M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004
Outline
Present Interaction Region Present Status Upgrade plans Plans for summer 2004 and summer 2005
Summary
2
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar
e-
e+
BaBar
Collision point
6
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar
Lower y* from 10.5 to 8mm Increase number of bunches to 1720 Raise LER beam current from 2.4 to 4.5 A
Increase LER bunch current from 1.6 mA to 2.6 mA
Units mA mA
Future 2007 goal 4500 2200 1715 8 0.055-0.08 24 1800 8 design Over 13 design design
2 design 3 design
cm
15-20 0.03
x1033 pb-1
3.0 130
LER - Main Ring Design Limit FY2005 Goal FY2007 Goal HER - Main Ring Design Limit FY2005 Goal FY2007 Goal Interaction Region (IR) LER Beam Power Design Limit FY2005 Goal FY2007 Goal HER Beam Power Design Limit FY2005 Goal FY2007 Goal
9
3 3.6 4.5
3 1.8 2.2
3.1 3.1 22% SR power increase 3.1 50% SR power increase 9 9 Less than design limit 9 10% SR power increase
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar
Bunch Current
LER 45% increase HER 30% increase
IR Modifications
We think we can get to 8 mm y* without any major hardware changes in the near IR. We have achieved these y*s in machine development days, which is encouraging. However, we still have a lot of work to do to make these lower y* values perform. Vacuum chamber heating from SR power at the higher beam currents is being re-evaluated for all of the chambers in the IR. For the chambers inside +/- 3 m of the IP things look OK. SR masking for detector backgrounds is OK We presently see some beam-beam effects from the 1st parasitic crossing in the by2 pattern, 63 cm from the IP. Presently, we can correct for most of this effect and get back the lost lumi. This parasitic crossing effect is made worse with lower y*s. Will we still be able to compensate? We want to maintain head-on collisions but keep open the option of introducing a small crossing angle at the collision point.
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar
11
IR modifications (cont.)
Looking at upgrading B1 magnets to improve the 1st parasitic crossing effect Keep the Bdl the same. Strengthen the inside magnetic slices and weaken or remove some of the outside slices. Need a rad hard magnetic material with a higher field strength We want to build new radial ion pumps. The present pumps are not working. Build new HER Q5 chambers and possibly new Q4 chambers Rebuild some of the LER vacuum chambers with NEG pumps (inadequate RF screens)
12
13
14
Status
Progressing on schedule for RF screen 2005 installation New pump design near Baffles to prevent completion SR scatter hitting Changed to a noble pump diode pump rebuild with tantalum plates Split pump into two circuits Added BPM set with the correct separation to decipher the position of the two beams Replaced feedthru with a standard pump feedthru
15
Plan to build a test bellows this fall and replace an existing bellows in a straight section with trapped HOM power.
16
17
18
Conclusions
Working on hardware upgrades for both this coming summer 2004 and for summer 2005
We have several meetings each week to address various issues: Tue vacuum present status and upgrade progress
Wed vacuum specifically for upgrade designs Fri IR upgrade all aspects of the IR upgrade Fri bkgds present and future projections of detector bkgds
19
Near term upgrades are going well Planned upgrades toward a luminosity of 2.41034 are on track
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar