

<No Title>

To apply the requirements to all galley exhaust ducts and to clarify the
requirements of the fire damper arrangements in order to make the fixed
fire extinguishing means effective.

5-1-1/5.47

<No Title>

To clarify the conditions for acceptance of air balancing ducts.

5-2-2/1.1.1

Number of Pumps

To refer to the new requirements for raw water systems in self-elevating


drilling units as supply to fire main systems.

5-2-2/1.5.2

Hoses

To align the hose length requirement with the Steel Vessel Rules.

5-2-4/1.1

Extinguishers

To clarify the requirements for portable fire extinguishers as a minimum


for class, which may be exceeded for compliance with the IMO MODU
Code, special instructions by the Flag Administration, or due to the
fire hazards on board.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

17

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

5-2-4/3.1

Number

To align the requirements with 9.13.3 of the 2009 IMO MODU Code.

5-2-4/3.3ii)

<No Title>

To align the requirements with 9.13.2 of the 2009 IMO MODU Code.

5-2-4/3.5
(New)

Recharging of Air Cylinders

To align the requirements with 9.14 of the 2009 IMO MODU Code.

5-2-4/Table 1

Classification of Portable and Semiportable Extinguishers

To align the requirements with Table 9-3 of the 2009 IMO MODU
Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO
MODU Code.

5-2-4/Table 2

Hand Portable Fire Extinguishers and


Semi-portable Fire-Extinguishing
Systems

To align the requirements with Table 9-3 of the 2009 IMO MODU
Code and MSC.1/Circ.1275 as referred to in 9.9.1 of the 2009 IMO
MODU Code.

5-2-5/1.1

Fire Detection and Alarm Systems

To align the requirements with 9.10.1 of the 2009 IMO MODU Code.

5-2-5/3.1
(New)

Hydrogen Sulfide Detection and


Alarm

To align the requirements with 9.12 of the 2009 IMO MODU Code.

5-3-1/1.1.4
(New)

<No Title>

To align the requirements with 9.4.1.4 of the 2009 IMO MODU Code.

5-3-1/1.3.1

<No Title>

To align the requirements with 9.4.2.1 of the 2009 IMO MODU Code.

5-3-1/1.3.2

<No Title>

To align the requirements with 9.4.2.2 of the 2009 IMO MODU Code.

5-3-1/1.11
(New)

<No Title>

To define the requirements for stairways and corridors to be accepted


as escape routes in line with 13.3 of the FSS Code.

5-3-1/1.13
(New)

<No Title>

To clarify the material requirements for escape routes and muster


stations.

5-3-1/3

Means of Access and Egress

To clarify the requirements.

Appendix 5-3-A1
(New)

Fiber Reinforced Plastic (FRP)


Gratings

To provide requirements for the acceptance of FRP gratings.

PART 6

Material, Marine Equipment and Machinery Certification

6-1-1/1.3.1

CDS Notation (optional)

To refer to the CDS Guide for certification of drilling equipment and


systems in units with CDS notation.

6-1-1/1.3.2

Drilling Units without CDS Notation

To clarify verification of drilling system equipment and components


in units without CDS notation.

6-1-1/3.1

Basic Requirements

To adapt the text to product unit certification only and to clarify the
requirements based on current practices.

6-1-1/3.3
(New)

Specific Requirements

To list the products covered by Part 6, Chapter 1 and their related


Sections.

6-1-1/3.5
(New)

Angles of Inclination

To highlight the requirements for angles of inclination as indicated in


4-1-1/7.1 as applied also to vendor machinery and equipment.

6-1-1/3.7
(New)

Ambient Temperature

To highlight the requirements for ambient temperature as indicated in


4-1-1/7.7 as applied also to vendor machinery and equipment.

6-1-1/3.9
(New)

Ambient Temperature

To introduce requirements for certification of products on skids, similar


to requirements for Floating Production Installations.

6-1-1/5
(New)

Design Review and Survey of


Equipment and Machinery

To introduce general requirements for certification of products,


specifically, to clarify general extent of survey requirements for unit
certification.

6-1-1/7
(New)

Prototype Testing

To introduce and clarify requirements for Prototype Testing.

6-1-1/9
(New)

Type Approval Program

To provide minimum amount of information that supplements the


administrative process of Type Approval program.

6-1-1/11
(New)

Manufacturers Guarantee

To clarify manufacturers responsibility.

6-1-2/1
(New)

General

To introduce and clarify requirements for Materials Certification and


to supplement Part 2.

18

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

6-1-2/3.1
(New)

Plating and Shapes

To emphasize that structural plating and shapes are to be manufactured


by an ABS approved mill and certified by a Surveyor attending the mill.

6-1-2/3.3
(New)

Seamless Steel Pipes or Novel Cast


Nodes used as Special or Primary
Application Structure of Legs for
Self-Elevating Units

To clarify that seamless tubular members used as a Primary member


(outer tubular members of the lattice leg chords) of a jack-ups leg
structure is to be treated same as a structural plating and require to be
manufactured by an ABS approved mill and certified by attending
Surveyor.

6-1-2/3.5
(New)

Seamless Steel Pipes used as


Secondary Application Structure of
Legs for Self-Elevating Units

To clarify that seamless tubular members used as a Secondary member


(internal tubular members of the lattice leg chords) of a jackups leg
structure need not be treated same as structural plating and do not
require to be manufactured by an ABS approved mill and certified by
attending Surveyor.

6-1-2/5
(New)

Material for Foundation Structures

To clarify acceptance requirement of material for foundation structures.

6-1-2/7
(New)

Helideck Structure

To clarify acceptance requirement of material for helideck structure.

6-1-2/9.1
(New)

General

To align the requirements for watertight doors with 3.6.3 of the 2009
IMO MODU code and with 3-2-9/9.9 of the Steel Vessel Rules.

6-1-2/9.3
(New)

Sliding Watertight Doors

To clarify the requirements for certification of sliding watertight doors


and to align them with 3-2-9/9.11.

6-1-2/9.5
(New)

Dogged Watertight Doors

To clarify the requirements for certification of dogged watertight doors.

6-1-3/3.1.3
(New)

Hot Surfaces

To incorporate new requirements related to high pressure fuel delivery


lines in line with 4.8.7.2 and 4.8.7.3 of the 2009 IMO MODU Code.

6-1-3/3.9
(New)

References

To provide references for major requirements related to internal


combustion engines in other sections of these Rules.

6-1-3/5
(New)

Survey and Certification

To provide an explanation of the survey and certification requirements.

6-1-4/5
(New)

Survey and Certification

To provide an explanation of the survey and certification requirements.

6-1-5/1.1
(New)

Application

To clarify the application of the requirements, in line with the Steel


Vessel Rules.

6-1-5/1.3
(New)

Grouping of Boilers and Pressure


Vessels

To specify the grouping used in the Tables, in line with the Steel Vessel
Rules.

6-1-5/3
(New)

Materials for Group I Boilers,


Heaters, Pressure Vessels and Heat
Exchangers

To make reference to Part 2 regarding material testing.

6-1-5/5
(New)

Survey and Certification

To provide an explanation of the survey and certification requirements.

6-1-6/3
(New)

Pipes

To provide specific requirements for pipes in line with the Steel Vessel
Rules and current practices.

6-1-6/5
(New)

Piping Components other than Pipes

To provide specific requirements for piping components other than


pipes in line with the Steel Vessel Rules and current practices.

6-1-6/7
(New)

Survey and Certification

To provide an explanation of the survey and certification requirements.

6-1-7/3.1

Rotating Machines of 100 kW and


Over

To refer to services related to additional optional notations since


4-3-4/Table 11 has been removed.

6-1-7/3.3

Switchboards, Distribution Boards,


Controllers, etc.

To refer to services related to additional optional notations since


4-3-4/Table 11 has been removed.

6-1-7/5.1.1

Applications

To refer to services related to additional optional notations since


4-3-4/Table 11 has been removed.

6-1-7/5.9.1

Temperature Rises

To change duty to rating as a term more used by the industry. To


clarify the requirement of temperature rises for insulation material above
180C (356F).

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

19

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

6-1-7/5.13

Lubrication

To refer to lubrication requirements in ship-type units.

6-1-7/5.15
(New)

Operating and Overspeed Governors


for Generator Prime Movers

To refer to governor requirements for generator prime movers.

6-1-7/9.1.1

Applications

To refer to services related to additional optional notations since


4-3-4/Table 11 has been removed.

6-1-7/9.1.2(f)

Earthing

To add reference for earthing related requirements of three-wire dualvoltage DC systems.

6-1-7/11.3

Temperature Rise

To clarify the requirement of temperature rises for insulation material


above 180C (356F).

6-1-7/17.3.5

Semiconductor Converters for


Propulsion

To add reference for protection of semiconductor converter circuits.

6-1-7/19
(New)

Survey and Certification

To provide an explanation of the survey and certification requirements.

Section 6-1-8
(New)

Fire and Safety Equipment and


Systems

To provide requirements for certification of fire and safety equipment


and systems.

6-1-9/3.11

Specified Service Temperature

To clarify terminology on temperature.

6-1-9/13.1

Bearings

To clarify terminology on temperature.

6-1-9/13.5

Flexible Shock Pads

To clarify terminology on temperature.

6-1-9/25

Survey and Certification

To consolidate all the related survey and testing requirements and to


clarify the attendance of the Surveyor.

Section 6-1-10
(New)

Anchoring System Symbol

To provide requirements for certification of anchoring systems.

The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date
that the requirement becomes effective [e.g., 6-2-1/3 Definitions (2010) is to apply for vessels undergoing survey
on or after 1 January 2010]
EFFECTIVE DATE 1 January 2010 shown as (2010)
Part/Para. No.

Title/Subject

Status/Remarks

PART 6

Surveys

6-1-1
(New)

General

To better outline ABS' general requirements for surveys during


construction/fabrication at Vendor's Facility and Builder's Yard, for
initial Classification. (Incorporates Notice No. 3)

6-1-2/9.1

Applications

To document that rotating machines for services indicated in 4-3-4/Table


11 require ABS certification. (Incorporates Notice No. 3)

6-1-2/23.1

Applications

To document that switchboards, motor controllers, and motor control


centers for services indicated in 4-3-4/Table 11 require ABS
certification. (Incorporates Notice No. 3)

6-2-1/1
(New)

Application

To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)

6-2-1/3

Definitions

To clarify the definitions. (Incorporates Notice No. 3)

6-2-1/13

Incomplete Surveys

To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)

6-2-1/15

Lay-up and Reactivation

To align the MODU Rules with the Steel Vessel Rules. (Incorporates
Notice No. 3)

6-2-2
(New)

Survey Intervals

To align the MODU Rules with the Steel Vessel Rules and to clarify
the intervals applicable to MODUs classed for Unrestricted Service
versus MODUs operating in Great Lakes Service. (Incorporates
Notice No. 3)

20

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

6-2-3/1

Special Surveys

To clarify that the planning document is to require review by the


attending Surveyor, and not ABS head offices. (Incorporates Notice
No. 3)

6-2-4/1.1.9
(New)

<No Title>

To provide specific requirements regarding how to handle Substantial


Corrosion during Annual Survey of Hull. (Incorporates Notice No. 3)

6-2-4/1.3

Corrosion Control Systems

To clarify the mandatory requirements for Annual Surveys.


(Incorporates Notice No. 3)

6-2-4/1.5

Alterations and Position of Load


Lines

To clarify the mandatory requirements for Annual Surveys.


(Incorporates Notice No. 3)

6-2-4/3

Annual Survey Machinery and


Electrical Systems

To clarify the mandatory requirements of Annual Survey of


Machinery and Electrical Systems. (Incorporates Notice No. 3)

6-2-4/3.5
(New)

Preventative Maintenance Techniques

To incorporate requirements for preventative maintenance techniques.


(Incorporates Notice No. 3)

6-2-4/3.7
(New)

Examination during Overhaul

To incorporate requirements for examination during overhaul.


(Incorporates Notice No. 3)

6-2-4/3.9
(New)

Examination at Shorter Intervals

To incorporate requirements for examination at shorter intervals.


(Incorporates Notice No. 3)

6-2-4/5
(New)

Thrusters and Dynamic Positioning


Systems

To incorporate requirements for thrusters and dynamic positioning


systems. (Incorporates Notice No. 3)

6-2-5/1.1.9

<No Title>

To provide specific requirements regarding how to handle Substantial


Corrosion during Special Periodical Survey Hull. (Incorporates
Notice No. 3)

6-2-5/1.5.6

<No Title>

To clarify that cans/mats would require internal and external examination.


(Incorporates Notice No. 3)

6-2-5/3.5

Column-Stabilized Units

To clarify that the close visual examination and NDT is required during
SPS, not every DD/UWILD, and that NDT requirements for rigs over
15 years of age (>SPS #3) would be subjected to more extensive close
visual examination and NDT. To clarify that Record Keeping is
mandatory but Inspection Manual is not. (Incorporates Notice No. 3)

6-2-5/5

Special Periodical Survey


Machinery

To clarify the mandatory requirements of SPS of Machinery.


(Incorporates Notice No. 3)

6-2-5/7
(New)

Special Periodical Survey Electrical


Equipment

To clarify the mandatory requirements of SPS of Electrical Systems.


(Incorporates Notice No. 3)

6-2-5/9

Special Periodical Survey Special


Features (All Types)

To clarify the mandatory requirements of SPS of Special Features


(mandatory for all rigs). (Incorporates Notice No. 3)

6-2-5/11

Thrusters and Dynamic Position


Systems

To clarify the requirements for thrusters and dynamic position systems.


(Incorporates Notice No. 3)

6-2-5/13

Units with Retractable Propulsion


Thrusters

To clarify ABS acceptance of waiving internal examination of


retractable thrusters. (Incorporates Notice No. 3)

6-2-6/1.3

Self-Elevating Units

To clarify items subjected to close visual examination and NDT during


UWILD, and introduced a new Note, which states conditions for
postponing the underwater survey until next rig move. (Incorporates
Notice No. 3)

6-2-6/1.9.3

External Portions of Propulsion Units

To clarify that survey of external portions of propulsion units is


applicable to all units. (Incorporates Notice No. 3)

6-2-A1/3.3.2v)

<No Title>

To include verification of weathertight doors. (Incorporates Notice No. 3)

6-2-A1/3.3.2x)

<No Title>

To remove requirements for radio installation and include verification


of helideck. (Incorporates Notice No. 3)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

21

Notices and General Information

EFFECTIVE DATE 1 January 2011 shown as (2011)


Part/Para. No.

Title/Subject

PART 6

Surveys

6-2-5/9.15

Self-Elevating Drilling Units Leg


Jacking Systems

Status/Remarks
To clarify the mandatory survey requirements of Jacking Systems.
(Incorporates Notice No. 4)

EFFECTIVE DATE 1 January 2012 shown as (2012)


Part/Para. No.

Title/Subject

Status/Remarks

PART 7

Surveys

7-1-1/1

General

To emphasize that requirements of subsequent Sections are to be done


to the satisfaction of the Surveyor.

7-1-1/5

Certification and Classification

To explain issuance of the initial class certificate to a drilling unit and


its validity.

7-1-2/3

Survey of Hull Structure and


Outfitting

To explain the main survey and testing items required for hull structure
and outfitting.

7-1-2/5
(New)

Material

To reemphasize that traceability and selection of material is required


to be verified by the Surveyor, and Part 3 is to be used to reference
application of different structural categories on various types of
drilling units.

7-1-2/11

Nondestructive Testing (NDT)

To include newly defined NDT requirements.

7-1-2/11
Second Paragraph
(New)

Nondestructive Testing (NDT)

To clarify that the NDT plan is reviewed by the attending Surveyor, not
an ABS Technical Office, must be accepted before NDT is commenced,
and the Surveyor may witness NDT as deemed necessary.

7-1-2/11.5
(New)

NDT of Surface-Type Drilling Units

To cover drill ships and requirement to specifically NDT within 0.6L


matched the area subjected to gauging when the vessel is surveyed
after construction.

7-1-2/11.9
(New)

NDT Personnel and Records

To clarify the objective of the NDT department, minimum NDT


qualification of NDT personnel, and maintenance of records.

7-1-2/Table 1
(New)

Nondestructive Testing (NDT) of


Steel Structure Welds

To define extent and type of NDT required for each type of structural
member.

7-1-2/13.1

Performance Standards for Protective


Coatings (PSPC)

To explain the difference between optional Class service and new IMO
requirements associated with ballast tanks on drilling units.

7-1-2/15

Survey of Load Line

To explain the process for obtaining the Load Line Certificate.

7-1-2/17.1
(New)

Damage Conditions for Self-Elevating


Units

To define where the assumed damage is assumed on self-elevating units.

7-1-2/Figure 1
(New)

Damage Conditions for Self-Elevating


Units

To define where the assumed damage is assumed on self-elevating units.

7-1-2/17.3
(New)

Damage Conditions for ColumnStabilized Drilling Units

To define where the assumed damage is assumed on column-stabilized


units.

7-1-2/Figure 2
(New)

Damage Conditions for ColumnStabilized Units

To define where the assumed damage is assumed on column-stabilized


units.

7-1-2/17.5
(New)

Surface-Type Drilling Units

To define where the assumed damage is assumed on surface-type units.

7-1-2/Figure 3
(New)

Damage Conditions for Surface-Type


Units

To define where the assumed damage is assumed on surface-type units.

7-1-2/23.3

Testing of Watertight Boundaries,


Tanks and Sliding Doors

To clarify how the testing of watertight sliding doors is to be carried


out and accepted.

22

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-1-2/23.9

Air Testing

To clarify how the air test procedure should be carried out while safety
is maintained during test preparation and that alternative tests are to be
agreed by the Surveyor.

7-1-2/23.11

Hose Testing

To clarify where alternative test procedure may be allowed.

7-1-2/23.13

Flood Testing

To clarify where flood testing is to be done and its alternative.

7-1-2/27
(New)

Hull Inspection and Maintenance


Program (HIMP) (Optional)

To highlight the existence of ABS Hull Inspection and Maintenance


Program.

7-1-3/3
(New)

Survey of Machinery, Piping, Pressure


Vessels, and other Outfitting Items

To require the builder to have a Quality Control Program that covers


all phases of the construction, testing and trials.

7-1-3/5.1
(New)

Material Tests and Inspection

To clarify references to material tests and inspection requirements.

7-1-3/5.5
(New)

Minimum Angle of Inclination for


Machinery

To remind the Surveyor of the limitation on angle of inclination.

7-1-3/5.7
(New)

Ambient Temperature for Machinery

To remind the Surveyor of the limitation on ambient temperature.

7-1-3/7
(New)

Internal Combustion Engines

To highlight the main items to be verified after installation of an engine


certified in accordance with Part 6 of these Rules.

7-1-3/9
(New)

Piping

To highlight the main items to be complied with for piping installed


onboard.

7-1-3/11
(New)

Piping Installation Details

To provide a listing of items that are required to be verified during


survey of piping systems.

7-1-3/13
(New)

Metallic and Plastic Pipes

To describe survey requirements for verifying compliance with 4-2-2/5


and 4-2-2/7.

7-1-3/15
(New)

Valves

To describe the Surveyors verification of compliance with 4-2-2/9.

7-1-3/17
(New)

Pipe Fittings

To describe the Surveyors verification of compliance with 4-2-2/11.

7-1-3/19
(New)

Flanges

To describe the Surveyors verification of compliance with 4-2-2/15.

7-1-3/21
(New)

Fluid Power Cylinders

To describe the Surveyors verification of compliance with 4-2-2/19.

7-1-3/23
First Paragraph
(New)

Sea Inlets and Overboard Discharges

To clarify that all inlets and overboard discharges are to be tested.

7-1-3/25
First Paragraph
(New)

Scuppers and Drains on Surface-Type


and Self-Elevating Drilling Units

To clarify that testing to be done preferably before launching of the hull.

7-1-3/27
First Paragraph
(New)

Cooler Installations External to the


Hull

To clarify that coolers are to be tested.

7-1-3/29
First Paragraph
(New)

Penetrations Through Watertight


Boundaries

To clarify that watertight penetrations are to be tested.

7-1-4/3
(New)

Jacking and Associated Systems

To clarify that the certified jacking system is to be surveyed upon


installation and before subjected to jacking trials.

7-1-4/5
(New)

Tank Vents and Overflows

To clarify that all tank vents and overflows are required to be surveyed
and tested when testing the tanks they are fitted on.

7-1-4/5.1

Progressive Flooding Consideration

To emphasize the importance of verifying measures against progressive


flooding during the survey of tanks/spaces after they are outfitted
particularly with vents and overflows.

7-1-4/7
(New)

Sounding

To clarify that sounding pipes are required to be surveyed and tested


when examining and testing the tanks they are fitted on.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

23

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-1-4/9
(New)

Bilge System

To clarify that the bilge system is to be surveyed and tested.

7-1-4/11
(New)

Ballast System

To clarify that the ballast system is to be surveyed and tested.

7-1-4/13
(New)

Fuel Oil System

To clarify that the fuel oil system is to be surveyed and tested.

7-1-4/15
(New)

Low Flash Point Fuels

To clarify that if low flash point fuel is used, verification for compliance
with 4-2-5/9 of these Rules is required.

7-1-4/17
(New)

Lubricating Oil System

To clarify that the lubricating oil system is to be surveyed and tested.

7-1-4/41.1.6
(New)

High Pressure Industrial Piping

To clarify that the high pressure piping is a class requirement and not
CDS.

7-1-4/41.1.7

All Piping Systems

To indicate that verification of the piping working under normal


operational condition can be done during the sea trials while verifying
normal operation of the machinery of the drilling unit.

7-1-5/5.13

Deck and Bulkhead Penetrations

To clarify that cable penetrations are to be examined and tested.

7-1-6/3

Main Source of Power

To clarify that all power sources are subjected to examination and


testing after installation.

7-1-6/9
(New)

Circuit Protection System

To clarify that the Surveyor is to be satisfied with circuit protection


system covered under Part 4 of these Rules.

7-1-6/11
(New)

Systems for Steering Gear Installed in


Self-Propelled Units

To clarify that the steering ear is to be tested alongside (dockside) before


commencement of the sea trial.

7-1-6/13
First Paragraph
(New)

Lighting and Navigation Light


Systems

To clarify that all lighting should be verified operational before


commencement of the sea trial.

7-1-6/13.5
(New)

Obstruction Light System

To clarify that all obstruction lights installed on the derrick and top of
cranes are to be verified.

7-1-6/15
First Paragraph
(New)

Interior Communication Systems

To clarify that communication system is to be verified operational before


commencement of the sea trial.

7-1-6/17
First Paragraph
(New)

Manually Operated Alarms

To clarify that all alarm systems are in satisfactory operational order


before commencement of the sea trial.

7-1-6/19
First Paragraph
(New)

Fire Protection and Fire Detection


Systems

To clarify that all fire protection work is to be completed before


commencement of the sea trial, and all fire detection systems should
be operational for the sea trial.

7-1-6/21
First Paragraph
(New)

Electrical System Testing

To clarify that dockside testing of the entire electrical system should


be complete before commencement of the sea trial.

7-1-6/21.13
(New)

Public Address (PA) & General


Alarm (GA) Systems

To clarify that the system is operational before commencement of the


sea trial.

7-1-6/21.15
(New)

Fire and Gas (F&G) Detection


System

To clarify that the system is operational before commencement of the


sea trial.

7-1-6/21.17
(New)

Electrical Equipment in Hazardous


Areas

To clarify that the entire equipment in hazardous areas are to be surveyed.

7-1-6/21.19
(New)

Hazardous Area Doors, Ventilation


and Alarms

To clarify that the survey of the hazardous areas includes verification


of doors, ventilation and their associated alarms.

7-1-6/21.21
(New)

Mud Pit Level Alarm

To clarify that the pit level alarms are class (not CDS) and should be
tested.

7-1-6/21.23
(New)

Shutdown of Ventilation Fans and


Openings

To clarify that the shutdown of ventilation systems are to be tested.

7-1-6/21.25
(New)

Emergency Shutdown System

To clarify that the Emergency Shutdown System (ESD) is to be tested.

24

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-1-6/21.27
(New)

Helicopter Deck Lighting

To clarify that the helideck lighting system is to be verified and tested.

7-1-6/21.29
(New)

Navigation and Obstruction Lights

To clarify that the obstruction lights are to be verified and tested.

7-1-8/1.1
(New)

Administration Certification

To clarify that approval of passive fire protection may be done directly


by the Flag Administration, who will issue the MODU Code Safety
Certificate and that in such case, the ABS Surveyors are not required
to survey fire protection per Subsection 5 of these Rules.

7-1-8/3
(New)

Survey of Fire and Safety Features

To clarify general requirements of surveying the fire and safety features


of the unit.

7-1-8/5.1.1

Construction Materials

To clarify that steel must be certified per these Rules and material
other than steel needs manufacturers affidavit/certificate.

7-1-8/5.1.2

Fire Integrity of Bulkheads and Decks

To clarify that all bulkheads and decks must be examined before


insulation is installed.

7-1-8/5.1.3
(New)

Fire Resistance of Bulkheads and Decks

To supplement the design review requirements contained in 5-1-1/3.19


of these Rules.

7-1-8/5.1.4

Structural Fire Protection Details in


way of Intersections, Joints and
Penetrations

To supplement the design review requirements contained in 5-1-1/3.13


of these Rules.

7-1-8/5.1.5
(New)

Windows and Side-scuttles

To supplement the design review requirements contained in 5-1-1/3.15


of these Rules.

7-1-8/5.1.6

Fire Doors

To supplement the design review requirements contained in 5-1-1/3.17


of these Rules.

7-1-8/5.3
(New)

Protection of Accommodation Spaces,


Service Spaces and Control Stations

To supplement the design review requirements contained in 5-1-1/5 of


these Rules.

7-1-8/7.1
(New)

Fire Control Plan

To clarify how to treat onboard Fire Control Plans.

7-1-8/7.3
(New)

Fire Pumps

To supplement the design review requirements contained in 5-2-2/1.1


of these Rules.

7-1-8/7.5
(New)

Fire Main

To supplement the design review requirements contained in 5-2-2/1.3


of these Rules.

7-1-8/7.7
(New)

Hydrants, Hoses, Nozzles and


International Shore Connection

To supplement the design review requirements contained in 5-2-2/1.5


of these Rules.

7-1-8/9.1
(New)

Gas Smothering System

To supplement the design review requirements contained in 5-2-3/3 of


these Rules.

7-1-8/9.3
(New)

Foam System

To supplement the design review requirements contained in 5-2-3/5 of


these Rules.

7-1-8/9.5
(New)

Fixed Pressure Water Spraying


Systems

To supplement the design review requirements contained in 5-2-3/7 of


these Rules.

7-1-8/9.7
(New)

Protection of Helicopter Decks

To supplement the design review requirements contained in 5-2-3/9 of


these Rules.

7-1-8/9.9
(New)

Paint and Flammable Liquid Lockers

To supplement the design review requirements contained in 5-2-3/11


of these Rules.

7-1-8/11.1
(New)

Portable Fire Extinguishers and Sand

To supplement the design review requirements contained in 5-2-4/1 of


these Rules.

7-1-8/11.3
(New)

Firefighters Outfit

To supplement the design review requirements contained in 5-2-4/3 of


these Rules.

7-1-8/13.1
(New)

Testing of Alarm Systems

To supplement the design review requirements contained in 5-2-5/1.1


of these Rules.

7-1-8/15.1
(New)

Hydrogen Sulfide (H2S) Detection


and Alarm System

To supplement the design review requirements contained in 5-2-5/1.1


of these Rules.

7-1-8/17.1
(New)

Means of Escape

To supplement the design review requirements contained in 5-2-3/1 of


these Rules and to clarify use of gratings in way of escape routes.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

25

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-1-8/17.3
(New)

Means of Access and Egress

To supplement the design review requirements contained in 5-2-3/3 of


these Rules.

7-1-8/17.5
(New)

Guards and Rails

To supplement the design review requirements contained in 5-2-3/5 of


these Rules.

7-1-8/17.7
(New)

Emergency Control Stations

To supplement the design review requirements contained in 5-2-3/7 of


these Rules.

7-1-8/17.9
(New)

Arrangements in Machinery Space

To supplement the design review requirements contained in 5-2-3/9 of


these Rules.

7-1-8/17.11
(New)

Segregation of Fuel Oil Purifiers

To supplement the design review requirements contained in 5-2-3/11


of these Rules.

7-1-8/17.13
(New)

Fire Precautions for Machinery Spaces

To supplement the design review requirements contained in 5-2-3/15


of these Rules.

7-1-8/19.1
(New)

Arrangements and Services

To supplement the design review requirements contained in 5-3-1/7


and 4-3-5/7 of these Rules.

7-1-9/1
(New)

General

To clarify the purpose of Surveyor witnessing a sea trial.

7-1-9/3
(New)

Stability Test

To clarify that a deadweight survey or an inclining experiment is


required for every new drilling unit built to ABS class.

7-1-9/5
(New)

Safety

To clarify that a Surveyor must ascertain the safety of the vessel


before he/she agrees to board the vessel to witness the sea trial.

7-1-9/7
(New)

Hull Structure Testing

To clarify that hull testing can be done at sea trial and its acceptance
criteria.

7-1-9/9.1

Initial Jacking Test

To clarify requirements after the initial jacking trial.

7-1-9/9.3

Moveable Cantilever and Skid Beam


Testing

To clarify conditions of the test.

7-1-9/11.11
(New)

Fire Extinguishing System

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.13
(New)

Main Source of Power

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.15
(New)

Emergency Source of Power

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.17
(New)

Distribution System

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.19
(New)

Circuit Protection System

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.21
(New)

Lighting and Navigation Light


Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.23
(New)

Public Address (PA) and General


Alarm (GA) Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.25
(New)

Fire Protection and Fire Detection


Systems

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/11.27
(New)

Gas Detection System

To clarify satisfactory operation of systems to be verified during sea trial.

7-1-9/15.1
(New)

Anchoring/Mooring System
Foundations

To include requirements for testing anchoring/mooring systems.

7-1-9/17
(New)

Dynamic Positioning System (DPS)

To clarify the dynamic positioning trials required during new construction.

Appendix 7-1-A1
(New)

Mooring Equipment and Systems

To identify minimum ABS requirements for mooring systems certified


based on the requested Symbol.

Appendix 7-1-A2
(New)

Surveys of Computers for Stability


Calculations

To provide requirements for surveys and testing to be carried out on


onboard computers for stability calculations.

7-2-1/1.1

Chapter 2 Sections 1 through 10

To clarify application of Rules/Guides.

26

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-2-1/3.13

Survey

To add industry terms Close Visual Inspection (CVI) and General


Visual Inspection (GVI).

7-2-1/3.21.1
(New)

Splash Zone (for Self-Elevating and


Column Stabilized Units)

To add definition of Splash Zone.

7-2-1/7.7
(New)

Application of Rules

To clarify application of the Rules when only repair is carried out to


the drilling unit without modifying its design.

7-2-1/9.1
(New)

Application of Rules

To clarify what constitutes a major or minor alteration, and the application


of respective Rules.

7-2-1/15.3

Units Operating in Fresh Water

To clarify that the requirements apply to drilling units not operating in


open sea water as unrestricted service but accepted for restricted
service in lakes or enclosed waters.

7-2-1/17
(New)

Onboard Drawings and Manuals

To clarify what documents are required to be available onboard.

7-2-2/1.9.1
(New)

Self-Elevating Drilling Units


Drydocking Survey Interval
Exceeding 36 Months

To clarify action to be taken on self-elevating drilling units where


intervals between two drydocking period exceed the Rule required
interval.

7-2-2/3

Units Operating in Fresh Water

To clarify that the requirements apply to drilling units not operating in


open sea water as unrestricted service but accepted for restricted
service in lakes or enclosed waters.

7-2-3/1.1
(New)

Plan for UWILD

To clarify who reviews the UWILD plan, etc.

7-2-3/1.3
(New)

Plan for Out-of-Water Drydocking


and Special Periodical Survey

To clarify who reviews the Drydocking and Special Periodical Survey


plans.

7-2-3/1.5.1

Critical Structural Areas

To clarify requirements of onboard drawing showing Critical Structural


Areas to be referenced during the pre-planning meeting.

7-2-4/1.1.10(a)
(New)

Performance Standards for Protective


Coatings (PSPC)

To highlight requirements for Corrosion Control Systems and to


mention PSPC.

7-2-4/1.1.14
(New)

HIMP Notation (optional)

To require HIMP to be confirmed during Annual Survey Hull.

7-2-4/1.3

Surface-Type Units

7-2-4/1.5

Self-Elevating Units

7-2-4/1.7

Column-Stabilized Units

7-2-5/1.1.6

Hull Attachments for Anchoring and


Mooring System

To clarify that this is in addition to general requirement listed under


7-2-4/1.1.
To clarify that this is in addition to general requirement listed under
7-2-4/1.1.
To clarify that this is in addition to general requirement listed under
7-2-4/1.1.
To correct items to be examined.

7-2-5/1.9
(New)

Onboard Computers for Stability


Calculations

To be consistent with Annual Surveys.

7-2-5/3.3

Close-Up Survey and Nondestructive


Testing on Self-Elevating Units

To clarify that 100% CVI plus extensive NDT is required and that fatigue
analysis is not always required unless otherwise requested by ABS.

7-2-5/3.3iii)

<No Title>

To clarify why such area is to be examined and subjected to NDT.

7-2-5/3.3iv)

<No Title>

7-2-5/3.3.1

Special Survey No. 3 and Subsequent


Special Surveys

7-2-5/3.5

Close-Up Survey and Nondestructive


Testing on Column-Stabilized Units

To remind that the leg-mat connection is a Special unless the modified


design has resulted in moving fatigue sensitive area to another location.
To make the requirements effective at the 3rd Special Periodical Survey
and not after the 3rd Special Periodical Survey and to clarify that the
fatigue analysis is not always required unless otherwise requested by
ABS.
To clarify that 100% CVI plus extensive NDT is required.

7-2-5/3.5.1

Special Survey No. 3 and Subsequent


Special Surveys

To make the requirements effective at the 3rd Special Periodical Survey


and not after the 3rd Special Periodical Survey and to clarify that the
fatigue analysis is not always required unless otherwise requested by
ABS.

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

27

Notices and General Information

Part/Para. No.

Title/Subject

Status/Remarks

7-2-5/3.9
(New)

Thickness Measurement (Gauging)

To explain requirements of gauging, wastage, etc.

7-2-5/Table 1

Thickness Gauging Requirements for


Surface-Type Units

To align the gauging requirement and the definitions of Special, Primary,


and Secondary Application Structures.

7-2-5/Table 2

Thickness Gauging Requirements for


Self-Elevating Units

To add definition of Splash Zone.

7-2-5/Table 3

Thickness Gauging Requirements for


Column-Stabilized Units

To add definition of Splash Zone.

7-2-5/5.3.4
(New)

Bilge and Ballast System, and other


Systems

To clarify that all bilge and ballast systems are to be operationally tested
at each Special Periodical Survey Machinery.

7-2-5/5.3.5

Machinery Foundations

7-2-5/7.3.6
(New)

Accumulator Batteries

To clarify that the not every machinery foundation is a concern for ABS
unless it is suspect.
To align the requirements with the Steel Vessel Rules.

7-2-6/1.3iii)

<No Title>

To clarify why such area is to be examined and subjected to NDT.

7-2-6/1.3iv)

<No Title>

7-2-6/3.7
(New)

Crediting UWILD on a Self-Elevating


Drilling Unit without Completing the
Examination of Spudcans/Mat

To remind that the leg-mat connection is a Special unless the modified


design has resulted in moving fatigue sensitive area to another location.
To clarify how the incomplete UWILD on self-elevating drilling units
may be treated by the Surveyor.

7-2-6/3.9
(New)

Incomplete UWILD over a Five-Year


Period Self-Elevating Drilling Units

7-2-7/1

Ocean Transit Wet Tow

To what will be required when UWILD of a self-elevating drilling


unit located at one site (without any rig move) cannot be completed
within a five-year period.
To clarify the requirements.

7-2-7/3
(New)

Ocean Transit Dry Tow

To introduce requirements for ocean transit dry tow.

Appendix 7-2-A2
(New)

Survey of Temporary Modular Units

To explain what surveys should be performed on temporary modular


units.

Appendix 7-2-A3
(New)

Modification of a Self-Elevating
Drilling Unit to Become Site-Specific
Fixed Offshore Installation

To clarify the minimum amount of surveys to be performed on a unit


that is converted into a site-specific fixed offshore unit.

