1. Check that sea water filteration system is in service. 2. Line up seal water injection system to CW pumps and establish seal water flow to CW pump (@100lpm). 3. Check that Travelling water screen is clean and the cleaning system is available for operation. 4. Remove bulk head at pump suction pit. 5. Close CW pipe line drain near jetty and all drains in the system. Open vents. 6. Open isolating valves of vacuum breakers. 7. Check that the following valves are closed. a) Screen wash pump water inlet. b) Sea water booster pump suction. c) Sea water heat exchanger inlet. d) Ash water sump water inlet. e) Sea water inlet to chlorination system. 8. Close condenser water box drain and open the vents. 9. Establish 415V supply to condenser inlet, outlet and backwashvalves.Check that the backwash valve is in normal position.
CONDENSER
SWBP
SCS
PHE
CW Pump
Nylon net
Condenser
CW Inlet
Back Wash valve
CW Outlet
1. Check that ACW of CEP is in service 2. Check that the hotwell level is normal and that hotwell make system is in service. 3. Establish sealing to CEP by opening sealing valve on HMP sealing line to CEP. 4. Open continuous vent(casing vent)valves of the pump. 5. Open discharge line vent valves. 6. Open suction valve of the pump. 7. Close isolating valves of all the sources taking supply from CEP discharge header. 8. Open isolating valve of gland steam condenser. 9. Open excess condensate return lines isolating valves. 10. Open isolating valves of CEP recirculation control valves. 11. Close isolating valves of 25% and 75% Deaerator level controllers. 12. Rack in 6.6 KV breaker of the pump motor and start the pump on recirculation. 13. Close discharge line vent. 14. Open isolating valves on sealing line from CEP discharge header and establish sealing * CEP is in service*
Filling Of Deaerator
1. Check that CEP is in service. 2. Check that deaerator drains are closed. Check that deaerator overflow control valve is in service and in minimum position. Check that deaerator recirculation valve is closed. Check deaerator vents are open. 3. Take LP heaters 123 heaters are in service on water side. i.e. heater inlet and outlet valves are open and bypass valves are closed. 4. Check that 25% and 75% deaerator level controllers are in manual mode and in minimum position . 5. Open isolating valves of deaerator level controllers. 6. Crack open 25% deaerator level control valve and fill up deaerator to normal level. *Deaerator filled up*
BFP Installation
Starting of STBFP
1. Check that all releases are cleared 2. Check that vacuum is built up in the condenser 3. Check that steam is available for starting STBFP Steam pressure > 3 bar is required for resetting the turbine. Initially steam is taken through Auxiliary Control Valve tapped from CRH line. Hence HPLP bypass should be in service. 4. Open isolating valve for Auxiliary Control Valve. 5. Check that deaerator level is ok. 6. Check that lube oil and governing system is lined up. 7. Start one AOP and put the other on auto standby. 8. Check the availability of DC EOP. 9. Check that the pump is lined for taking in service. 10. Engage quick disconnect coupling. Coupling can be engaged or disengaged only at zero speed.
Starting of STBFP
11. Start one jacking oil pump. 12. Open turning gear valve. Check that STBFP rpm picks up. 13. Open gland steam isolating valve and apply sealing to the glands. 14. Open turbine exhaust valve. 15. Open turbine casing drains and stop valve manual drain valve. Drains are connected to surge expander. 16. Close starting device (anticlockwise close). 17. Bring speeder gear to minimum(speeder gear range is from 50% to 110 %). 18. Ensure that speed reference is at minimum. Reset the turbine lockout(speed controller (EHC) range is from 20% to 110%. 19. Open starting device slowly. 20. Warm up the turbine at 500 rpm. 21. Close turning gear valve and put on auto. When turbine trips, the turning valve opens on Auto if JOP pressure is adequate(> 70 bar).
Starting of STBFP
22. Stop JOP. 23. Ensure that DC JOP is on Auto. 24. Open starting device further and roll the turbine. ( At 1200 rpm EHC comes into action). 25. Open starting device full. 26. Take control on EHC and increase speed to 3000 rpm. Close all the drains. While rolling monitor exhaust hood temperature, bearing temperatures, vibrations and expansions. 27. Put tracking on. (Speeder gear tracks EHC) 28. Open isolating valves for 25% control valve and use it initially. 29. If any other BFP is running open 100% discharge valve with STBFP discharge pressure lower than the BFP header pressure. 30. Slowly increase STBFP speed till the feed flow is equally shared between the two pumps. 31. Put STBFP speed control on Auto after ensuring that the control deviation is near zero. *STBFP is in service*
To Atmosphere
To Atmosphere Holding valve Ejector Separator tank Hogging valve Vacuum Pump 2 x 100 %
Holding valve
Steam Valve
To atmosphere