Introduction
Lifting Points of Interest This Presentation is a Reminder of Information You Should Already Know You or Your Company Should Have Copies of the Relevant Regulations
2 17/08/2012
Agenda
RoK Crane Rules Your Procedures Rigging Training Audits Actions Incidents Observations Paperwork
3 17/08/2012
Overview
THE BIG PICTURE IS SAFETY IN CRANE OPERATION THE RESULT IS ZERO CRANE INCIDENTS
safe
safe safe safe
safe safe
safe safe
4 17/08/2012
safe
Agip Kco Presentation
Vocabulary
We Will discuss Issues, in terms of a technical Nature, Based on RoK Rules Please Do Not Hesitate To Ask Questions
5 17/08/2012
rev1
Agip Kco Presentation 6 17/08/2012
ISO 4301/1 Cranes. Classification. ISO 4306/1 Hoisting Equipment. Glossary. ISO 4308/1 Load Lifting Cranes. Wire Rope Selection. ISO 4308/2 Load Lifting Cranes. Steel Cable Selection. Part 2. Self-Propelled Boom Cranes. Usage Ratio. ISO 4309 Cranes. Wire Ropes. Standards and Regulations for Inspection and Discarding.
8 17/08/2012
9 17/08/2012
10 17/08/2012
11 17/08/2012
The contact numbers and Location of the Onsite Engineer In Charge and his Certification from RoK GGT. Current sling and rigging Certification for all equipment on the Crane.
Note : partial/Full Inspection dates that are within 10 days of expiration, may be cause for rejection. rev1
Agip Kco Presentation 12 17/08/2012
13 17/08/2012
Qualification of Personnel
14 17/08/2012
Documentation of Personnel
15 17/08/2012
16 17/08/2012
Written Procedures
I.A.W. Schedule D of all Agip KCO contracts you shall have written procedures for Lifting Operations. Ref.1.7.3 Also , RoK Section7.4.30, 31 and 7.5.15 refer to procedures and Special lifting Operational requirements. Lift Plans are Required for ALL Multiple Crane Lifts within the Project. No Exceptions
18 17/08/2012
Equipment Condition
19 17/08/2012
Equipment on site that DOES NOT meet the Minimum Criteria as Outlined in the RoK Rules will stop working and PROPER Repairs Will be Made or Their Permits will be removed and they will be Asked to Leave the Site. Equipment entering the Site will be Denied Entry until Proper Repairs are Made. Our Continuous Auditing of Crane Operations Will Insure the High Degree of Safety is Maintained Throughout the Site.
20 17/08/2012
All Rigging Equipment used on this Agip KCO Project are subject to RoK Rules and Regulations Sections 7.3.28, 7.5.14, Appendix 10 and Appendix 13 Logs or Records of purchase, inspection, testing and certification shall be kept and appropriate audits will confirm compliance or disclose non-compliance with the RoK Rules. Shall be I.A.W. current Internationally accepted practice unless it is determined to create a safety hazard, and then referred to the original maker for advise. All other, nonstandard terminations will be evaluated for safety performance.
rev1
21 17/08/2012
22 17/08/2012
RoK Rules for the evaluation and training needs of selected Crane Operating and Rigging personnel are outlined in sections 7.4.2 and 7.4.25. Formats for documentation are in Appendix 14 and 16
23 17/08/2012
Detailed Inspections are the Responsibility of the Crane Owner, I.A.W. RoK Rules sections 7.3 and 7.4 and are to be performed on a regular Basis. Daily Inspections are to be performed by the Crane Operator I.A.W. RoK section 7.4.31 and recorded in the Log book (see Appendix 17) Rigging Equipment is to be inspected before use by qualified Rigging Personnel. All Records shall be I.A.W. RoK Rules Including Rigging Equipment.
24 17/08/2012
Action Items
Under the RoK Rules section 8.0, various actions are listed for Violation of the Rules as Stated. In addition Agip KCO management has a Responsibility to uphold these Rules and the Rules outlined in Schedule D of all Project Contracts. Actions for Correction of Rules Violations Shall be made as timely as Possible.
Incidents
Any Incidents involving Cranes and Rigging MUST be Reported to Agip KCO Immediately. RoK Rules of Section 9.0 are the Responsibility of the Crane Owner, and are part of the Agip KCO Commitment to the Safe Use of Cranes on This Project Please Report any and All Incidents or Near Miss Incidents to Agip KCO HSE
27 17/08/2012
Project Observations
Much of what is Seen on a Daily Basis, Around the Project, Needs No Comments You Be the Judge
28 17/08/2012
29 17/08/2012
30 17/08/2012
31 17/08/2012
32 17/08/2012
33 17/08/2012
34 17/08/2012
Paperwork
35 17/08/2012
Paperwork
For Further Clarification see RoK Sections 7.2.1c & d 7.2.6 7.3.3 7.3.4 Do NOT Use Paperwork for Wallpaper