28

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information

TABLE 4
Comparison of the Numbering System of the 2008 Rules vs. 2012 Rules
MODU 2008
Part
1
Whole Part
Part
1
Part
1
Chapter
1
Section
1
CC 1-1-1
CC 1-1-1/1
CC 1-1-1/1a)
CC 1-1-1/1b)
CC 1-1-1/1c)
CC 1-1-1/1d)
CC 1-1-1/3
CC 1-1-1/3.1
CC 1-1-1/3.3
CC 1-1-1/3.5
CC 1-1-1/3.7
CC 1-1-1/5
CC 1-1-1/7
Part
1
Chapter
1
Section
2
CC 1-1-2
CC 1-1-2/1
CC 1-1-2/1.1
CC 1-1-2/1.3
CC 1-1-2/3
CC 1-1-2/5
CC 1-1-2/7
CC 1-1-2/7.1
CC 1-1-2/7.3
CC 1-1-2/7.5
CC 1-1-2/7.5i)
CC 1-1-2/7.5ii)
CC 1-1-2/7.5iii)
CC 1-1-2/7.7
CC 1-1-2/7.9
CC 1-1-2/7.11
CC 1-1-2/7.11i)
CC 1-1-2/7.11ii)
CC 1-1-2/7.11iii)
CC 1-1-2/7.13
CC 1-1-2/7.15
CC 1-1-2/7.15i)
CC 1-1-2/7.15ii)
CC 1-1-2/7.15iii)
CC 1-1-2/9
CC 1-1-2/9.1
CC 1-1-2/9.3
CC 1-1-2/9.5
CC 1-1-2/11
CC 1-1-2/11.1
CC 1-1-2/11.3
CC 1-1-2/11.5
CC 1-1-2/13

Title
Conditions of Classification
In the list below, references to the ABS Rules for Conditions of Classification
Offshore Units and Structures (Part 1) are given as CC 1-1-X/Y.Y.Y and
references to Part 1 of the MODU Rules are given as 1-1-X/Y.Y.Y.
Rules for Conditions of Classification (Generic Part 1)
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification
Classification
Process
--------Certificates and Reports
--------Representations as to Classification
Scope of Classification
Rules for Conditions of Classification
Scope and Conditions of Classification
Suspension and Cancellation of Classification
Suspension and Cancellation of Classification
General
----Notice of Surveys
Special Notations
Suspension of Class
----------------------------------Lifting of Suspension
------Cancellation of Class
------Alternative Procedures

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
Part 1 and
Generic Part 1

CC 1-1-1
CC 1-1-1/1
CC 1-1-1/1a)
CC 1-1-1/1b)
CC 1-1-1/1c)
CC 1-1-1/1d)
CC 1-1-1/3
CC 1-1-1/3.1
CC 1-1-1/3.3
CC 1-1-1/3.5
CC 1-1-1/3.7
CC 1-1-1/5
CC 1-1-1/7

CC 1-1-2
CC 1-1-2/1
CC 1-1-2/1.1
CC 1-1-2/1.3
CC 1-1-2/3
CC 1-1-2/5
CC 1-1-2/7
CC 1-1-2/7.1
CC 1-1-2/7.3
CC 1-1-2/7.5
CC 1-1-2/7.5i)
CC 1-1-2/7.5ii)
CC 1-1-2/7.5iii)
CC 1-1-2/7.7
CC 1-1-2/7.9
CC 1-1-2/7.11
CC 1-1-2/7.11i)
CC 1-1-2/7.11ii)
CC 1-1-2/7.11iii)
CC 1-1-2/7.3
CC 1-1-2/7.15
CC 1-1-2/7.15i)
CC 1-1-2/7.15ii)
CC 1-1-2/7.15iii)
CC 1-1-2/9
CC 1-1-2/9.1
CC 1-1-2/9.3
CC 1-1-2/9.5
CC 1-1-2/11
CC 1-1-2/11.1
CC 1-1-2/11.3
CC 1-1-2/11.5
CC 1-1-2/13

29

Notices and General Information


MODU 2008
Part
1
Chapter
1
Section
3
CC 1-1-3
CC 1-1-3/1
CC 1-1-3/1.1
CC 1-1-3/1.3
CC 1-1-3/1.5
CC 1-1-3/1.5.1
CC 1-1-3/1.5.2
CC 1-1-3/1.7
CC 1-1-3/1.9
CC 1-1-3/1.11
CC 1-1-3/1.11.1
CC 1-1-3/1.11.2
CC 1-1-3/3
CC 1-1-3/5
CC 1-1-3/7
CC 1-1-3/9
CC 1-1-3/11
CC 1-1-3/13
CC 1-1-3/15
CC 1-1-3/17
CC 1-1-3/19
CC 1-1-3/19.1
CC 1-1-3/19.3
CC 1-1-3/21
CC 1-1-3/23
CC 1-1-3/25
CC 1-1-3/27
CC 1-1-3/29
CC 1-1-3/31
CC 1-1-3/33
Part
1
Chapter
1
Section
4
CC 1-1-4
CC 1-1-4/1
CC 1-1-4/1.1
CC 1-1-4/1.3
CC 1-1-4/3
CC 1-1-4/3.1
CC 1-1-4/3.3
CC 1-1-4/3.3.1
CC 1-1-4/3.3.2
CC 1-1-4/3.3.3
CC 1-1-4/3.3.3i)
CC 1-1-4/3.3.3ii)
CC 1-1-4/3.3.4
CC 1-1-4/5
CC 1-1-4/7
CC 1-1-4/9
CC 1-1-4/9.1
CC 1-1-4/9.3
CC 1-1-4/9.5
CC 1-1-4/9.7
CC 1-1-4/9.7.1
CC 1-1-4/9.7.2
CC 1-1-4/9.7.2i)
CC 1-1-4/9.7.2ii)
CC 1-1-4/9.7.2iii)
CC 1-1-4/9.7.2iv)
CC 1-1-4/9.7.2v)

30

Title
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification Symbols and Notations
Classification Symbols and Notations
Drilling Units Built Under Survey
Self-Elevating Drilling Units
Column-Stabilized Units
Surface-Type Drilling Units
Ship-Type Drilling Units
Barge-Type Drilling Units
Other Types of Drilling Units
Temporary Mooring Equipment Symbol
Position Mooring Equipment and Systems
Symbol
Symbol
Special Purpose Units
Service Limitations
Units Not Built Under Survey
Offshore Installations
Floating Production Installations
Liftboats
Subsea Pipeline Systems
Subsea Riser Systems
Facilities on Offshore Installations
Floating Installations
Fixed Installations
Single Point Moorings
Offshore LNG Terminals
Propulsion Machinery
Thrusters
Dynamic Positioning Systems
Drilling Systems
Ice Strengthening
Rules for Conditions of Classification
Scope and Conditions of Classification
Rules for Classification
Rules for Classification
Application of Rules
General
Application
Effective Date of Rule Change
Effective Date
Implementation of Rule Changes
General
Date of Contract for Construction
Series of Units and Optional Units
----Additional Optional Units
Other Conditions
Installations Not Covered by the Rules
Alternatives
General
National Standards
Other Rules
ABS Type Approval Program
Type Approval
Unit Certification
-----------

MODU 2012

CC 1-1-3
CC 1-1-3/1
CC 1-1-3/1.1
CC 1-1-3/1.3
CC 1-1-3/1.5
CC 1-1-3/1.5.1
CC 1-1-3/1.5.2
CC 1-1-3/1.7
CC 1-1-3/1.9
CC 1-1-3/1.11
CC 1-1-3/1.11.1
CC 1-1-3/1.11.2
CC 1-1-3/3
CC 1-1-3/5
CC 1-1-3/7
CC 1-1-3/9
CC 1-1-3/11
CC 1-1-3/13
CC 1-1-3/15
CC 1-1-3/17
CC 1-1-3/19
CC 1-1-3/19.1
CC 1-1-3/19.3
CC 1-1-3/21
CC 1-1-3/23
CC 1-1-3/25
CC 1-1-3/27
CC 1-1-3/29
CC 1-1-3/31
CC 1-1-3/33

CC 1-1-4
CC 1-1-4/1
CC 1-1-4/1.1
CC 1-1-4/1.3
CC 1-1-4/3
CC 1-1-4/3.1
CC 1-1-4/3.3
CC 1-1-4/3.3.1
CC 1-1-4/3.3.2
CC 1-1-4/3.3.3
CC 1-1-4/3.3.3i)
CC 1-1-4/3.3.3ii)
CC 1-1-4/3.3.4
CC 1-1-4/5
CC 1-1-4/7
CC 1-1-4/9
CC 1-1-4/9.1
CC 1-1-4/9.3
CC 1-1-4/9.5
CC 1-1-4/9.7
CC 1-1-4/9.7.1
CC 1-1-4/9.7.2
CC 1-1-4/9.7.2i)
CC 1-1-4/9.7.2ii)
CC 1-1-4/9.7.2iii)
CC 1-1-4/9.7.2iv)
CC 1-1-4/9.7.2v)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
CC 1-1-4/9.7.3
CC 1-1-4/9.7.4
CC 1-1-4/9.7.5
CC 1-1-4/9.7.5)
CC 1-1-4/9.7.5i)
CC 1-1-4/9.7.5ii)
CC 1-1-4/9.7.5iii)
CC 1-1-4/9.7.6
CC 1-1-4/9.7.7
CC 1-1-4/9.7.7i)
CC 1-1-4/9.7.7ii)
CC 1-1-4/9.7.7iii)
CC 1-1-4/9.7.7iv)
CC 1-1-4/9.7.7v)
CC 1-1-4/9.7.7vi)
CC 1-1-4/9.7.7vii)
CC 1-1-4/9.7.7viii)
CC 1-1-4/9.7.7ix)
CC 1-1-4/11
CC 1-1-4/13
Part
1
Chapter
1
Section
5
CC 1-1-5
CC 1-1-5/1
CC 1-1-5/3
CC 1-1-5/5
CC 1-1-5/5.1
CC 1-1-5/5.3
Part
1
Chapter
1
Section
6
CC 1-1-6
Part
1
Chapter
1
Section
7
CC 1-1-7
CC 1-1-7/1
CC 1-1-7/3
CC 1-1-7/5
CC 1-1-7/7
CC 1-1-7/9
Part
1
Chapter
1
Section
8
CC 1-1-8
CC 1-1-8/1
CC 1-1-8/1.1
CC 1-1-8/1.3
CC 1-1-8/1.5
CC 1-1-8/1.7
CC 1-1-8/3
CC 1-1-8/5
CC 1-1-8/7
Part
1
Chapter
1
Section
9
CC 1-1-9
Part
1
Chapter
1
Section
10
CC 1-1-10
CC 1-1-10/1

Title
Product Type Approval
Approval on Behalf of Administrations
Applicable Uses of Type approved Products
--------Definitions
The Terms and Conditions for Use of ABS Type Approved Product Logo
------------------Novel Features
Risk Evaluations for Alternative Arrangements and Novel Features
Rules for Conditions of Classification
Scope and Conditions of Classification
Other Regulations
Other Regulations
Governmental and Other Regulations
Other International Conventions or Codes
Governmental Regulations
Governmental Authorization
European Commission
Rules for Conditions of Classification
Scope and Conditions of Classification
IACS Audit
IACS Audit
Rules for Conditions of Classification
Scope and Conditions of Classification
Plans and Data to be Submitted
Plans and Data to be Submitted
Hull and Design Data
Machinery Plans
Calculations
Additional Plans
Submissions
Rules for Conditions of Classification
Scope and Conditions of Classification
Conditions for Surveys After Construction
Conditions for Surveys After Construction
Damage, Failure and Repair
Examination and Repair
Repairs
Suspension of Classification
Representation
Notification and Availability for Survey
Attendance at Port State Request
Safety Management System
Rules for Conditions of Classification
Scope and Conditions of Classification
Fees
Fees
Rules for Conditions of Classification
Scope and Conditions of Classification
Disagreement
Disagreement
Rules

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
CC 1-1-4/9.7.3
CC 1-1-4/9.7.4
CC 1-1-4/9.7.5
CC 1-1-4/9.7.5)
CC 1-1-4/9.7.5i)
CC 1-1-4/9.7.5ii)
CC 1-1-4/9.7.5iii)
CC 1-1-4/9.7.6
CC 1-1-4/9.7.7
CC 1-1-4/9.7.7i)
CC 1-1-4/9.7.7ii)
CC 1-1-4/9.7.7iii)
CC 1-1-4/9.7.7iv)
CC 1-1-4/9.7.7v)
CC 1-1-4/9.7.7vi)
CC 1-1-4/9.7.7vii)
CC 1-1-4/9.7.7viii)
CC 1-1-4/9.7.7ix)
CC 1-1-4/11
CC 1-1-4/13

CC 1-1-5
CC 1-1-5/1
CC 1-1-5/3
CC 1-1-5/5
CC 1-1-5/5.1
CC 1-1-5/5.3

CC 1-1-6

CC 1-1-7
CC 1-1-7/1
CC 1-1-7/3
CC 1-1-7/5
CC 1-1-7/7
CC 1-1-7/9

CC 1-1-8
CC 1-1-8/1
CC 1-1-8/1.1
CC 1-1-8/1.3
CC 1-1-8/1.5
CC 1-1-8/1.7
CC 1-1-8/3
CC 1-1-8/5
CC 1-1-8/7

CC 1-1-9

CC 1-1-10
CC 1-1-10/1

31

Notices and General Information


MODU 2008
CC 1-1-10/3
Part
1
Chapter
1
Section
11
CC 1-1-11
Part
1
Chapter
1
Section
12
CC 1-1-12
Part
1
Chapter
1
Section
13
CC 1-1-13
Part
1
Chapter
1
Section
14
CC 1-1-14
Part
1
Chapter
1
Appendix 1
CC 1-1-A1
Part
1
Chapter
1
Appendix 2
CC 1-1-A2
CC 1-1-A2/1
CC 1-1-A2/3
CC 1-1-A2/5
CC 1-1-A2/5.1
CC 1-1-A2/5.1.1
CC 1-1-A2/5.1.2
CC 1-1-A2/5.1.3
CC 1-1-A2/5.1.4
CC 1-1-A2/5.1.4i)
CC 1-1-A2/5.1.4ii)
CC 1-1-A2/5.3
CC 1-1-A2/5.3.1
CC 1-1-A2/5.3.1(a)
CC 1-1-A2/5.3.1(b)
CC 1-1-A2/5.3.1(c)
CC 1-1-A2/5.3.2
CC 1-1-A2/5.3.3
CC 1-1-A2/5.3.3i)
CC 1-1-A2/5.3.3ii)
CC 1-1-A2/5.3.3iii)
CC 1-1-A2/5.3.4
CC 1-1-A2/5.5
CC 1-1-A2/5.7
CC 1-1-A2/5.7.1
CC 1-1-A2/5.7.1(a)
CC 1-1-A2/5.7.1(b)
CC 1-1-A2/5.7.2
CC 1-1-A2/5.7.2(a)
CC 1-1-A2/5.7.2(b)
CC 1-1-A2/5.7.2(c)
CC 1-1-A2/5.7.2(d)
CC 1-1-A2/5.7.3
CC 1-1-A2/5.7.4
CC 1-1-A2/5.7.4i)
CC 1-1-A2/5.7.4ii)
CC 1-1-A2/5.7.4iii)
CC 1-1-A2/5.7.5
CC 1-1-A2/5.9

32

Title
Surveyors
Rules for Conditions of Classification
Scope and Conditions of Classification
Limitation of Liability
Limitation of Liability
Rules for Conditions of Classification
Scope and Conditions of Classification
Hold Harmless
Hold Harmless
Rules for Conditions of Classification
Scope and Conditions of Classification
Time Bar to Legal Action
Time Bar to Legal Action
Rules for Conditions of Classification
Scope and Conditions of Classification
Arbitration
Arbitration
Rules for Conditions of Classification
Scope and Conditions of Classification
Classification Symbols and Notations
Classification Symbols and Notations
Rules for Conditions of Classification
Scope and Conditions of Classification
ABS Type Approval Program
ABS Type Approval Program
General
Limitations
Process
Design Assessment (DA)
Design Evaluation
Survey and/or Testing of Prototype or Production Units
Design Assessment Certificate
Product Design Assessment, Limited
----Manufacturing Assessment (MA)
Quality Assurance Standard
Acceptable Quality Standard (AQS)
Recognized Quality Standard (RQS)
Quality Manual
Quality Control
Manufacturing Assessment Certificate (MA)
------Confirmation of Type Approval (CTA)
Product Quality Assurance Certification (PQA)
Certificates
Unit-Certification
Products Covered by Product Quality Assurance (1-1-A2/5.5)
Products Covered by Manufacturing Assessment (1-1-A2/5.3)
Issuance and Updating of Certificates
Issuance of Certificates
Changes to Design, Procedures and Regulations other than ABS Rules
Changes to ABS Rules
Website Entry
Acceptability of Type Approved Products
Renewal
------Overdue Audit
Terms and Conditions of the Request for Product Type Approval and Agreement

MODU 2012
CC 1-1-10/3

CC 1-1-11

CC 1-1-12

CC 1-1-13

CC 1-1-14

CC 1-1-A1

CC 1-1-A2
CC 1-1-A2/1
CC 1-1-A2/3
CC 1-1-A2/5
CC 1-1-A2/5.1
CC 1-1-A2/5.1.1
CC 1-1-A2/5.1.2
CC 1-1-A2/5.1.3
CC 1-1-A2/5.1.4
CC 1-1-A2/5.1.4i)
CC 1-1-A2/5.1.4ii)
CC 1-1-A2/5.3
CC 1-1-A2/5.3.1
CC 1-1-A2/5.3.1(a)
CC 1-1-A2/5.3.1(b)
CC 1-1-A2/5.3.1(c)
CC 1-1-A2/5.3.2
CC 1-1-A2/5.3.3
CC 1-1-A2/5.3.3i)
CC 1-1-A2/5.3.3ii)
CC 1-1-A2/5.3.3iii)
CC 1-1-A2/5.3.4
CC 1-1-A2/5.5
CC 1-1-A2/5.7
CC 1-1-A2/5.7.1
CC 1-1-A2/5.7.1(a)
CC 1-1-A2/5.7.1(b)
CC 1-1-A2/5.7.2
CC 1-1-A2/5.7.2(a)
CC 1-1-A2/5.7.2(b)
CC 1-1-A2/5.7.2(c)
CC 1-1-A2/5.7.2(d)
CC 1-1-A2/5.7.3
CC 1-1-A2/5.7.4
CC 1-1-A2/5.7.4i)
CC 1-1-A2/5.7.4ii)
CC 1-1-A2/5.7.4iii)
CC 1-1-A2/5.7.5
CC 1-1-A2/5.9

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
CC 1-1-A2/5.9.1
CC 1-1-A2/5.9.2
CC 1-1-A2/5.9.3
CC 1-1-A2/5.9.4
CC 1-1-A2/5.9.5
CC 1-1-A2/5.9.6
CC 1-1-A2/5.9.7
CC 1-1-A2/5.9.8
CC 1-1-A2/5.9.9
CC 1-1-A2/5.9.10
CC 1-1-A2/5.9.11
CC 1-1-A2/Figure 1

Title
Agreement
Representation as to Product Type Approval
Suspension of Certification
Validity
Disagreement
Limitation
Hold Harmless
Arbitration
Time Bar to Legal Action
Limitation of Liability
Scope of Certification
Process of the Type Approval Program

Part
Part
Chapter
Section
1-1-1
Part
Chapter
Section
1-1-2
Part
Chapter
Section
1-1-3
1-1-3/1
1-1-3/1.1
1-1-3/1.3
Part
Chapter
Section
1-1-4

Conditions of Classification (MODU Rules Supplement)


Conditions of Classification
Scope and Conditions of Classification
Classification
Classification
Conditions of Classification
Scope and Conditions of Classification
Classification Symbols and Notations
Classification Symbols and Notations
Conditions of Classification
Scope and Conditions of Classification
Rules for Classification
Rules for Classification
Application of Rules
General
Application
Conditions of Classification
Scope and Conditions of Classification
Plans and Data to be Submitted
Plans and Design Data to be Submitted

1
1
1
1
1
1
2
1
1
3

1
1
4

1-1-4/1

Hull and Design Data

1-1-4/3
1-1-4/5
1-1-4/7
1-1-4/9
Part
1
Chapter
1
Section
5
1-1-5
1-1-5/1
1-1-5/1.1
1-1-5/1.3
1-1-5/1.3i)
1-1-5/1.3ii)
1-1-5/1.3iii)
1-1-5/1.3iv)
1-1-5/1.3v)
1-1-5/1.3vi)
1-1-5/1.5
1-1-5/1.5i)
1-1-5/1.5ii)
1-1-5/1.5iii)
1-1-5/1.5iv)
1-1-5/1.5v)
1-1-5/1.5vi)
1-1-5/1.5vii)
1-1-5/1.5viii)
1-1-5/1.5ix)
1-1-5/1.5x)

Machinery Plans
Calculations
Additional Plans
Submissions
Conditions of Classification
Scope and Conditions of Classification
Operating Manual
Operating Manual
-----------------------------------------

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
CC 1-1-A2/5.9.1
CC 1-1-A2/5.9.2
CC 1-1-A2/5.9.3
CC 1-1-A2/5.9.4
CC 1-1-A2/5.9.5
CC 1-1-A2/5.9.6
CC 1-1-A2/5.9.7
CC 1-1-A2/5.9.8
CC 1-1-A2/5.9.9
CC 1-1-A2/5.9.10
CC 1-1-A2/5.9.11
CC 1-1-A2/Figure 1

1-1-1

1-1-2

1-1-3
1-1-3/1
1-1-3/1.1
1-1-3/1.3

1-1-4
1-1-4/1
3-1-2/1
1-1-4/3
3-1-2/3
1-1-4/5
1-1-4/7

1-1-5
1-1-5/1
1-1-5/1.1
1-1-5/1.3
1-1-5/1.3i)
1-1-5/1.3ii)
1-1-5/1.3iii)
1-1-5/1.3iv)
1-1-5/1.3v)
1-1-5/1.3vi)
1-1-5/1.5
1-1-5/1.5i)
1-1-5/1.5ii)
1-1-5/1.5iii)
1-1-5/1.5iv)
1-1-5/1.5v)
1-1-5/1.5vi)
1-1-5/1.5vii)
1-1-5/1.5viii)
1-1-5/1.5ix)
1-1-5/1.5x)

33

Notices and General Information


MODU 2008
1-1-5/1.5xi)
1-1-5/1.5xii)
1-1-5/1.7
1-1-5/1.9
1-1-5/1.11
1-1-5/1.13

-------------

1-1-5/1.15

---

Part
Chapter
Section
1-1-6
Part 2
Whole Part
Part
Chapter
Section
3-1-1
3-1-1/1
3-1-1/1.1
3-1-1/1.3
3-1-1/1.5
3-1-1/1.7
3-1-1/3
3-1-1/3.1
3-1-1/3.3
3-1-1/3.3.1
3-1-1/3.3.2
3-1-1/3.5
3-1-1/3.5.1
3-1-1/3.5.2
3-1-1/3.7
3-1-1/5
3-1-1/5.1
3-1-1/5.3
3-1-1/7
3-1-1/9
3-1-1/11
3-1-1/13
3-1-1/15
3-1-1/16
3-1-1/17
3-1-1/17.1
3-1-1/17.3
3-1-1/17.5
3-1-1/19
3-1-1/21
3-1-1/23
Part
Chapter
Section
3-1-2
3-1-2/1
3-1-2/1.1
3-1-2/1.3
3-1-2/1.3.1
3-1-2/1.3.2
3-1-2/1.3.3
3-1-2/1.3.3(a)
3-1-2/1.3.3(b)
3-1-2/1.3.3(c)
3-1-2/1.3.3(d)
3-1-2/1.3.3(e)

34

1
1
6

3
1
1

3
1
2

Title

Conditions of Classification
Scope and Conditions of Classification
Construction Booklet
Construction Booklet
Rules for Materials and Welding
Part 2 remains unchanged.
Hull Construction and Equipment
General
Definitions
Definitions
General
Unit
Drilling Unit
Self-Propelled Unit
Non-Self-Propelled Unit
Types of Drilling Unit
Self-elevating Drilling Unit
Column-stabilized Drilling Unit
Semi-submersible Drilling Unit
Submersible Drilling Unit
Surface-type Drilling Unit
Ship-type Drilling Unit
Barge-type Drilling Unit
Other Types of Drilling Unit
Dimensions
General
Draft
Water Depth
Molded Base Line
Bulkhead Deck
Freeboard Deck
Lightweight
Total Elevated Load
Mode of Operation
Normal Drilling Condition
Severe Storm Condition
Transit Condition
Weathertight
Watertight
Systems of Measurement
Hull Construction and Equipment
General
Environmental Loadings
Environmental Loadings
Loading Criteria
General
Wind Loadings
General
Wind Pressure
Wind Force
-----------

MODU 2012
1-1-5/1.5xi)
1-1-5/1.5xii)
1-1-5/1.7
1-1-5/1.9
1-1-5/1.11
1-1-5/1.13
1-1-5/1.15
1-1-5/3

7-1-2/25
Generic Part 2

3-1-1
3-1-1/1
3-1-1/1.1
3-1-1/1.3
3-1-1/1.5
3-1-1/1.7
3-1-1/3
3-1-1/3.1
3-1-1/3.3
3-1-1/3.3.1
3-1-1/3.3.2
3-1-1/3.5
3-1-1/3.5.1
3-1-1/3.5.2
3-1-1/3.7
3-1-1/5
3-1-1/5.1
3-1-1/5.3
3-1-1/7
3-1-1/9
3-1-1/11
3-1-1/13
3-1-1/15
3-1-1/16
3-1-1/17
3-1-1/17.1
3-1-1/17.3
3-1-1/17.5
3-1-1/19
3-1-1/21
3-1-1/23

3-1-3
3-1-3/1
3-1-3/1.1
3-1-3/1.3
3-1-3/1.3.1
3-1-3/1.3.2
3-1-3/1.3.3
3-1-3/1.3.3(a)
3-1-3/1.3.3(b)
3-1-3/1.3.3(c)
3-1-3/1.3.3(d)
3-1-3/1.3.3(e)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-1-2/1.5
3-1-2/1.5.1
3-1-2/1.5.2
3-1-2/1.5.3
3-1-2/1.5.4
3-1-2/1.7
3-1-2/1.7.1
3-1-2/1.7.2
3-1-2/1.9
3-1-2/1.11
3-1-2/1.11.1
3-1-2/1.11.2
3-1-2/1.11.3
3-1-2/Table 1
3-1-2/Table 2
3-1-2/Figure 1
Part
3
Chapter
1
Section
3
3-1-3
3-1-3/1

Title
Wave Loadings
General
Determination of Wave Loads
Morisons Equation
Wave-Induced Dynamic Responses
Current Loading
Current Associated with Waves
Drag Force
Loadings due to Vortex Shedding
Gravity and Functional Loads
General
Combinations of Gravity and Functional Loads for Design
Deck Loadings
Values of Cs
Values of Ch
Current Velocity Profile
Hull Construction and Equipment
General
Material Selection
Material Selection
Materials

3-1-3/1.1

General

3-1-3/1.3
3-1-3/1.5
3-1-3/1.7
3-1-3/3
3-1-3/3.1
3-1-3/3.3
3-1-3/3.5
3-1-3/3.7
3-1-3/5
3-1-3/5.1
3-1-3/5.3
3-1-3/5.3.1
3-1-3/5.3.2
3-1-3/5.3.3
3-1-3/5.5
3-1-3/5.5.1
3-1-3/5.5.2
3-1-3/5.5.3
3-1-3/5.7
3-1-3/5.9
3-1-3/5.9.1
3-1-3/5.9.2
3-1-3/5.9.3
3-1-3/5.9.4
3-1-3/5.9.5
3-1-3/5.9.5i)
3-1-3/5.9.5ii)
3-1-3/5.9.5iii)
3-1-3/5.9.5iv)
3-1-3/Table 1
Part
3
Chapter
1
Appendix 1
3-1-A1
3-1-A1/1
3-1-A1/3
3-1-A1/5
3-1-A1/7
3-1-A1/Figure 1
3-1-A1/Figure 1

Characteristics
Toughness
Materials Other than Steel
Hull Steel Grades
Ordinary and Higher Strength Steel
Quenched and Tempered Steel
Additional Requirements
Other Grades
Selection of Grades
General
Self-Elevating Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Column-Stabilized Units
Secondary Application Structure (Least Critical)
Primary Application Structure (Intermediate)
Special Application Structure (Most Critical)
Selection Criteria for ABS Grades of Steel
Criteria for Other Steels
General
CVN Requirements
CVN Temperatures
Extra High Strength Steels
Alternative Requirements
--------Material Selection Requirements for ABS Ordinary and Higher Strength Steels
Hull Construction and Equipment
General
Shallow Water Wave Theory
Shallow Water Wave Theory
Equations
Nomenclature
Example
Compute
Ratio of Crest Elevation to Wave Height SI and Metric Units
Ratio of Crest Elevation to Wave Height U.S. Units

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
3-1-3/1.5
3-1-3/1.5.1
3-1-3/1.5.2
3-1-3/1.5.3
3-2-3/5.9
3-1-3/1.7
3-1-3/1.7.1
3-1-3/1.7.2
3-1-3/1.9
3-1-3/1.11
3-1-3/1.11.1
3-1-3/1.11.2
3-1-3/1.11.3
3-1-3/Table 1
3-1-3/Table 2
3-1-3/Figure 1

3-1-4
3-1-4/1
3-1-4/1.1
4-1-1/7.11
3-1-4/1.3
3-1-4/1.5
3-1-4/1.7
3-1-4/3
3-1-4/3.1
3-1-4/3.3
3-1-4/3.5
3-1-4/3.7
3-1-4/5
3-1-4/5.1
3-2-3/3.1
3-2-3/3.1.1
3-2-3/3.1.2
3-2-3/3.1.3
3-2-4/1.7
3-2-4/1.7.1
3-2-4/1.7.2
3-2-4/1.7.3
3-1-4/5.5
3-1-4/5.7
3-1-4/5.7.1
3-1-4/5.7.2
3-1-4/5.7.3
3-1-4/5.7.4
3-1-4/5.7.5
3-1-4/5.7.5i)
3-1-4/5.7.5ii)
3-1-4/5.7.5iii)
3-1-4/5.7.5iv)
3-1-4/Table 1

3-1-A1
3-1-A1/1
3-1-A1/3
3-1-A1/5
3-1-A1/7
3-1-A1/Figure 1
3-1-A1/Figure 1

35

Notices and General Information


MODU 2008
3-1-A1/Figure 2
3-1-A1/Figure 2
3-1-A1/Figure 3
3-1-A1/Figure 3
3-1-A1/Figure 4
3-1-A1/Figure 4
3-1-A1/Figure 5
3-1-A1/Figure 5
3-1-A1/Figure 6
3-1-A1/Figure 6
3-1-A1/Figure 7
3-1-A1/Figure 7
3-1-A1/Figure 8
3-1-A1/Figure 8
3-1-A1/Figure 9
3-1-A1/Figure 9
Part
3
Chapter
1
Appendix 2
3-1-A2
3-1-A2/1
3-1-A2/3
3-1-A2/5
3-1-A2/7
3-1-A2/9
3-1-A2/11
3-1-A2/13
3-1-A2/15
3-1-A2/15I
3-1-A2/15II
3-1-A2/15III
3-1-A2/15IV
Part
3
Chapter
1
Appendix 3
3-1-A3
3-1-A3/1
3-1-A3/3
3-1-A3/5
3-1-A3/7
3-1-A3/Table 1
3-1-A3/Table 2
3-1-A3/Table 2A
3-1-A3/Table 3
Part
3
Chapter
2
Section
1
3-2-1
3-2-1/1
3-2-1/1.1
3-2-1/1.1i)
3-2-1/1.1ii)
3-2-1/1.3
3-2-1/1.5
3-2-1/1.7
3-2-1/1.9
3-2-1/1.9.1
3-2-1/1.9.2
3-2-1/1.11
3-2-1/1.13

36

Title
MODU 2012
Relative Wave Height SI and Metric Units
3-1-A1/Figure 2
Relative Wave Height U.S. Units
3-1-A1/Figure 2
Wave Length Correction Factor SI and Metric Units
3-1-A1/Figure 3
Wave Length Correction Factor U.S. Units
3-1-A1/Figure 3
Drag Force Factor SI and Metric Units
3-1-A1/Figure 4
Drag Force Factor U.S. Units
3-1-A1/Figure 4
Ratio of Drag Force Lever to Still Water Depth SI and Metric Units
3-1-A1/Figure 5
Ratio of Drag Force Lever to Still Water Depth U.S. Units
3-1-A1/Figure 5
Inertial Force Factor SI and Metric Units
3-1-A1/Figure 6
Inertial Force Factor U.S. Units
3-1-A1/Figure 6
Ratio of Inertial Force Lever to Still Water Depth SI and Metric Units
3-1-A1/Figure 7
Ratio of Inertial Force Lever to Still Water Depth U.S. Units
3-1-A1/Figure 7
Ratio Total Force to Drag Force SI and Metric Units
3-1-A1/Figure 8
Ratio Total Force to Drag Force U.S. Units
3-1-A1/Figure 8
Angular Position of Maximum Moment SI and Metric Units
3-1-A1/Figure 9
Angular Position of Maximum Moment U.S. Units
3-1-A1/Figure 9
Hull Construction and Equipment
General
Wave Theory for Deep Water
Wave Theory for Deep Water
3-1-A2
Surface Wave Equation
3-1-A2/1
Equations for Water Velocity
3-1-A2/3
Equations for Water Acceleration
3-1-A2/5
Equation for Dynamic Pressure
3-1-A2/7
Example of Determining Inertia Force in Deep Water
3-1-A2/9
Caisson
3-1-A2/11
Drag Force in Deep Water
3-1-A2/13
Recommended Mass Factors
3-1-A2/15
Two Dimensional Values of Cm
3-1-A2/15I
Three Dimensional Correction to Cm
3-1-A2/15II
Application
3-1-A2/15III
Nomenclature
3-1-A2/15IV
Hull Construction and Equipment
General
Guide for Material Selection for ABS Grades of High Strength Quenched and Tempered Steel
Guide for Material Selection for ABS Grades of High Strength Quenched and
3-1-A3
Tempered Steel
General
3-1-A3/1
Chemical Composition
3-1-A3/3
Mechanical Properties
3-1-A3/5
Heat Treatment
3-1-A3/7
Chemical Composition for ABS Grades of High Strength Quenched and Tempered
3-1-A3/Table 1
Steels
Mechanical Properties Requirements for ABS Grades of High Strength Quenched
3-1-A3/Table 2
and Tempered Steels
Elongation Requirements for Alternative B Specimen
3-1-A3/Table 2A
Material Selection Guidelines for ABS Quenched and Tempered Steel Grades
3-1-A3/Table 3
Hull Construction and Equipment
Hull Structures and Arrangements
Structural Analysis
Structural Analysis
3-2-1
Structural Analysis
3-2-1/1
Analysis of Primary Structure
3-2-1/1.1
--3-2-1/1.1i)
--3-2-1/1.1ii)
Consideration of Local Stresses
3-2-1/1.3
Combination of Stress Components
3-2-1/1.5
Consideration of Buckling
3-2-1/1.7
Determination of Bending Stresses
3-2-1/1.9
Effective Flange Area
3-2-1/1.9.1
Eccentric Axial Loading
3-2-1/1.9.2
Determination of Shear Stresses
3-2-1/1.11
Stress Concentration
3-2-1/1.13
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-2-1/1.15
3-2-1/1.15i)
3-2-1/1.15ii)
3-2-1/1.15iii)
3-2-1/1.15iv)
3-2-1/1.17
3-2-1/1.19
3-2-1/3
3-2-1/3.1
3-2-1/3.3
3-2-1/3.5
3-2-1/3.7
3-2-1/3.7.1
3-2-1/3.7.2
3-2-1/3.9
3-2-1/3.9.1
3-2-1/3.9.2
3-2-1/3.11
Part
3
Chapter
2
Section
2
3-2-2
3-2-2/1
3-2-2/1.1
3-2-2/1.3
3-2-2/1.5
3-2-2/1.7
3-2-2/3
3-2-2/3.1
3-2-2/3.3
3-2-2/3.3.1
3-2-2/3.3.2
3-2-2/3.3.3
3-2-2/3.3.4
3-2-2/5
3-2-2/5.1
3-2-2/5.1.1
3-2-2/5.1.2
3-2-2/5.3
3-2-2/7
3-2-2/7.1
3-2-2/7.3
3-2-2/7.5
3-2-2/7.7
3-2-2/7.7.1
3-2-2/7.7.2
3-2-2/7.7.3
3-2-2/7.9
3-2-2/7.9.1
3-2-2/7.9.2
3-2-2/7.9.3
3-2-2/9
3-2-2/9.1
3-2-2/9.3
3-2-2/9.5
3-2-2/9.7
3-2-2/9.9
3-2-2/9.9.1
3-2-2/9.9.2
3-2-2/9.9.3
3-2-2/9.11
3-2-2/11
3-2-2/11.1

Title
Analysis and Details of Structural Connections
--------Fatigue Analysis
Plastic Analysis
Allowable Stresses
General
Individual Stresses
Buckling Considerations
Members Subjected to Combined Axial Load and Bending
----Column Buckling Stresses
Overall Buckling
Local Buckling
Equivalent Stress Criteria for Plated Structures
Hull Construction and Equipment
Hull Structures and Arrangements
Common Structures
Common Structures
General
Materials
Scantlings
Surface-Type Drilling Units
Protection of Steel Work
Helicopter Deck
General
Structure
Overall Distributed Loading
Helicopter Landing Impact Loading
Stowed Helicopter Loading
Loading due to Motion of Unit
Structures Supporting the Drilling Derrick
Substructures
Individual Loads
Combined Loads
Substructure Supporting Arrangement
Watertight Bulkheads and Watertight Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Plating
Stiffeners
End Connections
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Tank Bulkheads and Tank Flats
General
Plating
Stiffeners and Beams
Corrugated Bulkheads
Girders and Webs
Strength Requirements
Proportions
Tripping Brackets
Drainage and Air Escape
Appurtenant Structure
General

