Purpose of Recommendation Meeting #1

1 Purpose of Recommendation Meeting #1........................... 3 2 Public Benefits Overview .................................................. 4 3 Composite Plans .............................................................. 5 4 Block 14 .......................................................................... 8 5 Block 19 ........................................................................ 20 6 Block 20 ........................................................................ 34 7 Street Trees .................................................................... 46 8 Art ................................................................................ 47 9 Lighting ....................................................................... 48
10 Security ....................................................................... 52 11 Design Departures ......................................................... 53 12 Design Continuity ......................................................... 56

Goals for Session Our purpose for todays Recommendation Meeting is to present the following: A concise overview of the public benefits provided by the project Detailed architectural plans for the Ground Level and Level 1 on each block, showing all points of access for pedestrians, bicycles, autos and trucks A refined retail plan Advanced landscape plans for each block and intended outdoor uses/activities Selective street sections Building sections Perspective sketches describing faade treatments and perimeter landscape conditions As part of our presentation, we will address each of the Priorities and Board Recommendations from our second Early Design Guidance Meeting, including detailed aspects such as our preliminary thoughts regarding: Art Exterior lighting Security Rooftop elements Opportunities for design diversity and continuity Being respectful of the Boards time, as well as the concerns expressed earlier about the challenges associated with evaluating a project of this size and complexity, we are not intending to seek a formal approval from this session, but see it as an opportunity to catch everyone up on our progress and build understanding for an informed approval at a later date. We look forward to receiving the Boards input.

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Public Benefits Overview Context Diagram

9th Ave

De

y nn

ay W

8th Ave

Shared Use

20

W es
Street

tla

ke A

ve

Ma

ste

rP

7th Ave

Cycle Track Concept Design

lan

Lenora St.

Virginia St.

Bell St.

6th Ave

Blanchard Green Street

19

14

Stewart

Olive

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Pike

Composite Plan Site Access, Retail & Lobby Locations

8th Avenue
Retail Lobby Retail Entry Primary Building Entry Secondary Building Entry Garage Elevator Entry Service Vehicle Entry Parking Garage Entry

We s

tla

ke A

ve

nu

7th Avenue

Blanchard Street

6th Avenue
5

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Lenora Street

Composite Plan Landscape

8th Ave

Open Space Goals: Create diverse range of open spaces Differentiate character of open spaces on each block Maximize use of sunny locations Maximize public access Strengthen pedestrian/bike experience on 7th Ave Maximize opportunities for street tree plantings and furnishings

Mid-Rise Building

Office Tower

We s

tla

ke A

ve

7th Ave

Office Tower

Mid-Rise Building Lenora Street

Meeting Facility

Office Tower

Blanchard Street

20

19

14

6th Ave

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Composite Plan Rooftop Elements

8th Avenue

Floor 2 Floor 4 Floor 8 Floor 38

We s
2

Green Roof and Decorative Ballast Accessible Roof Deck with Landscape Accessible Roof Deck with Hardscape
Flo
Floor 4

tla

ke A

ve

nu

7th Avenue

or

Floor 30 Floor 36

Floor 5

Floor 5
DN

Floor 35

DN

DN

Blanchard Street

Floor 4

Floor 7 Floor 38

Floor 6

Floor 38

Floor 15

6th Avenue
7

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Lenora Street

Floor 4

Block 14 Sections
ROOF DECK

ROOF

OFFICE

OFFICE

ROOF DECK

OFFICE

ROOF DECK

ROOF DECK
CAFE

OPEN BRIDGE

ROOF DECK- CAFE

oor 2
LOBBY LOADING RAMP BICYCLE STORAGE LOCKERS GALLERY

MEZZ

AUDITORIUM

OPEN BRIDGE

ROOF DECK- CAFE

CAFE

PARKING

oo

r2

East - West Section

MEZZ

LOBBY LOADING RAMP


Floor 5
DN

AUDITORIUM GALLERY

or 5

Floor 35

BICYCLE STORAGE

LOCKERS

DN

DN

Floor 4 Floor 6

oor 7

East - West
Floor 38 Floor 15

East - West Building Section


PARKING

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Open Space Enhancements

Section Through Block 14 Open Space

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Site Access, Retail & Lobby Locations

