Академический Документы
Профессиональный Документы
Культура Документы
Wall 1
1 1
Wall 2
2 2
Wall 3
3
E D 1 inch
Wall 4
3 4
Page 1
Wall 5
4 5 5
Wall 6
1
Roof Supports
There is no right or wrong angle or measurements for these.
You will glue the roof supports to this line, so that the roof sits flush with the top of the model on walls 6 and 1. This is done by pinning and glueing the supports top edge to the dashed and dotted black line. Any Scrap foam core will be used to add to the outside, to break up a flat smooth pattern, so keep your small cuttings.
1 inch
Page 2
Wall 1
1
Wall 6
Wall 5
1 inch
Page 3
5 8 1 1 2 2 3 3 4 4
5 6
A2
B2
C2 B2
D2
E2
F2
H2
D2
H2
G2 G2 1 inch 7
Page 4
Roof Supports
Done the same way as we did the first floor.
1 inch
Page 5
Support Base Support Base Pt. 2 Back Edge Underside SPINE 1 SPINE 2 SPINE 3
1 inch
Page 5
Support Arm
The three identical spines will be the main support. They will be touching, sandwiched at the top, to make the support arm.
Yellow arrow indicates Tower Angle
The back edge and underside will be pinned and glued along the edge of the support arm to close it up. These may be cut from foam core, however heavy card stock will be easier to cover the edges.
The crows nest will be glued on top when Complete in the same manner as the support base.
2nd Floor
B B
Page 6
The black dashed line is where your will glue the crows nest floor part 1 on the bottom of the crows nest floor part 2.
The crows nest can be glued at any angle on the support arm that you wish. Remember that the rope should hang to the second floor.