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
3-2-1/1.15
3-2-1/1.15i)
3-2-1/1.15ii)
3-2-1/1.15iii)
3-2-1/1.15iv
3-2-1/1.17
3-2-1/1.19
3-2-1/3
3-2-1/3.1
3-2-1/3.3
3-2-1/3.5
3-2-1/3.7
3-2-1/3.7.1
3-2-1/3.7.2
3-2-1/3.9
3-2-1/3.9.1
3-2-1/3.9.2
3-2-1/3.11

3-2-2
3-2-2/1
3-2-2/1.1
3-2-2/1.3
--3-2-2/1.5
3-2-2/3
3-2-2/3.1
3-2-2/3.3
3-2-2/3.3.1
3-2-2/3.3.2
3-2-2/3.3.3
3-2-2/3.3.4
3-2-2/5
3-2-2/5.1
3-2-2/5.1.1
3-2-2/5.1.2
3-2-2/5.3
3-2-2/7
3-2-2/7.1
3-2-2/7.3
3-2-2/7.5
3-2-2/7.7
3-2-2/7.7.1
3-2-2/7.7.2
3-2-2/7.7.3
3-2-2/7.9
3-2-2/7.9.1
3-2-2/7.9.2
3-2-2/7.9.3
3-2-2/9
3-2-2/9.1
3-2-2/9.3
3-2-2/9.5
3-2-2/9.7
3-2-2/9.9
3-2-2/9.9.1
3-2-2/9.9.2
3-2-2/9.9.3
3-2-2/9.11
3-2-2/11
3-2-2/11.1

37

Notices and General Information


MODU 2008
3-2-2/11.3
3-2-2/11.5
3-2-2/11.7
3-2-2/13
3-2-2/13.1
3-2-2/13.3
3-2-2/Table 1
3-2-2/Table 2
3-2-2/Table 3
3-2-2/Figure 1
3-2-2/Figure 2
Part
3
Chapter
2
Section
3
3-2-3
3-2-3/1
3-2-3/3
3-2-3/5
3-2-3/5.1
3-2-3/5.3
3-2-3/5.3.1
3-2-3/5.3.1(a)
3-2-3/5.3.1(b)
3-2-3/5.5
3-2-3/5.7
3-2-3/5.7.1
3-2-3/5.7.2
3-2-3/7
3-2-3/7.1
3-2-3/7.1.1
3-2-3/7.1.2
3-2-3/7.1.3
3-2-3/7.1.4
3-2-3/7.3
3-2-3/7.3.1
3-2-3/7.3.2
3-2-3/9
3-2-3/11
3-2-3/13
3-2-3/13.1
3-2-3/13.1.1
3-2-3/13.1.2
3-2-3/13.1.2i)
3-2-3/13.1.2i)a)
3-2-3/13.1.2i)b)
3-2-3/13.1.2i)c)
3-2-3/13.1.2ii)
3-2-3/13.1.2ii)a)
3-2-3/13.1.2ii)b)
3-2-3/13.1.2ii)c)
3-2-3/13.1.3
3-2-3/13.1.3i)
3-2-3/13.1.3ii)
3-2-3/13.1.3ii)a)
3-2-3/13.1.3ii)b)
3-2-3/13.3
3-2-3/15
3-2-3/15.1
3-2-3/15.3
3-2-3/15.5
3-2-3/15.7
3-2-3/15.9
3-2-3/15.11

38

Title
Lifeboat Platform
Crane Pedestal and Foundation
Pipe Racks
Higher-strength Materials
General
Watertight Bulkheads and Flats and Tank Bulkheads and Flats
Allowable Factors of Safety Based on Fy for Helicopter Decks
Thickness and Flange Width of Brackets and Knees
Values of Q
Corrugated Bulkhead
Corrugated Bulkhead End Connections
Hull Construction and Equipment
Hull Structures and Arrangements
Self-Elevating Drilling Units
Self-Elevating Drilling Units
Application
General Requirements for Scantlings
Units Elevated Modes
General
Safety Against Overturning
Nominal Loading Conditions for Calculation of Safety Against Overturning
Normal Drilling Condition
Severe Storm Condition
Wave Clearance
Preload
Capability
Leg Strength
Legs
Legs in Elevated Condition
Leg Types
Leg Scantlings
Spudcan-Soil Interaction
Sea Bed Conditions
Legs in the Transit Condition
Legs in Field Transit Condition
Legs in Severe Storm Transit Condition
Hull Interface Structure with Legs
Hull Structure
Spudcan and Bottom Mat
Spudcan
General
Afloat Mode Loading Conditions
--Plating
Stiffeners
Girders
--Plating
Stiffeners
Girders
Elevated Mode Loading Conditions
Preload Condition
Normal Operating and Severe Storm Conditions
----Bottom Mat
Deckhouses
General
Design Head
Plating
Stiffeners
House Sides
End Attachment

MODU 2012
3-2-2/11.3
3-2-2/11.5
3-2-2/11.7
3-2-2/13
3-2-2/13.1
3-2-2/13.3
3-2-2/Table 1
3-2-2/Table 2
3-2-2/Table 3
3-2-2/Figure 1
3-2-2/Figure 2

3-2-3
3-2-3/1
3-2-3/3.3
3-2-3/5
3-2-3/5.1
3-2-3/5.3
3-2-3/5.3.1
3-2-3/5.3.1(a)
3-2-3/5.3.1(b)
3-2-3/5.5
3-2-3/5.7
3-2-3/5.7.1
3-2-3/5.7.2
3-2-3/7
3-2-3/7.1
3-2-3/7.1.1
3-2-3/7.1.2
3-2-3/7.1.3
3-2-3/7.1.4
3-2-3/7.3
3-2-3/7.3.1
3-2-3/7.3.2
3-2-3/9
3-2-3/11
3-2-3/13
3-2-3/13.1
3-2-3/13.1.1
3-2-3/13.1.2
3-2-3/13.1.2i)
3-2-3/13.1.2i)a)
3-2-3/13.1.2i)b)
3-2-3/13.1.2i)c)
3-2-3/13.1.2ii)
3-2-3/13.1.2ii)a)
3-2-3/13.1.2ii)b)
3-2-3/13.1.2ii)c)
3-2-3/13.1.3
3-2-3/13.1.3i)
3-2-3/13.1.3ii)
3-2-3/13.1.3ii)a)
3-2-3/13.1.3ii)b)
3-2-3/13.3
3-2-3/15
3-2-3/15.1
3-2-3/15.3
3-2-3/15.5
3-2-3/15.7
3-2-3/15.9
3-2-3/15.11

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-2-3/15.13
3-2-3/17
3-2-3/Figure 1
Part
3
Chapter
2
Section
4
3-2-4
3-2-4/1
3-2-4/1.1
3-2-4/1.3
3-2-4/1.3i)
3-2-4/1.3ii)
3-2-4/1.5
3-2-4/3
3-2-4/3.1
3-2-4/3.3
3-2-4/3.3.1
3-2-4/3.3.2
3-2-4/3.3.3
3-2-4/3.3.4
3-2-4/3.5
3-2-4/3.7
3-2-4/3.7.1
3-2-4/3.7.2
3-2-4/3.7.3
3-2-4/3.9
3-2-4/3.9.1
3-2-4/3.9.2
3-2-4/3.9.3
3-2-4/3.9.4
3-2-4/3.11
3-2-4/3.13
3-2-4/3.15
3-2-4/5
3-2-4/5.1
3-2-4/5.3
3-2-4/5.3.1
3-2-4/5.3.2
3-2-4/5.3.3
3-2-4/5.3.4
3-2-4/5.5
3-2-4/5.7
3-2-4/5.9
3-2-4/5.9.1
3-2-4/5.9.2
3-2-4/5.9.3
3-2-4/5.9.3i)
3-2-4/5.9.3ii)
3-2-4/5.9.3iii)
3-2-4/5.9.3iv)
3-2-4/5.9.4
3-2-4/5.9.4i)
3-2-4/5.9.4ii)
3-2-4/5.9.4iii)
3-2-4/5.11
3-2-4/5.11.1
3-2-4/5.11.2
3-2-4/5.11.3
3-2-4/5.11.4
3-2-4/5.11.5
3-2-4/5.13
3-2-4/7
3-2-4/7.1

Title
Racking Resistance
Structures Supporting the Drilling Derrick
Typical Hull Construction
Hull Construction and Equipment
Hull Structures and Arrangements
Column-Stabilized Drilling Units
Column-stabilized Drilling Units
General
Application
Special Considerations Regarding Stresses
----Effect of Mooring Forces on Local Structure
Upper Structure
General
Deck Plating
General
Storage Area Decks
Decks in way of Tanks
Provision for Fork-Lift Trucks
Beams
Girders
Strength Requirements
Proportions
Tripping Brackets
Stanchions and Pillars
Permissible Load
Length
Calculated Load
Pillars Under the Tops of Tanks
Non-buoyant Upper Structure Not Subjected to Wave Loading
Buoyant Upper Structure
Upper Structure Subjected to Wave Loading
Columns, Lower Hulls and Footings
General
Scantlings of Framed Shells
Tank Space
Void Compartment Spaces
Areas Subject to Wave Immersion
Minimum Scantlings
Scantlings of Unframed Shells
Scantlings of Structural Flats
Additional Structural Requirements
Provision for Wave and Current Loadings
Provision for Frame Action
Consideration for High Local Loadings
--------Scouring Consideration
------Bracing Members
General
Loading Conditions
Effect of Wave Impact
Reinforcement of Tubular Bracing Members
Watertight Bracing Members
Openings in Columns
Deckhouses
General

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
3-2-3/15.13
3-2-3/17
3-2-3/Figure 2

3-2-4
3-2-4/1
3-2-4/1.1
3-2-4/1.3
3-2-4/1.3i)
3-2-4/1.3ii)
3-2-4/1.5
3-2-4/3
3-2-4/3.1
3-2-4/3.3
3-2-4/3.3.1
3-2-4/3.3.2
3-2-4/3.3.3
3-2-4/3.3.4
3-2-4/3.5
3-2-4/3.7
3-2-4/3.7.1
3-2-4/3.7.2
3-2-4/3.7.3
3-2-4/3.9
3-2-4/3.9.1
3-2-4/3.9.2
3-2-4/3.9.3
3-2-4/3.9.4
3-2-4/3.11
3-2-4/3.13
3-2-4/3.15
3-2-4/5
3-2-4/5.1
3-2-4/5.3
3-2-4/5.3.1
3-2-4/5.3.2
3-2-4/5.3.3
3-2-4/5.3.4
3-2-4/5.5
3-2-4/5.7
3-2-4/5.9
3-2-4/5.9.1
3-2-4/5.9.2
3-2-4/5.9.3
3-2-4/5.9.3i)
3-2-4/5.9.3ii)
3-2-4/5.9.3iii)
3-2-4/5.9.3iv)
3-2-4/5.9.4
3-2-4/5.9.4i)
3-2-4/5.9.4ii)
3-2-4/5.9.4iii)
3-2-4/5.11
3-2-4/5.11.1
3-2-4/5.11.2
3-2-4/5.11.3
3-2-4/5.11.4
3-2-4/5.11.5
3-2-4/5.13
3-2-4/7
3-2-4/7.1

39

Notices and General Information


MODU 2008
3-2-4/7.1.1
3-2-4/7.1.2
3-2-4/7.1.3
3-2-4/7.3
3-2-4/9
3-2-4/9.1
3-2-4/9.3
3-2-4/11
3-2-4/11.1
3-2-4/11.3
3-2-4/11.3i)
3-2-4/11.3ii)
3-2-4/11.5
3-2-4/13
3-2-4/15
3-2-4/15.1
3-2-4/15.3
3-2-4/Table 1
Part
3
Chapter
2
Section
5
3-2-5
3-2-5/1
3-2-5/3
3-2-5/3.1
3-2-5/3.3
3-2-5/3.5
3-2-5/3.7
3-2-5/3.9
3-2-5/5
Part
3
Chapter
2
Section
6
3-2-6
3-2-6/1
3-2-6/1.1
3-2-6/1.3
3-2-6/1.3.1
3-2-6/1.3.2
3-2-6/1.3.3
3-2-6/1.3.4
3-2-6/1.3.5
3-2-6/1.5
3-2-6/1.7
3-2-6/1.9
3-2-6/1.9.1
3-2-6/1.9.2
3-2-6/1.11
3-2-6/1.11.1
3-2-6/1.11.2
3-2-6/1.13
3-2-6/3
3-2-6/5
3-2-6/7
3-2-6/Table 1
Part
3
Chapter
2
Section
7
3-2-7
3-2-7/1
3-2-7/3
3-2-7/5
3-2-7/5.1

40

Title
Deckhouses on an Upper Structure Not Subjected to Wave Loading
Deckhouses on an Upper Structure Subjected to Wave Loading
Deckhouses on a Buoyant Upper Structure
Storage Tanks on Upper Structure
Wave Clearance
Afloat Modes of Operation
On-bottom Modes of Operation
Structural Redundancy
Assumed Damage
Analysis
----Upper Structure
Structures Supporting the Drilling Derrick
Higher-strength Materials
General
Upper Structure
Values of Q
Hull Construction and Equipment
Hull Structures and Arrangements
Surface-Type Drilling Units
Surface-type Drilling Units
General
Hull Scantlings
General
Drilling Well
Hatches
Concentrated Loads
Effect of Mooring Forces on Local Structure
Structures Supporting the Drilling Derrick
Hull Construction and Equipment
Hull Structures and Arrangements
Welding, Forming & Weld Design Weld Design
Welding, Forming and Weld Design Weld Design
Fillet Welds
Plans and Specifications
Tee Connections
Size of Fillet Welds
Length and Arrangement of Fillet
Intermittent Welding at Intersection
Welding of Longitudinals to Plating
Stiffeners and Webs to Hatch Covers
Tee-type End Connections
Ends of Unbracketed Stiffeners
Reduced Weld Size
Controlled Gaps
Deep Penetration Welds
Lapped Joints
Overlapped End Connections
Overlapped Seams
Plug Welds or Slot Welds
Full or Partial Penetration Corner or Tee Joints
Alternatives
Welding for Machinery Components
Weld Factors
Hull Construction and Equipment
Hull Structures and Arrangements
Welding, Forming & Weld Design Production Welding
Welding, Forming and Weld Design Production Welding
General
Thickness in Excess of 50 mm (2 in.)
Extent of Inspection of Welds
General

MODU 2012
3-2-4/7.1.1
3-2-4/7.1.2
3-2-4/7.1.3
3-2-4/7.3
3-2-4/9
3-2-4/9.1
3-2-4/9.3
3-2-4/11
3-2-4/11.1
3-2-4/11.3
3-2-4/11.3i)
3-2-4/11.3ii)
3-2-4/11.5
3-2-4/13
3-2-4/15
3-2-4/15.1
3-2-4/15.3
3-2-4/Table 1

3-2-5
3-2-5/1
----3-2-5/9
3-2-5/11
3-2-5/5.9.2
3-2-5/13
---

3-2-6
3-2-6/1
3-2-6/1.1
3-2-6/1.3
3-2-6/1.3.1
3-2-6/1.3.2
3-2-6/1.3.3
3-2-6/1.3.4
3-2-6/1.3.5
3-2-6/1.5
3-2-6/1.7
3-2-6/1.9
3-2-6/1.9.1
3-2-6/1.9.2
3-2-6/1.11
3-2-6/1.11.1
3-2-6/1.11.2
3-2-6/1.13
3-2-6/3
3-2-6/5
4-1-1/7.11
3-2-6/Table 1

7-1-2/9
7-1-2/9
7-1-2/9.1
--7-1-2/9.3

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-2-7/5.3
3-2-7/5.3.1
3-2-7/5.3.2
3-2-7/5.3.3
3-2-7/7
3-2-7/9
3-2-7/9.1
3-2-7/9.3
Part
3
Chapter
2
Appendix 1
3-2-A1
3-2-A1/1
3-2-A1/1.1
3-2-A1/1.3
3-2-A1/1.3.1
3-2-A1/1.3.2
3-2-A1/1.5
3-2-A1/3
3-2-A1/5
3-2-A1/7
3-2-A1/9
3-2-A1/11
3-2-A1/11.1
3-2-A1/11.3
3-2-A1/13
3-2-A1/13.1
3-2-A1/13.3
3-2-A1/15
3-2-A1/Table 1
3-2-A1/Table 2
3-2-A1/Table 3
3-2-A1/Figure 1
Part
3
Chapter
2
Appendix 2
3-2-A2
3-2-A2/1
3-2-A2/1.1
3-2-A2/3
3-2-A2/3.1
3-2-A2/3.1i)
3-2-A2/3.1ii)
3-2-A2/3.1iii)
3-2-A2/3.1iv)
3-2-A2/3.1v)
3-2-A2/3.3
3-2-A2/3.3i)
3-2-A2/3.3ii)
3-2-A2/3.3iii)
3-2-A2/3.5
3-2-A2/3.5i)
3-2-A2/3.5ii)
3-2-A2/3.7
3-2-A2/3.9
3-2-A2/3.11
3-2-A2/3.11i)
3-2-A2/3.11ii)
3-2-A2/5
3-2-A2/5.1
3-2-A2/5.3

Title
MODU 2012
Extent and Method
7-1-2/11.7
Self-elevating Units
7-1-2/11.3
Column-stabilized Units
7-1-2/11.1
Nondestructive Inspection Plan
7-1-2/11
Acceptance Criteria
7-1-2/11.11
Fillet Welds
7-1-2/9.5
Workmanship
7-1-2/9.5
Special Precautions
7-1-2/9.5
Hull Construction and Equipment
Hull Structures and Arrangements
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
Guide for Strengthening of Mobile Offshore Drilling Units for Navigation in Ice
3-2-A1
Application
3-2-A1/1
Column Stabilized Unit
3-2-A1/1.1
Units of Other Type
3-2-A1/1.3
Surface Units
3-2-A1/1.3.1
Self-elevating Units
3-2-A1/1.3.2
Novel Features
3-2-A1/1.5
Ice Class Selection
3-2-A1/3
Ice Waterline
3-2-A1/5
Clearance
3-2-A1/7
Ice Belt
3-2-A1/9
Design Ice Loads
3-2-A1/11
Design Ice Pressure
3-2-A1/11.1
Global Design Ice Load
3-2-A1/11.3
Structural Evaluation
3-2-A1/13
Global Evaluation
3-2-A1/13.1
Local Scantlings
3-2-A1/13.3
Other Requirements
3-2-A1/15
Guidance for Ice Class Selection of Column Stabilized Drilling Units
3-2-A1/Table 1
Definition of Ice Conditions of Broken First-year Ice Versus Concentration and
3-2-A1/Table 2
Thickness
Ice Pressure Factors
3-2-A1/Table 3
Ice Belt Areas
3-2-A1/Figure 1
Hull Construction and Equipment
Hull Structures and Arrangements
Response Analysis Guide for Selecting Design Waves for Structural Analysis of ColumnStabilized Drilling Units (Twin-Hull Semi-Submersible)
Response Analysis Guide for Selecting Design Waves for Structural Analysis of
3-2-A2
Column-Stabilized Drilling Units (Twin-Hull Semi-Submersible)
General
3-2-A2/1
Introduction
3-2-A2/1.1
Global Hydrodynamic Load Characteristics
3-2-A2/3
General
3-2-A2/3.1
--3-2-A2/3.1i)
--3-2-A2/3.1ii)
--3-2-A2/3.1iii)
--3-2-A2/3.1iv)
--3-2-A2/3.1v)
Split Force Between Pontoons
3-2-A2/3.3
--3-2-A2/3.3i)
--3-2-A2/3.3ii)
--3-2-A2/3.3iii)
Twisting Pitch Moment About Transverse Horizontal Axis
3-2-A2/3.5
--3-2-A2/3.5i)
--3-2-A2/3.5ii)
Longitudinal Shear Force Between Pontoons
3-2-A2/3.7
Longitudinal and Transverse Accelerations of Deck Mass
3-2-A2/3.9
Vertical Wave Bending Moment on the Pontoon
3-2-A2/3.11
--3-2-A2/3.11i)
--3-2-A2/3.11ii)
Selecting Design Waves by the Stochastic Method
3-2-A2/5
General
3-2-A2/5.1
Analytical Approach
3-2-A2/5.3

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

41

Notices and General Information


MODU 2008
3-2-A2/5.3.1
3-2-A2/5.3.2
3-2-A2/5.3.3
3-2-A2/5.3.4
3-2-A2/5.3.5
3-2-A2/5.3.6
3-2-A2/5.3.7
3-2-A2/5.3.8
3-2-A2/5.3.9
3-2-A2/5.5
3-2-A2/7
3-2-A2/7.1
3-2-A2/7.3
3-2-A2/7.3i)
3-2-A2/7.3ii)
3-2-A2/7.3iii)
3-2-A2/7.3iv)
3-2-A2/7.3v)
3-2-A2/7.5
Part
3
Chapter
2
Appendix 3
3-2-A3
3-2-A3/1
Part
3
Chapter
3
Section
1
3-3-1
3-3-1/1
3-3-1/1.1
3-3-1/1.3
3-3-1/1.3.1

Title
------------------Irregular Sea Steepness
Selecting Design Waves by the Deterministic Method
General
Analytical Approach
----------Regular Wave Steepness
Hull Construction and Equipment
Hull Structures and Arrangements
Guide for the Allowable Stresses for Localized Highly-Stressed Areas
Guide for the Allowable Stresses for Localized Highly-Stressed Areas
Plated Structures
Hull Construction and Equipment
Subdivision and Stability
Stability and Watertight/Weathertight Integrity
Stability and Watertight/Weathertight Integrity
Stability
General
Stability Afloat
Intact Stability

3-3-1/1.3.2

Damage Stability

3-3-1/1.3.2(a)
3-3-1/1.3.2(b)
3-3-1/1.3.2(b)i)
3-3-1/1.3.2(b)ii)
3-3-1/1.3.2(b)iii)
3-3-1/1.3.2(c)
3-3-1/1.3.3
3-3-1/1.3.3(a)
3-3-1/1.3.3(b)
3-3-1/1.5
3-3-1/3
3-3-1/3.1
3-3-1/3.3
3-3-1/3.3.1
3-3-1/3.3.2
3-3-1/3.3.3
3-3-1/3.3.3(a)
3-3-1/3.3.3(b)
3-3-1/3.3.4
3-3-1/3.5
3-3-1/3.7
3-3-1/3.9
3-3-1/3.9.1
3-3-1/3.9.2
3-3-1/3.9.2i)
3-3-1/3.9.2ii)
3-3-1/3.9.2iii)
3-3-1/3.9.2iv)
3-3-1/3.9.2v)

------------Alternatives for Treatment of Void Spaces


----Lightweight and Center of Gravity
Stability Criteria
General
Righting Moment
Intact Stability Criteria
Damage Stability Criteria
Residual Stability Criteria Column Stabilized Units
----Residual Stability Criteria Self-Elevating Units
Overturning Moment
Wind Tunnel Tests
Alternative Stability Criteria
General
Guidelines
-----------

42

MODU 2012
3-2-A2/5.3.1
3-2-A2/5.3.2
3-2-A2/5.3.3
3-2-A2/5.3.4
3-2-A2/5.3.5
3-2-A2/5.3.6
3-2-A2/5.3.7
3-2-A2/5.3.8
3-2-A2/5.3.9
3-2-A2/5.5
3-2-A2/7
3-2-A2/7.1
3-2-A2/7.3
3-2-A2/7.3i)
3-2-A2/7.3ii)
3-2-A2/7.3iii)
3-2-A2/7.3iv)
3-2-A2/7.3v)
3-2-A2/7.5

3-2-A3
3-2-A3/1

3-3-1, 3-3-2
3-3-2/1
3-3-2/1.1
3-3-2/1.3
3-3-2/1.3.1
3-3-2/1.3.2
3-3-2/1.3.3
3-3-2/1.3.2(a)
3-3-2/1.3.2(b)
3-3-2/1.3.2(b)i)
3-3-2/1.3.2(b)ii)
3-3-2/1.3.2(b)iii)
3-3-2/1.3.2(c)
3-3-2/1.3.4
3-3-2/1.3.4(a)
3-3-2/1.3.4(b)
3-3-1/3
3-3-2/3
3-3-2/3.1
3-3-2/3.3
3-3-2/3.3.1
3-3-2/3.3.2
3-3-2/3.3.4
3-3-2/3.3.4(a)
3-3-2/3.3.4(b)
3-3-2/3.3.3
3-3-2/3.7
3-3-2/3.9
3-3-2/3.11
3-3-2/3.11.1
3-3-2/3.11.2
3-3-2/3.11.2i)
3-3-2/3.11.2ii)
3-3-2/3.11.2iii)
3-3-2/3.11.2iv)
3-3-2/3.11.2v)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-3-1/3.9.2vi)
3-3-1/3.9.3
3-3-1/5
3-3-1/7
3-3-1/7.1
3-3-1/7.1i)
3-3-1/7.1ii)
3-3-1/7.3
3-3-1/7.3i)
3-3-1/7.3ii)
3-3-1/7.3iii)
3-3-1/7.3iv)
3-3-1/7.3v)
3-3-1/7.5
3-3-1/7.5i)
3-3-1/7.5ii)
3-3-1/9
3-3-1/9.1
3-3-1/9.3
3-3-1/9.3.1
3-3-1/9.3.1(a)
3-3-1/9.3.1(b)
3-3-1/9.3.1(c)
3-3-1/9.3.2
3-3-1/9.3.2(a)
3-3-1/9.3.2(b)
3-3-1/9.3.2(c)
3-3-1/9.3.2(d)
3-3-1/9.3.3
3-3-1/9.3.3(a)
3-3-1/9.3.3(b)
3-3-1/9.3.3(c)
3-3-1/9.3.4
3-3-1/9.5
3-3-1/11
3-3-1/Figure 1
3-3-1/Figure 2
3-3-1/Figure 3A
3-3-1/Figure 3B
3-3-1/Figure 4
3-3-1/Figure 5
Part
3
Chapter
3
Appendix 1
3-3-A1
3-3-A1/1
3-3-A1/3
3-3-A1/5
3-3-A1/5.1
3-3-A1/5.3
3-3-A1/5.5
3-3-A1/7
3-3-A1/7.1
3-3-A1/7.1.1
3-3-A1/7.1.2
3-3-A1/7.3
3-3-A1/7.3.1
3-3-A1/7.3.2
3-3-A1/7.3.3
3-3-A1/7.3.4

Title
MODU 2012
--3-3-2/3.11.2vi)
Alternative Intact Stability Criteria
3-3-2/3.11.3
Load Line
3-3-1/1
Extent of Damage for Damage Stability Studies
3-3-2/3.5
Self-Elevated Drilling Units
3-3-2/3.5.1
--3-3-2/3.5.1i)
--3-3-2/3.5.1ii)
Column-stabilized Drilling Units
3-3-2/3.5.2
--3-3-2/3.5.2i)
--3-3-2/3.5.2ii)
--3-3-2/3.5.2iii)
--3-3-2/3.5.2iv)
--3-3-2/3.5.2v)
Surface-Type Drilling Units
3-3-2/3.5.3
--3-3-2/3.5.3i)
--3-3-2/3.5.3ii)
Watertight/Weathertight Integrity
3-3-2/5
Weathertight Integrity
3-3-2/5.1
Watertight Integrity
3-3-2/5.3
Internal Openings Used for Access While Afloat
3-3-2/5.3.1
--3-3-2/5.3.1(a)
--3-3-2/5.3.1(b)
--3-3-2/5.3.1(c)
Internal Openings Secured Closed While Afloat
3-3-2/5.3.2
--3-3-2/5.3.2(a)
--3-3-2/5.3.2(b)
--3-3-2/5.3.2(c)
--3-3-2/5.3.2(d)
External Openings Used While Afloat
3-3-2/5.3.3
--3-3-2/5.3.3(a)
--3-3-2/5.3.3(b)
--3-3-2/5.3.3(c)
External Openings Secured Closed While Afloat
3-3-2/5.3.4
Penetrations
3-3-2/5.5
Onboard Computers for Stability Calculations
3-3-2/7
Intact Stability Curve
3-3-2/Figure 1
Damage Stability Curve
3-3-2/Figure 2
Residual Damage Stability Requirements for Column-Stabilized Units Collision
3-3-2/Figure 4A
Damage
Residual Damage Stability Requirements for Column-Stabilized Units Remote
3-3-2/Figure 4B
Flooding
Residual Damage Stability Requirements for Self-Elevating Units
3-3-2/Figure 3
Minimum Weathertight Integrity Requirements for Column Stabilized Units
3-3-2/Figure 5
Hull Construction and Equipment
Subdivision and Stability
Guide for the Application of Dynamic Response Based Intact Stability Criteria for ColumnStabilized Mobile Offshore Drilling Units
Guide for the Application of Dynamic Response Based Intact Stability Criteria for
3-3-A1
Column-stabilized Mobile Offshore Drilling Units
Introduction
3-3-A1/1
Definitions and Symbols
3-3-A1/3
General
3-3-A1/5
Scope
3-3-A1/5.1
Conditions for Compliance
3-3-A1/5.3
Dynamic-response-based Criteria
3-3-A1/5.5
Dynamic-response-based Criteria
3-3-A1/7
Criteria
3-3-A1/7.1
Capsizing
3-3-A1/7.1.1
Downflooding
3-3-A1/7.1.2
Conditions of Assessment
3-3-A1/7.3
--3-3-A1/7.3.1
--3-3-A1/7.3.2
--3-3-A1/7.3.3
--3-3-A1/7.3.4

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

43

Notices and General Information


MODU 2008
3-3-A1/9
3-3-A1/9.1
3-3-A1/9.1.1
3-3-A1/9.1.2
3-3-A1/9.3
3-3-A1/9.3.1
3-3-A1/9.3.2
3-3-A1/9.5
3-3-A1/Figure 1
3-3-A1/Figure 2
Part
3
Chapter
3
Appendix 1a
3-3-A1a
3-3-A1a/1
3-3-A1a/3
Part
3
Chapter
3
Appendix 1b
3-3-A1b
3-3-A1b/1
3-3-A1b/3
3-3-A1b/5
3-3-A1b/5.1
3-3-A1b/5.3
3-3-A1b/5.5
3-3-A1b/5.7
3-3-A1b/5.9
3-3-A1b/7
3-3-A1b/7.1
3-3-A1b/7.3
3-3-A1b/7.5
3-3-A1b/9
3-3-A1b/9i)
3-3-A1b/9ii)
3-3-A1b/9iii)
3-3-A1b/11
3-3-A1b/11i)
3-3-A1b/11ii)
3-3-A1b/11iii)
3-3-A1b/11iv)
Part
3
Chapter
3
Appendix 1c
3-3-A1c
3-3-A1c/1
3-3-A1c/3
3-3-A1c/5
3-3-A1c/5.1
3-3-A1c/5.3
3-3-A1c/Figure 1
Part
3
Chapter
3
Appendix 2
3-3-A2
3-3-A2/1
3-3-A2/1.1
3-3-A2/1.3
3-3-A2/3
3-3-A2/5
3-3-A2/7
3-3-A2/7.1
3-3-A2/7.3

44

Title
Determination of Dynamic Response
Empirical Approximations
Maximum Dynamic Response Angle, max
Reduction in Downflooding Distance, RDFD
Application Limits of Empirical Approximations
Geometric Parameters
Operating Parameters
Direct Calculation
Capsize Criteria Format
Downflooding Criteria Concepts
Hull Construction and Equipment
Subdivision and Stability
Sample Calculations
Sample Calculations
Capsize Criteria Assessment (Metric Units)
Downflooding Criteria Assessment (Metric Units)
Hull Construction and Equipment
Subdivision and Stability
Direct Analysis of Dynamic Motion Responses
Direct Analysis of Dynamic Motion Responses
General
Analysis Methods and Theoretical Background
Analysis Conditions
Environmental Conditions
Heading
Hydrodynamic Coefficients
Radii of Gyration
Mooring Arrangement
Representation of Environment
Wind Loads
Wave Loads
Current Effects
Results of Analyses and Format
------Model Tests
--------Hull Construction and Equipment
Subdivision and Stability
Environmental Conditions and Representations
Environmental Conditions and Representations
General
ABS Average Measured Wind Spectrum
Wave Spectra
Fetch-limited Regions
Open Seas
Joint Probabilities of Occurrence of Wind Speed and Wave Height
Hull Construction and Equipment
Subdivision and Stability
Onboard Computers for Stability Calculations
Onboard Computers for Stability Calculations
General
Scope
Design
Calculation Systems
Types of Stability Software
Functional Requirements
Calculation Program
Direct Damage Stability Calculation

MODU 2012
3-3-A1/9
3-3-A1/9.1
3-3-A1/9.1.1
3-3-A1/9.1.2
3-3-A1/9.3
3-3-A1/9.3.1
3-3-A1/9.3.2
3-3-A1/9.5
3-3-A1/Figure 1
3-3-A1/Figure 2

3-3-A1a
3-3-A1a/1
3-3-A1a/3

3-3-A1b
3-3-A1b/1
3-3-A1b/3
3-3-A1b/5
3-3-A1b/5.1
3-3-A1b/5.3
3-3-A1b/5.5
3-3-A1b/5.7
3-3-A1b/5.9
3-3-A1b/7
3-3-A1b/7.1
3-3-A1b/7.3
3-3-A1b/7.5
3-3-A1b/9
3-3-A1b/9i)
3-3-A1b/9ii)
3-3-A1b/9iii)
3-3-A1b/11
3-3-A1b/11i)
3-3-A1b/11ii)
3-3-A1b/11iii)
3-3-A1b/11iv)

3-3-A1c
3-3-A1c/1
3-3-A1c/3
3-3-A1c/5
3-3-A1c/5.1
3-3-A1c/5.3
3-3-A1c/Figure 1

3-3-A2
3-3-A2/1
3-3-A2/1.1
3-3-A2/1.3
3-3-A2/3
3-3-A2/5
3-3-A2/7
3-3-A2/7.1
3-3-A2/7.3

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
3-3-A2/7.5
3-3-A2/7.7
3-3-A2/7.9
3-3-A2/7.11
3-3-A2/7.13
3-3-A2/9
3-3-A2/9.1
3-3-A2/9.3
3-3-A2/11
3-3-A2/11.1
3-3-A2/11.3
3-3-A2/11.5
3-3-A2/13
3-3-A2/15

Title
Warning
Data Printout
Date and Time
Information of Program
Units
Acceptable Tolerances
Calculation Program of the Approved Stability Information
Independent Program for Assessment of Stability
Approval Procedure
Conditions of Approval of the Onboard Computers for Stability Calculations
General Approval (optional)
Specific Approval
Operation Manual
Installation Testing

3-3-A2/17

Periodical Testing

3-3-A2/19
3-3-A2/Table 1
Part
3
Chapter
4
Section
1
3-4-1
3-4-1/1
3-4-1/3
3-4-1/5
3-4-1/7
Part
3
Chapter
4
Appendix 1
3-4-A1
3-4-A1/1
3-4-A1/1.1
3-4-A1/3
3-4-A1/3.1
3-4-A1/3.3
3-4-A1/3.3.1
3-4-A1/3.3.1i)
3-4-A1/3.3.1ii)
3-4-A1/3.3.1iii)
3-4-A1/3.3.2
3-4-A1/3.3.3
3-4-A1/3.3.4
3-4-A1/3.3.4(a)
3-4-A1/3.3.4(b)
3-4-A1/3.3.5
3-4-A1/3.3.5(a)
3-4-A1/3.3.5(b)
3-4-A1/3.3.5(c)
3-4-A1/3.3.5(d)
3-4-A1/3.3.5(e)
3-4-A1/3.3.5(f)
3-4-A1/3.3.6
3-4-A1/3.3.7
3-4-A1/3.3.8
3-4-A1/3.3.9
3-4-A1/5
3-4-A1/5.1
3-4-A1/5.1.1
3-4-A1/5.1.2
3-4-A1/5.1.3
3-4-A1/5.3
3-4-A1/5.3.1
3-4-A1/7

Other Requirements
Acceptable Tolerances
Hull Construction and Equipment
Equipment
Position Mooring Systems and Equipment
Position Mooring Systems and Equipment
General
Temporary Mooring Equipment
Position Mooring Equipment
Position Mooring System
Hull Construction and Equipment
Equipment
Guide for Position Mooring Systems
Guide for Position Mooring Systems
General
--Anchoring Systems
General
Design
--------------------Operating Intact
Operating Damaged
Operating Transient
Severe Storm Intact
Severe Storm Damaged
Severe Storm Transient
--------Equipment
Winches and Windlasses
------Fairleads and Sheaves
--Anchor Lines

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
3-3-A2/7.5
3-3-A2/7.7
3-3-A2/7.9
3-3-A2/7.11
3-3-A2/7.13
3-3-A2/9
3-3-A2/9.1
3-3-A2/9.3
3-3-A2/11
3-3-A2/11.1
3-3-A2/11.3
3-3-A2/11.5
3-3-A2/13
7-1-A2/7
7-2-4/1.1.15
7-2-5/1.9
7-1-A2/9
3-3-A2/Table 1