7th Avenue
Retail Lobby Retail Entry Primary Building Entry Secondary Building Entry Garage Elevator Entry Service Vehicle Entry Parking Garage Entry

We s

tla

ke A

ve

nu

20

19

14

6th Avenue
10

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Lenora Street

Block 14 Level - G
Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space
DN UP DN

7th Avenue

We s

tla

ke A

ve

OFFICE
UP

nu

UP

DN

DN

DN

MEETING CENTER STORAGE

LOCKER ROOMS

BIKE STORAGE

20

MECHANICAL

CHILLER ROOM

PUMP ROOM

DN

19

14

6th Avenue
11

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Lenora Street

Block 14 Level - 1

Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space

7th Avenue

We s

tla

ke A

ve

nu

DN UP

DN

DN DN DN

UP UP DN

20

UP

19

14

6th Avenue
12

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Virginia Street

Lenora Street

Block 14 Loading Dock

Van 1

Van 2

Van 3

Van 4

Van 5

20

19

14
35 TRUCK 1 35 TRUCK 2 25 TRUCK 1 25 TRUCK 2
13

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Site Plan

7th Ave

W es

tla

ke A

ve

Bike Entry

Stairs

Overhead Connection Planters with Seatwalls


Lenora St Virginia St

Special Paving

6th Ave
14

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Open Space Enhancements Program: With an architectural trellis overhead to provide weather protection, the open space provides an inviting mid-block passage that meanders through lush planting areas. Ample seatwalls offer places to pause and gather, while art integrated into the site evokes a creative and inspirational sense of place.

15

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Open Space Enhancements

View A Looking into Mid-Block Public Space from 7th Ave

View B nto Mid-Block Open Space from 6th Ave

B
16

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Meeting Center

View of Meeting Center from 6th Ave & Lenora St


17

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Enhanced Streetcar Stop at Westlake Ave

View of Improved Westlake Ave Streetcar Stop at Block 14

18

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 14 Street Environment Enhancements

ROW

AA - Typical Section at Virginia Ave - Block 14

Improvements beyond existing curbline

Building Setback

B A A

BB - Typical Section at Westlake Ave - Block 14


19

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

ROW

Block 19 Sections

OFFICE

OFFICE

FIRE/ SERVICE ELEVATORS

OFFICE

OFFICE

OFFICE

Floor 2
LOBBY DOCK

Floor 4 Floor 8 Floor 38

FIRE/ SERVICE ELEVATORS

OFFICE

OFFICE

PARKING

OFFICE
East - West Building Section

Flo

Floor 4

or

LOBBY DOCK

Floor 30 Floor 36

Floor 5

Floor 5
DN

Floor 35

DN

DN

East - West
Floor 4 Floor 7 Floor 38

Floor 4 Floor 6

Floor 38

Floor 15

East - West Building Section


PARKING

20

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Open Space Enhancements

Section Through Block 19 Open Space

21

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Site Access, Retail & Lobby Locations

7th Avenue
Retail Lobby Retail Entry Primary Building Entry Secondary Building Entry Garage Elevator Entry Service Vehicle Entry Parking Garage Entry

Blanchard Street

20

19

14

6th Avenue
22

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 19 Level - G

Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space

7th Avenue

Blanchard Street

BIKE STORAGE

HVAC

LOCKER ROOMS

20
CHILLERS AND PUMPS FIRE PUMPS, HVAC

19

14

6th Avenue
23

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 19 Level - 1

7th Avenue
Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space
OFFICE OFFICE

Blanchard Street

DN

20

19

14

6th Avenue
24

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 19 Loading Dock

Van 1

Van 2

Van 3

Van 4

Van 5

20

19

14 35 TRUCK 1 35 TRUCK 2 25 TRUCK 1 25 TRUCK 2


25

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

7th Ave

Block 19 Site Plan

Playfield

Terraced Seatwalls

Blanchard St

Off-Leash Dog Area

6th Ave
26

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora St

Block 19 Open Space Enhancements Program: The generous open space on Block 19 creates a neighborhood place to gather and enjoy the outdoors. With an emphasis on flexibility and resilience, the playfield invites a wide range of recreational activities, while the terraced seatwalls provide additional gathering areas where people can enjoy the dynamics of urban life. An off-leash area adds an important amenity for dog owners, who can safely exercise their pets in an urban neighborhood.