3-4-1
3-4-1/1
3-4-1/3
3-4-1/5
3-4-1/7

3-4-A1
3-4-A1/1
3-4-A1/1.1
3-4-A1/3
3-4-A1/3.1
3-4-A1/3.3
3-4-A1/3.3.1
3-4-A1/3.3.1i)
3-4-A1/3.3.1ii)
3-4-A1/3.3.1iii)
3-4-A1/3.3.2
3-4-A1/3.3.3
3-4-A1/3.3.4
3-4-A1/3.3.4(a)
3-4-A1/3.3.4(b)
3-4-A1/3.3.5
3-4-A1/3.3.5(a)
3-4-A1/3.3.5(b)
3-4-A1/3.3.5(c)
3-4-A1/3.3.5(d)
3-4-A1/3.3.5(e)
3-4-A1/3.3.5(f)
3-4-A1/3.3.6
3-4-A1/3.3.7
3-4-A1/3.3.8
3-4-A1/3.3.9
3-4-A1/5
3-4-A1/5.1
3-4-A1/5.1.1
3-4-A1/5.1.2
3-4-A1/5.1.3
3-4-A1/5.3
3-4-A1/5.3.1
3-4-A1/7

45

Notices and General Information


MODU 2008
3-4-A1/7.1
3-4-A1/7.3
3-4-A1/7.5
3-4-A1/9
3-4-A1/9.1
3-4-A1/9.3
3-4-A1/11
3-4-A1/11.1
3-4-A1/13
3-4-A1/13.1
3-4-A1/13.3
3-4-A1/13.5
Part
4
Chapter
1
Section
1
4-1-1
4-1-1/1
4-1-1/3
4-1-1/5
4-1-1/5.1
4-1-1/5.3
4-1-1/5.5
4-1-1/5.7
4-1-1/7

Title
------Anchors
----Quality Control
--Control Stations
------Machinery and Systems
Machinery, Equipment, and Their Installation
General
General
Machinery and Equipment
Drilling Equipment
Certification of Machinery
Basic Requirements
Type Approval Program
Non-mass Produced Machinery
Details of Certification of Some Representative Products
Inclinations

4-1-1/9

Plans and Data to be Submitted

4-1-1/10
4-1-1/10.1
4-1-1/10.3
4-1-1/10.3i)
4-1-1/10.3ii)
4-1-1/11
4-1-1/13

Blackout and Dead Ship Condition


Blackout
Dead Ship Condition
----Dead Ship start
Unattended Machinery Spaces

4-1-1/15

Ambient Temperature

4-1-1/17
4-1-1/Table 1
4-1-1/Table 2
Part
Chapter
Section
4-1-2
4-1-2/1
4-1-2/3
4-1-2/3.1
4-1-2/3.1.1
4-1-2/3.1.2
4-1-2/3.3
4-1-2/3.3.1
4-1-2/3.3.2
4-1-2/3.3.3
4-1-2/3.5
4-1-2/3.7
4-1-2/3.9
Part
Chapter
Section
4-1-3
4-1-3/1
4-1-3/3
4-1-3/3.1
4-1-3/3.3
4-1-3/3.5

Materials Containing Asbestos


Angle of Inclination
Ambient Temperatures for Unrestricted Service
Machinery and Systems
Machinery, Equipment, and Their Installation
Rotating Machinery
Rotating Machinery
Drilling Units Without Propulsion Machinery
Internal Combustion Engines Designed for Drilling Operations
Crankcase Ventilation
General
Piping Arrangement
Explosion Relief Valves
General
Location of Valves
Additional Valves Required
Fire Extinguishing Systems for Scavenge Manifolds
Warning Notices
Governor Control
Machinery and Systems
Machinery, Equipment, and Their Installation
Jacking and Associated Systems
Jacking and Associated Systems
General
Definitions
Jacking System
Holding Mechanism
Rack and Pinion Jacking System

46

4
1
2

4
1
3

MODU 2012
3-4-A1/7.1
3-4-A1/7.3
3-4-A1/7.5
3-4-A1/9
3-4-A1/9.1
3-4-A1/9.3
3-4-A1/11
3-4-A1/11.1
3-4-A1/13
3-4-A1/13.1
3-4-A1/13.3
3-4-A1/13.5

4-1-1, 6-1-1
6-1-1/1.1
6-1-1/1.3
6-1-1/3
6-1-1/3.1
6-1-1/9.5
6-1-1/9.9
6-1-1/3.3
4-1-1/7.1
4-1-2/7
4-3-6/3
--4-1-1/3.11
4-1-1/3.9
4-1-1/3.9i)
4-1-1/3.9ii)
4-1-1/7.3
4-1-1/7.5
3-1-4/1.9
4-1-1/7.7
4-1-1/7.9
4-1-1/Table 1
4-1-1/Table 2

4-1-2
--4-1-2/3
4-1-2/3.1
4-1-2/3.1.1
4-1-2/3.1.2
4-1-2/3.3
4-1-2/3.3.1
4-1-2/3.3.2
4-1-2/3.3.3
4-1-2/3.5
4-1-2/3.7
4-1-2/3.9

6-1-9
6-1-9/1
6-1-9/3
6-1-9/3.1
6-1-9/3.3
6-1-9/3.5

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-1-3/3.7
4-1-3/3.9
4-1-3/3.11
4-1-3/3.13
4-1-3/3.15
4-1-3/5
4-1-3/7
4-1-3/9
4-1-3/9.1
4-1-3/11
4-1-3/13
4-1-3/13.1
4-1-3/13.3
4-1-3/13.5
4-1-3/15
4-1-3/17
4-1-3/19
4-1-3/21
4-1-3/23
4-1-3/25
4-1-3/Table 1
Part
4
Chapter
1
Section
4
4-1-4/1
Part
4
Chapter
2
Section
1
4-2-1
4-2-1/1
4-2-1/1.1
4-2-1/1.3
4-2-1/1.5
4-2-1/3
4-2-1/3.1
4-2-1/3.3
4-2-1/3.5
4-2-1/5
4-2-1/5.1
4-2-1/5.3
4-2-1/7

Title
Yoke and Pin Jacking System
Fixation System
Specified Service Temperature
Jacking Unit Rated Capacity
Lifting Capacity per Leg
Plans and data to be Submitted
Failure Modes and Effects Analysis (FMEA)
Material
Toughness
Strength Analysis
Mechanical Components
Bearings
Brakes
Flexible Shock Pads
Electrical Power System
Hydraulic System
Control, Monitoring, and Alarm System
Inspection and Material Testing
Low Temperature Operation
Jacking Systems of Novel Design
Charpy V-Notch (CVN) Impact Requirements for Steel Materials
Machinery and Systems
Machinery, Equipment, and Their Installation
Thrusters and Dynamic Positioning Systems
Thrusters and Dynamic Positioning Systems
Machinery and Systems
Pumps and Piping Systems
General
General
General Requirements
Damage Stability
Segregation of Piping System
Piping Groups
Plans and Data to be Submitted
Plans
All Piping Systems
Booklet of Standard Details
Material Tests and Inspection
Specifications and Purchase Orders
Special Materials
General Installation Details

4-2-1/7.1

Protection

4-2-1/7.3

Pipes Near Switchboards

4-2-1/7.5

Expansion and Contraction Stresses

4-2-1/7.7
4-2-1/7.7.1
4-2-1/7.7.2
4-2-1/7.7.2(a)
4-2-1/7.7.2(b)
4-2-1/7.7.2(c)
4-2-1/7.7.2(d)
4-2-1/7.7.3
4-2-1/7.9
4-2-1/7.11
4-2-1/7.13
4-2-1/7.15
4-2-1/7.15.1
4-2-1/7.17
4-2-1/7.19
4-2-1/7.21
4-2-1/7.23

Molded Expansion Joints


Circulating Water Systems
Oil Systems
--------Fire Resistant Test
Bulkhead, Deck or Tank-Top Penetrations
Collision Bulkhead Penetration
Sluice Valves and Cocks
Relief Valves
Exceptions
Common Overboard Discharges
Remote Operation
Standard or Extra Heavy Pipe
Instruments

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
6-1-9/3.7
6-1-9/3.9
6-1-9/3.11
6-1-9/3.13
6-1-9/3.15
6-1-9/5
6-1-9/7
6-1-9/9
6-1-9/9.1
6-1-9/11
6-1-9/13
6-1-9/13.1
6-1-9/13.3
6-1-9/13.5
6-1-9/15
6-1-9/17
6-1-9/19
6-1-9/25.1
6-1-9/21
6-1-9/23
6-1-9/Table 1

4-1-2/5

4-2-1, 7-1-3
4-2-1/1
4-2-1/1.1
4-2-1/1.3
4-2-1/5
4-2-1/7
4-2-1/7.1
4-2-1/7.3
4-2-1/7.5
4-2-1/9
4-2-1/9.1
4-2-1/9.3
4-2-1/11
4-2-1/11.1
7-1-3/11.3
4-2-1/11.3
7-1-3/11.5
4-2-1/11.5
7-1-3/11.7
4-2-1/11.7
4-2-1/11.7.1
4-2-1/11.7.2
4-2-1/11.7.2(a)
4-2-1/11.7.2(b)
4-2-1/11.7.2(c)
4-2-1/11.7.2(d)
4-2-1/11.7.3
4-2-1/11.15
4-2-1/11.17
4-2-1/11.19
4-2-1/11.21
4-2-1/11.21.1
4-2-1/11.23
4-2-1/11.25
4-2-1/3.9
4-2-1/11.27

47

Notices and General Information


MODU 2008
4-2-1/7.23.1
4-2-1/7.23.2
4-2-1/7.25

Temperature
Pressure
Hose

4-2-1/7.27

Control of Static Electricity

4-2-1/7.29
4-2-1/7.29.1
4-2-1/7.29.2
Part
Chapter
Section
4-2-2
4-2-2/1
4-2-2/1.1
4-2-2/1.3
4-2-2/3
4-2-2/3.1
4-2-2/5
4-2-2/5.1
4-2-2/5.3
4-2-2/5.3.1
4-2-2/5.3.2
4-2-2/5.3.3
4-2-2/5.5
4-2-2/5.7
4-2-2/5.9
4-2-2/5.9.1

Leakage Containment
Oil Leaks
Boiler Flats
Machinery and Systems
Pumps and Piping Systems
Pumps, Pipes, Valves, and Fittings
Pumps, Pipes, Valves and Fittings
General
Service Conditions
Standards for Valves, Fittings and Flanges
Pumps
General Requirements
Metallic Piping
Test and Inspection Group I Piping
Steel Pipe
Seamless Pipe
Welded Pipe
Fuel-oil Pipe
Copper Pipe
Brass Pipe
Design
Maximum Allowable Working Pressure and Minimum Thickness

4
2
2

Title

4-2-2/5.9.2

Pipe Bending

4-2-2/5.11
4-2-2/7
4-2-2/7.1
4-2-2/7.3
4-2-2/7.3.1
4-2-2/7.3.2
4-2-2/7.3.3
4-2-2/7.5
4-2-2/7.5.1
4-2-2/7.5.2
4-2-2/7.5.3
4-2-2/7.5.3(a)
4-2-2/7.5.3(b)
4-2-2/7.5.4
4-2-2/7.5.5
4-2-2/7.5.6
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6iv)
4-2-2/7.5.6v)
4-2-2/7.5.7
4-2-2/7.5.7(a)
4-2-2/7.5.7(b)
4-2-2/7.5.8
4-2-2/7.5.8(a)
4-2-2/7.5.8(b)

Working Pressure and Thickness Alternative Consideration


Plastic Pipes
General
Plans and Data to be Submitted
General Information
Drawings and Supporting Documentation
Materials
Design
Internal Pressure
External Pressure
Axial Strength
----Temperature
Impact Resistance
Fire Endurance
----------------Flame Spread
Plastic Pipes
Multi-core Metallic Tubes Sheathed by Plastic Materials
Electrical Conductivity
-----

4-2-2/7.5.8(c)

---

4-2-2/7.5.8(d)

---

4-2-2/7.5.9

Marking

48

MODU 2012
4-2-1/11.27.1
4-2-1/11.27.2
4-2-1/11.29
4-2-1/11.31
7-1-3/11.29
4-2-1/11.33
4-2-1/11.33.1
4-2-1/11.33.2

4-2-2, 6-1-6, 7-1-3


4-2-2/1
4-2-2/1.1
4-2-2/1.3
6-1-6/7.3.2
6-1-6/7.3.2
4-2-2/5
6-1-6/7.1
4-2-2/5.1
----4-2-2/5.1.1
4-2-2/5.3
4-2-2/5.5
4-2-2/5.7
4-2-2/5.7.1
4-2-2/5.7.2
7-1-3/11.1
4-2-2/5.9
4-2-2/7
4-2-2/7.1
4-2-2/7.3
4-2-2/7.3.1
4-2-2/7.3.2
4-2-2/7.3.3
4-2-2/7.5
4-2-2/7.5.1
4-2-2/7.5.2
4-2-2/7.5.3
4-2-2/7.5.3(a)
4-2-2/7.5.3(b)
4-2-2/7.5.4
4-2-2/7.5.5
4-2-2/7.5.6
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6i)
4-2-2/7.5.6ii)
4-2-2/7.5.6iii)
4-2-2/7.5.6iv)
4-2-2/7.5.6v)
4-2-2/7.5.7
4-2-2/7.5.7(a)
4-2-2/7.5.7(b)
4-2-2/7.5.8
4-2-2/7.5.8(a)
4-2-2/7.5.8(b)
4-2-2/7.5.8(c)
7-1-3/13.5.3iv)
4-2-2/7.5.8(d)
4-2-2/7.5.9
7-1-3/13.5.2

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-2-2/7.7
4-2-2/7.7.1
4-2-2/7.7.1(a)
4-2-2/7.7.1(b)
4-2-2/7.7.1(c)
4-2-2/7.7.1(d)
4-2-2/7.7.1(e)

Installation of Plastic Piping


Supports
-----------

4-2-2/7.7.2

External Loads

4-2-2/7.7.3
4-2-2/7.7.3(a)
4-2-2/7.7.3(b)
4-2-2/7.7.3(c)
4-2-2/7.7.3(d)
4-2-2/7.7.4
4-2-2/7.7.4(a)
4-2-2/7.7.4(b)
4-2-2/7.7.5
4-2-2/7.7.6
4-2-2/7.7.6(a)
4-2-2/7.7.6(b)
4-2-2/7.7.6(c)
4-2-2/7.7.7
4-2-2/7.9
4-2-2/7.11
4-2-2/7.11.1
4-2-2/7.11.1(a)
4-2-2/7.11.1(a)i)
4-2-2/7.11.1(a)ii)
4-2-2/7.11.1(a)iii)
4-2-2/7.11.1(a)iv)
4-2-2/7.11.1(a)v)
4-2-2/7.11.1(a)vi)
4-2-2/7.11.1(a)vii)
4-2-2/7.11.1(b)
4-2-2/7.11.2
4-2-2/7.11.2(a)
4-2-2/7.11.2(b)
4-2-2/7.11.2(b)i)
4-2-2/7.11.2(b)ii)
4-2-2/7.11.2(c)

Plastic Pipe Connections


--------Electrical Conductivity
----Shell Connections
Bulkhead and Deck Penetrations
------Application of Fire Protecting Coatings
Manufacturing of Plastic Pipes
Plastic Pipe Bonding Procedure Qualification
Procedure Qualification Requirements
-----------------

4-2-2/7.13
4-2-2/7.13.1
4-2-2/7.13.1(a)
4-2-2/7.13.1(b)
4-2-2/7.13.1(b)i)
4-2-2/7.13.1(b)ii)
4-2-2/7.13.1(b)iii)
4-2-2/7.13.1(b)iv)
4-2-2/7.13.1(c)
4-2-2/7.13.2
4-2-2/7.13.2(a)
4-2-2/7.13.2(b)
4-2-2/7.13.2(c)
4-2-2/7.13.2(d)
4-2-2/7.13.2(e)
4-2-2/7.13.2(f)
4-2-2/7.13.3
4-2-2/7.13.4
4-2-2/7.13.4(a)
4-2-2/7.13.4(b)
4-2-2/7.13.4(c)

Title

Procedure Qualification Testing


----------Test by the Manufacturer - Fire Endurance Testing of Plastic Piping in dry
Conditions (For Level 1 and Level 2)
Test Method
--------------Test Specimen
------------Test Condition
Acceptance Criteria
-------

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-2-2/7.7
4-2-2/7.7.1
4-2-2/7.7.1(a)
7-1-3/13.5.3i)
7-1-3/13.5.3i)
4-2-2/7.7.1(b)
4-2-2/7.7.1(c)
4-2-2/7.7.2
7-1-3/13.5.2
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iii)
7-1-3/13.5.3iv)
7-1-3/13.5.3iv)
7-1-3/13.5.3iv)
4-2-2/7.7.3
4-2-2/7.7.4
4-2-2/7.7.4(a)
4-2-2/7.7.4(b)
4-2-2/7.7.4(c)
7-1-3/13.5.3vii)
4-2-2/7.9
4-2-2/7.11
4-2-2/7.11.1
4-2-2/7.11.1(a)
4-2-2/7.11.1(a)i)
4-2-2/7.11.1(a)ii)
4-2-2/7.11.1(a)iii)
4-2-2/7.11.1(a)iv)
4-2-2/7.11.1(a)v)
4-2-2/7.11.1(a)vi)
4-2-2/7.11.1(a)vii)
4-2-2/7.11.1(b)
4-2-2/7.11.2
4-2-2/7.11.2(a)
4-2-2/7.11.2(b)
4-2-2/7.11.2(b)i)
4-2-2/7.11.2(b)ii)
4-2-2/7.11.2(c)
4-2-2/7.13
4-2-2/7.13.1
4-2-2/7.13.1(a)
4-2-2/7.13.1(b)
4-2-2/7.13.1(b)i)
4-2-2/7.13.1(b)ii)
4-2-2/7.13.1(b)iii)
4-2-2/7.13.1(b)iv)
4-2-2/7.13.1(c)
4-2-2/7.13.2
4-2-2/7.13.2(a)
4-2-2/7.13.2(b)
4-2-2/7.13.2(c)
4-2-2/7.13.2(d)
4-2-2/7.13.2(e)
4-2-2/7.13.2(f)
4-2-2/7.13.3
4-2-2/7.13.4
4-2-2/7.13.4(a)
4-2-2/7.13.4(b)
4-2-2/7.13.4(c)

49

Notices and General Information


MODU 2008
4-2-2/7.15
4-2-2/7.15.1
4-2-2/7.15.1(a)
4-2-2/7.15.1(b)
4-2-2/7.15.1(c)
4-2-2/7.15.1(d)
4-2-2/7.15.1(e)
4-2-2/7.15.2
4-2-2/7.15.2(a)
4-2-2/7.15.2(b)
4-2-2/7.15.2(c)
4-2-2/7.15.2(d)
4-2-2/7.15.2(e)
4-2-2/7.15.2(f)
4-2-2/7.15.2(g)
4-2-2/7.15.3
4-2-2/7.15.3(a)
4-2-2/7.15.3(b)
4-2-2/7.15.3(c)
4-2-2/7.15.4
4-2-2/7.15.4(a)
4-2-2/7.15.4(b)
4-2-2/7.17
4-2-2/7.17.1
4-2-2/7.17.1(a)
4-2-2/7.17.1(b)
4-2-2/7.17.1(c)
4-2-2/7.17.1(d)
4-2-2/7.17.1(e)
4-2-2/7.17.1(f)
4-2-2/7.17.1(g)
4-2-2/7.17.1(h)
4-2-2/7.17.1(i)
4-2-2/7.19
4-2-2/9
4-2-2/9.1
4-2-2/9.1.1
4-2-2/9.1.2
4-2-2/9.3
4-2-2/9.5
4-2-2/11
4-2-2/11.1
4-2-2/11.3
4-2-2/11.5
4-2-2/11.7
4-2-2/13
4-2-2/15
4-2-2/15.1
4-2-2/15.3
4-2-2/15.3.1
4-2-2/15.3.2
4-2-2/15.5
4-2-2/17
4-2-2/17.1
4-2-2/17.3
4-2-2/17.5
4-2-2/17.7
4-2-2/17.9
4-2-2/19
4-2-2/19.1
4-2-2/19.3
4-2-2/19.3i)
4-2-2/19.3ii)

50

Title
Test by the Manufacturer - Fire Endurance Testing of Water-Filled Plastic Piping
(For Level 3)
Test Method
----------Test Specimen
--------------Test Conditions
------Acceptance Criteria
----Test by Manufacturer Flame Spread
Test Method
------------------Testing by Manufacturer General
Valves
General
Standard Valves
Non-Standard Valves
Construction
Hydrostatic Test and Identification
Pipe Fittings
General
Hydrostatic Test and Identification
Nonstandard Fittings
Mechanical Joints
Welded Nonstandard Valves and Fittings
Flanges
General
Group I Piping Flanges
Steel Pipe
Nonferrous Pipe
Group II Piping Flanges
Material of Valves and Fittings
General
Forged or Cast Steel
Cast Iron
Nonferrous
Ductile (Nodular) Iron
Fluid Power Cylinders
General
Non-compliance with a Recognized Standard
-----

MODU 2012
4-2-2/7.15
4-2-2/7.15.1
4-2-2/7.15.1(a)
4-2-2/7.15.1(b)
4-2-2/7.15.1(c)
4-2-2/7.15.1(d)
4-2-2/7.15.1(e)
4-2-2/7.15.2
4-2-2/7.15.2(a)
4-2-2/7.15.2(b)
4-2-2/7.15.2(c)
4-2-2/7.15.2(d)
4-2-2/7.15.2(e)
4-2-2/7.15.2(f)
4-2-2/7.15.2(g)
4-2-2/7.15.3
4-2-2/7.15.3(a)
4-2-2/7.15.3(b)
4-2-2/7.15.3(c)
4-2-2/7.15.4
4-2-2/7.15.4(a)
4-2-2/7.15.4(b)
4-2-2/7.17
4-2-2/7.17.1
4-2-2/7.17.1(a)
4-2-2/7.17.1(b)
4-2-2/7.17.1(c)
4-2-2/7.17.1(d)
4-2-2/7.17.1(e)
4-2-2/7.17.1(f)
4-2-2/7.17.1(g)
4-2-2/7.17.1(h)
4-2-2/7.17.1(i)
4-2-2/7.19
4-2-2/9
4-2-2/9.1
4-2-2/9.1.1
4-2-2/9.1.2
4-2-2/9.3
4-2-2/9.5
4-2-2/11
4-2-2/11.1
4-2-2/11.3
4-2-2/11.5
7-1-3/17.5
4-2-2/13
4-2-2/15
4-2-2/15.1
4-2-2/15.3
4-2-2/15.3.1
4-2-2/15.3.2
4-2-2/15.5
4-2-2/17
4-2-2/17.1
4-2-2/17.3
4-2-2/17.5
4-2-2/17.7
4-2-2/17.9
4-2-2/19
4-2-2/19.1
4-2-2/19.3
4-2-2/19.3i)
4-2-2/19.3ii)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-2-2/19.3iii)
4-2-2/19.5
4-2-2/19.5i)
4-2-2/19.5ii)
4-2-2/19.5iii)
4-2-2/19.7
4-2-2/19.9
4-2-2/19.11
4-2-2/21
4-2-2/21.1
4-2-2/21.3
4-2-2/21.5
4-2-2/21.7

Title
--Materials
------Rudder Actuators
Cylinders below Pressures or Temperatures Indicated in 4-2-2/19.1
Independently Manufactured and Assembled Units
Sea Inlets and Overboard Discharges
Installation
Valve Connection to Shell
Materials
Shell Reinforcement

4-2-2/21.9

Sea-Water Inlet and Discharge Valves

4-2-2/21.9i)
4-2-2/21.9ii)
4-2-2/21.9iii)
4-2-2/21.9.1
4-2-2/21.9.2
4-2-2/21.9.3
4-2-2/21.11
4-2-2/23
4-2-2/23.1
4-2-2/23.1.1
4-2-2/23.1.2
4-2-2/23.1.3
4-2-2/23.3
4-2-2/23.5
4-2-2/27
4-2-2/27.1
4-2-2/27.3
4-2-2/27.5
4-2-2/29
4-2-2/29.1
4-2-2/29.1i)
4-2-2/29.1ii)
4-2-2/29.3
4-2-2/29.3.1
4-2-2/29.3.2
4-2-2/Table 1
4-2-2/Table 2
4-2-2/Table 3

------Column Stabilized Units


Self Elevating and Surface Type Units
Self Elevating Units
Sea Chests
Scuppers and Drains on Surface-type and Self-Elevating Units
Discharges through the Shell
------Scuppers and Discharges below the Freeboard Deck Shell Penetration
Scuppers from Superstructures or Deckhouses
Cooler Installation External to the Hull
General
Integral Keel Cooler Installation
Non-integral Keel Cooler Installation
Penetration Throughout Watertight Boundaries
Ventilating Systems
----Internal Drain System
----Allowable Stress Values S for Piping N/mm2
Fire Endurance Requirements Matrix
Standards for Plastic Pipes Typical Requirements for All System
Standards for Plastic Pipes Additional Requirements Depending on Service and/or
Location of Piping
Fire Endurance Burner Assembly
Fire Endurance Test Stand With Mounted Sample
Machinery and Systems
Pumps and Piping Systems
Tanks Vents and Overflows
Tank Vents and Overflows
Tank Vents and Overflows
General
Progressive Flooding Consideration
Height and Wall Thickness of Vent Pipes
Vents Exposed to Weather
Vents not Exposed to Weather
Size
Termination of Vent Pipes
Termination on or Above Freeboard Deck
Termination in Machinery Spaces
Protection for Fuel Oil and Lubricating Oil Tanks
Fuel Oil Tanks Vent Outlets
Vent Outlet Closing Devices

4-2-2/Table 4
4-2-2/Figure 1
4-2-2/Figure 2
Part
4
Chapter
2
Section
3
4-2-3
4-2-3/1
4-2-3/1.1
4-2-3/1.3
4-2-3/1.5
4-2-3/1.5.1
4-2-3/1.5.2
4-2-3/1.7
4-2-3/1.9
4-2-3/1.9.1
4-2-3/1.9.2
4-2-3/1.9.3
4-2-3/1.9.4
4-2-3/1.9.5

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-2-2/19.3iii)
4-2-2/19.5
4-2-2/19.5i)
4-2-2/19.5ii)
4-2-2/19.5iii)
4-2-2/19.7
4-2-2/19.9
4-2-2/19.11
4-2-2/21
4-2-2/21.1
4-2-2/21.3
4-2-2/21.5
4-2-2/21.7
4-2-2/21.9
7-1-3//23.3
7-1-3//23.3i)
7-1-3//23.3ii)
7-1-3//23.3iii)
4-2-2/21.9.1
4-2-2/21.9.2
4-2-2/21.9.3
4-2-2/21.11
4-2-2/23
4-2-2/23.1
4-2-2/23.1.1
4-2-2/23.1.2
4-2-2/23.1.3
4-2-2/23.3
4-2-2/23.5
4-2-2/27
4-2-2/27.1
4-2-2/27.3
4-2-2/27.5
4-2-2/29
4-2-2/29.1
4-2-2/29.1i)
4-2-2/29.1ii)
4-2-2/29.3
4-2-2/29.3.1
4-2-2/29.3.2
4-2-2/Table 1
4-2-2/Table 2
4-2-2/Table 3
4-2-2/Table 4
4-2-2/Figure 1
4-2-2/Figure 2

4-2-3
4-2-3/1
4-2-3/1.1
4-2-3/1.3
4-2-3/1.5
4-2-3/1.5.1
4-2-3/1.5.2
4-2-3/1.7
4-2-3/1.9
4-2-3/1.9.1
4-2-3/1.9.2
4-2-3/1.9.3
4-2-3/1.9.4
4-2-3/1.9.5

51

Notices and General Information


MODU 2008
4-2-3/1.9.5(a)
4-2-3/1.9.5(b)
4-2-3/1.9.5(b)i)
4-2-3/1.9.5(b)ii)
4-2-3/1.9.5(b)iii)
4-2-3/1.9.5(b)iv)
4-2-3/1.9.5(b)v)
4-2-3/1.9.5(b)vi)
4-2-3/1.9.5(b)vii)
4-2-3/1.9.5(b)viii)
4-2-3/1.9.5(b)ix)
4-2-3/1.9.5(c)
4-2-3/1.9.5(c)i)
4-2-3/1.9.5(c)ii)
4-2-3/1.9.5(c)iii)
4-2-3/1.9.5(c)iv)
4-2-3/1.9.5(d)
4-2-3/1.9.5(d)i)
4-2-3/1.9.5(d)ii)
4-2-3/1.9.5(d)iii)
4-2-3/1.11
4-2-3/3
4-2-3/3.1
4-2-3/3.3
4-2-3/3.3.1
4-2-3/3.3.2
4-2-3/3.3.3
4-2-3/3.3.3(a)
4-2-3/3.3.3(a)i)
4-2-3/3.3.3(a)ii)
4-2-3/3.3.3(a)iii)
4-2-3/3.3.3(b)
4-2-3/3.3.3(b)i)
4-2-3/3.3.3(b)ii)
4-2-3/3.5
4-2-3/3.7
Part
4
Chapter
2
Section
4
4-2-4
4-2-4/1
4-2-4/1.1
4-2-4/1.3
4-2-4/1.5
4-2-4/1.7
4-2-4/3
4-2-4/3.1
4-2-4/3.3
4-2-4/3.5
4-2-4/3.7
4-2-4/5
4-2-4/5.1
4-2-4/5.3
4-2-4/5.5
4-2-4/5.7
4-2-4/5.9
4-2-4/5.11
4-2-4/5.13
4-2-4/5.15
4-2-4/7
4-2-4/7.1
4-2-4/7.3
4-2-4/9

52

Title
General
Design
------------------Materials
--------Type Testing
------Overflow Pipes
Sounding Arrangements
General
Sounding Pipes
Oil Tanks
Other Tanks
Ignition of Spillage
Fuel Oil Tanks
------Lubricating Oil Tanks
----Gauge Glasses
Level Indicating Device
Machinery and Systems
Pumps and Piping Systems
Bilge and Ballast Systems and Tanks
Bilge and Ballast Systems and Tanks
General Arrangement of Bilge and Ballast Systems for Surface Type Units
General
Number of Bilge Pumps
Direct Bilge Suctions
Emergency Bilge Suctions
General Arrangement for Bilge Systems for Column-Stabilized Units and Self
Elevating Units
Permanent Systems
Void Compartments
Chain Lockers
Bilge Alarm
Bilge Piping (All Units)
General
Installation
Manifolds, Cocks, and Valves
Common-main-type Bilge System
Strainers
Gravity Drains
Bilge Suctions from Hazardous Areas
Exceptions
Bilge Pumps (All Units)
General
Arrangement and Capacity
Size of Bilge Suctions

MODU 2012
4-2-3/1.9.5(a)
4-2-3/1.9.5(b)
4-2-3/1.9.5(b)i)
4-2-3/1.9.5(b)ii)
4-2-3/1.9.5(b)iii)
4-2-3/1.9.5(b)iv)
4-2-3/1.9.5(b)v)
4-2-3/1.9.5(b)vi)
4-2-3/1.9.5(b)vii)
4-2-3/1.9.5(b)viii)
4-2-3/1.9.5(b)ix)
4-2-3/1.9.5(c)
4-2-3/1.9.5(c)i)
4-2-3/1.9.5(c)ii)
4-2-3/1.9.5(c)iii)
4-2-3/1.9.5(c)iv)
4-2-3/1.9.5(d)
4-2-3/1.9.5(d)i)
4-2-3/1.9.5(d)ii)
4-2-3/1.9.5(d)iii)
4-2-3/1.11
4-2-3/3
4-2-3/3.1
4-2-3/3.3
4-2-3/3.3.1
4-2-3/3.3.2
4-2-3/3.3.3
4-2-3/3.3.3(a)
4-2-3/3.3.3(a)i)
4-2-3/3.3.3(a)ii)
4-2-3/3.3.3(a)iii)
4-2-3/3.3.3(b)
4-2-3/3.3.3(b)i)
4-2-3/3.3.3(b)ii)
4-2-3/3.5
4-2-3/3.7

4-2-4
4-2-4/1
4-2-4/1.1
4-2-4/1.3
4-2-4/1.5
4-2-4/1.7
4-2-4/3
4-2-4/3.1
4-2-4/3.3
4-2-4/3.5
4-2-4/3.7
4-2-4/5
4-2-4/5.1
4-2-4/5.3
4-2-4/5.5
4-2-4/5.7
4-2-4/5.9
4-2-4/5.11
4-2-4/5.13
4-2-4/5.15
4-2-4/7
4-2-4/7.1
4-2-4/7.3
4-2-4/9

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-2-4/9.1
4-2-4/9.1.1
4-2-4/9.1.2
4-2-4/9.1.3
4-2-4/9.1.4
4-2-4/9.3
4-2-4/9.3.1
4-2-4/9.3.2
4-2-4/9.3.3
4-2-4/11
4-2-4/11.1
4-2-4/11.3
4-2-4/11.5
4-2-4/11.7
4-2-4/13
4-2-4/13.1
4-2-4/13.1i)
4-2-4/13.1ii)
4-2-4/13.3
4-2-4/13.5
4-2-4/13.5.1
4-2-4/13.5.2
4-2-4/13.7
4-2-4/13.7.1
4-2-4/13.7.1(a)
4-2-4/13.7.1(b)
4-2-4/13.7.1(b)i)
4-2-4/13.7.1(b)ii)
4-2-4/13.7.1(b)iii)
4-2-4/13.7.1(b)iv)
4-2-4/13.7.1(b)v)
4-2-4/13.7.1(b)vi)
4-2-4/13.7.1(b)vii)
4-2-4/13.7.1(b)viii)
4-2-4/13.7.1(b)ix)
4-2-4/13.7.1(b)x)
4-2-4/13.7.1(b)xi)
4-2-4/13.7.1(c)
4-2-4/13.7.1(d)
4-2-4/13.7.2
4-2-4/13.7.3
4-2-4/13.7.3(a)
4-2-4/13.7.3(a)i)
4-2-4/13.7.3(a)ii)
4-2-4/13.7.3(b)
4-2-4/13.7.3(c)
4-2-4/13.7.3(d)
4-2-4/13.7.3(e)
4-2-4/13.7.4
4-2-4/13.7.5
4-2-4/13.7.6
Part
4
Chapter
2
Section
5
4-2-5
4-2-5/1
4-2-5/1.1
4-2-5/1.1.1
4-2-5/1.1.1(a)
4-2-5/1.1.1(b)
4-2-5/1.1.2
4-2-5/1.1.3

Title
Surface Type Units
Main Line
Branch Line
Main Line Reduction
Size Limits
Column-Stabilized Units and Self-Elevating Units
Main Line
Branch Line
Size Limits
Ballast Piping (All Units)
General
Installation
Controls for Ballast Tank Valves
Exceptions
Ballasting Systems for Column-Stabilized Units
General
----Manifolds
Pumps
Number
Pump Performance
Ballast Control Features
Centralized Control Station
Location
Controls and Indications
----------------------Communication
Back-up Station
Independent Local Control
Safety Futures
Independence
All Systems
Pump/Valve Control System
Dual Power Source
Disconnects
Electronic Systems
Valve Controls
Valve Positioning Indicating System
Draft Indicating System
Tank Level indicating System
Machinery and Systems
Pumps and Piping Systems
Fuel Oil Systems and Tanks
Fuel Oil Systems and Tanks
Fuel Oil Piping System General
Arrangement
Tanks
Structural Tanks
Free Standing Tanks
Spillage
Sounding Arrangements

4-2-5/1.1.4

Service and Settlings Tanks

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-2-4/9.1
4-2-4/9.1.1
4-2-4/9.1.2
4-2-4/9.1.3
4-2-4/9.1.4
4-2-4/9.3
4-2-4/9.3.1
4-2-4/9.3.2
4-2-4/9.3.3
4-2-4/11
4-2-4/11.1
4-2-4/11.3
4-2-4/11.5
4-2-4/11.7
4-2-4/13
4-2-4/13.1
4-2-4/13.1i)
4-2-4/13.1ii)
4-2-4/13.3
4-2-4/13.5
4-2-4/13.5.1
4-2-4/13.5.2
4-2-4/13.7
4-2-4/13.7.1
4-2-4/13.7.1(a)
4-2-4/13.7.1(b)
4-2-4/13.7.1(b)i)
4-2-4/13.7.1(b)ii)
4-2-4/13.7.1(b)iii)
4-2-4/13.7.1(b)iv)
4-2-4/13.7.1(b)v)
4-2-4/13.7.1(b)vi)
4-2-4/13.7.1(b)vii)
4-2-4/13.7.1(b)viii)
4-2-4/13.7.1(b)ix)
4-2-4/13.7.1(b)x)
4-2-4/13.7.1(b)xi)
4-2-4/13.7.1(c)
4-2-4/13.7.1(d)
4-2-4/13.7.2
4-2-4/13.7.3
4-2-4/13.7.3(a)
4-2-4/13.7.3(a)i)
4-2-4/13.7.3(a)ii)
4-2-4/13.7.3(b)
4-2-4/13.7.3(c)
4-2-4/13.7.3(d)
4-2-4/13.7.3(e)
4-2-4/13.7.4
4-2-4/13.7.5
4-2-4/13.7.6