27

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Open Space Enhancements

View of Block 19 Open Space: Sports Field and Dog Park


28

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Open Space Enhancements

View of Mid-Block Open Space and Sports Field on Block 19

29

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Blanchard Green Street

View of Green Street Improvements along Blanchard St


30

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 19 Blanchard Green Street

View of Green Street Improvements along Blanchard St

Plan Detail of Blanchard St Improvements between 6th & 7th Ave


31

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Blanchard St

Block 19 Street Environment Enhancements

Building Setback B

A 12 AA - Typical Section at Blanchard St - Blocks 19 and 20 10

32

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

ROW

Block 19 Street Environment Enhancements

ROW

6 Improvements beyond existing curbline

38 Improvements beyond existing curbline

BB - Typical Section at 7th Ave Cycle Track - Blocks 19 and 20


33

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

ROW

Block 20 Sections

OFFICE

ROOF

MECH. PENTHOUSE

OFFICE

OFFICE

EXHAUST

RETAIL

LOBBY

PLAZA

ELEV.

RETAIL

BIKE LOCKERS

LOADING DOCK

PARKING PARKING

East - West Section


OFFICE

Floor 2 Floor 4 Floor 8 Floor 38

EXHAUST

RETAIL

LOBBY

PLAZA

ELEV.

RETAIL

East - West
BIKE LOCKERS
r2

LOADING DOCK

Flo o

Floor 4

East - West Building Section

34
Floor 30 Floor 36 Floor 5

PARKING
Floor 5
DN

Floor 35

PARKING

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012
DN DN

Floor 4 Floor 7 Floor 6

Block 20 Open Space Enhancements

Section Through Block 19 Open Space

35

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 20 Site Access, Retail & Lobby Locations

Retail Lobby Retail Entry Primary Building Entry Secondary Building Entry Garage Elevator Entry Service Vehicle Entry Parking Garage Entry

8th Avenue

We s

tla

ke A

ve

nu

Blanchard Street

20

19

14

7th Avenue
36

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 20 Level - G

8th Avenue
Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space
BIKE STORAGE

We s

tla

ke A

ve

nu

Blanchard Street

DN DN UP

LOCKER ROOMS

DN RAMP DN

20
MECHANICAL AND BOILERS

19

14

7th Avenue
37

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 20 Level - 1

8th Avenue
Stairs Elevator Parking Elevator Retail Lobby Parking Ramp Loading Dock Meeting Space
UP

We s

tla

ke A

ve

nu

OFFICE OFFICE

Blanchard Street

UP

UP

DN

UP

DN

20

19

14

7th Avenue
38

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora Street

Block 20 Loading Dock

Van 1

Van 2

Van 3

Van 4

Van 5

20

19

14
35 TRUCK 1 35 TRUCK 2 25 TRUCK 1 25 TRUCK 2
39

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

8th Ave

Block 20 Site Plan


We st lak eA

ve

Overhead Connection Retail Seating Area Blanchard St

Special Paving Stormwater Feature

Shared-Use Street

Seating

7th Ave

40

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora St

Block 20 Open Space Enhancements Program: The garden plaza features a variety of seating opportunities throughout the planting areas and at retail frontages. Distinctive paving patterns and materials lend character and definition to gathering and pass-through spaces. A landscaped runnel arcs through the site, collecting site stormwater as an aesthetic feature that evokes an element of play and dynamism.

41

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 20 Open Space Enhancements Program: Capitalizing on the sunny exposure, the plaza incorporates gathering areas throughout the landscape, with additional seating opportunities along the stairs. The plazas paving pattern extends across Lenora St. to create a pedestrian-friendly, shared-use street that connects improvements on Westlake Blvd. and 7th Ave.

We s

tla

ke A

ve

42

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lenora St

Block 20 Open Space Enhancements

View of Block 20 Shared Use Street and Gathering Space


43

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 20 Street Environment Enhancements

View of Lenora - Shared Use Street


44

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Block 20 Street Environment Enhancements

Building Setback

ROW

12-6 24 Shared Use Street Section at Lenora St - Block 20 22 Improvements beyond existing curbline 8 12

45

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Materials Street Trees

Horsechestnut @ Westlake Ave

Swamp White Oak @ 6th

Accolade Elm @ 7th Ave

Frontier Elm @ 8th Ave

20

19

14
Tschonoski Crabapple @ Blanchard Franz Fontaine Hornbeam @ Lenora Afterburner Tupelo @ Virgina

46

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

1 3 1

Art Opportunities
Amazon envisions art as key to creating a sense of place. With the guidance of an experienced art advisor, Margery Aronson, the team is developing an overall plan for art in the Denny Triangle project. A minimum of two signature artworks, visible from a distance and located on Blocks 14 and 20, will draw people into the neighborhood. To invite a closer exploration of the new streetscapes and open spaces, the project will incorporate unexpected and found art in the form of permanent artwork and installations, artist-made building parts, temporary exhibitions in collaboration with local artists and selected work by art students and Amazon employees. The art program will be reinforced by an interpretive signage program highlighting local history and environment, as well as the art itself. Prior to issuance of the building permit for each block, a final artwork plan will be reviewed with the Office of Arts and Cultural Affairs and its Public Arts Advisory Committee. 1 Signature Artwork Commissioned artworks Purchased artworks 2 Integrated Artwork Permanent art installations Easter Eggs (unexpected or found art) Collaborations with art educators (student projects) Amazon.com art (employee art projects) 3 Artist-Made Building Parts Outdoor furniture (i.e., benches, bollards, trash & recycle containers) Walking surfaces (pavers, paving patterns & insets) Manhole covers Tree grates Fences and gates Canopies and screens Lighting 4 Interpretive Art Program Narratives about artworks and artists Historical context Horticultural references

Alternate locations for block 20 signature art

3,4 2,3,4 3 1 3,4 1

3,4 2,3,4 3 2,3,4

47

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lighting Illustrated Plan


Exterior lighting will play a large role in the nighttime activity and appearance of the three projects. The primary lighting concept for each block creates a unique experience for each block while providing unity across the three projects. The exterior lighting fixtures will be incorporated into architectural and landscape elements to activate the sites and invite exploration of the new streetscapes and open spaces, and will provide function light levels to meet safety and security needs. Energy efficient fixtures will be used to minimize energy use, and fixtures will be selected, located, and controlled to minimize brightness and glare - both on the sites and to the surrounding buildings and neighbors. Block 14 - Gallery A Illuminated benches and site walls to highlight paths and stairs B Colored linear fixtures to highlight gallery space C Supplemental downlights for fucntional lighting Block 19 - Park D Pedestrian-scale pole fixtures to highlight curved path E Low-level steplights outline and reveal the playfield F Illuminated playfield to allow for nighttime activities (fixtures to be low-glare and switched off by a time clock) G Low-level steplights highlight stairs for safety H Bollards integrated into the fence illuminate the offleash dog area Block 20 - Garden I Illuminated groups of trees J Low-level landscape fixtures illuminate paths and stairs K Illuminated benches and site walls highlight path Throughout L Canopy lighting at building perimeter M Brithly illuminated garage entries

K J I

G L D F E

L A L

B, C H

48

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lighting Block 14 Exterior Lighting Concept - Gallery

49

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lighting Block 19 Exterior Lighting Concept - Park

50

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

Lighting Block 20 Exterior Lightign Concept - Garden

51

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

10

Security

Security Design Concepts for Public Spaces The plans for the public spaces have been based on the basic principles of Crime Prevention Through Environmental Design (CPTED), which is an approach to crime prevention that takes into account the relationship between the physical environment and the users of that environment with the ultimate goal of making the publics use of our spaces a safe and enjoyable occasion. A few examples of where we have leveraged CPTED include: Sizing and locating landscape materials to increase the visitors ability to see and be seen Well-lit paths and walkways that permit identifying a person from a distance Locating garage elevator lobbies so that they empty into public open spaces rather than the office towers Site lighting that limits areas cast in shadow, Windows that permit a high degree of visibility into and from the building lobbies Designing paths between buildings to increase foot traffic in exterior public areas. Security cameras will monitor the public areas and security professionals will be stationed at all times in the lobbies of the buildings as well as patrolling the outdoor areas. These same areas will also be equipped with highly visible emergency phone stations that connect directly to 911. If an emergency situation should occur outdoors during the evening hours, the security operations center will have the ability to increase the exterior lighting to assist the Seattle Police and Fire Departments.