4-2-5, 6-1-3
4-2-5/1
4-2-5/1.1
4-2-5/1.1.1
4-2-5/1.1.1(a)
4-2-5/1.1.1(b)
4-2-5/1.1.2
4-2-5/1.1.3
4-2-5/1.1.4
4-2-3/1.9.3

53

Notices and General Information


MODU 2008
4-2-5/1.3
4-2-5/1.5
4-2-5/1.5.1
4-2-5/1.5.2
4-2-5/1.7
4-2-5/3
4-2-5/3.1
4-2-5/3.3
4-2-5/3.5
4-2-5/3.7
4-2-5/3.9
4-2-5/3.9i)
4-2-5/3.9ii)
4-2-5/3.9iii)
4-2-5/5
4-2-5/7
4-2-5/7.1
4-2-5/7.1.1
4-2-5/7.1.2
4-2-5/7.1.3
4-2-5/7.3
4-2-5/7.5
4-2-5/7.7
4-2-5/7.7.1

Title
Piping, Valves and Fittings
Oil Heating Arrangements
Oil Heaters
Tanks
Fuel Oil Purifiers
Fuel Oil Transfer and Filling
General
Heating Coils
Pipes in Oil Tanks
Control Valves or Cocks
Valves on Oil Tanks
------Fuel-oil Service System for Boilers
Fuel-oil Service System for Internal Combustion Engines
Fuel-oil Pumps and Oil Heaters
Transfer Pumps
Booster Pumps
Heaters
Oil Tanks and Drains for Fuel Oil Systems
Fuel-oil Pressure Piping
Fuel-oil Injection System
General

4-2-5/7.7.2

Piping Between Injection Pump and Injectors

4-2-5/7.7.2(a)
4-2-5/7.7.2(b)
4-2-5/7.9
4-2-5/9
4-2-5/9.1
4-2-5/9.1.1
4-2-5/9.1.2
4-2-5/9.1.3
4-2-5/9.3
4-2-5/9.5
4-2-5/11
4-2-5/11.1
4-2-5/11.1.1
4-2-5/11.1.2
4-2-5/11.3
4-2-5/11.3.1
4-2-5/11.3.2
4-2-5/11.3.2(a)
4-2-5/11.3.2(a)i)
4-2-5/11.3.2(a)ii)
4-2-5/11.3.2(a)iii)
4-2-5/11.3.2(a)iv)
4-2-5/11.3.2(b)
4-2-5/13
4-2-5/13i)
4-2-5/13ii)
4-2-5/Figure 1
Part
4
Chapter
2
Section
6
4-2-6
4-2-6/1
4-2-6/1.1
4-2-6/1.3
4-2-6/1.5
4-2-6/1.7
4-2-6/1.7.1
4-2-6/1.7.2

Injection Piping
Fuel Oil Return Piping
Piping Between Booster Pump and Injection Pumps
Low Flash Point Fuels
General
------Fuel Heating
Fuel-tank Vents
Additional Measures for Oil Pollution Prevention
General
Application
Submission of Plans
Tank Protection Requirements
General
Protective Location of Tanks
Deterministic Approach
--------Probabilistic Approach
Class Notation POT
----Acceptable Fuel Oil Tanks Arrangements Inside Category A Machinery Spaces
Machinery and Systems
Pumps and Piping Systems
Other Piping Systems and Tanks
Other Piping Systems and Tanks
Lubricating Oil Systems
General
Sight Flow Glasses
Turbines and Reduction Gears
Internal Combustion Engines and Reduction Gear
Lubricating Oil Pumps
Filters

54

MODU 2012
4-2-5/1.3
4-2-5/1.5
4-2-5/1.5.1
4-2-5/1.5.2
4-2-5/1.7
4-2-5/3
4-2-5/3.1
4-2-5/3.3
4-2-5/3.5
4-2-5/3.7
4-2-5/3.9
4-2-5/3.9i)
4-2-5/3.9ii)
4-2-5/3.9iii)
4-2-5/5
4-2-5/7
4-2-5/7.1
4-2-5/7.1.1
4-2-5/7.1.2
4-2-5/7.1.3
4-2-5/7.3
4-2-5/7.5
4-2-5/7.7
4-2-5/7.7.1
4-2-5/7.7.2
6-1-3/3.1
6-1-3/3.1.1
6-1-3/3.1.2
4-2-5/7.9
4-2-5/9
4-2-5/9.1
4-2-5/9.1.1
4-2-5/9.1.2
4-2-5/9.1.3
4-2-5/9.3
4-2-5/9.5
4-2-5/11
4-2-5/11.1
4-2-5/11.1.1
4-2-5/11.1.2
4-2-5/11.3
4-2-5/11.3.1
4-2-5/11.3.2
4-2-5/11.3.2(a)
4-2-5/11.3.2(a)i)
4-2-5/11.3.2(a)ii)
4-2-5/11.3.2(a)iii)
4-2-5/11.3.2(a)iv)
4-2-5/11.3.2(b)
4-2-5/13
4-2-5/13i)
4-2-5/13ii)
4-2-5/Figure 1

4-2-6
4-2-6/1
4-2-6/1.1
4-2-6/1.3
4-2-6/1.5
4-2-6/1.7
4-2-6/1.7.1
4-2-6/1.7.2

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-2-6/1.7.3
4-2-6/1.7.4
4-2-6/1.9
4-2-6/3
4-2-6/3.1
4-2-6/3.3
4-2-6/3.3.1
4-2-6/3.3.2
4-2-6/3.5
4-2-6/3.7
4-2-6/3.7.1
4-2-6/3.7.2
4-2-6/3.7.3
4-2-6/3.7.4
4-2-6/3.9
4-2-6/3.11
4-2-6/3.13
4-2-6/3.15
4-2-6/3.17
4-2-6/5
4-2-6/5.1
4-2-6/5.3
4-2-6/5.3.1
4-2-6/5.3.1(a)
4-2-6/5.3.1(b)
4-2-6/5.3.1(c)
4-2-6/5.3.2
4-2-6/5.3.3
4-2-6/5.5
4-2-6/5.5.1
4-2-6/5.5.1(a)
4-2-6/5.5.1(b)
4-2-6/5.5.1(c)
4-2-6/5.5.1(d)
4-2-6/5.5.1(e)
4-2-6/5.5.2
4-2-6/5.5.3
4-2-6/5.5.4
4-2-6/7
4-2-6/7.1
4-2-6/7.1.1
4-2-6/7.1.2
4-2-6/7.1.2(a)
4-2-6/7.1.2(b)
4-2-6/7.1.2(c)
4-2-6/7.1.3
4-2-6/7.1.4
4-2-6/7.1.5
4-2-6/7.3
4-2-6/7.3.1
4-2-6/7.3.2
4-2-6/7.3.3
4-2-6/9
4-2-6/9.1
4-2-6/9.3
4-2-6/9.3.1
4-2-6/9.3.2
4-2-6/9.3.3
4-2-6/9.5
4-2-6/11
4-2-6/11.1
4-2-6/11.3
4-2-6/11.5
4-2-6/11.7

Title
Low Oil Pressure Alarm
Drain Pipes
Electrical Machinery
Hydraulic Systems
General
Valves
General
Relief Valves
Piping
Pipe Fittings
Non-standard Fittings
Split Flanges
Straight Thread O Rings Connections
Tapered Threaded Connections
Hose
Accumulators
Fluid Power Cylinders
Design Pressure
Segregation of High Pressure Hydraulic Units
Fixed Oxygen Acetylene Installations
Application
Gas Storage
Storage of Gas Cylinders
Storage Room
Open Area
Piping Passing Through Storage Room or Area
Ventilation of Storage Room
Electrical Installation in Storage Room
Piping System Components
Pipe and Fittings
General
Piping Materials
Design Pressure
Pipe Joints
Flexible Hoses
Pressure Relief Devices
System Arrangements
Gas Cylinders
Fuel Storage for Helicopter Facilities
General
Isolation
Hazardous Areas
Ventilation Capacity
Exhaust Ventilation Duct and Fan
Dewatering System
Fuel Storage Tank Construction
Fuel Storage Tank Vents
Fuel Storage Tank Valves
Spill Containment
------Starting-air Systems
Design and Construction
Starting-air Capacity
Diesel Propulsion
Diesel-Electric Propulsion
Non Self-Propelled Units
Protective Devices for Starting Air Mains
Cooling Water Systems for Internal Combustion Engines
General
Sea Suctions
Strainers
Circulating Water Pumps

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-2-6/1.7.3
4-2-6/1.7.4
4-2-6/1.9
4-2-6/3
4-2-6/3.1
4-2-6/3.3
4-2-6/3.3.1
4-2-6/3.3.2
4-2-6/3.5
4-2-6/3.7
4-2-6/3.7.1
4-2-6/3.7.2
4-2-6/3.7.3
4-2-6/3.7.4
4-2-6/3.9
4-2-6/3.11
4-2-6/3.13
4-2-6/3.15
4-2-6/3.17
4-2-6/5
4-2-6/5.1
4-2-6/5.3
4-2-6/5.3.1
4-2-6/5.3.1(a)
4-2-6/5.3.1(b)
4-2-6/5.3.1(c)
4-2-6/5.3.2
4-2-6/5.3.3
4-2-6/5.5
4-2-6/5.5.1
4-2-6/5.5.1(a)
4-2-6/5.5.1(b)
4-2-6/5.5.1(c)
4-2-6/5.5.1(d)
4-2-6/5.5.1(e)
4-2-6/5.5.2
4-2-6/5.5.3
4-2-6/5.5.4
4-2-6/7
4-2-6/7.1
4-2-6/7.1.1
4-2-6/7.1.2
4-2-6/7.1.2(a)
4-2-6/7.1.2(b)
4-2-6/7.1.2(c)
4-2-6/7.1.3
4-2-6/7.1.4
4-2-6/7.1.5
4-2-6/7.3
4-2-6/7.3.1
4-2-6/7.3.2
4-2-6/7.3.3
4-2-6/9
4-2-6/9.1
4-2-6/9.3
4-2-6/9.3.1
4-2-6/9.3.2
4-2-6/9.3.3
4-2-6/9.5
4-2-6/11
4-2-6/11.1
4-2-6/11.3
4-2-6/11.5
4-2-6/11.7

55

Notices and General Information


MODU 2008
4-2-6/13
4-2-6/13.1
4-2-6/13.3
4-2-6/15
4-2-6/17
4-2-6/19
4-2-6/21
4-2-6/23
Part
4
Chapter
3
Section
1
4-3-1
4-3-1/1
4-3-1/3
4-3-1/3.1

Title
Exhaust System
Exhaust Lines
Exhaust Gas Temperature
Valves in Atomizing Lines
Helicopter Deck Drainage Arrangements
Boilers and Associated Piping
Steering Gear Piping
Gas Turbine Piping
Machinery and Systems
Electrical Installations
General
General
Applications
Definitions
Earthed Distribution System

4-3-1/3.3

Essential Services

4-3-1/3.5
4-3-1/3.5i)
4-3-1/3.5ii)
4-3-1/3.7
4-3-1/3.9
4-3-1/3.11
4-3-1/3.11.1
4-3-1/3.13
4-3-1/3.15
4-3-1/3.17
4-3-1/3.19
4-3-1/3.21
4-3-1/3.23
4-3-1/3.25
4-3-1/3.27
4-3-1/3.29
4-3-1/3.31
4-3-1/5
4-3-1/7
4-3-1/9
4-3-1/11
4-3-1/12
4-3-1/13
4-3-1/13.1
4-3-1/13.3
4-3-1/13.5
4-3-1/13.7
4-3-1/13.9
4-3-1/13.11
4-3-1/15
4-3-1/17
4-3-1/17.1
4-3-1/17.3
4-3-1/17.3.1
4-3-1/17.3.1i)
4-3-1/17.3.1ii)
4-3-1/17.3.1iii)
4-3-1/17.3.1iv)
4-3-1/17.3.2
4-3-1/17.3.3
4-3-1/19
4-3-1/Table 1
4-3-1/Table 2
4-3-1/Table 3
4-3-1/Table 4
4-3-1/Table 5

Explosion-proof (Flameproof) Equipment


----Hazardous Area (Hazardous Location)
Hull-return System
Intrinsically-safe
Category "ia"
Increased Safety
Non-Periodic Duty Rating
Non-sparking Fan
Periodic Duty Rating
Portable Apparatus
Pressurized Equipment
Semi-enclosed Space
Separate Circuit
Short Circuit
Short-time Rating
Plans and Data to be Submitted
Standard Distribution System
Voltage and Frequency Variations
Materials
Grounding Arrangements
Insulation Material
Class A Insulation
Class B Insulation
Class E Insulation
Class F Insulation
Class H Insulation
Insulation for Temperature Above 180C (356F)
Degree of Protection for Enclosure
Temperature Ratings
General
Reduced Ambient Temperature
Environmentally Controlled Spaces
--------Rating of Cables
Ambient Temperature Control Equipment
Clearances and Creepage Distances
Voltage and Frequency Variations
Degree of Protection Indicated by the First Characteristic Numeral
Degree of Protection - Indicated by the Second Characteristic Numeral
Primary Essential Services
Secondary Essential Services

56

MODU 2012
4-2-6/13
4-2-6/13.1
4-2-6/13.3
4-2-6/15
4-2-6/17
4-2-6/19
4-2-6/21
4-2-6/23

4-3-1, 6-1-7
4-3-1/1
4-3-1/3
4-3-1/3.1
4-3-1/3.3
4-1-1/3.5
4-3-1/3.5
4-3-1/3.5i)
4-3-1/3.5ii)
4-3-1/3.7
4-3-1/3.9
4-3-1/3.11
4-3-1/3.11.1
4-3-1/3.13
4-3-1/3.15
4-3-1/3.17
4-3-1/3.19
4-3-1/3.21
4-3-1/3.23
4-3-1/3.25
4-3-1/3.27
4-3-1/3.29
4-3-1/3.31
4-3-1/5
4-3-1/7
4-3-1/9
4-3-1/11
4-3-1/13
6-1-7/1.1
6-1-7/1.1.1
6-1-7/1.1.2
6-1-7/1.1.3
6-1-7/1.1.4
6-1-7/1.1.5
6-1-7/1.1.6
4-3-1/15
4-3-1/17
4-3-1/17.1
4-3-1/17.3
4-3-1/17.3.1
4-3-1/17.3.1i)
4-3-1/17.3.1ii)
4-3-1/17.3.1iii)
4-3-1/17.3.1iv)
4-3-1/17.3.2
4-3-1/17.3.3
4-3-1/19
4-3-1/Table 1
4-3-1/Table 2
4-3-1/Table 3
4-1-1/Table 3
4-1-1/Table 4

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
Part
4
Chapter
3
Section
2
4-3-2
4-3-2/1
4-3-2/1.1
4-3-2/1.1.1
4-3-2/1.1.2
4-3-2/1.3
4-3-2/1.5
4-3-2/1.7
4-3-2/3
4-3-2/3.1
4-3-2/3.1.1
4-3-2/3.1.2
4-3-2/3.1.3
4-3-2/3.1.4
4-3-2/3.1.5
4-3-2/3.1.6
4-3-2/3.1.6(a)
4-3-2/3.1.6(b)
4-3-2/3.1.6(c)
4-3-2/3.3
4-3-2/3.3.1
4-3-2/3.3.1i)
4-3-2/3.3.1ii)
4-3-2/3.3.1iii)
4-3-2/3.3.2
4-3-2/3.3.2i)
4-3-2/3.3.2ii)
4-3-2/3.3.2iii)
4-3-2/3.3.2iv)
4-3-2/3.3.2v)
4-3-2/3.5
4-3-2/5
4-3-2/5.1
4-3-2/5.1.1
4-3-2/5.1.2
4-3-2/5.1.3
4-3-2/5.1.3i)
4-3-2/5.1.3ii)
4-3-2/5.1.3iii)
4-3-2/5.1.3iv)
4-3-2/5.1.3v)
4-3-2/5.3
4-3-2/5.3.1
4-3-2/5.3.1(a)
4-3-2/5.3.1(b)
4-3-2/5.3.1(c)
4-3-2/5.3.1(d)
4-3-2/5.3.1(e)
4-3-2/5.3.1(f)
4-3-2/5.3.1(g)
4-3-2/5.3.1(h)
4-3-2/5.3.2
4-3-2/5.3.3
4-3-2/5.3.4
4-3-2/5.3.5
4-3-2/5.3.6
4-3-2/5.3.7
4-3-2/5.3.8
4-3-2/5.3.9
4-3-2/5.3.10
4-3-2/5.3.10(a)

Title
Machinery and Systems
Electrical Installations
Drilling Unit Systems
Drilling Unit Systems
Plans and Data to be Submitted
Wiring
Systems
Data for Wiring Systems
Short-circuit Data
Protective Device Coordination
Load Analysis
Drilling Unit Main Service Source of Power
Power Supply by Generators
Number of Generators
Capacity of Generators
Multiple Generators
Starting from "Dead Ship" Condition
Fuel Capacity for Generator Prime Mover
System Arrangement
General
Single Generator Operation
Multiple Generator Operation
Generator Driven by Propulsion Unit
Constant Speed Drive
------Variable Speed Drive
----------Sizing of AC Generator
Emergency Source of Power
General
Basic Requirement
Boundary
Alternative Arrangements
----------Emergency Power Supply
Emergency Lighting
----------------Navigation Lights and Signals
Marking of Offshore Structures
Internal Communications
Fire and Gas Detection and Alarm Systems
Emergency Signals
Blow-Out Preventer (BOP) and Well Disconnection
Fire Pump and Fire Extinguishing Systems
Diving Equipment
Column-Stabilized Units
---

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012

4-3-2, 7-1-6
4-3-2/1
4-3-2/1.1
4-3-2/1.1.1
4-3-2/1.1.2
4-3-2/1.3
4-3-2/1.5
4-3-2/1.7
4-3-2/3
4-3-2/3.1
4-3-2/3.1.1
4-3-2/3.1.2
4-3-2/3.1.3
4-3-2/3.1.4
4-3-2/3.1.5
4-3-2/3.1.6
4-3-2/3.1.6(a)
4-3-2/3.1.6(b)
4-3-2/3.1.6(c)
4-3-2/3.3
4-3-2/3.3.1
4-3-2/3.3.1i)
4-3-2/3.3.1ii)
4-3-2/3.3.1iii)
4-3-2/3.3.2
4-3-2/3.3.2i)
4-3-2/3.3.2ii)
4-3-2/3.3.2iii)
4-3-2/3.3.2iv)
4-3-2/3.3.2v)
4-3-2/3.5
4-3-2/5
4-3-2/5.1
4-3-2/5.1.1
4-3-2/5.1.2
4-3-2/5.1.3
4-3-2/5.1.3i)
4-3-2/5.1.3ii)
4-3-2/5.1.3iii)
4-3-2/5.1.3iv)
4-3-2/5.1.3v)
4-3-2/5.3
4-3-2/5.3.1
4-3-2/5.3.1(a)
4-3-2/5.3.1(b)
4-3-2/5.3.1(c)
4-3-2/5.3.1(d)
4-3-2/5.3.1(e)
4-3-2/5.3.1(f)
4-3-2/5.3.1(g)
4-3-2/5.3.1(h)
4-3-2/5.3.2
4-3-2/5.3.3
4-3-2/5.3.4
4-3-2/5.3.5
4-3-2/5.3.6
4-3-2/5.3.7
4-3-2/5.3.8
4-3-2/5.3.9
4-3-2/5.3.10
4-3-2/5.3.10(a)

57

Notices and General Information


MODU 2008
4-3-2/5.3.10(b)
4-3-2/5.3.11
4-3-2/5.3.11(a)
4-3-2/5.3.11(b)
4-3-2/5.3.11(c)
4-3-2/5.3.11(d)
4-3-2/5.3.12
4-3-2/5.3.12(a)
4-3-2/5.3.12(b)
4-3-2/5.3.12(c)
4-3-2/5.5
4-3-2/5.5.1
4-3-2/5.5.2
4-3-2/5.5.2i)
4-3-2/5.5.2ii)
4-3-2/5.5.2iii)
4-3-2/5.5.3
4-3-2/5.5.3i)
4-3-2/5.5.3ii)
4-3-2/5.5.3iii)
4-3-2/5.5.4
4-3-2/5.7
4-3-2/5.7i)
4-3-2/5.7ii)
4-3-2/5.9
4-3-2/5.9.1
4-3-2/5.9.2
4-3-2/5.9.3
4-3-2/5.9.4
4-3-2/5.9.5
4-3-2/5.11
4-3-2/5.13
4-3-2/5.15
4-3-2/5.15.1
4-3-2/5.15.2
4-3-2/5.15.3
4-3-2/5.15.3(a)
4-3-2/5.15.3(b)
4-3-2/5.15.3(c)
4-3-2/5.15.4
4-3-2/5.17
4-3-2/5.17.1
4-3-2/5.17.2
4-3-2/5.17.2(a)
4-3-2/5.17.2(b)
4-3-2/5.17.2(c)
4-3-2/5.17.2(d)
4-3-2/5.17.2(e)
4-3-2/5.17.2(f)
4-3-2/5.19
4-3-2/7
4-3-2/7.1
4-3-2/7.1.1
4-3-2/7.1.2
4-3-2/7.1.3
4-3-2/7.1.4
4-3-2/7.1.5
4-3-2/7.1.6
4-3-2/7.1.6(a)
4-3-2/7.1.6(b)
4-3-2/7.1.6(c)
4-3-2/7.1.6(c)i)
4-3-2/7.1.6(c)ii)
4-3-2/7.1.6(c)iii)

58

Title
--Self-propelled Drilling Units
--------Other Emergency Services
------Emergency Sources
General
Generator
------Accumulator Battery
------Emergency Generator for Non-emergency Services
Transitional Source of Power
----Emergency Switchboard
General
Emergency Switchboard for Generator
Accumulator Battery
Interconnect Feeder Between Emergency and Main Switchboard
Disconnection of Non-emergency Circuits
Ballast Pumps
Arrangement for Periodic Testing
Starting Arrangement for Emergency Generator Sets
Cold Conditions
Number of Starts
Charging of Stored Energy
------Manual Starting
Alarms and Safeguards for Emergency Diesel Engines
Information to be Submitted
Alarms and Safeguards
------------Requirements by the Governmental Authority
Distribution System
Drilling Unit Main Service Distribution System
General
Method of Distribution
Through-feed Arrangement
Motor Control Center
Motor Branch Circuit
Power Supply Through Transformer and Converters
Continuity of Supply
Arrangements
Transformers and Converters for Battery Charger
-------

MODU 2012
4-3-2/5.3.10(b)
4-3-2/5.3.11
4-3-2/5.3.11(a)
4-3-2/5.3.11(b)
4-3-2/5.3.11(c)
4-3-2/5.3.11(d)
4-3-2/5.3.12
4-3-2/5.3.12(a)
4-3-2/5.3.12(b)
4-3-2/5.3.12(c)
4-3-2/5.5
4-3-2/5.5.1
4-3-2/5.5.2
4-3-2/5.5.2i)
4-3-2/5.5.2ii)
4-3-2/5.5.2iii)
4-3-2/5.5.3
4-3-2/5.5.3i)
4-3-2/5.5.3ii)
4-3-2/5.5.3iii)
4-3-2/5.5.4
4-3-2/5.7
4-3-2/5.7i)
4-3-2/5.7ii)
4-3-2/5.9
4-3-2/5.9.1
4-3-2/5.9.2
4-3-2/5.9.3
4-3-2/5.9.4
4-3-2/5.9.5
4-3-2/5.11
4-3-2/5.13
4-3-2/5.15
4-3-2/5.15.1
4-3-2/5.15.2
4-3-2/5.15.3
4-3-2/5.15.3(a)
4-3-2/5.15.3(b)
4-3-2/5.15.3(c)
4-3-2/5.15.4
4-3-2/5.17
4-3-2/5.17.1
4-3-2/5.17.2
4-3-2/5.17.2(a)
4-3-2/5.17.2(b)
4-3-2/5.17.2(c)
4-3-2/5.17.2(d)
4-3-2/5.17.2(e)
4-3-2/5.17.2(f)
4-3-2/5.19
4-3-2/7
4-3-2/7.1
4-3-2/7.1.1
4-3-2/7.1.2
4-3-2/7.1.3
4-3-2/7.1.4
4-3-2/7.1.5
4-3-2/7.1.6
4-3-2/7.1.6(a)
4-3-2/7.1.6(b)
4-3-2/7.1.6(c)
4-3-2/7.1.6(c)i)
4-3-2/7.1.6(c)ii)
4-3-2/7.1.6(c)iii)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-2/7.1.7
4-3-2/7.3
4-3-2/7.3.1
4-3-2/7.3.1i)
4-3-2/7.3.1ii)
4-3-2/7.3.1iii)
4-3-2/7.3.2
4-3-2/7.5
4-3-2/7.7
4-3-2/7.7.1
4-3-2/7.7.2
4-3-2/7.7.3
4-3-2/7.7.4

Title
Heating Appliances
Hull Return System
General
------Final Subcircuits and Earth Wires
Earthed Distribution Systems
External or Shore Power Supply Connection
General
Earthing Terminal
Indicators
Polarity or Phase Sequence

4-3-2/7.7.5

Information Plate

4-3-2/7.7.6
4-3-2/7.7
4-3-2/9
4-3-2/9.1
4-3-2/9.1.1
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.1iii)
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.2
4-3-2/9.1.2(a)
4-3-2/9.1.2(b)
4-3-2/9.1.2(c)
4-3-2/9.1.3
4-3-2/9.1.3(a)
4-3-2/9.1.3(b)
4-3-2/9.1.3(c)
4-3-2/9.1.3(d)
4-3-2/9.1.4
4-3-2/9.1.4(a)
4-3-2/9.1.4(b)
4-3-2/9.1.5
4-3-2/9.1.5(a)
4-3-2/9.1.5(b)
4-3-2/9.1.5(c)
4-3-2/9.3
4-3-2/9.3.1
4-3-2/9.3.2
4-3-2/9.3.3
4-3-2/9.3.3(a)
4-3-2/9.3.3(a)i)
4-3-2/9.3.3(a)ii)
4-3-2/9.3.3(b)
4-3-2/9.3.3(b)i)
4-3-2/9.3.3(b)ii)
4-3-2/9.3.3(b)iii)
4-3-2/9.3.4
4-3-2/9.5
4-3-2/9.5.1
4-3-2/9.5.2
4-3-2/9.5.2(a)
4-3-2/9.5.2(b)
4-3-2/9.5.2(c)
4-3-2/9.7
4-3-2/9.7.1
4-3-2/9.7.2
4-3-2/9.7.2(a)
4-3-2/9.7.2(b)

Securing of Trailing Cable


Harmonics
Circuit Protection System
System Design
General
----------Protection Against Short-circuit
Protective Devices
Rated Short-circuit Breaking Capacity
Rated Short-circuit Making capacity
Protection Against Overload
Circuit Breaks
Fuses
Rating
Indication
Back-up Protection
Back-up Fuse Arrangement
Cascade Protection
Coordinated Tripping
------Protection for Generators
General
Trip Setting for Coordination
Load-shedding Arrangements
Provision for Load Shedding Arrangements
----Services Not Allowed for Shedding
------Emergency Generator
Protection for Alternating Current (AC) Generators
Short-time Delay Trip
Parallel Operation
Instantaneous Trip
Reverse Power Protection
Undervoltage Protection
Protection for Direct Current (DC) Generators
Instantaneous Trip
Parallel Operation
Reverse Current Protection
Generator Ammeter Shunts

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-3-2/7.1.7
4-3-2/7.3
4-3-2/7.3.1
4-3-2/7.3.1i)
4-3-2/7.3.1ii)
4-3-2/7.3.1iii)
4-3-2/7.3.2
4-3-2/7.5
4-3-2/7.7
4-3-2/7.7.1
4-3-2/7.7.2
4-3-2/7.7.3
4-3-2/7.7.4
4-3-2/7.7.5
7-1-6/7.7.1
7-1-6/7.7.2
4-3-2/7.7
4-3-2/9
4-3-2/9.1
4-3-2/9.1.1
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.1iii)
4-3-2/9.1.1i)
4-3-2/9.1.1ii)
4-3-2/9.1.2
4-3-2/9.1.2(a)
4-3-2/9.1.2(b)
4-3-2/9.1.2(c)
4-3-2/9.1.3
4-3-2/9.1.3(a)
4-3-2/9.1.3(b)
4-3-2/9.1.3(c)
4-3-2/9.1.3(d)
4-3-2/9.1.4
4-3-2/9.1.4(a)
4-3-2/9.1.4(b)
4-3-2/9.1.5
4-3-2/9.1.5(a)
4-3-2/9.1.5(b)
4-3-2/9.1.5(c)
4-3-2/9.3
4-3-2/9.3.1
4-3-2/9.3.2
4-3-2/9.3.3
4-3-2/9.3.3(a)
4-3-2/9.3.3(a)i)
4-3-2/9.3.3(a)ii)
4-3-2/9.3.3(b)
4-3-2/9.3.3(b)i)
4-3-2/9.3.3(b)ii)
4-3-2/9.3.3(b)iii)
4-3-2/9.3.4
4-3-2/9.5
4-3-2/9.5.1
4-3-2/9.5.2
4-3-2/9.5.2(a)
4-3-2/9.5.2(b)
4-3-2/9.5.2(c)
4-3-2/9.7
4-3-2/9.7.1
4-3-2/9.7.2
4-3-2/9.7.2(a)
4-3-2/9.7.2(b)

59

Notices and General Information


MODU 2008
4-3-2/9.7.2(c)
4-3-2/9.9
4-3-2/9.11
4-3-2/9.11.1
4-3-2/9.11.2
4-3-2/9.13
4-3-2/9.13.1
4-3-2/9.13.2
4-3-2/9.13.3
4-3-2/9.13.4
4-3-2/9.13.5
4-3-2/9.13.5i)
4-3-2/9.13.5ii)
4-3-2/9.13.6
4-3-2/9.15
4-3-2/9.15.1
4-3-2/9.15.2
4-3-2/9.17
4-3-2/11
4-3-2/11.1
4-3-2/11.3
4-3-2/11.3.1
4-3-2/11.3.1(a)
4-3-2/11.3.1(b)
4-3-2/11.3.1(c)
4-3-2/11.3.2
4-3-2/11.5
4-3-2/11.7
4-3-2/13
4-3-2/13.1
4-3-2/13.1.1
4-3-2/13.1.2
4-3-2/13.1.2(a)
4-3-2/13.1.2(b)
4-3-2/13.1.3
4-3-2/13.1.4
4-3-2/13.3
4-3-2/13.3.1
4-3-2/13.3.2
4-3-2/13.3.3
4-3-2/15
4-3-2/15.1
4-3-2/15.1.1
4-3-2/15.1.2
4-3-2/15.3
4-3-2/15.5
4-3-2/15.5.1
4-3-2/15.5.2
4-3-2/15.5.3
4-3-2/15.5.4
4-3-2/15.5.5
4-3-2/15.7
4-3-2/15.9
4-3-2/15.9.1
4-3-2/15.9.2
4-3-2/15.9.2i)
4-3-2/15.9.2ii)
4-3-2/15.9.3
4-3-2/15.9.4
4-3-2/17
4-3-2/17.1
4-3-2/17.1.1
4-3-2/17.1.2
4-3-2/17.1.2(a)

60

Title
Undervoltage Protection
Protection for Accumulator Batteries
Protection for External or Shore Power Supply
General
Interlocking Arrangement
Protection for Motor Branch Circuits
General
Direct-current Motor Branch Circuits
Alternating-current Motor Branch Circuits
Motor Running Protection
Undervoltage Protection and Undervoltage Release
----Jacking Gear Motors
Protection for Transformer Circuits
Setting for Overcurrent Device
Parallel Operation
Protection for Meters, Pilot Lamps, and Control Circuits
Systems for Steering Gear Installed in Self-propelled Units
Power Supply Feeder
Protection for Steering Gear Motor Circuit
Short Circuit Protection
Direct Current (DC) Motors
Alternating Current (AC) Motors
Fuses as Motor-feeder Protection
Undervoltage Release
Emergency Power Supply
Controls, Instrumentation, and Alarms
Lighting and Navigation Light Systems
Lighting System
Main Lighting System
System Arrangement
Main Lighting System
Emergency Lighting System
Lighting Circuits in Machinery Space and Accommodation Spaces
Protection for Lighting Circuits
Navigation Light System
Feeders
Navigation Light Indicator
Protection
Interior Communication Systems
Navigation Bridge
General
Engine Order Telegraph
Main Propulsion Control Stations
Voice Communications
Propulsion and Steering Control Stations
Communication in Case of an Emergency
Elevator
Jacking System
Independence of Power Supply Circuit
Emergency and Interior-communication Switchboard
Public Address System
System Requirements
Minimum Sound Levels
----Emergency Source of Power
Public Address System Combined with General Alarm System
Manually Operated Alarms
General Emergency Alarm Systems
General
System Requirements
---

MODU 2012
4-3-2/9.7.2(c)
4-3-2/9.9
4-3-2/9.11
4-3-2/9.11.1
4-3-2/9.11.2
4-3-2/9.13
4-3-2/9.13.1
4-3-2/9.13.2
4-3-2/9.13.3
4-3-2/9.13.4
4-3-2/9.13.5
4-3-2/9.13.5i)
4-3-2/9.13.5ii)
4-3-2/9.13.6
4-3-2/9.15
4-3-2/9.15.1
4-3-2/9.15.2
4-3-2/9.17
4-3-2/11
4-3-2/11.1
4-3-2/11.3
4-3-2/11.3.1
4-3-2/11.3.1(a)
4-3-2/11.3.1(b)
4-3-2/11.3.1(c)
4-3-2/11.3.2
4-3-2/11.5
4-3-2/11.7
4-3-2/13
4-3-2/13.1
4-3-2/13.1.1
4-3-2/13.1.2
4-3-2/13.1.2(a)
4-3-2/13.1.2(b)
4-3-2/13.1.3
4-3-2/13.1.4
4-3-2/13.3
4-3-2/13.3.1
4-3-2/13.3.2
4-3-2/13.3.3
4-3-2/15
4-3-2/15.1
4-3-2/15.1.1
4-3-2/15.1.2
4-3-2/15.3
4-3-2/15.5
4-3-2/15.5.1
4-3-2/15.5.2
4-3-2/15.5.3
4-3-2/15.5.4
4-3-2/15.5.5
4-3-2/15.7
4-3-2/15.9
4-3-2/15.9.1
4-3-2/15.9.2
4-3-2/15.9.2i)
4-3-2/15.9.2ii)
4-3-2/15.9.3
4-3-2/15.9.4
4-3-2/17
4-3-2/17.1
4-3-2/17.1.1
4-3-2/17.1.2
4-3-2/17.1.2(a)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-2/17.1.2(b)
4-3-2/17.1.2(c)
4-3-2/17.1.2(d)
4-3-2/17.1.2(e)
4-3-2/17.1.2(f)
4-3-2/17.1.2(g)

-------------

4-3-2/17.3

Engineers Alarm

4-3-2/17.5
4-3-2/17.7
4-3-2/19
4-3-2/19.1
4-3-2/19.1.1
4-3-2/19.1.1(a)
4-3-2/19.1.1(b)
4-3-2/19.1.1(c)
4-3-2/19.1.2
4-3-2/19.3
4-3-2/Table 1
Part
4
Chapter
3
Section
3
4-3-3
4-3-3/1
4-3-3/1.1
4-3-3/1.3
4-3-3/1.5
4-3-3/1.7
4-3-3/1.9
4-3-3/3
4-3-3/3.1
4-3-3/3.1.1
4-3-3/3.1.1(a)
4-3-3/3.1.2

Refrigerated Space Alarm


Elevator
Fire Protection and Fire Detection Systems
Emergency Stop
Ventilation System
General
Machinery Space Ventilation
Ventilation Other Than Machinery Spaces
Other Auxiliaries
Fire Detection and Alarm System
Alarms and Safeguards for Emergency Diesel Engines
Machinery and Systems
Electrical Installations
Drilling Unit Installation
Drilling Unit Installation
Plans and Data to be Submitted
Booklet of Standard Details
Arrangement of Electrical Equipment
Electrical Equipment in Hazardous Areas
Emergency Shutdown Procedure
Maintenance Schedule of Batteries
Equipment Installation and Arrangement
General Consideration
Equipment Location
General
Equipment in Areas Protected by Local Fixed Pressure Water-spraying or Local
Water-mist Fire Extinguishing System in Machinery Spaces
Protection from Bilge Water