52

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

11
Item #
1

Summary of Potential Development Standard Departures


Development Standard
SMC 23.49.058.C Upper Level Development Standard

Requirement
Portion of building above 240 feet shall be no more than 145 feet along the general N_S axis of a site( in this case parallel to 7th and 8th Avenues. Note that Westlake Ave is oriented true north and is therefore not considered parallel to the general north-south axis of the Avenues).

Departure Amount Required


On Block 20, portion of building above 240 feet shall be approximately 200 feet along the general N_S axis of a site(in this case, parallel to 7th and 8th Avenues. Note that Westlake Ave does not align with the general N_S axis of the site and any portion of a building above 240 that aligns with Westlake will require a departure).

Rationale
Block 20 is at the intersection between the general N-S grid of 7th and 8th Avenues as well and Westlake Avenue which is aligned true north. The main axis of the building is oriented along Westlake Avenue as the primary Avenue in this neighborhood and meets the spirit of the code. In addition, the Westlake orientation for the Block 20 tower would: 1) better address Westlake as a primary arterial connecting the Downtown Core with South Lake Union 2) create more open space at street level that has better solar access 3) create a large open space or urban room across the three sites when the office tower on Block 20 is oriented parallel to Westlake coupled with the office towers on Blocks 14 and 19 oriented parallel to the Streets

Downtown Design Guidelines Reinforced


A-1 Respond to physical environment A-2 Enhance the skyline B-1 Respond to neighborhood context B-3 Reinforce the positive urban form and architectural attributes of immediate area

Diagram
See Diagram 1

SMC 23.54.035.C.2 Loading Berth Requirements and Space Standards

The standard length of a loading berth shall be 10 feet x 35 feet.

On Blocks 14, 19 and 20 at the main loading dock, we will provide two 10 x 35 deep loading berths and two 10 x 25 deep loading berths. We request a design departure to permit five loading berths to be van sized spaces measuring 8-6 x 19-0. We further request that one additional van size stall measuring 8-6 x 19-0 and located on level P1 of the garage be provided to service the retail spaces on each block.

A high percentage of the deliveries made to Amazon buildings are done by carriers such as Apex, UPS which smaller vans that do not require standard loading berths sized at 10 x 35. This will enable to loading dock to be sized more efficiently to meet the true loading demands of the building user. A more compact loading dock will also permit more space for uses such as retail at the ground level. We have prepared a study of dock use and capacity at Amazon buildings as well as downtown high rises including Seattle Municipal Tower and Russell Investment Center and the data does support the following: - 9 loading berths would adequate serve the peak office demand at each of the buildings. - 5 (or more) of those spaces could be reduced in size. - If the building were ever converted to a multi-tenant building, the loading dock is still adequate (and in fact would probably be oversized).

C-1 Promote pedestrian interaction. C-3 Provide active not blank facades

See Diagrams 2 -4 for layout of each loading dock on Blocks 14, 19 and 20. See Diagrams 5-7 for proposed location of van parking stall for retail loading on P1 level of the garage on Blocks 14, 19 and 20.

DIAGRAM #1

8TH AVE. (GENERAL N-S AXIS)

ES

TL

MA

AK

IN

AX

IS

EA VE

OF

BU

ILD

IN

BLANCHARD ST.

8TH AVE. (GENERAL N-S AXIS)

212 REQUESTED
ALONG GENERAL N-S AXIS OF SITE PARALLEL TO AVENUES

67
DEPARTURE REQUESTED

145
LENGTH PERMITTED

LENORA ST.

53

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

11

Summary of Potential Development Standard Departures

Design departure requested to permit five loading berths to be van sized spaces measuring 8-6 x 19-0.
DN UP DN

W es

tla

ke

DN

Av

7th Avenue

7th Avenue

en

ue

Van 5 25 Truck 1 Van 4 Van 3 Van 2 Van 1 Blanchard Street Van 1 25 Truck 2 25 Truck 1
DN

Van 4 Van 3 Van 2 35 Truck 2 35 Truck 1


DN

25 Truck 1

35 Truck 1

35 Truck 2

25 Truck 2

Virginia Street

Van 5

Blanchard Street

25 Truck 2

35 Truck 1

35 Truck 2

Van 5
DN

Van 1

Van 2

Van 3 Van 4

DN RAMP DN

6th Avenue Block 14 Loading Dock Block 19 Loading Dock Block 20 Loading Dock

DIAGRAM #2
54

DIAGRAM #3

DIAGRAM #4

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

11

Summary of Potential Development Standard Departures

AIR INTAKE

Retail loading space sized for a full-size vehicle with 82 max overhead clearance

GARAGE EXAUST

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

64' - 0"
LARGE

66' - 6 9/32"

64' - 0"

5% PARKING RAMP
LARGE LARGE LARGE LARGE

69' - 0"

LARGE

LARGE

LARGE

LARGE

LARGE

VAN ACCESSIBLE

SMALL

SMALL

SMALL

SMALL

SMALL

LARGE

SM AL

VAN ACCESSIBLE

SMALL

LARGE

SMALL

SMALL

VAN ACCESSIBLE

SMALL

SMALL

SMALL

VAN ACCESSIBLE

ELEV 2
LARGE

SMALL

SMALL

SMALL

Van
SMALL

SMALL

SMALL

LARGE

STAIR 3
LARGE

SMALL

15 .0 0%

ELEV

RAMP ABOVE
GARAGE EXHAUST

SMALL

ELEV

SMALL

PARKING LOBBY

SMALL

SMALL

SMALL

ELEV

LARGE

LARGE

UP

SM AL

SM AL

SM AL

SM AL

TYP SMALL STALL

LARGE

71' - 0"

TYP LARGE STALL

ELEV 1

SM AL

OPEN TO BELOW

SMALL

TYP VAN ACCESSIBLE

LARGE

SM AL

SM AL

SM AL

VESTIBULE

SWITCHGEAR ROOM

TRANSFORMER VAULT

SMALL

SMALL

SMALL

SMALL

SMALL

SMALL

6.65% PARKING RAMP

SMALL

LARGE

LARGE

ELEV

SMALL LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE

64' - 0"

64' - 0"

61' - 5 23/32"

5% PARKING RAMP

SWITCHGEAR ROOM

TRANSFORMER VAULT

LARGE SMALL

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

AIR INTAKE

SMALL

SMALL

SMALL

AIR INTAKE

DIAGRAM #5
SMALL SMALL

Block 20 Level - P1

DN

GARAGE INTAKE

TELCOM SERVICE ENTRY #1

WATER SERVICE ENTRY

SMALL

SMALL SMALL LARGE VAN ACCESSIBLE VAN ACCESSIBLE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE LARGE

SMALL

SMALL

SMALL

SMALL

SMALL

AUDITORIUM PASSENGER ELEVATOR CONTROL ROOM AUDITORIUM SERVICE ELEVATOR CONTROL ROOM
78' - 6"
LARGE LARGE LARGE LARGE LARGE LARGE

SMALL

LARGE

LARGE

LARGE

LARGE SMALL

15% PARKING RAMP

SMALL

84' - 0"

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

84' - 0"
SMALL SMALL

SMALL

SWITCHGEAR

LARGE

LARGE

TRANSFORMER VAULT #1

SMALL

Van
ELEV 3 ELEV 4 ELEV 5

PARKING CONCIERGE
78' - 6"

SWITCH VAULT 1

SMALL

SMALL

SMALL

6.67% PARKING RAMP

SMALL

SMALL

VAN ACCESSIBLE

LARGE

SWITCH VAULT 2 STORAGE

MOTORCYCLE PARKING

UP SMALL SMALL LARGE VAN ACCESSIBLE

STORAGE

SMALL

SMALL

LARGE

84' - 0"