4-3-3/3.1.3

Accessibility

4-3-3/3.3
4-3-3/3.5
4-3-3/3.5.1
4-3-3/3.5.2
4-3-3/3.5.3
4-3-3/3.5.4
4-3-3/3.7
4-3-3/3.7.1
4-3-3/3.7.2
4-3-3/3.7.2(a)
4-3-3/3.7.2(b)
4-3-3/3.7.2(c)
4-3-3/3.7.2(d)
4-3-3/3.7.2(d)i)
4-3-3/3.7.2(d)ii)
4-3-3/3.7.2(e)
4-3-3/3.7.2(f)
4-3-3/3.7.3
4-3-3/3.7.3(a)
4-3-3/3.7.3(b)
4-3-3/3.7.3(c)
4-3-3/3.7.3(d)
4-3-3/3.7.4
4-3-3/3.7.5
4-3-3/3.7.5(a)
4-3-3/3.7.5(b)

Generators
Drilling Unit Main Service Motors
General
Pump Motors
Motors on Weather Decks
Motors Below Decks
Accumulator Batteries
General
Battery Installation and Arrangement
Large Batteries
Moderate-size Batteries
Small Batteries
Low-hydrogen-emission Battery Installations
----Battery Trays
Identification of Battery Types
Ventilation
Battery Rooms
Battery Lockers
Deck Boxes
Small Battery Boxes
Protection from Corrosion
Maintenance of Batteries
Maintenance Schedule of Batteries
Procedure of Maintenance

4-3-3/3.1.1(b)

Title

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-3-2/17.1.2(b)
4-3-2/17.1.2(c)
4-3-2/17.1.2(d)
4-3-2/17.1.2(e)
7-1-6/17.1i)
7-1-6/17.1ii)
4-3-2/17.3
7-1-6/17.3
4-3-2/17.5
4-3-2/17.7
4-3-2/19
4-3-2/19.1
4-3-2/19.1.1
4-3-2/19.1.1(a)
4-3-2/19.1.1(b)
4-3-2/19.1.1(c)
4-3-2/19.1.2
4-3-2/19.3
4-3-2/Table 1

4-3-3, 6-1-7, 7-1-5


4-3-3/1
4-3-3/1.1
4-3-3/1.3
4-3-3/1.5
4-3-3/1.7
4-3-3/1.9
4-3-3/3
4-3-3/3.1
4-3-3/3.1.1
4-3-3/3.1.1(a)
4-3-3/3.1.1(b)
7-1-5/7.13.2
6-1-7/1.3
7-1-5/7.13.3
4-3-3/3.3
4-3-3/3.5
4-3-3/3.5.1
4-3-3/3.5.2
4-3-3/3.5.3
4-3-3/3.5.4
4-3-3/3.7
4-3-3/3.7.1
4-3-3/3.7.2
4-3-3/3.7.2(a)
4-3-3/3.7.2(b)
4-3-3/3.7.2(c)
4-3-3/3.7.2(d)
4-3-3/3.7.2(d)i)
4-3-3/3.7.2(d)ii)
4-3-3/3.7.2(e)
4-3-3/3.7.2(f)
4-3-3/3.7.3
4-3-3/3.7.3(a)
4-3-3/3.7.3(b)
4-3-3/3.7.3(c)
4-3-3/3.7.3(d)
4-3-3/3.7.4
4-3-3/3.7.5
4-3-3/3.7.5(a)
4-3-3/3.7.5(b)

61

Notices and General Information


MODU 2008
4-3-3/3.7.6
4-3-3/3.9
4-3-3/3.11
4-3-3/3.11.1
4-3-3/3.11.2
4-3-3/3.11.3
4-3-3/3.13
4-3-3/3.13.1
4-3-3/3.13.2
4-3-3/3.13.2(a)
4-3-3/3.13.2(b)
4-3-3/3.13.2(c)
4-3-3/3.13.2(d)
4-3-3/3.13.2(e)
4-3-3/3.13.3
4-3-3/3.15
4-3-3/3.17
4-3-3/3.19
4-3-3/3.21
4-3-3/3.23
4-3-3/3.25
4-3-3/3.27
4-3-3/3.29
4-3-3/3.29i)
4-3-3/3.29ii)
4-3-3/3.29iii)
4-3-3/3.29iv)
4-3-3/3.29v)
4-3-3/3.29vi)
4-3-3/3.29vii)
4-3-3/3.29viii)
4-3-3/3.29ix)
4-3-3/3.31
4-3-3/3.31i)
4-3-3/3.31ii)
4-3-3/3.31iii)
4-3-3/3.31iv)
4-3-3/5
4-3-3/5.1
4-3-3/5.1.1
4-3-3/5.1.2
4-3-3/5.1.3
4-3-3/5.1.4
4-3-3/5.1.5
4-3-3/5.1.6
4-3-3/5.1.7
4-3-3/5.1.8

Title
Replacement of Batteries
Switchboard
Distribution Boards
Location and Protection
Switchboard-type Distribution Boards
Safety-type Panels
Motor Controllers and Control Centers
Location and Installation
Disconnecting Arrangement
Device
Location
Locking Means
Identification Plate
Open and Close Indications
Indicating-light Circuits
Resistors for Control Apparatus
Lighting Fixtures
Heating Equipment
Magnetic Compasses
Portable Equipment and Outlets
Receptacles and Plugs of Different Ratings
Installation Requirements for Recovery from Dead Ship Condition
Services Required to be Operable Under a Fire Condition
------------------High Fire Risk Areas
--------Cable Installation
General Consideration
Continuity of Cabling
Choice of Cables
Cable Voltage Drop for New Installation
Restricting Locating of Cabling
Means of Drainage from Cable Enclosures
High Voltage Cables
Paint on Cables
Cable Installation above High Voltage Switchgear and Control-Gear

4-3-3/5.3

Insulation Resistance for New Installation

4-3-3/5.5
4-3-3/5.5.1
4-3-3/5.5.2
4-3-3/5.5.2(a)
4-3-3/5.5.2(b)
4-3-3/5.5.2(c)
4-3-3/5.5.3
4-3-3/5.7
4-3-3/5.9

Protection for Electro-magnetic Induction


Multiple Conductor Cables
Single Conductor Cables
------Non-shielded Signal Cables
Joints and Sealing
Support and Bending

4-3-3/5.9.1

Support and Fixing

4-3-3/5.9.1(a)
4-3-3/5.9.1(b)
4-3-3/5.9.1(c)
4-3-3/5.9.1(d)

---------

62

MODU 2012
4-3-3/3.7.6
4-3-3/3.9
4-3-3/3.11
4-3-3/3.11.1
4-3-3/3.11.2
4-3-3/3.11.3
4-3-3/3.13
4-3-3/3.13.1
4-3-3/3.13.2
4-3-3/3.13.2(a)
4-3-3/3.13.2(b)
4-3-3/3.13.2(c)
4-3-3/3.13.2(d)
4-3-3/3.13.2(e)
4-3-3/3.13.3
4-3-3/3.15
4-3-3/3.17
4-3-3/3.19
4-3-3/3.21
4-3-3/3.23
4-3-3/3.25
4-3-3/3.27
4-3-3/3.29
4-3-3/3.29i)
4-3-3/3.29ii)
4-3-3/3.29iii)
4-3-3/3.29iv)
4-3-3/3.29v)
4-3-3/3.29vi)
4-3-3/3.29vii)
4-3-3/3.29viii)
4-3-3/3.29ix)
4-3-3/3.31
4-3-3/3.31i)
4-3-3/3.31ii)
4-3-3/3.31iii)
4-3-3/3.31iv)
4-3-3/5
4-3-3/5.1
4-3-3/5.1.1
4-3-3/5.1.2
4-3-3/5.1.3
4-3-3/5.1.4
4-3-3/5.1.5
4-3-3/5.1.6
7-1-5/5.1
4-3-3/5.1.7
4-3-3/5.3
7-1-5/5.3
4-3-3/5.5
4-3-3/5.5.1
4-3-3/5.5.2
4-3-3/5.5.2(a)
4-3-3/5.5.2(b)
4-3-3/5.5.2(c)
4-3-3/5.5.3
4-3-3/5.7
4-3-3/5.9
4-3-3/5.9.1
7-1-5/5.9.1
7-1-5/5.9.1(a)
7-1-5/5.9.1(b)
7-1-5/5.9.1(c)
7-1-5/5.9.1(d)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-3/5.9.1(e)

---

Title

4-3-3/5.9.2

Bending Radius

4-3-3/5.9.3

Plastic Cable Trays and Protective Casings

4-3-3/5.9.3(a)
4-3-3/5.9.3(b)
4-3-3/5.9.3(c)
4-3-3/5.9.3(d)
4-3-3/5.9.3(e)
4-3-3/5.11
4-3-3/5.11.1
4-3-3/5.11.2
4-3-3/5.11.3

Installations
Safe Working Load
Cable Occupation Ratio in Protective Casing
Hazardous Areas
Type Testing
Cable Run and Bunches
Reduction of Current Rating
Clearance and Segregation
Cable of Lower Conductor Temperature

4-3-3/5.13

Deck and Bulkhead Penetrations

4-3-3/5.15

Mechanical Penetrations

4-3-3/5.15.1

Metallic Armor

4-3-3/5.15.2

Conduit Pipe or Structural Shapes

4-3-3/5.17
4-3-3/5.17.1

Emergency and Essential Feeders


Location

4-3-3/5.17.2

Services Necessary Under a Fire Condition

4-3-3/5.17.2(a)
4-3-3/5.17.2(b)
4-3-3/5.17.2(c)
4-3-3/5.17.3

------Electrical Cables for the Emergency Fire Pump

4-3-3/5.17.4

Requirements by the Governmental Authority

4-3-3/5.19
4-3-3/5.21
4-3-3/5.23
4-3-3/5.25
4-3-3/5.27
4-3-3/5.29
4-3-3/5.29.1
4-3-3/5.29.2
4-3-3/5.29.3
4-3-3/5.31
4-3-3/5.33
4-3-3/5.33.1
4-3-3/5.33.2
4-3-3/5.33.3
4-3-3/5.33.3(a)
4-3-3/5.33.3(b)
4-3-3/5.33.3(c)
4-3-3/5.33.4
4-3-3/5.33.5
4-3-3/7
4-3-3/7.1
4-3-3/7.1i)
4-3-3/7.1ii)
4-3-3/7.1iii)
4-3-3/7.3
4-3-3/7.5
4-3-3/7.5.1
4-3-3/7.5.2
4-3-3/7.5.3
4-3-3/7.7
4-3-3/7.9
4-3-3/9

Mineral Insulated Cables


Fiber Optic Cables
Battery Room
Paneling and Dome Fixtures
Sheathing and Structural Insulation
Splicing of Electrical Cables
Basis of Approval
Installation
Protection
Splicing of Fiber Optic Cables
Cable Junction Box
----------------Earthing
General
------Permanent Equipment
Connections
General
Earthed Distribution System
Connection to Hull Structure
Portable Cords
Cable Metallic Covering
Equipment and Installation in Hazardous Areas

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
7-1-5/5.9.1(e)
4-3-3/5.9.2
7-1-5/5.9.2
4-3-3/5.9.3
7-1-5/5.9.3
4-3-3/5.9.3(a)
4-3-3/5.9.3(b)
7-1-5/5.9.3
4-3-3/5.9.3(c)
4-3-3/5.9.3(d)
4-3-3/5.11
4-3-3/5.11.1
4-3-3/5.11.2
4-3-3/5.11.3
4-3-3/5.13
7-1-5/5.13
4-3-3/5.15
7-1-5/5.15
4-3-3/5.15.1
7-1-5/5.15.1
4-3-3/5.15.2
7-1-5/5.15.2
4-3-3/5.17
4-3-3/5.17.1
4-3-3/5.17.2
7-1-5/5.17.1
4-3-3/5.17.2(a)
4-3-3/5.17.2(b)
4-3-3/5.17.2(c)
4-3-3/5.17.3
4-3-3/5.17.4
7-1-5/5.17.2
7-1-5/5.19
7-1-5/5.21
4-3-3/5.19
7-1-5/5.25
7-1-5/5.27
4-3-3/5.21
4-3-3/5.21.1
7-1-5/5.29.1
7-1-5/5.29.2
4-3-3/5.23
4-3-3/5.25
4-3-3/5.25.1
4-3-3/5.25.2
4-3-3/5.25.3
4-3-3/5.25.3(a)
4-3-3/5.25.3(b)
4-3-3/5.25.3(c)
4-3-3/5.25.4
7-1-5/5.33
4-3-3/7
4-3-3/7.1
4-3-3/7.1i)
4-3-3/7.1ii)
4-3-3/7.1iii)
4-3-3/7.3
4-3-3/7.5
4-3-3/7.5.1
4-3-3/7.5.2
4-3-3/7.5.3
4-3-3/7.7
4-3-3/7.9
4-3-3/9

63

Notices and General Information


MODU 2008
4-3-3/9.1
4-3-3/9.1.1
4-3-3/9.1.2
4-3-3/9.1.2(a)
4-3-3/9.1.2(b)
4-3-3/9.1.2(b)i)
4-3-3/9.1.2(b)ii)
4-3-3/9.1.2(b)iii)
4-3-3/9.1.2(b)iv)
4-3-3/9.1.2(b)v)
4-3-3/9.1.2(b)vi)
4-3-3/9.1.2(c)
4-3-3/9.1.2(c)i)
4-3-3/9.1.2(c)ii)
4-3-3/9.1.2(c)iii)
4-3-3/9.1.3

General Consideration
General
Electrical Equipment
Zone 0 Areas
Zone 1 Areas
------------Zone 2 Areas
------Cables Installation

4-3-3/9.1.4

Lighting Circuits

4-3-3/9.1.5
4-3-3/9.3
4-3-3/9.3.1
4-3-3/9.3.2
4-3-3/9.3.2(a)
4-3-3/9.3.2(b)
4-3-3/9.3.2(c)
4-3-3/9.3.2(d)
4-3-3/9.3.3
4-3-3/9.5
4-3-3/9.5.1
4-3-3/9.5.1i)
4-3-3/9.5.1ii)
4-3-3/9.5.1iii)
4-3-3/9.5.1iv)
4-3-3/9.5.1v)
4-3-3/9.5.2
4-3-3/9.5.3
4-3-3/9.5.3i)
4-3-3/9.5.3ii)
4-3-3/9.5.3iii)
4-3-3/9.7
4-3-3/9.7.1
4-3-3/9.7.1(a)
4-3-3/9.7.1(b)
4-3-3/9.7.2
4-3-3/9.7.2(a)
4-3-3/9.7.2(b)
4-3-3/9.7.2(c)
4-3-3/9.7.2(c)i)
4-3-3/9.7.2(c)ii)
4-3-3/9.7.2(c)iii)
4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d)
4-3-3/9.7.2(d)i)
4-3-3/9.7.2(d)ii)
4-3-3/9.7.2(d)iii)
4-3-3/9.7.3
4-3-3/Table 1
4-3-3/Table 2
4-3-3/Table 3

Permanent Warning Plates


Certified-safe Type and Pressurized Equipment and Systems
Installation Approval
Intrinsically-safe System
Separation
Physical Barrier
Nameplate
Replacement
Pressurized Equipment
Paint Stores
General
----------Open Area Near Ventilation Openings
Enclosed Access Spaces
------Non-sparking Fans
Design Criteria
Air Gap
Protection Screen
Materials
Impeller and its Housing
Electrostatic Charges
Acceptance Combination of Materials
--------Unacceptable Combination of Materials
------Type Test
Minimum Degree of protection
Minimum Bending Radii of Cables
Size of Earth-continuity Conductors and Earthing Connections
Example of Protected Area, Adjacent Area of Direct Spray and Adjacent Area where
Water May Extend
Cables within High Fire Risk Areas

4-3-3/Figure 1
4-3-3/Figure 2

64

Title

MODU 2012
4-3-3/9.1
4-3-3/9.1.1
4-3-3/9.1.2
4-3-3/9.1.2(a)
4-3-3/9.1.2(b)
4-3-3/9.1.2(b)i)
4-3-3/9.1.2(b)ii)
4-3-3/9.1.2(b)iii)
4-3-3/9.1.2(b)iv)
4-3-3/9.1.2(b)v)
4-3-3/9.1.2(b)vi)
4-3-3/9.1.2(c)
4-3-3/9.1.2(c)i)
4-3-3/9.1.2(c)ii)
4-3-3/9.1.2(c)iii)
4-3-3/9.1.4
4-3-3/9.1.5
7-1-7/9.1.2
7-1-7/9.1.3
4-3-3/9.3
4-3-3/9.3.1
4-3-3/9.3.2
4-3-3/9.3.2(a)
4-3-3/9.3.2(b)
7-1-7/9.3.1
4-3-3/9.3.2(c)
4-3-3/9.3.3
4-3-3/9.5
4-3-3/9.5.1
4-3-3/9.5.1i)
4-3-3/9.5.1ii)
4-3-3/9.5.1iii)
4-3-3/9.5.1iv)
4-3-3/9.5.1v)
4-3-3/9.5.2
4-3-3/9.5.3
4-3-3/9.5.3i)
4-3-3/9.5.3ii)
4-3-3/9.5.3iii)
4-3-3/9.7
4-3-3/9.7.1
4-3-3/9.7.1(a)
4-3-3/9.7.1(b)
4-3-3/9.7.2
4-3-3/9.7.2(a)
4-3-3/9.7.2(b)
4-3-3/9.7.2(c)
4-3-3/9.7.2(c)i)
4-3-3/9.7.2(c)ii)
4-3-3/9.7.2(c)iii)
4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d)
4-3-3/9.7.2(d)i)
4-3-3/9.7.2(d)ii)
4-3-3/9.7.2(d)iii)
4-3-3/9.7.3
4-3-3/Table 1
7-1-5/Table 1
4-3-3/Table 2
4-3-3/Figure 1
4-3-3/Figure 2

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
Part
4
Chapter
3
Section
4
4-3-4
4-3-4/1
4-3-4/1.1
4-3-4/1.3
4-3-4/3
4-3-4/3.1
4-3-4/3.1.1
4-3-4/3.1.2
4-3-4/3.1.3
4-3-4/3.1.3(a)
4-3-4/3.1.3(b)
4-3-4/3.1.3(c)
4-3-4/3.1.3(d)
4-3-4/3.1.3(e)
4-3-4/3.1.3(f)
4-3-4/3.1.3(g)
4-3-4/3.1.3(h)
4-3-4/3.3
4-3-4/3.5
4-3-4/3.5.1
4-3-4/3.5.2
4-3-4/3.5.2(a)
4-3-4/3.5.2(b)
4-3-4/3.5.2(c)
4-3-4/3.7
4-3-4/3.7.1
4-3-4/3.7.2
4-3-4/3.7.3
4-3-4/3.9
4-3-4/3.9.1
4-3-4/3.9.1(a)
4-3-4/3.9.1(b)
4-3-4/3.9.1(c)
4-3-4/3.9.1(d)
4-3-4/3.9.1(e)
4-3-4/3.9.2
4-3-4/3.11
4-3-4/3.11.1
4-3-4/3.11.2
4-3-4/3.11.3
4-3-4/3.11.4
4-3-4/3.11.5
4-3-4/3.11.6
4-3-4/3.11.7
4-3-4/3.11.8
4-3-4/3.11.9
4-3-4/3.13
4-3-4/3.15
4-3-4/3.15.1
4-3-4/3.15.1(a)
4-3-4/3.15.1(a)i)
4-3-4/3.15.1(a)ii)
4-3-4/3.15.1(b)
4-3-4/3.15.1(c
4-3-4/3.15.2
4-3-4/3.15.3
4-3-4/3.17
4-3-4/3.17.1
4-3-4/3.17.1(a)
4-3-4/3.17.1(a)i)
4-3-4/3.17.1(a)ii)

Title
Machinery and Systems
Electrical Installations
Machinery and Equipment
Machinery and Equipment
Plans and Data to Be Submitted
Rotating Machines of 100 kW and Over
Switchboards, Distribution Boards, Controllers, etc.
Rotating Machines
General
Applications
Certification on Basis of an Approved Quality Assurance Program
References
Inclination
Insulation Material
Capacity of Generators
Power Supply by Generator
Protection for Generator Circuits
Protection for Motor Circuits
Installation
Protection Enclosures and its Selection
Insulation Resistance Measurement
Overload and Overcurrent Capacity
AC Generators
AC Motors
Overcurrent Capacity
Overload Capacity
Overload Capacity for Synchronous Motors
Dielectric Strength of Insulation
Application
Standard Voltage Test
Direct Current Test
Temperature Rating
Temperature Rises
Continuous Rating Machines
Short-time Rating Machines
Periodic Duty Rating Machines
Non-Periodic Duty Rating Machines
Insulation Material Above 180C (356F)
Ambient Temperature
Construction and Assembly
Enclosure, Frame and Pedestals
Shafts and Couplings
Circulating Current
Rotating Exciters
Insulation of Winding
Protection Against Cooling Water
Moisture-condensation Prevention
Terminal Arrangements
Nameplates
Lubrication
Turbines for Generators
Operating Governor
Transient Frequency Variations
----Speed Variation in Steady State
Emergency Generator Prime Mover
Overspeed Governor
Power Output of Gas Turbines
Diesel Engines for Generators
Operating Governor
Transient Frequency Variations
-----

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012

4-3-4, 6-1-3, 6-1-7


6-1-7/3
6-1-7/3.1
6-1-7/3.3
6-1-7/5
6-1-7/5.1
6-1-7/5.1.1
6-1-7/5.1.2
6-1-7/5.1.3
6-1-7/5.1.3(a)
6-1-7/5.1.3(b)
6-1-7/5.1.3(c)
6-1-7/5.1.3(d)
6-1-7/5.1.3(e)
6-1-7/5.1.3(f)
6-1-7/5.1.3(g)
6-1-7/5.1.3(h)
6-1-7/5.3
6-1-7/5.5
6-1-7/5.5.1
6-1-7/5.5.2
6-1-7/5.5.2(a)
6-1-7/5.5.2(b)
6-1-7/5.5.2(c)
6-1-7/5.7
6-1-7/5.7.1
6-1-7/5.7.2
6-1-7/5.7.3
6-1-7/5.9
6-1-7/5.9.1
6-1-7/5.9.1(a)
6-1-7/5.9.1(b)
6-1-7/5.9.1(c)
6-1-7/5.9.1(d)
6-1-7/5.9.1(e)
6-1-7/5.9.2
6-1-7/5.11
6-1-7/5.11.1
6-1-7/5.11.2
6-1-7/5.11.3
6-1-7/5.11.4
6-1-7/5.11.5
6-1-7/5.11.6
6-1-7/5.11.7
6-1-7/5.11.8
6-1-7/5.11.9
6-1-7/5.13
6-1-3/3.3
6-1-3/3.3.1
6-1-3/3.3.1(a)
6-1-3/3.3.1(a)i)
6-1-3/3.3.1(a)ii)
6-1-3/3.3.1(b)
6-1-3/3.3.1(c)
6-1-3/3.3.2
6-1-3/3.3.3
6-1-3/3.5
6-1-3/3.5.1
6-1-3/3.5.1(a)
6-1-3/3.5.1(a)i)
6-1-3/3.5.1(a)ii)

65

Notices and General Information


MODU 2008
4-3-4/3.17.1(a)iii)
4-3-4/3.17.1(b)
4-3-4/3.17.1(c)
4-3-4/3.17.2
4-3-4/3.19
4-3-4/3.19.1
4-3-4/3.19.2
4-3-4/3.19.2(a)
4-3-4/3.19.2(b)
4-3-4/3.19.2(c)
4-3-4/3.19.2(d)
4-3-4/3.19.3
4-3-4/3.19.3(a)
4-3-4/3.19.3(b)
4-3-4/3.19.3(c)
4-3-4/3.21
4-3-4/3.21.1
4-3-4/3.21.1(a)
4-3-4/3.21.1(b)
4-3-4/3.21.1(c)
4-3-4/3.21.2
4-3-4/3.21.2(a)
4-3-4/3.21.2(b)
4-3-4/3.21.2(c)
4-3-4/3.21.3
4-3-4/3.21.3(a)
4-3-4/3.21.3(b)
4-3-4/3.21.3(c)
4-3-4/5
4-3-4/5.1
4-3-4/5.1.1
4-3-4/5.1.2
4-3-4/5.1.3
4-3-4/5.1.3(a)
4-3-4/5.1.3(b)
4-3-4/5.1.3(c)
4-3-4/5.1.3(d)
4-3-4/5.3
4-3-4/5.3.1
4-3-4/5.3.2
4-3-4/5.3.3
4-3-4/5.5
4-3-4/7
4-3-4/7.1
4-3-4/7.1.1
4-3-4/7.1.1(a)
4-3-4/7.1.1(b)
4-3-4/7.1.1(c)
4-3-4/7.1.1(d)
4-3-4/7.1.1(e)
4-3-4/7.1.2
4-3-4/7.1.2(a)
4-3-4/7.1.2(b)
4-3-4/7.1.2(c)
4-3-4/7.1.2(d)
4-3-4/7.1.2(e)
4-3-4/7.1.2(f)
4-3-4/7.1.2(g)
4-3-4/7.1.2(h)
4-3-4/7.3
4-3-4/7.5
4-3-4/7.5i)
4-3-4/7.5ii)
4-3-4/7.5.1

66

Title
--Frequency Variations in Steady State
Emergency Generator Prime Movers
Overspeed Governor
Alternating-current (AC) Generators
Control and Excitation of Generators
Voltage Regulation
Voltage Regulators
Variation from Rated Voltage Steady Conditions
Variation from Rated Voltage Transient Conditions
Short Circuit Conditions
Parallel Operation
Reactive Load Sharing
Load Sharing
Facilities for Load Adjustment
Direct-current (DC Generators
Control and Excitation of Generators
Field Regulations
Polarity of Series Windings
Equalizer Connections
Voltage Regulation
Shunt or Stabilized Shunt-wound Generator
Compound-wound Generator
Automatic Voltage Regulators
Parallel Operation
Stability
Load Sharing
Tripping of Circuit Breaker
Accumulator Batteries
General
Application
Sealed Type Batteries
References
Emergency Service
Protection of Batteries
Battery Installation
Cable Installation
Construction and Assembly
Cells and Fillings Plugs
Crates and Trays
Nameplate
Engine-starting Battery
Switchboards, Distribution Boards, Controllers, etc.
General
Applications
Switchboards
Motor Controllers
Motor Control Centers
Battery Charger Units and Uninterruptible Power System (UPS) Units
Distribution Boards
References
Inclination
Emergency Switchboard
Circuit Breakers
Feeder Protection
Hull Return and Earthed Distribution System
Earthing
Installation
Protection Enclosures and its Selection
Insulation Resistance Measurement
Dielectric Strength of Insulation
----Production-line Apparatus

MODU 2012
6-1-3/3.5.1(a)iii)
6-1-3/3.5.1(b)
6-1-3/3.5.1(c)
6-1-3/3.5.2
6-1-7/5.17
6-1-7/5.17.1
6-1-7/5.17.2
6-1-7/5.17.2(a)
6-1-7/5.17.2(b)
6-1-7/5.17.2(c)
6-1-7/5.17.2(d)
6-1-7/5.17.3
6-1-7/5.17.3(a)
6-1-7/5.17.3(b)
6-1-7/5.17.3(c)
6-1-7/5.19
6-1-7/5.19.1
6-1-7/5.19.1(a)
6-1-7/5.19.1(b)
6-1-7/5.19.1(c)
6-1-7/5.19.2
6-1-7/5.19.2(a)
6-1-7/5.19.2(b)
6-1-7/5.19.2(c)
6-1-7/5.19.3
6-1-7/5.19.3(a)
6-1-7/5.19.3(b)
6-1-7/5.19.3(c)
6-1-7/7
6-1-7/7.1
6-1-7/7.1.1
6-1-7/7.1.2
4-3-4/3.1
4-3-4/3.1.1
4-3-4/3.1.2
4-3-4/3.1.3
4-3-4/3.1.4
6-1-7/7.3
6-1-7/7.3.1
6-1-7/7.3.2
6-1-7/7.3.3
4-3-4/3.3
6-1-7/9
6-1-7/9.1
6-1-7/9.1.1
6-1-7/9.1.1(a)
6-1-7/9.1.1(b)
6-1-7/9.1.1(c)
6-1-7/9.1.1(d)
6-1-7/9.1.1(e)
6-1-7/9.1.2
6-1-7/9.1.2(a)
6-1-7/9.1.2(b)
6-1-7/9.1.2(c)
6-1-7/9.1.2(d)
6-1-7/9.1.2(e)
6-1-7/9.1.2(f)
6-1-7/9.1.2(g)
6-1-7/9.1.2(h)
6-1-7/9.3
6-1-7/9.5
6-1-7/9.5i)
6-1-7/9.5ii)
6-1-7/9.5.1

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-4/7.5.2
4-3-4/7.7
4-3-4/7.7.1
4-3-4/7.7.2
4-3-4/7.7.3
4-3-4/7.7.4
4-3-4/7.9
4-3-4/7.9.1
4-3-4/7.9.2
4-3-4/7.9.3
4-3-4/7.9.4
4-3-4/7.9.5
4-3-4/7.9.5(a)
4-3-4/7.9.5(b)
4-3-4/7.9.5(c)
4-3-4/7.9.6
4-3-4/7.9.7
4-3-4/7.11
4-3-4/7.11.1
4-3-4/7.11.1(a)
4-3-4/7.11.1(b)
4-3-4/7.11.1(c)
4-3-4/7.11.2
4-3-4/7.11.2(a)
4-3-4/7.11.2(b)
4-3-4/7.11.2(c)
4-3-4/7.11.2(d)
4-3-4/7.11.2(e)
4-3-4/7.11.2(f)
4-3-4/7.11.3
4-3-4/7.13
4-3-4/7.13.1
4-3-4/7.13.2
4-3-4/7.13.3
4-3-4/7.13.3(a)
4-3-4/7.13.3(b)
4-3-4/7.13.4
4-3-4/7.15
4-3-4/7.15.1
4-3-4/7.15.2
4-3-4/7.15.3
4-3-4/7.17
4-3-4/7.17.1
4-3-4/7.17.2
4-3-4/7.17.3
4-3-4/7.17.4
4-3-4/7.17.4(a)
4-3-4/7.17.4(b)
4-3-4/7.17.4(c)
4-3-4/7.17.4(d)
4-3-4/7.17.4(e)
4-3-4/7.17.5
4-3-4/7.17.5(a)
4-3-4/7.17.5(b)
4-3-4/7.17.5(c)
4-3-4/7.17.6
4-3-4/7.17.6(a)
4-3-4/7.17.6(b)
4-3-4/7.17.6(c)
4-3-4/7.17.7
4-3-4/7.17.7(a)
4-3-4/7.17.7(b)
4-3-4/7.17.7(c)
4-3-4/9

Title
Devices with Low Insulation Strength
Construction and Assembly
Enclosure and Assemblies
Dead Front
Mechanical Strength
Mechanical Protection
Bus Bars, Wiring and Contacts
Design
Operating Temperature of Bus Bars
Short Circuit Rating
Internal Wiring
Arrangement
Accessibility
Locking of Connections
Soldered Connections
Clearances and Creepage Distances
Terminals
Control and Protection Devices
Circuit-disconnecting Devices
Systems Exceeding 55 Volts
Systems of 55 Volts and Less
Disconnected Devices
Arrangement of Equipment
Air Circuit Breakers
Voltage Regulators
Equipment Operated in High Temperature
Accessibility to Fuses
Protective Devices for Instruments
Wearing Parts
Markings
Switchboards
Handrails
Main Bus Bar Sub-division
Equalizer Circuit for Direct-current (D.C.) Generators
Equalizer Main Circuit
Equalizer Bus Bar
Equipment and Instrumentation
Motor Controllers and Control Centers
Enclosures and Assemblies
Disconnect Switches and Circuits Breakers
Auto-starters
Battery Systems and Uninterruptible Power Systems (UPS)
Definitions
Battery Charging Rate
Discharge Protection
Design and Construction
Construction
Operation
Type
Continuity of Supply
Monitoring and Alarming
Location
Location
Ventilation
Battery Installation
Performance
Duration
Battery Capacity
Recharging
Testing and Survey
Surveys
Testing
Test upon Power Input Failure
Transformers

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
6-1-7/9.5.2
6-1-7/9.7
6-1-7/9.7.1
6-1-7/9.7.2
6-1-7/9.7.3
6-1-7/9.7.4
6-1-7/9.9
6-1-7/9.9.1
6-1-7/9.9.2
6-1-7/9.9.3
6-1-7/9.9.4
6-1-7/9.9.5
6-1-7/9.9.5(a)
6-1-7/9.9.5(b)
6-1-7/9.9.5(c)
6-1-7/9.9.6
6-1-7/9.9.7
6-1-7/9.11
6-1-7/9.11.1
6-1-7/9.11.1(a)
6-1-7/9.11.1(b)
6-1-7/9.11.1(c)
6-1-7/9.11.2
6-1-7/9.11.2(a)
6-1-7/9.11.2(b)
6-1-7/9.11.2(c)
6-1-7/9.11.2(d)
6-1-7/9.11.2(e)
6-1-7/9.11.2(f)
6-1-7/9.11.3
6-1-7/9.13
6-1-7/9.13.1
6-1-7/9.13.2
6-1-7/9.13.3
6-1-7/9.13.3(a)
6-1-7/9.13.3(b)
6-1-7/9.13.4
6-1-7/9.15
6-1-7/9.15.1
6-1-7/9.15.2
6-1-7/9.15.3
6-1-7/9.17
6-1-7/9.17.1
6-1-7/9.17.2
6-1-7/9.17.3
6-1-7/9.17.4
6-1-7/9.17.4(a)
6-1-7/9.17.4(b)
6-1-7/9.17.4(c)
6-1-7/9.17.4(d)
6-1-7/9.17.4(e)
4-3-4/3.5
4-3-4/3.5.1
4-3-4/3.5.2
4-3-4/3.5.3
4-3-4/3.7
4-3-4/3.7.1
4-3-4/3.7.2
4-3-4/3.7.3
6-1-7/19.9
--6-1-7/19.9
6-1-7/19.9
6-1-7/11

67

Notices and General Information


MODU 2008
4-3-4/9.1
4-3-4/9.1.1
4-3-4/9.1.2
4-3-4/9.1.2(a)
4-3-4/9.1.2(b)
4-3-4/9.1.2(c)
4-3-4/9.1.3
4-3-4/9.3
4-3-4/9.5
4-3-4/9.5.1
4-3-4/9.5.2
4-3-4/9.5.3
4-3-4/9.5.4
4-3-4/11
4-3-4/11.1
4-3-4/11.1.1
4-3-4/11.1.2
4-3-4/11.1.3
4-3-4/11.3
4-3-4/11.5
4-3-4/11.5.1
4-3-4/11.5.2
4-3-4/11.5.3
4-3-4/11.5.4
4-3-4/11.7
4-3-4/11.7.1
4-3-4/11.7.2
4-3-4/13
4-3-4/13.1
4-3-4/13.1.1
4-3-4/13.1.2
4-3-4/13.1.2(a)
4-3-4/13.1.2(a)i)
4-3-4/13.1.2(a)ii)
4-3-4/13.1.2(a)iii)
4-3-4/13.1.2(b)
4-3-4/13.1.3
4-3-4/13.1.4
4-3-4/13.1.5
4-3-4/13.1.6
4-3-4/13.3
4-3-4/13.5
4-3-4/Table 1
4-3-4/Table 2
4-3-4/Table 3
4-3-4/Table 4
4-3-4/Table 5
4-3-4/Table 6
4-3-4/Table 7
4-3-4/Table 8
4-3-4/Table 9
4-3-4/Table 10
4-3-4/Table 11
4-3-4/Figure 1
Part
Chapter
Section
4-3-5
4-3-5/1

68

4
3
5

Title
General
Applications
References
Power Supply Arrangements
Protections
Protection Enclosures and its Selection
Forced Cooling Arrangement (Air or Liquid)
Temperature Rise
Construction and Assembly
Windings
Terminals
Nameplate
Prevention of the Accumulation of Moisture
Other Electric and Electronics Devices
Circuit Breakers
General
Mechanical property
Isolation
Fuses
Semiconductor Converters
General
Cooling Arrangement
Accessibility
Nameplate
Cable Junction Boxes
General
Design and Construction
Cables and Wires
Cable Construction
General
Flame Retarded Property
Standards
------Alternative Arrangement
Fire Resistant Property
Insulating Material
Armor for Single-conductor Cables
Fabric Optic Cables
Portable and Flexing Electric Cables
Mineral-isolated Metal-sheathed Cable
Factory Testing Schedule for Generators and Motors 100 kW (135 hp)
Dielectric Strength Test for Rotating Machines
Limits of Temperature Rise for Air-Cooled Rotating Machines
Nameplates
Factory Testing Schedule for Switchboards, Chargers, Motor Control Centers, and
Controllers
Clearance and Creepage Distance for Switchboards, Distribution Boards, Chargers,
Motor Control Centers, and Controllers
Equipment and Instrumentation for Switchboard
Temperature Rise for Transformers
Types of Cable Insulation
Maximum Current Carrying Capacity for Insulated Copper Wires and Cables
Additional Services Requiring Electrical Equipment to be Designed, Constructed and
Tested to the Requirements in Section 4-3-4
Limiting Curves for Loading 4-stroke Diesel Engine Step-by-step from No-load to
Rated Power as Function of the Brake Mean Effective Pressure
Machinery and Systems
Electrical Installations
Specialized Installations
Specialized Installations
High Voltage System