ELEV 6
VAN ACCESSIBLE

SMALL

SMALL

STORAGE

VESTIBULE

15% PARKING RAMP

STAIR 3
SMALL

SMALL

SMALL

LARGE

TRANSFORMER VAULT #2

SWITCHGEAR

LARGE

SMALL

STAIR 3
DN

VESTIBULE

LARGE

VAN ACCESSIBLE

SMALL

SMALL

ELEV 2

ELEV 1

SMALL

SMALL

P1 PARKING

LARGE

LARGE

LARGE

SMALL

SMALL

SMALL

78' - 6"

LARGE

LARGE

ELEVATOR PIT
SMALL LARGE

LARGE

LARGE

SMALL

SMALL

SMALL

LARGE

LARGE

SMALL

SMALL

STORAGE

LARGE

SMALL

SMALL

ELEV 1

ELEV 2

SMALL

LARGE

LARGE

SMALL

SMALL

SMALL

STORAGE
SMALL SMALL

SMALL

LARGE

LARGE

SMALL

LARGE

SMALL

SMALL

ELEVATOR PIT
LARGE

PARKING P1
84' - 0"

LARGE

LARGE

LARGE

SMALL

SMALL

SMALL

EMERGENCY GET SET ROOM

EM SWITCHGEAR

LARGE

78' - 6"

LARGE

LARGE

LARGE

SMALL

LARGE

LARGE

SMALL

SMALL

LARGE

SMALL

TYP. SM STALL

LARGE

STORAGE

TYP. LARGE STALL

LARGE

SMALL

SMALL

SMALL

LARGE

SMALL

VESTIBULE

LARGE

VAN ACCESSIBLE

LARGE

SMALL

LARGE

LARGE

LARGE

SMALL

TYP VAN ACCESSIBLE

LARGE

LARGE

SMALL

LARGE

LARGE

LARGE

LARGE

T.I. GEN SET ROOM

LARGE

SMALL

VAN ACCESSIBLE

LARGE

LARGE

LARGE

SMALL

SMALL

6.67% PARKING RAMP


84' - 0"

Van
SMALL SMALL SMALL

STAIR

SMALL

78' - 6"

SMALL

LARGE

SMALL

STORAGE

SMALL

SMALL

ELEVATOR PIT

SMALL

GARAGE EXHAUST

SMALL

STORAGE

SMALL

ELEVATOR PIT

LARGE

SWITCHGEAR

TRANSFORMER VAULT #1

LARGE

SMALL

SMALL

LARGE

LARGE

LARGE

LARGE

LARGE

SMALL

SWITCHGEAR TRANSFORMER VAULT #2

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

LARGE

STORAGE

SMALL

SMALL

SMALL

SMALL

SMALL

SMALL

TELCOM SERVICE ENTRY #2


GARAGE INTAKE

Stair
UP DN

SMALL

DIAGRAM #6

Block 19 Level - P1

DIAGRAM #7

Block 14 Level - P1
55

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

12

Design Continuity

Aerial View Looking South and West


56

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012

12

Design Continuity Continuity and Diversity in Design As indicated in the plans and sketches illuminating the grade level experience, our design seeks to highlight the variety of pedestrian experience by: Emphasizing the differences in programmed uses (indoor and outdoor) between the blocks, and Allowing the lower buildings and tower podiums to respond to their specific environmental and physical context. The design of tower facades is still a work in progress, but we anticipate using similar material strategies in each of the three high-rise structures, as well as designing them to be responsive to their specific solar and wind orientation. In addition, each of the towers will have operable windows. These factors will result in a syntactic or genetic similarity between the towers, so that there will be a family resemblance between the multiple blocks when seen from a distance. Although entitled together, the three blocks will be constructed incrementally. Over time, the project will help build a mixed-use neighborhood and will reflect advances in architectural and urban design, as well as building codes (particularly energy).

57

Project # 3013151, #3013153, #3013154 DRB Recommendation Meeting #1 July 10, 2012