MODU 2012
6-1-7/11.1
6-1-7/11.1.1
6-1-7/11.1.2
6-1-7/11.1.2(a)
6-1-7/11.1.2(b)
6-1-7/11.1.2(c)
6-1-7/11.1.3
6-1-7/11.3
6-1-7/11.5
6-1-7/11.5.1
6-1-7/11.5.2
6-1-7/11.5.3
6-1-7/11.5.4
6-1-7/13
6-1-7/13.1
6-1-7/13.1.1
6-1-7/13.1.2
6-1-7/13.1.3
6-1-7/13.3
6-1-7/13.5
6-1-7/13.5.1
6-1-7/13.5.2
6-1-7/13.5.3
6-1-7/13.5.4
6-1-7/13.7
6-1-7/13.7.1
6-1-7/13.7.2
4-3-4/7
4-3-4/7.1
4-3-4/7.1.1
4-3-4/7.1.2
4-3-4/7.1.2(a)
4-3-4/7.1.2(a)i)
4-3-4/7.1.2(a)ii)
4-3-4/7.1.2(a)iii)
4-3-4/7.1.2(b)
4-3-4/7.1.3
4-3-4/7.1.4
4-3-4/7.1.5
4-3-4/7.1.6
4-3-4/7.3
4-3-4/7.5
6-1-7/Table 2
6-1-7/Table 3
6-1-7/Table 4
6-1-7/Table 5
6-1-7/Table 6
6-1-7/Table 7
6-1-7/Table 8
6-1-7/Table 9
4-3-4/Table 1
4-3-4/Table 2
6-1-7/3.3
6-1-7/5.1.1
6-1-3/Figure 1

4-3-5, 6-1-3. 6-1-7


4-3-5/1
6-1-7/15

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008

Title

4-3-5/1.1

General

4-3-5/1.1.1

Application

4-3-5/1.1.2
4-3-5/1.1.3
4-3-5/1.1.3(a)
4-3-5/1.1.3(b)
4-3-5/1.3
4-3-5/1.3.1
4-3-5/1.3.2
4-3-5/1.3.2(a)
4-3-5/1.3.2(b)
4-3-5/1.3.3
4-3-5/1.3.4
4-3-5/1.3.5
4-3-5/1.3.6

Standard Voltages
Air Clearance and Creepage Distance
Air Clearance
Creepage Distance
System Design
Selective Coordination
Earthed Neutral Systems
Neutral Earthing
Equipment
Neutral Disconnection
Hull Connection of Earthing Impedance
Earth Fault Detection
Number and Capacity of Transformers
Circuit Breakers and Switches Auxiliary Circuit Power Supply Systems for
Operating Energy
Source and Capacity of Power Supply
Number of External Sources of Stored Energy
Circuit Protection
Protection of Generator
Protection of Power Transformers
Coordinated Trips of Protective Devices
----Load Shedding Arrangements
Protection from Electrical Disturbance
Detection of Phase-to-Phase Internal Faults
Protection from Earth-Faults
Transformers Arranged in Parallel
Voltage Transformers for Control and Instrumentation
Fuses
Over Voltage Protection
------Equipment Installation and Arrangement
Degree of Protection
Protective Arrangements
Interlocking Arrangements
Warning Plates
Cables
Runs of Cables
Segregation
Installation Arrangement
Termination and Splices
Marking
Test after Installation
Machinery and Equipment
Rotating Machines
Protection
Windings
Temperature Detectors
(No Text)
Space Heater
Tests
Switchgear and Control-gear Assemblies
Protection
Mechanical Construction
Configuration
Clearance and Creepage Distances
Locking Facilities

4-3-5/1.5
4-3-5/1.5.1
4-3-5/1.5.2
4-3-5/1.7
4-3-5/1.7.1
4-3-5/1.7.2
4-3-5/1.7.2(a)
4-3-5/1.7.2(a)i)
4-3-5/1.7.2(a)ii)
4-3-5/1.7.2(b)
4-3-5/1.7.2(c)
4-3-5/1.7.2(d)
4-3-5/1.7.2(e)
4-3-5/1.7.2(f)
4-3-5/1.7.3
4-3-5/1.7.4
4-3-5/1.7.5
4-3-5/1.7.5i)
4-3-5/1.7.5ii)
4-3-5/1.7.5iii)
4-3-5/1.9
4-3-5/1.9.1
4-3-5/1.9.2
4-3-5/1.9.2(a)
4-3-5/1.9.2(b)
4-3-5/1.9.3
4-3-5/1.9.3(a)
4-3-5/1.9.3(b)
4-3-5/1.9.3(c)
4-3-5/1.9.3(d)
4-3-5/1.9.3(e)
4-3-5/1.9.3(f)
4-3-5/1.11
4-3-5/1.11.1
4-3-5/1.11.1(a)
4-3-5/1.11.1(b)
4-3-5/1.11.1(c)
4-3-5/1.11.1(d)
4-3-5/1.11.1(e)
4-3-5/1.11.1(f)
4-3-5/1.11.2
4-3-5/1.11.2(a)
4-3-5/1.11.2(b)
4-3-5/1.11.2(c)
4-3-5/1.11.2(d)
4-3-5/1.11.2(e)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-3-5/1.1
6-1-7/15.1
4-3-5/1.1.1
6-1-7/15.1.1
4-3-5/1.1.2
4-3-5/1.1.3
4-3-5/1.1.3(a)
4-3-5/1.1.3(b)
4-3-5/1.3
4-3-5/1.3.1
4-3-5/1.3.2
4-3-5/1.3.2(a)
4-3-5/1.3.2(b)
4-3-5/1.3.3
4-3-5/1.3.4
4-3-5/1.3.5
4-3-5/1.3.6
4-3-5/1.5
4-3-5/1.5.1
4-3-5/1.5.2
4-3-5/1.7
4-3-5/1.7.1
4-3-5/1.7.2
4-3-5/1.7.2(a)
4-3-5/1.7.2(a)i)
4-3-5/1.7.2(a)ii)
4-3-5/1.7.2(b)
4-3-5/1.7.2(c)
4-3-5/1.7.2(d)
4-3-5/1.7.2(e)
4-3-5/1.7.2(f)
4-3-5/1.7.3
4-3-5/1.7.4
4-3-5/1.7.5
4-3-5/1.7.5i)
4-3-5/1.7.5ii)
4-3-5/1.7.5iii)
4-3-5/1.9
4-3-5/1.9.1
4-3-5/1.9.2
4-3-5/1.9.2(a)
4-3-5/1.9.2(b)
4-3-5/1.9.3
4-3-5/1.9.3(a)
4-3-5/1.9.3(b)
4-3-5/1.9.3(c)
4-3-5/1.9.3(d)
4-3-5/1.9.3(e)
4-3-5/1.9.3(f)
6-1-7/15.3
6-1-7/15.3.1
6-1-7/15.3.1(a)
6-1-7/15.3.1(b)
6-1-7/15.3.1(c)
--6-1-7/15.3.1(d)
6-1-7/19.19
6-1-7/15.3.2
6-1-7/15.3.2(a)
6-1-7/15.3.2(b)
6-1-7/15.3.2(c)
6-1-7/15.3.2(d)
6-1-7/15.3.2(r)

69

Notices and General Information


MODU 2008
4-3-5/1.11.2(f)
4-3-5/1.11.2(g)
4-3-5/1.11.2(h)
4-3-5/1.11.3
4-3-5/1.11.3(a)
4-3-5/1.11.3(b)
4-3-5/1.11.3(c)
4-3-5/1.11.3(d)
4-3-5/1.11.3(e)
4-3-5/1.11.3(e)i)
4-3-5/1.11.3(e)ii)
4-3-5/1.11.3(f)
4-3-5/1.11.4
4-3-5/1.11.4(a)
4-3-5/3
4-3-5/3.1
4-3-5/3.1.1
4-3-5/3.1.2
4-3-5/3.3
4-3-5/3.3.1
4-3-5/3.3.2
4-3-5/3.3.3
4-3-5/3.3.4
4-3-5/3.3.5
4-3-5/3.5
4-3-5/3.5.1
4-3-5/3.5.1(a)
4-3-5/3.5.1(b)
4-3-5/3.5.1(c)
4-3-5/3.5.1(d)
4-3-5/3.5.1(e)
4-3-5/3.5.2
4-3-5/3.5.2(a)
4-3-5/3.5.2(b)
4-3-5/3.5.2(c)
4-3-5/3.5.3
4-3-5/3.5.3(a)
4-3-5/3.5.3(b)
4-3-5/3.5.3(c)
4-3-5/3.7
4-3-5/3.7.1
4-3-5/3.7.2
4-3-5/3.7.2(a)
4-3-5/3.7.2(b)
4-3-5/3.7.3
4-3-5/3.7.4
4-3-5/3.7.5
4-3-5/3.7.5(a)
4-3-5/3.7.5(b)
4-3-5/3.7.5(c)
4-3-5/3.7.5(d)
4-3-5/3.7.6
4-3-5/3.9
4-3-5/3.9.1
4-3-5/3.9.2
4-3-5/3.9.3
4-3-5/3.9.4
4-3-5/3.11
4-3-5/3.11.1
4-3-5/3.11.2
4-3-5/3.11.3
4-3-5/3.11.4
4-3-5/3.11.5
4-3-5/3.11.6

70

Title
Shutters
Earthing and Short-circuiting
Tests
Transformers
Application
Plans
Enclosure
Space Heater
Testing
----Nameplate
Cables
Standards
Electric Propulsion System
General
Application
Plans and Data to be Submitted
System Design
General
Generating Capacity
Power Management System
Regenerative Power
Harmonics
Propulsion Power Supply Systems
Propulsion Generators
Power Supply
Single System
Multiple System
Excitation System
Features for Other Services
Propulsion Excitation
Excitation Circuits
Field Circuits
Drilling Unit's Service Generator Connections
Semiconductor Converters
------Circuit Protection
Settings
Direct-current (DC) Propulsion Circuits
Circuit Protection
Protection for Reversal of the Rotation
Excitation Circuits
Reduction of Magnetic Fluxes
Semiconductor Converters
Overvoltage Protection
Overcurrent Protection
Short-circuit Protection
Filter Circuits
Direct-current (DC) Propulsion Motors Supplied by Semiconductor Converters
Protection for Earth Leakage
Main Propulsion Circuits
Excitation Circuits
Alternating-current (AC) Systems
Direct-current (DC) Systems
Electric Propulsion Control
General
Automatic and Remote Control System
Testing and Inspection
Initiation of Control
Emergency Stop
Prime Mover Control

MODU 2012
6-1-7/15.3.2(f)
6-1-7/15.3.2(g)
6-1-7/19.21
6-1-7/15.3.3
6-1-7/15.3.3(a)
6-1-7/15.3.3(b)
6-1-7/15.3.3(c)
6-1-7/15.3.3(d)
6-1-7/19.23
6-1-7/19.23i)
6-1-7/19.23ii)
6-1-7/19.23
4-3-5/1.11
4-3-5/1.11
4-3-5/3
4-3-5/3.1
4-3-5/3.1.1
4-3-5/3.1.2
4-3-5/3.3
4-3-5/3.3.1
4-3-5/3.3.2
4-3-5/3.3.3
4-3-5/3.3.4
4-3-5/3.3.5
4-3-5/3.5
4-3-5/3.5.1
4-3-5/3.5.1(a)
4-3-5/3.5.1(b)
4-3-5/3.5.1(c)
4-3-5/3.5.1(d)
4-3-5/3.5.1(e)
4-3-5/3.5.2
4-3-5/3.5.2(a)
4-3-5/3.5.2(b)
4-3-5/3.5.2(c)
4-3-5/3.5.3
4-3-5/3.5.3(a)
4-3-5/3.5.3(b)
4-3-5/3.5.3(c)
4-3-5/3.7
4-3-5/3.7.1
4-3-5/3.7.2
4-3-5/3.7.2(a)
4-3-5/3.7.2(b)
4-3-5/3.7.3
4-3-5/3.7.4
4-3-5/3.7.5
4-3-5/3.7.5(a)
4-3-5/3.7.5(b)
4-3-5/3.7.5(c)
4-3-5/3.7.5(d)
4-3-5/3.7.6
4-3-5/3.9
4-3-5/3.9.1
4-3-5/3.9.2
4-3-5/3.9.3
4-3-5/3.9.4
4-3-5/3.11
4-3-5/3.11.1
4-3-5/3.11.2
6-1-7/19.17
4-3-5/3.11.3
4-3-5/3.11.4
4-3-5/3.11.5

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-5/3.11.7
4-3-5/3.11.8
4-3-5/3.11.9
4-3-5/3.13
4-3-5/3.13.1
4-3-5/3.13.1(a)
4-3-5/3.13.1(b)
4-3-5/3.13.1(c)
4-3-5/3.13.2
4-3-5/3.13.2(a)
4-3-5/3.13.2(b)
4-3-5/3.13.2(c)
4-3-5/3.15
4-3-5/3.15.1
4-3-5/3.15.2
4-3-5/3.15.2(a)
4-3-5/3.15.2(b)
4-3-5/3.15.2(c)
4-3-5/3.15.3
4-3-5/3.15.4
4-3-5/3.17
4-3-5/3.17.1
4-3-5/3.17.2
4-3-5/3.17.3
4-3-5/3.17.4
4-3-5/3.17.4(a)
4-3-5/3.17.4(b)
4-3-5/3.17.4(c)
4-3-5/3.17.4(d)
4-3-5/3.17.4(e)
4-3-5/3.17.5
4-3-5/3.17.5(a)
4-3-5/3.17.5(b)
4-3-5/3.17.5(c)
4-3-5/3.17.5(d)
4-3-5/3.17.6
4-3-5/3.17.7
4-3-5/3.17.7(a)
4-3-5/3.17.7(b)
4-3-5/3.17.8
4-3-5/3.17.8(a)
4-3-5/3.17.8(b)
4-3-5/3.17.8(c)
4-3-5/3.17.8(d)
4-3-5/3.17.8(e)
4-3-5/3.17.8(f)
4-3-5/3.17.9
4-3-5/3.17.9(a)
4-3-5/3.17.9(b)
4-3-5/3.17.9(c)
4-3-5/3.17.9(d)
4-3-5/3.17.10
4-3-5/3.17.10(a)
4-3-5/3.17.10(b)
4-3-5/3.17.10(c)
4-3-5/3.17.11
4-3-5/3.17.11(a)
4-3-5/3.17.11(b)
4-3-5/3.17.11(c)
4-3-5/3.17.12
4-3-5/3.17.12(a)
4-3-5/3.17.12(b)
4-3-5/3.17.12(c)
4-3-5/3.17.12(d)

Title
Control Power Failure
Protection
Interlocks
Instrumentation at the Control Station
Indication, Display and Alarms
For AC Systems
For DC Systems
For Electric Slip Couplings
Indication of Propulsion System Status
Ready for Operation
Faulty
Power Limitation
Equipment Installation and Arrangement
General
Accessibility and Facilities for Repairs
Accessibility
Facility for Supporting
Slip couplings
Semiconductor Converters
Propulsion Cables
Machinery and equipment
Material Tests
Temperature Rating
Protection Against Moisture Condensation
Prime Movers
Capability
Speed Control
Manual Controls
Parallel Operation
Protection for Regenerated Power
Rotating Machines for Propulsion
Ventilation and Protection
Fire-extinguishing Systems
Air Coolers
Temperature Sensors
Propulsion Generators
Direct-current (DC) Propulsion Motors
Rotors
Overspeed Protection
Electric Couplings
General
Accessibility for Repairs
Temperature Rating
Excitation
Control Equipment
Nameplates
Semiconductor Converters for Propulsion
General
Testing and Inspection
Forced Cooling
Additional Requirements for Water Cooled Converters
Reactors and Transformers for Semiconductor Converters
General
Voltage Regulation
High Temperature Alarm
Switches
General Design
Generator and Motor Switches
Field Switches
Propulsion Cables
Conductors
Insulation Materials
Braided Metallic Armor and Impervious Metallic Sheaths
Inner Wiring

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-3-5/3.11.6
4-3-5/3.11.7
4-3-5/3.11.8
4-3-5/3.13
4-3-5/3.13.1
4-3-5/3.13.1(a)
4-3-5/3.13.1(b)
4-3-5/3.13.1(c)
4-3-5/3.13.2
4-3-5/3.13.2(a)
4-3-5/3.13.2(b)
4-3-5/3.13.2(c)
4-3-5/3.15
4-3-5/3.15.1
4-3-5/3.15.2
6-1-7/17.1.3
4-3-5/3.15.2(a)
4-3-5/3.15.2(b)
4-3-5/3.15.3
4-3-5/3.15.4
6-1-7/17
6-1-4/3
6-1-7/17.1.1
6-1-7/17.1.1
6-1-3/3.7
6-1-3/3.7.1
6-1-3/3.7.2
6-1-3/3.7.3
6-1-3/3.7.4
6-1-3/3.7.5
6-1-7/17.3.1
6-1-7/17.3.1(a)
6-1-7/17.3.1(b)
6-1-7/17.3.1(c)
6-1-7/17.3.1(d)
6-1-7/17.3.2
6-1-7/17.3.3
6-1-7/17.3.3(a)
6-1-7/17.3.3(b)
6-1-7/17.3.4
6-1-7/17.3.4(a)
6-1-7/17.3.4(b)
6-1-7/17.3.4(c)
6-1-7/17.3.4(d)
6-1-7/17.3.4(e)
6-1-7/17.3.4(f)
6-1-7/17.3.5
6-1-7/17.3.5(a)
6-1-7/19.13
6-1-7/17.3.5(b)
6-1-7/17.3.5(c)
6-1-7/17.3.6
6-1-7/17.3.6(a)
6-1-7/17.3.6(b)
6-1-7/17.3.6(c)
4-3-5/3.17.2
4-3-5/3.17.2(a)
4-3-5/3.17.2(b)
4-3-5/3.17.2(c)
6-1-7/17.3.7
6-1-7/17.3.7(a)
6-1-7/17.3.7(b)
6-1-7/17.3.7(c)
6-1-7/17.3.7(d)

71

Notices and General Information


MODU 2008
4-3-5/3.17.12(e)
4-3-5/5
4-3-5/5.1
4-3-5/5.3
4-3-5/5.3.1
4-3-5/5.3.2
4-3-5/5.5
4-3-5/7
4-3-5/7.1
4-3-5/7.1.1
4-3-5/7.1.2
4-3-5/7.1.2i)
4-3-5/7.1.2ii)
4-3-5/7.1.2iii)
4-3-5/7.1.2iv)
4-3-5/7.1.2v)
Part
4
Chapter
3
Section
6
4-3-6
4-3-6/1
4-3-6/1.1
4-3-6/1.3
4-3-6/1.5
4-3-6/3
4-3-6/3.1
4-3-6/3.1i)
4-3-6/3.1ii)
4-3-6/3.1iii)
4-3-6/3.3
4-3-6/3.3i)
4-3-6/3.3ii)
4-3-6/3.3iii)
4-3-6/3.3iv)
4-3-6/3.3v)
4-3-6/3.5
4-3-6/3.5i)
4-3-6/3.5ii)
4-3-6/3.5iii)
4-3-6/3.5iv)
4-3-6/3.5v)
4-3-6/3.5vi)
4-3-6/3.5vii)
4-3-6/3.5viii)
4-3-6/3.5ix)
4-3-6/5
4-3-6/5.1
4-3-6/5.1i)
4-3-6/5.1ii)
4-3-6/5.1iii)
4-3-6/5.3
4-3-6/5.3i)
4-3-6/5.3ii)
4-3-6/5.3iii)
4-3-6/5.5
4-3-6/5.5i)
4-3-6/5.5ii)
4-3-6/5.5iii)
4-3-6/7
4-3-6/7.1
4-3-6/7.3
4-3-6/7.5
4-3-6/9

72

Title
Testing
Three-wire Dual-voltage DC System
Three-wire DC Drilling Unit's Generator
Neutral Earthing
Main Switchboard
Emergency Switchboard
Size of Neutral Conductor
Systems Associated with Drilling Operations
Emergency Shutdown Facilities
Shutdown Arrangements
Operation After Shutdown
----------Machinery and Systems
Machinery, Equipment, and Their Installation
Hazardous Areas
Hazardous Areas
Definitions
Hazardous Areas
Enclosed Space
Semi-Enclosed Location
Classification of Areas
Hazardous Areas Zone 0 include
------Hazardous Areas Zone 1 include
----------Hazardous Areas Zone 2 include
------------------Openings, Access, and Ventilation Conditioning Affecting the Extent of Hazardous
Zones
Enclosed Space with Direct Access to any Zone 1 Location
------Enclosed Space with Direct Access to any Zone 2 Location
------Enclosed Space with Access to any Zone 1 Location
------Ventilation
General
Ventilation of Hazardous Areas
Ventilation of Non-Hazardous Areas
Machinery Installations

MODU 2012
6-1-7/19.15
4-3-5/5
4-3-5/5.1
4-3-5/5.3
4-3-5/5.3.1
4-3-5/5.3.2
4-3-5/5.5
4-3-5/7
4-3-5/7.1
4-3-5/7.1
4-3-5/7.1.2
4-3-5/7.1.2i)
4-3-5/7.1.2ii)
4-3-5/7.1.2iii)
4-3-5/7.1.2iv)
4-3-5/7.1.2v)

4-3-6
4-3-6/1
4-3-6/1.1
4-3-6/1.3
4-3-6/1.5
4-3-6/5
4-3-6/5.1
4-3-6/5.1i)
4-3-6/5.1ii)
4-3-6/5.1iii)
4-3-6/5.3
4-3-6/5.3i)
4-3-6/5.3ii)
4-3-6/5.3iii)
4-3-6/5.3iv)
4-3-6/5.3v)
4-3-6/5.5
4-3-6/5.5i)
4-3-6/5.5ii)
4-3-6/5.5iii)
4-3-6/5.5iv)
4-3-6/5.5v)
4-3-6/5.5vi)
4-3-6/5.5vii)
4-3-6/5.5viii)
4-3-6/5.5ix)
4-3-6/7
4-3-6/7.1
4-3-6/7.1i)
4-3-6/7.1ii)
4-3-6/7.1iii)
4-3-6/7.3
4-3-6/7.3i)
4-3-6/7.3ii)
4-3-6/7.3iii)
4-3-6/7.5
4-3-6/7.5i)
4-3-6/7.5ii)
4-3-6/7.5iii)
4-3-6/9
4-3-6/9.1
4-3-6/9.3
4-3-6/9.5
4-3-6/11

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
4-3-6/9.1
4-3-6/9.3
4-3-6/Figure 1
4-3-6/Figure 2
4-3-6/Figure 3
Part
5
Chapter
1
Section
1
5-1-1
5-1-1/1
5-1-1/1.1
5-1-1/1.3
5-1-1/1.5
5-1-1/3
5-1-1/3.1
5-1-1/3.3
5-1-1/3.5
5-1-1/3.7
5-1-1/3.7.1
5-1-1/3.7.2
5-1-1/3.7.2(1)
5-1-1/3.7.2(2)
5-1-1/3.7.2(3)
5-1-1/3.7.2(4)
5-1-1/3.7.2(5)
5-1-1/3.7.2(6)
5-1-1/3.7.2(7)
5-1-1/3.7.2(8)
5-1-1/3.7.2(9)
5-1-1/3.7.2(10)
5-1-1/3.7.2(11)
5-1-1/3.9
5-1-1/3.11
5-1-1/3.13
5-1-1/3.15
5-1-1/3.15i)
5-1-1/3.15ii)
5-1-1/3.15iii)
5-1-1/3.15iv)
5-1-1/3.15v)
5-1-1/3.17
5-1-1/3.17i)
5-1-1/3.17ii)
5-1-1/3.17iii)
5-1-1/3.19
5-1-1/3.21
5-1-1/3.21i)
5-1-1/3.21ii)
5-1-1/3.21iii)
5-1-1/5
5-1-1/5.1

Title
General
Hazardous Areas
Hazardous Zones
Hazardous Zones
Hazardous Zones
Fire and Safety Measures and Features
Passive Fire Protection
General
General
General
Administrative Review
ABS Review
Materials Containing Asbestos
Structural Fire Protection
Construction Materials
Alternate Materials
Fire Integrity of Bulkheads and Decks
Application of Tables
--------------------------------------------------------------Protection of Accommodation Spaces, Service Spaces and Control Stations
---

5-1-1/5.3

---

5-1-1/5.5
5-1-1/5.7
5-1-1/5.9
5-1-1/5.11
5-1-1/5.13
5-1-1/5.13i)
5-1-1/5.13ii)
5-1-1/5.13iii)
5-1-1/5.15
5-1-1/5.17
5-1-1/5.19

-----------------------

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
4-3-6/11
4-3-6/11
4-3-6/Figure 1
4-3-6/Figure 2
4-3-6/Figure 3

5-1-1
5-1-1/1
5-1-1/1.1
5-1-1/1.3
5-1-1/1.5
5-1-1/3
5-1-1/3.1
5-1-1/3.3
5-1-1/3.7
5-1-1/3.9
5-1-1/3.9.1
5-1-1/3.9.2
5-1-1/3.9.2(1)
5-1-1/3.9.2(2)
5-1-1/3.9.2(3)
5-1-1/3.9.2(4)
5-1-1/3.9.2(5)
5-1-1/3.9.2(6)
5-1-1/3.9.2(7)
5-1-1/3.9.2(8)
5-1-1/3.9.2(9)
5-1-1/3.9.2(10)
5-1-1/3.9.2(11)
5-1-1/3.11
5-1-1/3.13
5-1-1/3.15
5-1-1/3.17
5-1-1/3.17i)
5-1-1/3.17ii)
5-1-1/3.17iii)
5-1-1/3.17iv)
5-1-1/3.17v)
5-1-1/3.19
5-1-1/3.19i)
5-1-1/3.19ii)
5-1-1/3.19iii)
5-1-1/3.21
5-1-1/3.23
5-1-1/3.23i)
5-1-1/3.23ii)
5-1-1/3.23iii)
5-1-1/5
5-1-1/5.7
5-1-1/5.9
5-1-1/3.17vi)
5-1-1/5.9
5-1-1/5.11
5-1-1/5.13
5-1-1/5.15
5-1-1/5.17
5-1-1/5.17i)
5-1-1/5.17ii)
5-1-1/5.17iii)
5-1-1/5.19
5-1-1/5.21
5-1-1/5.23

73

Notices and General Information


MODU 2008
5-1-1/5.21
5-1-1/5.21i)
5-1-1/5.21ii)
5-1-1/5.21iii)
5-1-1/5.23
5-1-1/5.23i)
5-1-1/5.23ii)
5-1-1/5.23iii)
5-1-1/5.25
5-1-1/5.25i)
5-1-1/5.25ii)
5-1-1/5.25iii)
5-1-1/5.25iv)
5-1-1/5.25v)
5-1-1/5.25.1
5-1-1/5.25.1i)
5-1-1/5.25.1ii)
5-1-1/5.25.1iii)
5-1-1/5.25.1iv)
5-1-1/5.25.1v)
5-1-1/5.25.1vi)
5-1-1/5.27
5-1-1/5.27i)
5-1-1/5.27ii)
5-1-1/5.27iii)
5-1-1/5.27iv)
5-1-1/5.27v)
5-1-1/5.29

---------------------------------------------------------

5-1-1/5.31

---

5-1-1/5.31i)
5-1-1/5.31ii)
5-1-1/5.31iii)
5-1-1/5.31iv)
5-1-1/5.33
5-1-1/5.35
5-1-1/5.37
5-1-1/5.37i)
5-1-1/5.37ii)
5-1-1/5.37iii)
5-1-1/5.39
5-1-1/5.41
5-1-1/5.41i)
5-1-1/5.41ii)
5-1-1/5.41iii)
5-1-1/5.41iv)
5-1-1/Table 1
5-1-1/Table 2
5-1-1/Figure 1
5-1-1/Figure 2
5-1-1/Figure 3
5-1-1/Figure 4
Part
5
Chapter
2
Section
1
5-2-1/1
5-2-1/3
5-2-1/3.1
5-2-1/3.3

--------------------------------Fire Integrity of Bulkheads Separating Adjacent Spaces


Fire Integrity of Decks Separating Adjacent Spaces
Pipes Penetrating A Class Divisions
Pipes Penetrating B Class Divisions
Ventilation Ducts Penetrating A Class Divisions
Ventilation Ducts Penetrating B Class Divisions
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
General
Governmental Authority
Plans and Specifications
General
Fire Control Plans

74

Title

MODU 2012
5-1-1/5.25
5-1-1/5.25i)
5-1-1/5.25ii)
5-1-1/5.25iii)
5-1-1/5.27
5-1-1/5.27i)
5-1-1/5.27ii)
5-1-1/5.27iii)
5-1-1/5.29
5-1-1/5.29i)
5-1-1/5.29ii)
5-1-1/5.29iii)
5-1-1/5.29v)
5-1-1/5.29vi)
5-1-1/5.29.1
5-1-1/5.29.1i)
5-1-1/5.29.1ii)
5-1-1/5.29.1iii)
5-1-1/5.29.1iv)
5-1-1/5.29.1v)
5-1-1/5.29.1vi)
5-1-1/5.31
5-1-1/5.31i)
5-1-1/5.31ii)
5-1-1/5.31iii)
5-1-1/5.31iv)
5-1-1/5.31v)
5-1-1/5.33
5-1-1/5.35
5-1-1/5.37
5-1-1/5.37i)
5-1-1/5.37ii)
5-1-1/5.37iii)
5-1-1/5.37iv)
5-1-1/5.39
5-1-1/5.41
5-1-1/5.43
5-1-1/5.43i)
5-1-1/5.43ii)
5-1-1/5.43iii)
5-1-1/5.45
5-1-1/5.47
5-1-1/5.47i)
5-1-1/5.47ii)
5-1-1/5.47iii)
5-1-1/5.47iv)
5-1-1/Table 1
5-1-1/Table 2
5-1-1/Figure 1
5-1-1/Figure 2
5-1-1/Figure 3
5-1-1/Figure 4

5-2-1/1
5-2-1/3
5-2-1/3.1
5-2-1/3.3

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
Part
5
Chapter
2
Section
2
5-2-2
5-2-2/1
5-2-2/1.1
5-2-2/1.1.1
5-2-2/1.1.2
5-2-2/1.1.2(a)
5-2-2/1.1.2(a)i)
5-2-2/1.1.2(a)ii)
5-2-2/1.1.2(a)iii)
5-2-2/1.1.2(b)
5-2-2/1.1.3
5-2-2/1.1.4
5-2-2/1.1.5
5-2-2/1.1.5(a)
5-2-2/1.1.5(b)
5-2-2/1.1.5(b)i)
5-2-2/1.1.5(b)ii)
5-2-2/1.1.6
5-2-2/1.1.7
5-2-2/1.1.7(a)
5-2-2/1.1.7(b)
5-2-2/1.1.7(b)i)
5-2-2/1.1.7(b)ii)
5-2-2/1.1.7(b)iii)
5-2-2/1.1.8
5-2-2/1.3
5-2-2/1.3.1
5-2-2/1.3.2
5-2-2/1.3.3
5-2-2/1.3.4
5-2-2/1.3.5
5-2-2/1.3.6
5-2-2/1.5
5-2-2/1.5.1
5-2-2/1.5.2
5-2-2/1.5.3
5-2-2/1.5.4
5-2-2/Figure 1
Part
5
Chapter
2
Section
3
5-2-3
5-2-3/1
5-2-3/1i)
5-2-3/1ii)
5-2-3/1iii)
5-2-3/1iv)
5-2-3/1v)
5-2-3/3
5-2-3/3.1
5-2-3/3.1.1
5-2-3/3.1.2
5-2-3/3.1.3
5-2-3/3.1.3(a)
5-2-3/3.1.3(b)
5-2-3/3.1.4
5-2-3/3.3
5-2-3/5
5-2-3/5.1
5-2-3/5.3

Title
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Fixed Fire Fighting Systems
Fixed Fire Fighting Systems
Fire Main Systems
Fire Pumps
Number of Pumps
Location of Pumps
Location
------Remote Operation
Type of Pumps
Pressure
Pump Capacity
General
Ship-type Drilling Units
Total Pump Capacity
Individual Pump Capacity
Relief Valves
Intermediate Tank Water Supply
Tank Capacity
Features
------Pressurized Main Water supply
Fire Main
Size
Cocks or Valves
Isolation
Cold Weather Protection
Materials
Connections
Hydrants, Hoses, and Nozzles
Hydrants
Hoses
Nozzles
International Shore Connection
International Shore Connection
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Additional Fixed Fire Fighting Systems
Additional Fixed Firefighting Systems
Fixed Firefighting Systems
----------Gas Smothering
General
Storage
Design
Alarm
Electric
Pneumatic
Controls
Carbon Dioxide Systems
Foam
Fixed High Pressure Expansion Foam System
Low Expansion Foam System

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012

5-2-2
5-2-2/1
5-2-2/1.1
5-2-2/1.1.1
5-2-2/1.1.2
5-2-2/1.1.2(a)
5-2-2/1.1.2(a)i)
5-2-2/1.1.2(a)ii)
5-2-2/1.1.2(a)iii)
5-2-2/1.1.2(b)
5-2-2/1.1.3
5-2-2/1.1.4
5-2-2/1.1.5
5-2-2/1.1.5(a)
5-2-2/1.1.5(b)
5-2-2/1.1.5(b)i)
5-2-2/1.1.5(b)ii)
5-2-2/1.1.6
5-2-2/1.1.7
5-2-2/1.1.7(a)
5-2-2/1.1.7(b)
5-2-2/1.1.7(b)i)
5-2-2/1.1.7(b)ii)
5-2-2/1.1.7(b)iii)
5-2-2/1.1.8
5-2-2/1.3
5-2-2/1.3.1
5-2-2/1.3.2
5-2-2/1.3.3
5-2-2/1.3.4
5-2-2/1.3.5
5-2-2/1.3.6
5-2-2/1.5
5-2-2/1.5.1
5-2-2/1.5.2
5-2-2/1.5.3
5-2-2/1.5.4
5-2-2/Figure 1

5-2-3
5-2-3/1
5-2-3/1i)
5-2-3/1ii)
5-2-3/1iii)
5-2-3/1iv)
5-2-3/1v)
5-2-3/3
5-2-3/3.1
5-2-3/3.1.1
5-2-3/3.1.2
5-2-3/3.1.3
5-2-3/3.1.3(a)
5-2-3/3.1.3(b)
5-2-3/3.1.4
5-2-3/3.3
5-2-3/5
5-2-3/5.1
5-2-3/5.3

75

Notices and General Information


MODU 2008
5-2-3/5.3.1
5-2-3/5.3.2
5-2-3/7
5-2-3/9
5-2-3/9.1
5-2-3/9.3
5-2-3/9.3.1
5-2-3/9.3.2
5-2-3/9.3.3
5-2-3/9.3.4
5-2-3/11
5-2-3/11.1
5-2-3/11.1i)
5-2-3/11.1ii)
5-2-3/11.1iii)
5-2-3/11.1iv)
5-2-3/11.3
Part
Chapter
Section
5-2-4
5-2-4/1
5-2-4/1.1
5-2-4/1.3
5-2-4/3
5-2-4/3.1
5-2-4/3.3
5-2-4/3.3i)
5-2-4/3.3ii)
5-2-4/3.5
5-2-4/3.7
5-2-4/3.9
5-2-4/3.11
5-2-4/3.13
5-2-4/Table 1
5-2-4/Table 2
Part
Chapter
Section
5-2-5
5-2-5/1
5-2-5/1.1
5-2-5/1.3
5-2-5/1.5
5-2-5/1.7
5-2-5/3
5-2-5/3i)
5-2-5/3ii)
5-2-5/3iii)
5-2-5/3iv)
5-2-5/3v)
Part
Chapter
Section
5-3-1/1
5-3-1/1.1
5-3-1/1.1.1
5-3-1/1.1.2
5-3-1/1.1.3
5-3-1/1.3
5-3-1/1.3.1

76

5
2
4

5
2
5

5
3
1

Title
Application
Design
Fixed Pressure Water Spraying System
Protection of Helicopter Decks and Refueling Facilities
General
Firefighting Systems
Hoses and Nozzles
Portable Extinguisher
Back-up System
Fixed-Foam System
Paint and Flammable Liquid Lockers
Lockers of 4 m2 (43 ft2) or More Floor Area and Lockers with Access to
Accommodation Spaces
--------Lockers of Less Than 4 m2 (43 ft2) Floor Area Having no Access to Accommodation
Spaces
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Portable Fire Fighting Systems
Portable Fire Fighting Systems
Portable Fire Extinguishers and Sand
Extinguishers
Sand
Fireman's Outfit
Number
Breathing Apparatus
----Lifeline
Safety lamp and Axe
Boots and Gloves
Helmet
Protective Clothing
Classification of Portable and Semi-portable Extinguishers
Hand Portable Fire Extinguishers and Semi-portable Fire-Extinguishing Systems
Fire and Safety Measures and Features
Active Fire Protection Systems and Equipment
Fire and Gas Detection
Fire and Gas Detection
Other Fire Protection Requirements
Fire Detection and Alarm Systems
General Alarm
Mud tanks Level Alarm
Ventilation System Alarms
Gas Detection and Alarm Systems
----------Fire and Safety Measures and Features
Outfitting
General
Means of Escape
-------------

MODU 2012
5-2-3/5.3.1
5-2-3/5.3.2
5-2-3/7
5-2-3/9
5-2-3/9.1
5-2-3/9.3
5-2-3/9.3.1
5-2-3/9.3.2
5-2-3/9.3.3
5-2-3/9.3.4
5-2-3/11
5-2-3/11.1
5-2-3/11.1i)
5-2-3/11.1ii)
5-2-3/11.1iii)
5-2-3/11.1iv)
5-2-3/11.3

5-2-4
5-2-4/1
5-2-4/1.1
5-2-4/1.3
5-2-4/3
5-2-4/3.1
5-2-4/3.3
5-2-4/3.3i)
5-2-4/3.3ii)
5-2-4/3.7
5-2-4/3.9
5-2-4/3.11
5-2-4/3.13
5-2-4/3.15
5-2-4/Table 1
5-2-4/Table 2

5-2-5
5-2-5/1
5-2-5/1.1
5-2-5/1.3
5-2-5/1.5
5-2-5/1.7
5-2-5/3
5-2-5/3i)
5-2-5/3ii)
5-2-5/3iii)
5-2-5/3iv)
5-2-5/3v)

5-3-1/1
5-3-1/1.1
5-3-1/1.1.1
5-3-1/1.1.2
5-3-1/1.1.3
5-3-1/1.3
5-3-1/1.3.1

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
5-3-1/1.3.2
5-3-1/1.5
5-3-1/1.7
5-3-1/1.9
5-3-1/3
5-3-1/5
5-3-1/5.1
5-3-1/5.3
5-3-1/7
5-3-1/9
5-3-1/9.1
5-3-1/9.1.1
5-3-1/9.1.2
5-3-1/9.3
5-3-1/9.5
5-3-1/9.7
5-3-1/11
5-3-1/11i)
5-3-1/11ii)
5-3-1/11iii)
5-3-1/11iv)
5-3-1/13
5-3-1/15
5-3-1/15i)
5-3-1/15ii)
5-3-1/15iii)
5-3-1/15iv)
Part
6
Chapter
1
Section
1
6-1-1
6-1-1/1
6-1-1/3

Title
--------Means of Access and Egress
Guards and Rails
Floor Deck Areas and Openings
Helicopter Landing Deck
Emergency Control Station
Arrangements in Machinery Space
Ventilation Fans and Openings
General
Release of Smoke from Machinery Space
Other Auxiliaries
Oil Tank Suction Pipes
Oil Fuel Units
Segregation of Fuel Oil Purifiers
--------Rotary Table Area
Fire Precautions for Machinery Spaces
--------Surveys
Surveys During Construction
General
General
General
Construction Surveys

6-1-1/3.1

Structure Fabrication/Erection

6-1-1/3.1.1
6-1-1/3.1.1(a)
6-1-1/3.1.1(b)
6-1-1/3.1.1(c)
6-1-1/3.1.1(d)
6-1-1/3.1.1(e)
6-1-1/3.1.1(f)
6-1-1/3.1.1(g)
6-1-1/3.1.1(h)
6-1-1/3.1.1(i)
6-1-1/3.1.1(j)
6-1-1/5

Surveys on Steel Structures


Quality Control Program
Material Quality and Traceability
Steel Forming
Welder Qualification and Record
Welding Procedure Specifications and Qualifications
Weld Inspection
Tolerances and Alignments
Corrosion Control System
Tightness and Hydrostatic Testing Procedures
Nondestructive Testing
Survey of Equipment

6-1-1/5.1

General

6-1-1/5.3
Part
Chapter
Section

6
1
2

Survey at Vendor's Shop


Surveys
Surveys During Construction
Testing and Trials

6-1-2

Testing and Trials

6-1-2/1
6-1-2/1.1
6-1-2/1.3
6-1-2/1.5
6-1-2/3
6-1-2/3.1
6-1-2/3.3
6-1-2/3.5

Watertight Bulkhead Testing


General
Hose Testing
Air Testing
Tank Bulkhead Testing
General
Hydrostatic Testing
Air Testing

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
5-3-1/1.3.2
5-3-1/1.5
5-3-1/1.7
5-3-1/1.9
5-3-1/3
5-3-1/5
5-3-1/5.1
5-3-1/5.3
5-3-1/7
5-3-1/9
5-3-1/9.1
5-3-1/9.1.1
5-3-1/9.1.2
5-3-1/9.3
5-3-1/9.5
5-3-1/9.7
5-3-1/11
5-3-1/11i)
5-3-1/11ii)
5-3-1/11iii)
5-3-1/11iv)
5-3-1/13
5-3-1/15
5-3-1/15i)
5-3-1/15ii)
5-3-1/15iii)
5-3-1/15iv)

6-1-1, 7-1-1, 7-1-2


7-1-1/1
--7-1-1/3.1
7-1-2/3
--7-1-2/3
7-1-2/5.1
7-1-2/5.5
7-1-2/7
7-1-2/7
7-1-2/9
7-1-2/9
--7-1-2/23.1
7-1-2/11
--6-1-1/5.3
7-1-1/3
6-1-1/5.3

6-1-3, 6-1-6, 6-1-7,


7-1-2, 7-1-4, 7-1-6,
7-1-9
--7-1-2/23.3
7-1-2/23.11
7-1-2/23.9
--7-1-2/23.3
7-1-2/23.5
7-1-2/23.9

77

Notices and General Information


MODU 2008
6-1-2/3.7
6-1-2/5
6-1-2/5.1
6-1-2/5.3
6-1-2/5.5
6-1-2/5.7
6-1-2/7
6-1-2/9
6-1-2/9.1
6-1-2/9.1.1
6-1-2/9.1.2
6-1-2/9.1.3
6-1-2/9.3
6-1-2/11
6-1-2/13
6-1-2/13.1
6-1-2/13.3
6-1-2/13.5
6-1-2/13.7
6-1-2/13.9
6-1-2/13.11
6-1-2/13.13
6-1-2/13.15
6-1-2/15
6-1-2/17
6-1-2/18
6-1-2/19
6-1-2/21
6-1-2/23
6-1-2/23.1
6-1-2/23.1.1
6-1-2/23.1.2
6-1-2/23.1.3
6-1-2/23.1.5
6-1-2/23.2
6-1-2/25
6-1-2/25i)
6-1-2/25ii)
6-1-2/25iii)
6-1-2/27

Title
Structural Testing
Jacking Gear
Prototype Test
Prior to the Test
Test
Subsequent to the Test
Initial Jacking Test
Rotating Machines Testing and Inspection
Applications
Machines of 100 kW and Over
Machines Below 100 kW
Other Machines
Special Testing Arrangements
Moveable Cantilever and Skid Beam Testing
Metallic Piping Systems Pressure Tests
Fuel-oil Service System
Fuel-oil Suction and Transfer Lines
Starting-air Piping
Hydraulic Power Piping
All Piping
Specific Systems
Hydrostatic Tests of Shell Valves
Pneumatic Tests in Lieu of Hydrostatic Tests
Pump Hydrostatic Test
Pump Capacity Test
Relief Valve Capacity Test
Plastic Piping Testing On Board After Installation
Fixed Oxygen-Acetylene Installations Testing
Switchboards, Distribution Boards, Controllers, etc. Testing and Inspection
Applications
Switchboards
Motor Controllers
Motor Control Centers
Battery Charger Units, Uninterruptible Power System (UPS) Units, and Distribution
Boards
Test Items
Special Testing Arrangements
Transformers Testing
------Electrical Service Trials

6-1-2/27.1

Electrical Installation for Drilling Unit Main Services

6-1-2/27.3
6-1-2/29
6-1-2/29.1
6-1-2/29.3
6-1-2/29.5
6-1-2/31
6-1-2/33
Part
Chapter
Section
6-2-1
6-2-1/1
6-2-1/1.1
6-2-1/3
6-2-1/3.1
6-2-1/3.3
6-2-1/3.5
6-2-1/3.7
6-2-1/3.9
6-2-1/3.11

Communication Facilities
Trials for Self-Propelled Drilling Units
Full Power
Reduced Power
Machinery Operation
Trials for Non Self-Propelled Drilling Units
Dock and Sea Trials
Surveys
Surveys After Construction
Conditions for Surveys After Construction
Conditions for Surveys After Construction
Application
Chapter 2 Sections 1 through 10
Definitions
Ballast Tank
Corrosion
Corrosion Control System
Critical Structural Areas
Girth Belt (Transverse Section)
Panel

6-1-2/23.1.4

78

6
2
1

MODU 2012
7-1-2/23.7
6-1-3/25.3
6-1-3/25.3
6-1-3/25.3i)
6-1-3/25.3ii)
6-1-3/25.3iii)
7-1-9/9.1
----6-1-7/19.1
6-1-7/5.1.1
----7-1-9/9.3
7-1-4/41.1
7-1-4/41.1.1
7-1-4/41.1.2
7-1-4/41.1.3
7-1-4/41.1.4
7-1-4/41.1.7
7-1-4/41.1.5
7-1-4/41.5
7-1-4/41.3
6-1-6/7.3.2(a)
6-1-6/7.3.2(b)
6-1-6/7.3.2(c)
7-1-4/41.7
7-1-4/41.9
----6-1-7/19.5
6-1-7/19.7
6-1-7/19.7
6-1-7/19.9
----6-1-7/19.11
6-1-7/19.11i)
6-1-7/19.11ii)
6-1-7/19.11iii)
--7-1-6/21
7-1-9/11.7
7-1-9/11.9
7-1-9/13
7-1-9/13.1
7-1-9/13.3
7-1-9/13.5
7-1-9/11
7-1-9/1

7-2-1
7-2-1/1
7-2-1/1.1
7-2-1/3
7-2-1/3.1
7-2-1/3.3
7-2-1/3.5
7-2-1/3.7
7-2-1/3.9
7-2-1/3.11

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
6-2-1/3.13
6-2-1/3.15
6-2-1/3.17
6-2-1/3.19
6-2-1/3.21
6-2-1/5
6-2-1/7
6-2-1/7.1
6-2-1/7.3
6-2-1/7.5
6-2-1/9
6-2-1/11
6-2-1/11.1
6-2-1/11.3
6-2-1/13
6-2-1/15
6-2-1/15.1
6-2-1/15.3
Part
6
Chapter
2
Section
2
6-2-2
6-2-2/1
6-2-2/1.1
6-2-2/1.3
6-2-2/1.5
6-2-2/1.7
6-2-2/1.9
6-2-2/1.9.1
6-2-2/1.11
6-2-2/1.11.1
6-2-2/1.11.2
6-2-2/1.11.2(a)
6-2-2/1.11.2(b)
6-2-2/1.11.2(c)
6-2-2/1.11.2i)
6-2-2/1.11.2ii)
6-2-2/1.11.3
6-2-2/1.11.4
6-2-2/1.11.4(a)
6-2-2/1.11.4(b)
6-2-2/1.11.5
6-2-2/1.11.5(a)
6-2-2/1.11.5(b)
6-2-2/1.11.5(c)
6-2-2/1.13
6-2-2/3
Part
6
Chapter
2
Section
3
6-2-3
6-2-3/1
Part
Chapter
Section
6-2-4
6-2-4/1
6-2-4/1.1
6-2-4/1.1.1
6-2-4/1.1.2
6-2-4/1.1.3
6-2-4/1.1.4

6
2
4

Title
Survey
Representative Spaces/Tanks
Spaces
Suspect Areas
Wind and Water Strakes
Notification and Availability for Survey
Damage, Failure and Repair
Examination and Repair
Repairs
Representation
Alterations
Welding and Replacement of Materials
Ordinary and Higher Strength Structural Steels
Special Materials
Incomplete Surveys
Lay-up and Reactivation
Units for Unrestricted Service
Units in Great Lakes Service
Surveys
Surveys After Construction
Survey Intervals
Survey Intervals
Units Unrestricted Service
Annual Surveys
Special Periodical Surveys
Continuous Surveys
In-line Surveys
Drydocking Survey or Equivalent
Underwater Inspection in Lieu of Drydocking Survey
Tail Shaft Surveys
Water-Lubricated Bearings in Fresh Water Exclusively
Water-Lubricated Bearings in Fresh Water and Sea Water
Single Screw
Multiple Screw
Continuous Liner or Equivalent
----Oil-Lubricated Bearings
Extensions Water-Lubricated Bearings
Extension up to Three (3) Months
Extension up to One (1) Year
Extensions Oil-Lubricated Bearings
Extension up to Three (3) Months
Extension up to One (1) Year
Extensions not Exceeding Five (5) Years
Auxiliary Boiler Surveys
Units Great Lakes Service
Surveys
Surveys After Construction
Survey Pre-planning
Survey Pre-planning
Special Surveys, Drydocking Surveys, and Underwater Inspections in Lieu of
Drydocking
Surveys
Surveys After Construction
Annual Surveys
Annual Surveys
Annual Survey Hull
All Types of Mobile Offshore Drilling Units
---------

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
7-2-1/3.13
7-2-1/3.15
7-2-1/3.17
7-2-1/3.19
7-2-1/3.21
7-2-1/5
7-2-1/7
7-2-1/7.1
7-2-1/7.3
7-2-1/7.5
7-2-1/9
7-2-1/11
7-2-1/11.1
7-2-1/11.3
7-2-1/13
7-2-1/15
7-2-1/15.1
7-2-1/15.3

7-2-2
7-2-2/1
7-2-2/1.1
7-2-2/1.3
7-2-2/1.5
7-2-2/1.7
7-2-2/1.9
7-2-6/3
7-2-2/1.11
7-2-2/1.11.1
7-2-2/1.11.2
7-2-2/1.11.2(a)
7-2-2/1.11.2(b)
7-2-2/1.11.2(c)
7-2-2/1.11.2i)
7-2-2/1.11.2ii)
7-2-2/1.11.3
7-2-2/1.11.4
7-2-2/1.11.4(a)
7-2-2/1.11.4(b)
7-2-2/1.11.5
7-2-2/1.11.5(a)
7-2-2/1.11.5(b)
7-2-2/1.11.5(c)
7-2-2/1.13
7-2-2/3

7-2-3
7-2-3/1

7-2-4
7-2-4/1
7-2-4/1.1
7-2-4/1.1.1
7-2-4/1.1.1
7-2-4/1.1.2
7-2-4/1.1.3

79

Notices and General Information


MODU 2008
6-2-4/1.1.5
6-2-4/1.1.6
6-2-4/1.1.7
6-2-4/1.1.8
6-2-4/1.1.9
6-2-4/1.3
6-2-4/1.5
6-2-4/1.7
6-2-4/1.9
6-2-4/1.11
6-2-4/3
6-2-4/3.1
6-2-4/3.3
6-2-4/3.5
6-2-4/3.7
6-2-4/3.9
6-2-4/5
Part
6
Chapter
2
Section
5
6-2-5
6-2-5/1
6-2-5/1.1
6-2-5/1.1.1

Title
----------Corrosion Control Systems
Alterations and Position of Load Lines
Surface-type Units
Self-elevating Units
Column-stabilized Units
Annual Survey Machinery and Electrical Systems
Non-self-propelled Units
Self-propelled Units
Preventative Maintenance Techniques
Examination during Overhaul
Examination at Shorter Intervals
Thrusters and Dynamic Positioning Systems
Construction
Surveys After Construction
Special Periodical Surveys
Special Periodical Surveys
Special Periodical Survey Hull No. 1
General All Types of Mobile Offshore Drilling Units
---

6-2-5/1.1.2

---

6-2-5/1.1.3
6-2-5/1.1.4
6-2-5/1.1.5
6-2-5/1.1.6
6-2-5/1.1.7
6-2-5/1.1.8

-------------

6-2-5/1.1.9

---

6-2-5/1.3
6-2-5/1.3.1
6-2-5/1.5
6-2-5/1.5.1
6-2-5/1.5.2
6-2-5/1.5.3
6-2-5/1.5.4
6-2-5/1.5.5
6-2-5/1.5.6
6-2-5/1.7
6-2-5/3
6-2-5/3.1
6-2-5/3.3
6-2-5/3.5
6-2-5/3.5.1
6-2-5/3.5.1i)
6-2-5/3.5.1ii)
6-2-5/3.5.1iii)
6-2-5/3.5.1iv)
6-2-5/3.5.1v)
6-2-5/3.5.1vi)
6-2-5/3.5.1vii)
6-2-5/3.5.2
6-2-5/3.5.2i)
6-2-5/3.5.2ii)
6-2-5/3.5.2iii)
6-2-5/3.5.2iv)
6-2-5/3.5.3

Surface-type Units
--Self-elevating Units
------------Column-stabilized Units
Special Survey No. 2 and Subsequent
General
Thickness Gauging Requirements
Nondestructive Testing
Column-Stabilized Units
--------------Self-Elevating Units
--------Record Keeping

80

MODU 2012
7-2-4/1.1.4
7-2-4/1.1.5
7-2-4/1.1.6
7-2-4/1.1.7
7-2-4/1.1.8
7-2-4/1.1.10
7-2-4/1.1.11
7-2-4/1.3
7-2-4/1.5
7-2-4/1.7
7-2-4/3
7-2-4/3.1
7-2-4/3.3
7-2-4/3.5
7-2-4/3.7
7-2-4/3.9
7-2-4/5

7-2-5
7-2-5/1
7-2-5/1.1
7-2-5/1.1.1
7-2-5/1.1.2
7-2-5/1.1.3
7-2-5/1.1.4
7-2-5/1.1.5
7-2-5/1.1.6
7-2-5/1.1.7
7-2-5/1.1.8
7-2-5/1.1.9
7-2-5/1.1.10
7-2-5/1.1.11
7-2-5/1.1.12
7-2-5/1.1.13
7-2-5/1.3
7-2-5/1.3.1
7-2-5/1.5
7-2-5/1.5.1
7-2-5/1.5.2
7-2-5/1.5.3
7-2-5/1.5.4
7-2-5/1.5.5
7-2-5/1.5.6
7-2-5/1.7
7-2-5/3
7-2-5/3.1
7-2-5/3.9
--7-2-5/3.5
7-2-5/3.5i)
7-2-5/3.5ii)
7-2-5/3.5iii)
7-2-5/3.5iv)
7-2-5/3.5v)
7-2-5/3.5vi)
7-2-5/3.5vii)
7-2-5/3.3
7-2-5/3.3i)
7-2-5/3.3ii)
7-2-5/3.3iii)
7-2-5/3.3iv)
7-2-5/3.7

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
6-2-5/3.5.3i)
6-2-5/3.5.3ii)
6-2-5/5
6-2-5/5.1

Title
----Special Periodical Survey Machinery
Correlation with Special Periodical Survey Hull

6-2-5/5.3

Parts to be Examined

6-2-5/5.3.1

---

6-2-5/5.3.2

---

6-2-5/5.3.3
6-2-5/5.3.4
6-2-5/7
6-2-5/7.1
6-2-5/7.3
6-2-5/7.3.1
6-2-5/7.3.2
6-2-5/7.3.3
6-2-5/7.3.4
6-2-5/7.3.5
6-2-5/7.3.6
6-2-5/7.5
6-2-5/7.7
6-2-5/9
6-2-5/9.1
6-2-5/9.3
6-2-5/9.5
6-2-5/9.7
6-2-5/9.9
6-2-5/9.11
6-2-5/9.13
6-2-5/9.15
6-2-5/11
6-2-5/13
6-2-5/Table 1
6-2-5/Table 2
6-2-5/Table 3
Part
6
Chapter
2
Section
6
6-2-6
6-2-6/1
6-2-6/1.1
6-2-6/1.3
6-2-6/1.3i)
6-2-6/1.3ii)
6-2-6/1.3iii)
6-2-6/1.3iv)
6-2-6/1.3v)
6-2-6/1.5
6-2-6/1.7
6-2-6/1.7.1
6-2-6/1.7.2
6-2-6/1.7.3
6-2-6/1.9
6-2-6/1.9.1
6-2-6/1.9.2
6-2-6/1.9.3
6-2-6/3
6-2-6/3.1
6-2-6/3.1.1
6-2-6/3.1.2
6-2-6/3.1.3
6-2-6/3.1.4

----Special Periodical Survey Electrical Equipment


Correlation with Special Periodical Surveys Hull
Parts to be Examined
------------Self Propelled Units Main Propulsion Apparatus
Major Repairs
Special Periodical Survey Special Features (All Types)
Correlation with Special Periodical Surveys Hull Hazardous Areas
Hazardous Areas
Remote Shutdown Arrangements
Passive Fire Protection System
Active Fire Protection Systems and Equipment
Outfitting
Piping Systems Supporting the Drilling System
Self-Elevating Drilling Units Leg Jacking Systems
Thrusters and Dynamic Position Systems
Units with Retractable Propulsion Thrusters
Thickness Gauging Requirements for Surface-type Units
Thickness Gauging Requirements for Self-elevating Units
Thickness Gauging Requirements for Column-Stabilized Units
Surveys
Surveys After Construction
Drydocking Surveys or Equivalent
Drydocking Survey or Equivalent
Parts to be Examined
Surface-type Units (Ship or Barge Type Units)
Self-Elevating Units
----------Column-Stabilized Units
Ballast and Preload Spaces All Units
Surface-Type Units
Self-Elevating Units
Column-stabilized Units
All Units
Internal Examinations of Tanks and Voids
Sea Valves
External Portions of Propulsion Units
Underwater Inspection in Lieu of Drydocking (UWILD)
Conditions
Limitations
Thickness Gauging and Nondestructive Testing
Plans and Data
Underwater Conditions

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
7-2-5/3.7i)
7-2-5/3.7ii)
7-2-5/5
7-2-5/5.1
7-2-5/5.3
7-2-5/5.5
7-2-5/5.3.1
7-2-5/5.3.2
7-2-5/5.3.3
7-2-5/5.3.4
7-2-5/5.3.5
7-2-5/5.3.6
7-2-5/7
7-2-5/7.1
7-2-5/7.3
7-2-5/7.3.1
7-2-5/7.3.2
7-2-5/7.3.3
7-2-5/7.3.4
7-2-5/7.3.5
7-2-5/7.3.7
7-2-5/7.5
7-2-5/7.7
7-2-5/9
7-2-5/9.1
7-2-5/9.3
7-2-5/9.5
7-2-5/9.7
7-2-5/9.9
7-2-5/9.11
7-2-5/9.13
7-2-5/9.15
7-2-5/11
7-2-5/13
7-2-5/Table 1
7-2-5/Table 2
7-2-5/Table 3

7-2-6
7-2-6/1
7-2-6/1.1
7-2-6/1.3
7-2-6/1.3i)
7-2-6/1.3ii)
7-2-6/1.3iii)
7-2-6/1.3iv)
7-2-6/1.3v)
7-2-6/1.5
7-2-6/1.7
7-2-6/1.7.1
7-2-6/1.7.2
7-2-6/1.7.3
7-2-6/1.9
7-2-6/1.9.1
7-2-6/1.9.2
7-2-6/1.9.3
7-2-6/3
7-2-6/3.1
7-2-6/3.1.1
7-2-6/3.1.2
7-2-6/3.1.3
7-2-6/3.1.4

81

Notices and General Information


MODU 2008
6-2-6/3.3
6-2-6/3.3.1
6-2-6/3.3.2
6-2-6/3.3.3
6-2-6/3.3.4
6-2-6/3.5
6-2-6/3.5.1
6-2-6/3.5.2
6-2-6/3.5.3
6-2-6/3.7
Part
6
Chapter
2
Section
7
6-2-7
Part
6
Chapter
2
Section
8
6-2-8
6-2-8i)
6-2-8ii)
6-2-8iii)
6-2-8iv)
Part
6
Chapter
2
Section
9
6-2-9
6-2-9/1
6-2-9/1.1
6-2-9/1.3
6-2-9/1.5
6-2-9/1.7
Part
6
Chapter
2
Section
10
6-2-10
6-2-10/1
6-2-10/3
6-2-10/3.1
6-2-10/3.3
6-2-10/3.5
6-2-10/5
Part
6
Chapter
2
Appendix 1
6-2-A1
6-2-A1/1
6-2-A1/1.1
6-2-A1/1.1i)
6-2-A1/1.1ii)
6-2-A1/1.1iii)
6-2-A1/1.3
6-2-A1/1.3i)
6-2-A1/1.3ii)
6-2-A1/1.3iii)
6-2-A1/1.3iv)
6-2-A1/1.3v)
6-2-A1/1.3vi)
6-2-A1/1.3vii)
6-2-A1/1.3viii)
6-2-A1/1.3ix)
6-2-A1/1.3x)
6-2-A1/1.3xi)
6-2-A1/1.3xii)

82

Title
MODU 2012
Physical Features
7-2-6/3.3
Stern Bearing
7-2-6/3.3.1
Rudder Bearings
7-2-6/3.3.2
Sea Suctions
7-2-6/3.3.3
Sea Valves
7-2-6/3.3.4
Procedures
7-2-6/3.5
Exposed Areas
7-2-6/3.5.1
Underwater Areas
7-2-6/3.5.2
Damage Areas
7-2-6/3.5.3
Alternatives
7-2-6/3.11
Surveys
Surveys After Construction
Specific Survey on Self-Elevating Units After Ocean Transit Tow
Specific Survey on Self-elevating Units After Ocean Transit Tow
7-2-7
Surveys
Surveys After Construction
Tail Shaft Surveys
Tail Shaft Surveys
7-2-8
--7-2-8i)
--7-2-8ii)
--7-2-8iii)
--7-2-8iv)
Surveys
Surveys After Construction
Boiler Surveys
Boiler Surveys
7-2-9
Parts to be Examined
7-2-9/1
--7-2-9/1.1
--7-2-9/1.3
--7-2-9/1.5
--7-2-9/1.7
Surveys After Construction
Surveys After Construction
Automatic and Remote-control Systems
Automatic and Remote-control Systems
7-2-10
Annual Survey
7-2-10/1
Special Periodical Surveys
7-2-10/3
Control Actuators
7-2-10/3.1
Electrical
7-2-10/3.3
Unattended Plants
7-2-10/3.5
Repairs or Alternatives
7-2-10/5
Surveys
Surveys After Construction
Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units
Guide for Lay-up and Reactivation of Laid-up Mobile Offshore Drilling Units
7-2-A1
Guide for Lay-up of Mobile Offshore Drilling Units
7-2-A1/1
Lay-up Requirements
7-2-A1/1.1
--7-2-A1/1.1i)
--7-2-A1/1.1ii)
--7-2-A1/1.1iii)
Safety and Protection
7-2-A1/1.3
--7-2-A1/1.3i)
--7-2-A1/1.3ii)
--7-2-A1/1.3iii)
--7-2-A1/1.3iv)
--7-2-A1/1.3v)
--7-2-A1/1.3vi)
--7-2-A1/1.3vii)
--7-2-A1/1.3viii)
--7-2-A1/1.3ix)
--7-2-A1/1.3x)
--7-2-A1/1.3xi)
--7-2-A1/1.3xii)
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Notices and General Information


MODU 2008
6-2-A1/1.3xiii)
6-2-A1/1.3xiv)
6-2-A1/1.3xv)
6-2-A1/1.3xvi)
6-2-A1/1.5
6-2-A1/1.5.1
6-2-A1/1.5.1(a)
6-2-A1/1.5.1(b)
6-2-A1/1.5.1(c)
6-2-A1/1.5.1(d)
6-2-A1/1.5.1(e)
6-2-A1/1.5.1(f)
6-2-A1/1.5.1(g)
6-2-A1/1.5.1(h)
6-2-A1/1.5.1(i)
6-2-A1/1.5.1(j)
6-2-A1/1.5.1(k)
6-2-A1/1.5.1(l)
6-2-A1/1.5.1(m)
6-2-A1/1.5.1(n)
6-2-A1/1.5.1(o)
6-2-A1/1.5.1(p)
6-2-A1/1.5.1(q)
6-2-A1/1.5.1(r)
6-2-A1/1.5.2
6-2-A1/1.5.2(a)
6-2-A1/1.5.2(b)
6-2-A1/1.5.2(c)
6-2-A1/1.5.2(d)
6-2-A1/1.5.2(e)
6-2-A1/1.5.2(f)
6-2-A1/1.5.2(g)
6-2-A1/1.5.2(h)
6-2-A1/1.5.2(i)
6-2-A1/1.5.3
6-2-A1/1.5.3(a)
6-2-A1/1.5.3(b)
6-2-A1/1.5.4
6-2-A1/1.5.5
6-2-A1/1.5.5(a)
6-2-A1/1.5.5(b)
6-2-A1/1.5.5(c)
6-2-A1/1.5.5(d)
6-2-A1/1.5.5(e)
6-2-A1/1.5.5(f)
6-2-A1/1.5.5(g)
6-2-A1/1.5.5(h)
6-2-A1/1.5.5(i)
6-2-A1/1.5.6
6-2-A1/1.5.7
6-2-A1/1.5.7(a)
6-2-A1/1.5.7(a)i)
6-2-A1/1.5.7(a)ii)
6-2-A1/1.5.7(a)iii)
6-2-A1/1.5.7(a)iv)
6-2-A1/1.5.7(a)v)
6-2-A1/1.5.7(a)vi)
6-2-A1/1.5.7(a)vii)
6-2-A1/1.5.7(a)viii)
6-2-A1/1.5.7(a)ix)
6-2-A1/1.5.7(a)x)
6-2-A1/1.5.7(a)xi)
6-2-A1/1.5.7(b)
6-2-A1/1.5.7(b)i)

Title
--------Preservation and Maintenance
Hull and Deck Equipment
------------------------------------Machinery Spaces, Machinery, and Drilling Equipment
------------------Boilers
----Boiler Stack Openings
Electrical Installation
------------------Tensioning System and Heave Compensators
Lay-up Site and Mooring Arrangements
Lay-up Site Considerations
----------------------Mooring Arrangements Considerations
---

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

MODU 2012
7-2-A1/1.3xiii)
7-2-A1/1.3xiv)
7-2-A1/1.3xv)
7-2-A1/1.3xvi)
7-2-A1/1.5
7-2-A1/1.5.1
7-2-A1/1.5.1(a)
7-2-A1/1.5.1(b)
7-2-A1/1.5.1(c)
7-2-A1/1.5.1(d)
7-2-A1/1.5.1(e)
7-2-A1/1.5.1(f)
7-2-A1/1.5.1(g)
7-2-A1/1.5.1(h)
7-2-A1/1.5.1(i)
7-2-A1/1.5.1(j)
7-2-A1/1.5.1(k)
7-2-A1/1.5.1(l)
7-2-A1/1.5.1(m)
7-2-A1/1.5.1(n)
7-2-A1/1.5.1(o)
7-2-A1/1.5.1(p)
7-2-A1/1.5.1(q)
7-2-A1/1.5.1(r)
7-2-A1/1.5.2
7-2-A1/1.5.2(a)
7-2-A1/1.5.2(b)
7-2-A1/1.5.2(c)
7-2-A1/1.5.2(d)
7-2-A1/1.5.2(e)
7-2-A1/1.5.2(f)
7-2-A1/1.5.2(g)
7-2-A1/1.5.2(h)
7-2-A1/1.5.2(i)
7-2-A1/1.5.3
7-2-A1/1.5.3(a)
7-2-A1/1.5.3(b)
7-2-A1/1.5.4
7-2-A1/1.5.5
7-2-A1/1.5.5(a)
7-2-A1/1.5.5(b)
7-2-A1/1.5.5(c)
7-2-A1/1.5.5(d)
7-2-A1/1.5.5(e)
7-2-A1/1.5.5(f)
7-2-A1/1.5.5(g)
7-2-A1/1.5.5(h)
7-2-A1/1.5.5(i)
7-2-A1/1.5.6
7-2-A1/1.5.7
7-2-A1/1.5.7(a)
7-2-A1/1.5.7(a)i)
7-2-A1/1.5.7(a)ii)
7-2-A1/1.5.7(a)iii)
7-2-A1/1.5.7(a)iv)
7-2-A1/1.5.7(a)v)
7-2-A1/1.5.7(a)vi)
7-2-A1/1.5.7(a)vii)
7-2-A1/1.5.7(a)viii)
7-2-A1/1.5.7(a)ix)
7-2-A1/1.5.7(a)x)
7-2-A1/1.5.7(a)xi)
7-2-A1/1.5.7(b)
7-2-A1/1.5.7(b)i)

83

Notices and General Information


MODU 2008
6-2-A1/1.5.7(b)ii)
6-2-A1/1.5.7(b)iii)
6-2-A1/1.5.7(b)iv)
6-2-A1/1.5.7(b)iv)a)
6-2-A1/1.5.7(b)iv)b)
6-2-A1/1.5.7(b)iv)c)
6-2-A1/1.5.7(b)iv)d)
6-2-A1/1.5.7(b)v)
6-2-A1/1.5.7(b)vi)
6-2-A1/1.5.7(b)vii)
6-2-A1/1.5.7(b)viii)
6-2-A1/1.5.7(b)ix)
6-2-A1/1.5.7(b)x)
6-2-A1/1.5.7(b)xi)
6-2-A1/1.5.7(b)xii)
6-2-A1/1.5.7(b)xiii)
6-2-A1/3
6-2-A1/3.1
6-2-A1/3.1i)
6-2-A1/3.1ii)
6-2-A1/3.1iii)
6-2-A1/3.3
6-2-A1/3.3.1
6-2-A1/3.3.2
6-2-A1/3.3.2i)
6-2-A1/3.3.2ii)
6-2-A1/3.3.2iii)
6-2-A1/3.3.2iv)
6-2-A1/3.3.2v)
6-2-A1/3.3.2vi)
6-2-A1/3.3.2vii)
6-2-A1/3.3.2viii)
6-2-A1/3.3.2ix)
6-2-A1/3.3.2x)
6-2-A1/3.3.2xi)
6-2-A1/3.3.2xii)
6-2-A1/3.5
6-2-A1/3.5i)
6-2-A1/3.5ii)
6-2-A1/3.5iii)
6-2-A1/3.5iv)
6-2-A1/3.5v)
6-2-A1/3.5vi)
6-2-A1/3.5vii)
6-2-A1/3.5viii)
6-2-A1/3.5ix)
6-2-A1/3.5x)
6-2-A1/3.5xi)
6-2-A1/3.5xii)
6-2-A1/3.5xiii)
6-2-A1/3.7
6-2-A1/3.7i)
6-2-A1/3.7ii)
6-2-A1/3.7iii)
6-2-A1/3.9
6-2-A1/3.11
6-2-A1/3.13
6-2-A1/3.15
6-2-A1/3.15i)
6-2-A1/3.15ii)
6-2-A1/3.15iii)

84

Title
--------------------------------Guide for Reactivation of Laid-up Mobile Offshore Drilling Units
Reactivation Survey Status
------Hull and Outfit
Drydocking Survey
Witnessing of Functional Testing or Verification of Fitness for Service
------------------------Machinery and Drilling Equipment
--------------------------Electrical
------Tensioner System and Motion Compensator
Control and Instrumentation
Trial
Documentation and Certification
-------

MODU 2012
7-2-A1/1.5.7(b)ii)
7-2-A1/1.5.7(b)iii)
7-2-A1/1.5.7(b)iv)
7-2-A1/1.5.7(b)iv)a)
7-2-A1/1.5.7(b)iv)b)
7-2-A1/1.5.7(b)iv)c)
7-2-A1/1.5.7(b)iv)d)
7-2-A1/1.5.7(b)v)
7-2-A1/1.5.7(b)vi)
7-2-A1/1.5.7(b)vii)
7-2-A1/1.5.7(b)viii)
7-2-A1/1.5.7(b)ix)
7-2-A1/1.5.7(b)x)
7-2-A1/1.5.7(b)xi)
7-2-A1/1.5.7(b)xii)
7-2-A1/1.5.7(b)xiii)
7-2-A1/3
7-2-A1/3.1
7-2-A1/3.1i)
7-2-A1/3.1ii)
7-2-A1/3.1iii)
7-2-A1/3.3
7-2-A1/3.3.1
7-2-A1/3.3.2
7-2-A1/3.3.2i)
7-2-A1/3.3.2ii)
7-2-A1/3.3.2iii)
7-2-A1/3.3.2iv)
7-2-A1/3.3.2v)
7-2-A1/3.3.2vi)
7-2-A1/3.3.2vii)
7-2-A1/3.3.2viii)
7-2-A1/3.3.2ix)
7-2-A1/3.3.2x)
7-2-A1/3.3.2xi)
7-2-A1/3.3.2xii)
7-2-A1/3.5
7-2-A1/3.5i)
7-2-A1/3.5ii)
7-2-A1/3.5iii)
7-2-A1/3.5iv)
7-2-A1/3.5v)
7-2-A1/3.5vi)
7-2-A1/3.5vii)
7-2-A1/3.5viii)
7-2-A1/3.5ix)
7-2-A1/3.5x)
7-2-A1/3.5xi)
7-2-A1/3.5xii)
7-2-A1/3.5xiii)
7-2-A1/3.7
7-2-A1/3.7i)
7-2-A1/3.7ii)
7-2-A1/3.7iii)
7-2-A1/3.9
7-2-A1/3.11
7-2-A1/3.13
7-2-A1/3.15
7-2-A1/3.15i)
7-2-A1/3.15ii)
7-2-A1/3.15iii)

ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS . 2012

Вам также может понравиться